HomeMy WebLinkAboutMFP23006162.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23006162
IVR Number: 23006162
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:12/12/2023Application Date:1253600070Parcel Number: 3400 LIND AVE SW
Permit Type:12/19/2023Issue Date:Franchise
Permit Work Class:12/18/2024Expiration Date:Minor Utility
Job Number: JB0001452509Franchise Type:Cable
Description: TIE IN AT EXISTING VAULT NEAR 3400 LIND AVE SW THEN PROOF/PULL NEW CATV CABLE TO EXISTING VAULT
NEAR 3324 LIND AVE SW. TRENCH PLACING NEW (1) 2'' CONDUIT AND CATV CABLE THEN PLACE NEW 1730
VAULT AT PROPOSED LOCATION.
CONTINUE TRENCH INTO PRIVATE PROPERTY. ALL CONSTRUCTION AND RESTORATION TO MEET OR EXCEED
CITY OF RENTON STANDARDS. POTHOLE ALL EXISTING UTILITIES.
Contacts
Name Address PhoneTypeBilling
Leah Ihlenfeldt
Cablecom LLC
1316 Bonneville Avenue
Snohomish, WA 98290
B: (360) 670-4291ApplicantX
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Contact
CABLECOM LLC 20021 120th Ave NE, #101
BOTHELL, WA 98011
B: (360) 668-1300Contractor
Business License Number: 52252Construction Contractor: CABLEL*971DP
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Emergency
Contact
POWELL-RENTON NO 1 LLC 13727 NOEL ROAD #900
DALLAS , TX 75240
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
COMCAST
Jessamin Santos
206-401-2188
WAConstruction_JointUse@comcast.com
360-670-4291
CABLEL*971DP
Cablecom LLC - Leah Ihlenfeldt
52252
3400 LIND AVE SW, RENTON, WA 98057 Comcast - JB0001452509
TIE IN AT EXISTING VAULT NEAR 3400 LIND AVE SW THEN PROOF/PULL NEW CATV CABLE TO EXISTINGVAULT NEAR 3324 LIND AVE SW. TRENCH PLACING NEW (1)-2'' CONDUIT AND CATV CABLE THEN PLACENEW 1730 VAULT AT PROPOSED LOCATION. CONTINUE TRENCH INTO PRIVATE PROPERTY. ALLCONSTRUCTION AND RESTORATION TO MEET OR EXCEED CITY OF RENTON STANDARDS
12/12/23
x x x
x
Scott Warlick 12/19/2023
MFP23006162
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Cablecom LLC
Leah Ihlenfeldt 360-670-4291
1316 Bonneville Ave Snohomish, WA 98290
COMCAST - JB0001452509
3400 LIND AVE SW, RENTON, WA 98057tbd upon permit inssuance
TIE IN AT EXISTING VAULT NEAR 3400 LIND AVE SW THEN PROOF/PULL NEW CATV CABLE TO EXISTINGVAULT NEAR 3324 LIND AVE SW. TRENCH PLACINGNEW (1)-2'' CONDUIT AND CATV CABLE THEN PLACE NEW 1730 VAULT AT PROPOSED LOCATION. CONTINUE TRENCH INTO PRIVATE PROPERTY. ALLCONSTRUCTION AND RESTORATION TO MEET OR EXCEED CITY OF RENTON STANDARDS.Scott Warlick CED 12/19/2023
Monday - Friday 8:00AM - 3:00PM
MFP23006162
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessamin Santos
12/12/23
SPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK: PROOF/PULLHOURS OF TCP: 8AM-5PM24 HR CONTACT:ANTONIO BUTTELCABLECOM360.926.3494ANTONIO.BUTTEL@CABLECOMLLC.NETJOB NUMBER: JB0001452509JOB ADDRESS: 3400 LIND AVE SW,RENTON.DESCRIPTION: PROOF/PULL BETWEENVAULTS. TRENCH TO NEW VAULT.11SHEET NUMBEROFLEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREABUS STOPL225'ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2RX*X*X*LIND AVE SWSW 34TH ST5'5'5'5'4'62'36'SPEEDLIMIT35SPEEDLIMIT2511'11'11'11'340534053400X*ROADWORKAHEADW20-1PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.11'11'MFP23006162
SPENCER KARINIEMITRAFFIC CONTROL SUPERVISOR360-722-2852NOTES:1. ALL SIGNS ARE 36"-48" ACROSS2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURBRURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICESPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)TRAFFIC CONTROL PLANN O R T H253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA20115TYPE OF TCP: WORK HOURSPHASE OF WORK: TRENCHHOURS OF TCP: 8AM-5PM24 HR CONTACT:ANTONIO BUTTELCABLECOM360.926.3494ANTONIO.BUTTEL@CABLECOMLLC.NETJOB NUMBER: JB0001452509JOB ADDRESS: 3400 LIND AVE SW,RENTON.DESCRIPTION: PROOF/PULL BETWEENVAULTS. TRENCH TO NEW VAULT.22SHEET NUMBEROFSW 34TH STL115'X*ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2RX*X*5'5'76'4'34003324400PEDESTRIAN ESCORT: STOP WORK, SECUREPASSABLE ADA COMPLIANT PEDESTRIAN ACCESS ONEXISTING SIDEWALK (4' MIN.). CLEAR ZONE MUST BEFREE OF OVERHEAD HAZARDS WHEN PEDESTRIANSARE MOVING THROUGH THE WORK ZONE.SPEEDLIMIT2512'11'11'11'11'LEGENDTRAFFIC SAFETY DRUMSTEMP SIGN LOCATIONWORK VEHICLEARROWBOARDWORK AREABUS STOPMFP23006162
ADDRESS: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NAME: JB0001452509 - PRINTSDRAWING FILE LOCATION: G:\SHARED DRIVES\2023 BOOKER ENGINEERING\CLIENTS\CABLECOM\PRINTS\RENTON\JB0001452509_PRINTS\CAD\JB0001452509_PRINTS.DWGAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285261SHEET NUMBEROFRSITE LOCATIONSHEET INDEX1 - COVER SHEET2 - GENERAL NOTES3 - LEGEND4 - DESIGN VIEW5/6 - TYPICALS 1/27 - SITE PHOTOGRAPHSSCOPE OF WORKTIE IN AT EXISTING VAULT NEAR 3400 LIND AVE SWTHEN PROOF/PULL NEW CATV CABLE TO EXISTINGVAULT NEAR 3324 LIND AVE SW. TRENCH PLACINGNEW (1)-2'' CONDUIT AND CATV CABLE THEN PLACENEW 1730 VAULT AT PROPOSED LOCATION.CONTINUE TRENCH INTO PRIVATE PROPERTY. ALLCONSTRUCTION AND RESTORATION TO MEET OREXCEED CITY OF RENTON STANDARDS.VICINITY MAPCONTACTSN O R T HSHEET 4KEVIN HARMONCONSTRUCTION MANAGERCABLECOMKEVIN.HARMON@CABLECOMLLC.NET360.322.2805SPENCER KARINIEMIOPERATIONS MANAGERBOOKER ENGINEERINGSPENCER@BOOKERENG.COM360.722.2852MFP23006162
GENERAL NOTES(1)All design and construction shall be in accordance with permit conditions, the King County Code (KCC),Road Standards (KCRS), Washington State DOT (WSDOT) Standard Specifications and the conditions ofpreliminary approval. It shall be the sole responsibility of the applicant and the professional civil engineer tocorrect any error, omission, or variation from the above requirements found in these plans. All correctionsshall be at no additional cost or liability to King County.(2)The design elements within these plans have been reviewed according to the King County Department ofDevelopment and Environmental Services (DDES) Engineering Review checklist. Some elements mayhave been overlooked or missed by the DDES plan reviewer. Any variance from adopted standards is notallowed unless specifically approved by King County prior to construction.(3)Approval of this road, grading, parking and drainage plan does not constitute an approval of any otherconstruction (e.g. domestic water conveyance, sewer conveyance, gas, electrical, etc.)(4)Before any construction or development activity, a preconstruction meeting must be held between theDDES's Land Use Inspection Section, the Applicant, and the Applicant's Construction Representative.(5)A copy of these approved plans must be on the job site whenever construction is in progress.(6)Grading activities (site alteration) are limited to the hours of 7 a.m. to 7 p.m. Monday through Saturday and10 a.m. to 5 p.m. on Sunday, unless otherwise approved with a written decision by the Reviewing Agency.(7)It shall be the applicant's/contractor's responsibility to obtain all construction easements necessary beforeinitiating off-site work. Easements require review and approval prior to construction.(8)Franchised utilities or other installations that are not shown on these approved plans shall not beconstructed unless an approved set of plans that meet all requirements of KCRS Chapter 8 are submitted tothe DDES's Land Use Inspection Section three days prior to construction.(9)Datum shall be KCAS unless otherwise approved by DDES.(10)Dewatering system (underdrain) construction shall be within a right-of-way or appropriate drainageeasement, but not underneath the roadway section. All underdrain systems must be constructed inaccordance with WSDOT Standard Specifications.(11)All utility trenches and roadway subgrade shall be backfilled and compacted to 95 percent density, standardproctor.(12)Open cutting of existing roadways for non-franchised utility or storm work is not allowed unless specificallyapproved by DDES and noted on these approved plans. Any open cut shall be restored in accordance withKCRS.(13)The Contractor shall be responsible for providing adequate safeguards, safety devices, protectiveequipment, flaggers, and any other needed actions to protect the life, health, and safety of the public, and toprotect property in connection with the performance of work covered by the contractor. Any work within thetraveled right-of-way that may interrupt normal traffic flow shall require at least one flagger for each lane oftraffic affected. Manual on Uniform Traffic Control Devices (MUTCD) shall apply. Work in right-of-way isnot authorized until a traffic control plan is approved by King County.AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285262SHEET NUMBEROFRMFP23006162
AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285263SHEET NUMBEROFRLEGENDXX(XXX')N O R T H#F#F#FMFP23006162
LIND AVE SWSW 34TH ST3400 LIND AVE SWPARCEL# 12536000703324 LIND AVE SWPARCEL# 125380006027'138'151'#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #6 FOR SITE PHOTOGRAPHS.CONSTRUCTION NOTES1PROOF/PULL NEW CATV CABLE THROUGH EXISTING (1)-2''CONDUIT.AS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285264SHEET NUMBEROFRRESTORATION NOTESARESTORE SOFT SURFACE TO PRIOR CONDITIONS.POTHOLE UTILITY CROSSING PRIOR TO BORE/TRENCH.MAINTAIN MINIMUM VERTICAL CLEARANCE FROMEXISTING UTILITIES AT THE CROSSING.2TRENCH PLACING NEW (1)-2'' CONDUIT AND CATV CABLE.3PLACE NEW 1730 VAULT THEN TRENCH TO PRIVATE.123AN O R T HThis work appears to be on privateproperty and will need additionalapproval from the propertyowner.Work within the dripline ofthe trees to be performed via vactortruckMove bore pit and new vault so thatthey split the difference between thetrees to avoid the critical root zone.Work within the dripline of the treesto be performed via vactor truckMFP23006162
TYPICALSAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285265SHEET NUMBEROFRMFP23006162
TYPICALSAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285266SHEET NUMBEROFRMFP23006162
SITE PHOTOGRAPHSAS-BUILTREVISIONSNO.DATEENGINEERDRAFTERORIGINAL12PROJECT LOCATION: 3400 LIND AVE SW, RENTON, WA 98057PROJECT NUMBER: JB0001452509PERMIT NUMBER: ----CABLECOM ENGINEER: KEVIN HARMONCONFIDENTIAL/ PROPRIETARYSDKJPS11/17/23------------------------THE ACTUAL LOCATION OF EXISTING CONDUIT ANDCABLES MAY VARY FROM THE LOCATION SHOWN.BOOKER ENGINEERING DISCLAIMS ANYRESPONSIBILITIES FOR DAMAGES INCURRED TO ANYFACILITIES SHOWN OR NOT SHOWN IN THESEPRINTS. PERSONS WORKING IN THE AREA COVEREDBY THIS DRAWING MUST CONTACT THE STATEWIDECALL-BEFORE-YOU-DIG SYSTEM TO CONFIRM THELOCATION OF UNDERGROUND FACILITIES.------------BOOKER ENGINEERING LLC16778 146TH ST SE #190,MONROE, WA 98272360.722.285267SHEET NUMBEROFRCONSTRUCTION NOTES1PROOF/PULL NEW CATV CABLE THROUGH EXISTING (1)-2''CONDUIT.2TRENCH PLACING NEW (1)-2'' CONDUIT AND CATV CABLE.3PLACE NEW 1730 VAULT THEN TRENCH TO PRIVATE.11223PHOTO #1: FACING (S) ON THE (S) SIDE OF SW 34TH STPHOTO #2: FACING (E) ON THE (E) SIDE OF LIND AVE SWPHOTO #3: FACING (E) ON THE (N) SIDE OF SW 34TH ST151'27'138'(138')MFP23006162