HomeMy WebLinkAboutMFP23005735.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23005735
IVR Number: 23005735
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:11/14/2023Application Date:0523059075Parcel Number: 1053 LAKE WASHINGTON BLVD N
Permit Type:12/20/2023Issue Date:Franchise
Permit Work Class:12/19/2024Expiration Date:Minor Utility
Job Number: JB0001532734Franchise Type:Cable
Description: JB0001532734 Comcast proposes proof/pull 48CT fiber 5LF, tie in to SP.WAKV.0127.
Contacts
Name Address PhoneTypeBilling
Joshua Day
CCI SYSTEMS
105 Kent St
Iron Mountain, MI 49801
Applicant
Michele Moore
Prince Telecom LLC
13701 24th St E, 24th St E
Sumner, WA 98390
H: (206) 388-4316Applicant
April Theoudele
CHC Consulting
903 Calle Amanecer Ste 310
San Clemente, CA 92673
Applicant
Ashley Kiehn 4610 Tacoma Avenue
Sumner, WA 98390
ApplicantX
Leah Ihlenfeldt
Cablecom LLC
1316 Bonneville Avenue
Snohomish, WA 98290
B: (360) 670-4291Applicant
Danielle Hughes
Prince Telecom LLC
13701 24th St E Bldg G
Sumner, WA 98390
Applicant
Christie Walker
Prince Telecom
13701 24th St E Building G, Building
G
Sumner, WA 98390
B: (253) 294-6548Applicant
Prime Electric Inc 3460 161ST Ave SE
Bellevue, WA 98008
Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Contact
Andrew Parker
comcast
410 Valley Ave NW
Puyallup, WA 98371
B: (253) 864-4249Contact
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Emergency
Contact
HOTEL AT SOUTHPORT LLC 1083 LAKE WASHINGTON BLVD N
SUITE 50
RENTON , WA 98056
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
SEFNCO Communications, Inc.
SEFNCC1850QD BLO29666
Comcast Cable Communications Management, LLC
253 235-7406
owen_shackett@comcast.comCody Shackett
MFP23005735
Scott Warlick 12/20/23
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 3/18/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/18/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
▪ Include map(s) showing the location of the project and work area.
▪ Be legible lettering and clear, contrasting, symbols of viewing or printing.
▪ Must indicate street names, and north arrow and scale.
▪ Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
SEFNCO Communications
SEFNCO Permit Coordinator info (253) 999-2271
4610 Tacoma Ave Sumner, WA 98390
9:00am 3:30pm
Anchovies and Salt
910 Lake Washington BLVD
1/4/2023 2/4/2023
JB0001538734 Comcast proposes proof and pull 48CT fiver 5LF, tie in to SP.WAKV0127
MFP23005735
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 12/20/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 3/18/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
• Must have approved Traffic Control Plan (TCP) prior to commencing the work.
• Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
• WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
• All permit conditions shall be met.
NOTES:
• Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
• In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 3/18/2021
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessica Bucholtz
12/4/2023
FO
C
FO
C
SWFOCFOC FOC
SWSWSW
FOCFOCFOCFOCFOCFOCFOC
SWSWSWSWSWSWSWSWSWSWSWSWSWSWSWFOC
FLFLFLFLFLFLFLFOCF
O
C
FO
C FOCFOCFOCFOCFL
FL
FL
FL FL FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFL
PARK AVE NN SOUTHPORT DRGARDEN
A
V
E
N
W
S
W
SW
S
W
S
W
SW
SW
S
W
S
W
S
W
S
W
SWSW
LAKE WASHINGTON BLVD NREVISIONSDATE DESCRIPTION INITIAL1ADVANCED WARNING SIGN SPACINGROAD TYPE SPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSXXXXFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS 60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS 45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBANARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =LBSSPEED (MPH)20 25 30 35 40 45 50 55 60 65 70DISTANCE (FT)115 155 200 250 305 360 425 495 570 645 730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 7010 105 150 205 270 450 500 550---11115 160 225 295 495 550 605 660--12125 180 245 320 540 600 660 720 780 8401Know what'sRANCHOVIES & SALT910 LAKE WASHINGTON BLVD NRENTON, WA 98056JB0001532734REVISIONSDATE DESCRIPTION INITIALCOMCASTSHEET OFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:COMCAST JOB NUMBER: STAMPDRAWN BY:JDS10/23/2023WARNING SIGNREGULATORY SIGNTRAFFIC CONEFLAGGER STATIONPATROL CARPOLICE OFFICERWORK VEHICLELIT INTERSECTIONUNLIT INTERSECTIONSPOTTER STATIONKEEPRIGHTTCP DEVICE LEGENDFLASHING ARROWFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTION1. AN ARROWBOARD SHALL MEET THE MINIMUM SIZE,LEGIBILITY DISTANCE, NUMBER OF ELEMENTS ANDOTHER SPECIFICATIONS SHOWN.2. LENGTH OF ARROW EQUALS 48", WIDTH OFARROWHEAD EQUALS 24".3. TYPE A, B AND C ARROW BOARDS SHALL HAVESOLID RECTANGULAR APPEARANCES. A TYPE DARROW BOARD SHALL CONFORM TO THE SHAPE OFTHE ARROW.4. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES5. SIDEWALK ARE EITHER OPEN OR NOT OPEN. ASIDEWALK IS CLOSED IF A MINIMUM 5' PATH CANNOTBE MAINTAINED MEASURED FROM PROPERTY LINE,OR 5.5' IF CREATED FROM FACE OF CURB.(PEDESTRIAN PATH PROVIDED WHERE REQUIRED)AND WILL BE MONITORED BY A SPOTTER TOENSURE FLOW AND SAFETY DURING WORK UNLESSOTHERWISE NOTED. A SPOTTER SHALL NOT DIRECTTRAFFIC.6. NO EXCEPTION TAKEN- CONTRACTOR ISRESPONSIBLE FOR ADA COMPLIANCE.7. ALL CONTROL SET-UP, SIGN SPACING ANDPROCEDURES. WILL CONFORM TO SPECIFICATIONSSTATED IN THE FEDERAL MANUAL ON UNIFORMEDTRAFFIC CONTROL DEVICES (M.U.T.C.D).8. CITIES AND VARIOUS MUNICIPALITIES MAY HAVEALSO ADOPTED SPECIALIZED GUIDELINES FORTRAFFIC CONTROL WITHIN THEIR JURISDICTION. ITIS THE RESPONSIBILITY OF THE ON-SITE TRAFFICCONTROL PERSONAL TO SEE IF AND ANY SPECIALCONDITIONS EXIST.9. FLAGGERS SHALL BE USED IN ACCORDANCE WITHWAC 468-95-302.10. IF ONLY ONE LANE IS OPEN IN A DIRECTION,THATLANE SHALL BE A MINIMUM OF 11' WIDE, UNLESSSPOTTER/FLAGGERS ARE USED, IN WHICH CASETHE LANE CAN BE A MINIMUM OF 10'.11. ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT,EMPLOYEES AND CHILDREN. WHILE PASSENGERLOADING/UNLOADING, STOPPED OR SLOWING:CEASE WORK, YIELD. WHEN SCHOOL TRANSIT,AND/OR PEDESTRIANS, DEPART COMMENCE WORK.NXXXX
X
WORK ZONEX3525MFP23005735Maintain 11' for travellane. close this turn laneif more room needed.
SEFNCOCOMMUNICATIONSPROPOSED UNDERGROUND FIBER INSTALLATIONCOMCASTANCHOVIES & SALT910 LAKE WASHINGTON BLVD N, RENTON, WA 98056JB0001532734MFP23005735
Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.ANCHOVIES & SALT
910 LAKE WASHINGTON BLVD N
RENTON, WA 98056
JB0001532734REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS10/23/2023CONTACTSPG#SHEET INDEX1COVER SHEET2VICINITY MAP, CONTACTS & SHEET INDEX3GENERAL NOTES4LEGEND5SITE-PLAN5DESCRIPTION OF WORKTOTALPROOF & PULL 48CT FIBER5LFTIE-IN TO SP.WAKV.01271TOTAL:5LFVICINITY
MAP2PERMITTINGASHLEY KIEHN4610 TACOMA AVESUMNER, WA 98390PHONE: (253) 999-2271EMAIL: ASKIEHN@SEFNCO.COMCOMCASTSEFNCO OPE910 LAKE WASHINGTON BLVDRENTON, WA 98056BEGINNTSJESSAMIN SANTOS410 VALLEY AVEPUYALLUP, WA 98371PHONE: (253) 256-8843EMAIL: Jessamin_Santos@cable.comcast.comSTEVE HARSHFIELD4610 TACOMA AVESUMNER, WA 98390PHONE:253-266-4741EMAIL: STHARSHFIELD@SEFNCO.COMMFP23005735
Know what'sbelow.CallR81148 HOURS BEFORE YOU D
IGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.ANCHOVIES & SALT
910 LAKE WASHINGTON BLVD N
RENTON, WA 98056
JB0001532734REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS10/23/2023GENERAL NOTES5GENERAL
NOTES3 THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTORSHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALLBE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCALJURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BEPROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORDDRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALLTIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OFCONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED INGOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITHHARD SURFACE OR LANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNINGOF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATEDEQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.NTSMFP23005735
Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.
ANCHOVIES & SALT
910 LAKE WASHINGTON BLVD N
RENTON, WA 98056
JB0001532734REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS10/23/20235LEGEND
4LEGENDTELECOMMUNICATIONSANITARY SEWERGAS LINEWATERSTORM DRAINRECYCLED WATERPOWERPARCEL LINERIGHT OF WAYDITCH LINECENTER LINEEDGE OF PAVEMENTFACE OF CURBPROPERTY LINELIP OF GUTTERGUARDRAILSDSDWWSSSSGGTTLIPD/LEOPFOCRWRWBUILDING OUTLINEPFLFOG LINESIDEWALKSWSWTRENCHDIRECT BOREPROPOSED AERIAL STRAND APROOF/PULLPROPOSED OVERLASHMINOR ARTERIALCOLLECTOR ARTERIALINTERSTATE FREEWAYACCESS STREETPRINCIPAL ARTERIALBUILDINGR/WWARNING SIGN PLACEMENT (W/ PART #)TRAFFIC BARRELHYDRO-VAC TRENCHKEEPRIGHTREGULATORY SIGN (W/ PART #)LIMITSPEEDR2-125SPEED LIMIT CALLOUTSIGN PLACEMENT / DIRECTIONTRAFFIC CONEFLAGGER STATIONFLAGGER STATIONPATROL CARUNIFORMED POLICE OFFICERWORK VEHICLEFENCESTREET LIGHT HANDHOLETELECOM MANHOLETELECOM HANDHOLETELECOM CABINETTRAFFIC SIGNAL MANHOLETRAFFIC CABINETTRAFFIC SIGNAL PEDESTALSTREET LIGHT POLETRAFFIC SIGNAL HANDHOLECATV MANHOLECATV HANDHOLECATV PEDESTALTRAFFIC SIGNAL POLESTORM MANHOLEWATER VALVEWATER METERTELECOM PEDESTALSTORM INLETSTORM DRAIN UNKNOWN D?SISEWER VALVESSEWER VAULT SSSEWER UNKNOWN S?STORM DRAIN VAULT SDSEWER CLEANOUTSEWER MANHOLESCSEWER CATCH BASIN SSSTORM ACCESS POINTBASE LAYERSEXISTING UTILITIESROAD HATCH CLASSIFICATIONROW WORK LINETYPECOMCAST UNDERGROUND SYMBOLSEXISTING UTILITY SYMBOLSTRAFFIC CONTROL SYMBOLSSTORM CATCH BASIN SDTRAFFIC SIGNAL VAULTGAS METERTEST VALVEPEDESTAL UNK UTILITYFIRE HYDRANTGAS VALVEGAS TEST POINTGAS MANHOLEWATER PUMPGGGWATER AIR CONTROL VALVEWATER WELLWATER SAMPLING STATIONPOWER HANDHOLEPOWER MANHOLEPOWER CABINETPOWER VAULTPOWER PEDESTALPPOWER UNKNOWN PPPPPP?SIGN POSTCULVERTTRANSIT STOPDRIVEWAY (FOC OR EOP)SDSSANCHORSIDEWALK ANCHOR & GUY(P) FIBER & COUNTF48(P) .625 COAX(P) .875 COAXCOMCAST AERIAL SYMBOLSPROPOSEDEXISTINGWRECKOUTPOLE W/O RISERRISERARMVERTICAL GROUNDSLACK SPANOVERHEAD GUYTANGENT ATTACHMENTDEAD-ENDDOUBLE DEAD-END(E) FIBER & COUNTF48(E) .625 COAX(E) .875 COAXSLSLTSTSTSTSCCCTTTTTSTS?PUMPFWELLTREE TRIMLIGHT/MEDIUM/HEAVYLMH//WRECKOUTVAULTSPLICE CASEMANHOLEPEDESTALPPPAMINIBRIDGERTTTAATAPAMPLIFER POTHOLEBORE PIT / EXCAVATIONMMMPROPOSEDEXISTINGWRECKOUTNODEABCDSTORAGE LOOPX'X'LIT INTERSECTIONFASFLASHING ARROWSEQUENTIAL ARROWSEQUENTIAL CHEVRONFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTIONORFLASHING DIAMOND CAUTIONARROWBOARD PLACEMENT (SEE BELOW)CHANNELIZING DEVICES / MIN DIMENSIONSNOTE(S):1.AN ARROWBOARD SHALL MEET THE MINIMUM SIZE, LEGIBILITYDISTANCE, NUMBER OF ELEMENTS AND OTHERSPECIFICATIONS SHOWN.2.LENGTH OF ARROW EQUALS 48", WIDTH OF ARROWHEADEQUALS 24".3.TYPE A, B AND C ARROW BOARDS SHALL HAVE SOLIDRECTANGULAR APPEARANCES. A TYPE D ARROW BOARDSHALL CONFORM TO THE SHAPE OF THE ARROW.ARROWBOARD TYPE MIN LEGIBILITYDISTANCEMIN SIZE MINIMUM# OFELEMENTSABCD48"×24"60"×30"96"×48"NONE12 MILE1 MILE34 MILE12 MILE121315125FT MIN4FT MIN8-12"45°TYPE 3 BARRICADE3FT MIN45°2FT MIN8-12"TYPE 1 BARRICADE3FT MIN8-12"2FT MIN45°TYPE 2 BARRICADE3-4"6"2"4"28'-36" MAXSPEED < 45MPHNIGHT AND/OR FREEWAYMORE THAN 36"4-6" TYPCONECONESPEED ≥ 45MPHDIRECTION INDICATOR BARRICADE12"8"36" MIN 24" MIN45°UNLIT INTERSECTIONDBTRENCHAVAC-TSPOTTER STATIONALL TRAFFIC CONTROL DEVICES / ANNOTATIONS PER MUTCDAMPLIFIER PICTURETAP PICTUREEquipmentNTSMFP23005735
FOCFOCSWSWFOC FOCFOCSW SWSWSWFOC FOC
F
O
C
F
O
C
F
O
C
F
O
C
FOC FOCSW SW SW
SW
SW
SW
SW
SW
SW
SW
SW SW
S
W
S
W
S
W
SW
FOCFL
F
L
FL
FL
FL
FL
F
L
FL
FOCFOCF
O
C
F
O
C
F
O
C FLFLFLFLFOC
FOC
FOC FOCFOCFOCF
O
C
F
O
C SITE PLAN CONSTRUCTION NOTES12TIE-IN TO (E) SP.WAKV.0127PROOF & PULL 48CT FIBERP
A
R
K
A
V
E
N
N
S
O
U
T
H
P
O
R
T
D
RGARDEN AVE NSWSWSWSWSWSWSWSWSWSW21910
1000L
A
K
E
W
A
S
H
ING
TON
B
L
V
D
N
Know what
'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.ANCHOVIES & SALT
910 LAKE WASHINGTON BLVD N
RENTON, WA 98056
JB0001532734REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS10/23/20235SITE PLAN
5N5'MFP23005735
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23005735
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES