Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Regular Meeting - 16 Jun 2014 - Agenda - Pdf
AGENDA RENTON CITY COUNCIL REGULAR MEETING June 16, 2014 Monday, 7 p.m. *REVISED* 1.CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2.ROLL CALL 3.SPECIAL PRESENTATIONS a. REACH Center of Hope 1st Anniversary Celebration b. Cedar River Library Update 4.ADMINISTRATIVE REPORT 5.AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is allowed five minutes. The first comment period is limited to one-half hour. The second comment period later on in the agenda is unlimited in duration.) When you are recognized by the Presiding Officer, please walk to the podium and state your name and city of residence for the record, SPELLING YOUR LAST NAME. 6.CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a. Approval of Council meeting minutes of 6/9/2014. Council concur. b. City Clerk reports bid opening on 6/10/2014 for CAG-14-078, Sewer Radio Panel Relocation and Lift Station Improvements project; three bids; engineer's estimate $166,440; and submits staff recommendation to award the contract to the low bidder, Equity Builders, LLC, in the amount of $145,799.25. Refer to Utilities Committee for discussion of funding. c. City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Community Low Impact Development Retrofit Stormwater Green Connection: Harrington Ave. NE & Harrington Ave. NE Water Main Replacement project; nine bids; engineer's estimate $1,302,442; and submits staff recommendation to award the contract to the low bidder, Northwest Cascade, Inc., in the amount of $1,101,142.55. Council concur. d. Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Weibel, P.S., Attorneys for Plaintiff, vs. The Estate of Donald O. Carlile, The City of Renton, et al, regarding the collection of debts. Refer to City Attorney and Insurance Services. e. Administrative Services Department recommends approval of an addendum for Project #64 to the Community Connectivity Consortium agreement (CAG-11-176), to provide fiber optic cable as a segment in the Consortium's Ring Around the Lake goal and install fiber optic backbone cable for the exclusive use of the City of Tukwila. Total cost is $941,863 funded by grants and in-kind contributions from Bellevue and Tukwila. Refer to Finance Committee. f. Community Services Department recommends approval of a contract with Jansen, Inc. in the amount of $192,076.68 for the Cedar River Gabion Repair project. Refer to Finance Committee. Page 1 of 227 g. Community Services Department recommends approval of a joint interlocal agreement with King County to continue participating in the HOME Investment Partnership Program for 2015-2017. Council concur. (See 8.a. for resolution.) h. Fire & Emergency Services Department requests authorization to convert a Fire Lieutenant position (grade f71) to a Fire Captain position (grade f72) due to the level of authority required to manage the department's health and wellness programs. The salary increase will be absorbed through reduction of departmental injuries. Refer to Finance Committee. 7.UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a. Transportation (Aviation) Committee: NE 31st St. Culvert Repair Project Replacement Alternative - Bridge Bid Award; 156th Ave. SE Corridor (Carpenter Correspondence) b. Utilities Committee: Revisions to RMC 9-5, Latecomer's Agreements* 8.RESOLUTIONS AND ORDINANCES Resolution: a. Interlocal agreement with King County regarding HOME Investment Partnership Program 2015-2017 (See 6.g.) Ordinance for first reading: a. Amend RMC 9-5, Latercomer's Agreements (See 7.b.) 9.NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded information.) 10.AUDIENCE COMMENT 11.ADJOURNMENT ------------------------------------------------------------------------------------------------------------------------------ COMMITTEE OF THE WHOLE AGENDA (Preceding Council Meeting) COUNCIL CHAMBERS June 16, 2014 Monday, 5:30 p.m. Community Needs Assessment/McOmber Request; Regional Issues & Updates • Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk • CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 AND ARE RECABLECAST: Tues. & Thurs. at 11 AM & 9 PM, Wed. & Fri at 9 AM & 7 PM and Sat. & Sun. at 1 PM & 9 PM --------------------------------------------------------------------------------------------------------------------------------- Page 2 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Contract Award for Bid Opening on 6/10/2014; CAG-14-078; Sewer Radio Panel Relocation and Lift Station Improvements Project Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Staff Recommendation Bid Tab (three bids) Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk ext. 6502 Recommended Action: Refer to Utilities Committee Fiscal Impact: Expenditure Required: $ 145,799.25 Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ 160,000 City Share Total Project: $ SUMMARY OF ACTION: Engineer's Estimate: $166,440.00 In accordance with Council procedures, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, the low bid was within total project budget, and there were no irregularities with the low bid. However, the total project budget is not sufficient to cover the entirety of the project. Therefore, staff recommends that $30,000 from the 2014 Sewer Replacement/Rehabilitation account (426.465502) be transferred to the Mill Avenue S. Manhole Rehabilitation account (426.465504) to cover the budget shortfall. Additionally, staff recommends accepting the low bid submitted by Equity Builders, LLC, in the amount of $145,799.25 for the Sewer Radio Panel Relocation and Lift Station Improvements Project and to refer the bid to the Utilities Committee for discussion of funding. STAFF RECOMMENDATION: Accept the low bid submitted by Equity Builders, LLC in the amount of $145,799.25 for the Sewer Radio Panel Relocation and Lift Station Improvements project, subject to discussion of funding. 6b. - City Clerk reports bid opening on 6/10/2014 for CAG-14-078, Sewer Radio Page 3 of 227 6b. - City Clerk reports bid opening on 6/10/2014 for CAG-14-078, Sewer Radio Page 4 of 227 6b. - City Clerk reports bid opening on 6/10/2014 for CAG-14-078, Sewer Radio Page 5 of 227 6b. - City Clerk reports bid opening on 6/10/2014 for CAG-14-078, Sewer Radio Page 6 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Contract Award for Bid Opening on 6/10/2014; CAG-14-079; Sunset Community Low Impact Development Retrofit Stormwater Green Connection: Harrington Ave. NE & Harrington Ave. NE Water Main Replacement Project Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Staff Recommendation Bid Tab (nine bids) Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk ext. 6502 Recommended Action: Council concur Fiscal Impact: Expenditure Required: $ 1,101,142.55 Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ 1,669,000 City Share Total Project: $ SUMMARY OF ACTION: Engineer's Estimate: $1,302,442. In accordance with Council procedures, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, the low bid was within total project budget, and there were no irregularities with the low bid. Therefore, staff recommends accepting the bid submitted by Northwest Cascade, Inc. in the amount of the $1,101,142.55 for the Sunset Community Low Impact Development Retrofit Stormwater Green Connection: Harrington Ave. NE & Harrington Ave. NE Water Main Replacement project. STAFF RECOMMENDATION: Accept the low bid submitted by Northwest Cascade, Inc. in the amount of $1,101,142.55 for the Sunset Community Low Impact Development Retrofit Stormwater Green Connection: Harrington Ave. NE & Harrington Ave. NE Water Main Replacement project. 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 7 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 8 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 9 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 10 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 11 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 12 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 13 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 14 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 15 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 16 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 17 of 227 6c. - City Clerk reports bid opening on 6/10/2014 for CAG-14-079, Sunset Page 18 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Court Case: Capital One, N.A. vs. The Estate of Donald O. Carlile, City of Renton, et al; CRT-14- 003 Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Summons Complaint for Judicial Foreclosure Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk ext. 6502 Recommended Action: Refer to City Attorney and Insurance Services Fiscal Impact: Expenditure Required: $ Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ City Share Total Project: $ SUMMARY OF ACTION: 6/4/2014 - Summons and Complaint for Judicial Foreclosure filed in Superior Court of Washington in and for the County of King submitted via legal courier for Capital One, N.A., represented by William L. Bishop, Jr., David A. Weibel, and Annette E. Cook of Biship, Marshal & Weibel, P.S., Attorneys for Plaintiff, vs. The Estate of Donald O. Carlile deceased; the unknown heirs and devisees of Donald O. Carlile, deceased; Jane Doe Carlile, wife of Donald O. Carlile, deceased; Heather Fisher; Mortgage Electronic Registration Systems, Inc., as nominee for Greenpoint Mortgage Funding, Inc.; City of Renton, Finance Department; John and Jane Does, I through V, occupants of the subject real property; and also all unknown owners claiming any right, title, interest, lien or estate in the property herein described; regarding the collection of debts. STAFF RECOMMENDATION: n/a 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 19 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 20 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 21 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 22 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 23 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 24 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 25 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 26 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 27 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 28 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 29 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 30 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 31 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 32 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 33 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 34 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 35 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 36 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 37 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 38 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 39 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 40 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 41 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 42 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 43 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 44 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 45 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 46 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 47 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 48 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 49 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 50 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 51 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 52 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 53 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 54 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 55 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 56 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 57 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 58 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 59 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 60 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 61 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 62 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 63 of 227 6d. - Court Case filed by Capital One, N.A., represented by Bishop, Marshall & Page 64 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Consortium Fiber Project Agreement 64 Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Issue Paper Project Agreement #64 Submitting Data: Dept/Div/Board: Administrative Services Staff Contact: Mehdi Sadri, ASD, InformtionTechnology Director x- 6886 Recommended Action: Refer to Finance Committee Fiscal Impact: Expenditure Required: $ Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ City Share Total Project: $ SUMMARY OF ACTION: This specific project will provide a 288 count fiber optic cable for Consortium member use as a segment in the Consortium’s Ring Around the Lake goal and install a 72 strand count fiber optic backbone cable for the exclusive use of the City of Tukwila from SW Grady Way/Interurban Ave S north on Interurban to South 133rd Street, west on South 133rd Street to South 120th Place and East Marginal Way and Sabey Data Center, adding to consortium backbone fiber and continuing to build around Lake Washington and to Snohomish and Pierce counties. In consideration for contributions to previous projects in Renton, the City of Renton is granted fibers in this cable which will be used to provide fiber optic connections to internet service providers. The total cost of this project is approximately $941,863 (funded by 2010 UASI Grant) and in-kind asset contributions from City of Tukwila and City of Bellevue. STAFF RECOMMENDATION: Approve the Consortium Fiber Project Agreement 64 and authorize the Mayor and City Clerk to sign. 6e. - Administrative Services Department recommends approval of an addendum Page 65 of 227 ADMINISTRATIVE SERVICES M E M O R A N D U M DATE:June 9, 2014 TO:Don Persson, Council President Members of Renton City Council VIA:Denis Law, Mayor FROM:Mehdi Sadri, Information Technology Director STAFF CONTACT:Ronald Hansen, Network Systems Manager SUBJECT:Consortium Fiber Project Agreement 64, Backbone fiber from SW Grady Way/Interurban Ave S to South120th Place and East Marginal Way and Sabey Data Center. ISSUE: Should the City approve Consortium Project Agreement with the City of Bellevue, the City of Kirkland, City of Tukwila and the University of Washington to share fiber optic cable from SW Grady Way/Interurban Ave S to South120th Place and East Marginal Way and Sabey Data Center? RECOMMENDATION: Staff recommends approval of the Consortium Project Agreement. BACKGROUND SUMMARY: Council approved an updated and expanded interlocal agreement that consolidates the Eastside Fiber Consortium and government agencies in the Valley Cities group into the “Community Connectivity Consortium” to jointly construct, manage, and share fiber optic resources in August of 2011. The City of Renton and the fiber consortium have worked under this Consortium Agreement and partnered on a number of projects which have resulted in many schools and City facilities within the community being connected with high-speed fiber optic connections as well as getting access to fiber and facilities outside the City. This specific project will provide a 288 count fiber optic cable for consortium member use as a segment in the Consortium’s Ring Around the Lake goal and install a 72 strand count fiber optic backbone cable for the exclusive use of the City of Tukwila from SW Grady Way/Interurban Ave S north on Interurban to South 133rd Street, west on South 133rd Street to South 120th Place and East Marginal Way and Sabey Data Center, adding to consortium backbone fiber and continuing to build around Lake Washington 6e. - Administrative Services Department recommends approval of an addendum Page 66 of 227 Addressee Name Page 2 of 2 June 9, 2014 and to Snohomish and Pierce counties. In consideration for contributions to previous projects in Renton, the City of Renton is granted fibers in this cable which will be used to provide fiber optic connections to internet service providers. The total cost of this project is approximately $941,863 (funded by 2010 UASI Grant) and in-kind asset contributions from City of Tukwila and City of Bellevue. CONCLUSION: Staff recommends that the City Council approve the interlocal agreement and authorize the Mayor and City Clerk to sign the Consortium project agreement to be executed with participating agencies. cc:Bonnie Walton, City Clerk Iwen Wang, Finance and Information Technology Administrator Mehdi Sadri, Information Technology Director 6e. - Administrative Services Department recommends approval of an addendum Page 67 of 227 Community Connectivity Consortium Project Agreement 64 City of Bellevue 450 110th Ave NE Bellevue, WA 98009 City of Kirkland 123 Fifth Ave Kirkland, WA 98033 City of Renton 1055 S Grady Way Renton, WA 98057 City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 University of Washington 4545 15th Ave NE Seattle, WA 98105 Provide pathway, conduit and fiber to connect the SW Grady Way and Interurban Ave South meet me point in the City of Tukwila to Sabey Data Center Campus in the City of Tukwila. Addendum to the Community Connectivity Consortium’s Project Agreement Template Policy 6e. - Administrative Services Department recommends approval of an addendum Page 68 of 227 1 Table of Contents I. Project Description .................................................................................................. 2 A. Project Number 64 ................................................................................................ 2 B. Project Name Connect the Fun Center and Sabey Data Center Campus. ............. 2 C. Project Description ............................................................................................... 2 D. Lead Agency / Project Manager ........................................................................... 2 E. Participating Agencies .......................................................................................... 2 II. Physical Description of Project ............................................................................... 2 A. Project Route (see Exhibit A) ............................................................................... 2 B. Points of Demarcation .......................................................................................... 3 C. Facilities to be Used, Owners and Managers ........................................................ 3 D. Project Specifications and Scope of Work ........................................................... 3 E. Fiber Apportionment ............................................................................................. 6 E. Fiber Splice Details ............................................................................................... 7 Attached as Exhibit B of this agreement is the project splice table. ............................ 7 III. Project Budget ......................................................................................................... 7 A. Construction Budget ............................................................................................. 7 B. Construction Cost Apportionment ........................................................................ 7 C. In-Kind Asset Contributions ................................................................................. 7 D. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Repairs and Relocations. ...................................................... 8 IV. Apportionment of Liability ...................................................................................... 9 V. Project Schedule ...................................................................................................... 9 VI Changes or Addenda to Project Agreement Template Policy ................................. 9 6e. - Administrative Services Department recommends approval of an addendum Page 69 of 227 2 I. Project Description A. Project Number 64 B. Project Name Connect the Fun Center and Sabey Data Center Campus. C. Project Description Provide a 288 count fiber optic cable for Consortium member use as a segment in the Consortium’s Ring Around the Lake goal and install a 72 strand count fiber optic backbone cable for the exclusive use of the City of Tukwila from SW Grady Way/Interurban Ave S north on Interurban to South 133rd Street, west on South 133rd Street to South120th Place and East Marginal Way and Sabey Data Center as generally illustrated in Exhibit A (Route Illustration). D. Lead Agency / Project Manager City of Bellevue The Lead Agency is responsible for ensuring that all applicable terms and conditions of the Project Agreement(s), General Terms and Conditions, exhibits and addenda are included in the contract agreements with Facility Owners and contractors. E. Participating Agencies City of Bellevue City of Kirkland City of Renton City of Tukwila University of Washington II. Physical Description of Project A. Project Route (see Exhibit A) Segment A: From the City of Tukwila manhole located in the traffic triangle on the east side of the intersection of Interurban Avenue South and SW Grady Way continue north in City of Tukwila conduit to 4x4 pull vault at the intersection of Interurban Avenue South and South 143rd Street. Segment B: Continuing north on Interurban Avenue South to the intersection of Interurban Avenue South and South 133rd Street, turning west on South 133rd Street until the road transitions to East Marginal Way; continue in City of Tukwila conduit to the City of Tukwila manhole approximately 200 feet south of South 120th Street adjacent to the Sabey Data Center Campus property, entering Building 2. Total estimated project length is approximately 25,000 feet. 6e. - Administrative Services Department recommends approval of an addendum Page 70 of 227 3 B. Points of Demarcation Existing City of Tukwila TA-25 on the east side of Interurban Avenue South on the west side of the traffic island on the east side of the intersection of Interurban Avenue South and Southwest Grady Way; City of Tukwila manhole east of Building 2, Sabey Data Center – Intergate West. C. Facilities to be Used, Owners and Managers Facilities to be used on this project are the existing underground pathway and conduit systems owned by the City of Tukwila, along with modifications and additions specified herein. All upgrades to conduit systems installed on City property and in the City right of way will be owned and maintained by the City where the modifications are installed. D. Project Specifications and Scope of Work This project and all Work performed hereunder shall meet all requirements of the City of Tukwila Public Works Department Standards, including traffic control plans, street use permits, waiver of existing underground ordinance, city and county business license requirements, and any other applicable requirements, as appropriate. All improvements made in the right of way shall become an asset of the City of Tukwila. Note: All construction instructions are subject to conditions that may not be known before proofing/locates are completed. The contractor performing the Work hereunder is responsible for all project conditions. Route Preparation Work to be done during normal working hours: Project Route: Obtain the required permits and permissions before proceeding with the work. o Using City of Tukwila provided drawings, the City will locate and install the following three (3) new 4’ x 4’ vaults, to City of Tukwila Public Works specifications and standards: o The first vault/fiber storage location is approximately 700 feet north of the beginning City of Tukwila TA-25 located at Interurban Ave S and SW Grady Way, adjacent to the traffic cabinet at SW Grady Way o The second vault/fiber storage location is approximately 1,500 feet north of the beginning TA-25, noted above, at SW Grady Way and Interurban Avenue South. 6e. - Administrative Services Department recommends approval of an addendum Page 71 of 227 4 o The third vault shall be located approximately 6,300 feet north of the beginning TA-25 located at SW Grady Way and Interurban Avenue South, at 140th. o The fourth vault will be installed as a part of this work and shall be located approximately 7,500 feet north (at South 140th St.) of the beginning City of Tukwila TA-25 at SW Grady Way and Interurban Avenue South. o Project route has not been proofed. The Contractor performing the Work hereunder shall assume responsibility for proofing all conduit, handholds, pull boxes and vaults to be used by this project. Infrastructure Improvements Work to be done during normal working hours: 1. Install one new manhole described as manhole number 4 above, placed adjacent to the city’s 4” conduit. Uncover the city conduit and insert two 90 degree sweeps connected to the existing conduit, into the manhole. All work must be coordinated with the City of Tukwila, including specific placement of the manhole. The Contractor will contact Mr. Scott Bates, 206.571.6302, City of Tukwila Public Works Department, for specific placement instructions before beginning any work. 2. Two manholes located at station 50 on McLeodUSA drawing sheet 21, have been paved over and will need to be uncovered and raised to road level as per the City of Tukwila Public Works requirements. Underground Fiber Placement Work to be done during normal working hours: 1. Installation shall conform to generally accepted, industry standards. 2. All fiber optic cable provided for this project shall meet the requirements of long haul, full spectrum, low water peak fiber including ITU-T G.652. 3. All cabling will be labeled, as noted below, with UASI Project data and emergency contact information. The Contractor shall attach a weather-resistant, bright orange label with black machine generated lettering to each cable (288 and 72 strand) at each access point along the route reading: 288 Strand Cable 72 Strand Cable Purchased with 2010 UASI Funds Grant # E14-118 Fiber Optic Cable Fiber Optic Cable Contact: City of Tukwila Contact: City of Bellevue IT 206-465-2062 425.452.2886 6e. - Administrative Services Department recommends approval of an addendum Page 72 of 227 5 4. Fusion splices along the route shall be performed such that there are no breaks in the Consortium strands and that all Consortium strands are continuous between the identified points of demarcation. 5. Install four one inch, smooth wall, orange/blue innerduct with toneable mule/pull cord in City of Tukwila owned conduit designated by Mr. Scott Bates, 206.571.6302, City of Tukwila Public Works Department. There are multiple city owned conduits. The city will designate the appropriate conduit for use with this project. Four (4) one (1) inch innerduct will run the entire length of the project. 6. Install a 288 strand count OSP, single mode, full spectrum, loose tube, fiber optic cable meeting the requirements of ITU G652 and specifically meet ITU G652.D Attributes for Zero Water Peak full spectrum Optical Cable. The fibers shall support the transmission of wavelengths for Coarse Wavelength Division Multiplexing (CWDM) as defined in ITU G694.2. At each vault along the route, leave a 200 foot service loop for future access, maintenance and future splicing. 7. Install a 72 strand, single mode fiber optic cable, provided by the City of Tukwila, in separate innerduct along the project route leaving the identical service loops as with the 288 strand cable using the route specified above. Fiber Terminations and Splicing Work to be done during normal working hours: Important Note: Confirm all splice details prior to undertaking any work in this section. The items below will be detailed in a separate splice document. Where appropriate, each participating agency has provided the spice details for the fibers assigned in E. Fiber Apportionment below. Any splice diagrams/tables/details will be consistent with paragraph E. below and are noted in paragraph F. Fiber Splice Details below. 1. The TA-25 vault location adjacent at SW Grady Way and Interurban South is the starting point for this project. Install a water proof, sealed splice case of sufficient size to accommodate splicing 216 existing fiber optic strands to the newly installed 288 strand fiber optic backbone. Specific splice instructions are noted below. All splicing shall use the fusion method of splicing and shall be tested from the manhole meet me point at the Sabey Data Center campus, Tukwila through to the backbone end point at Coal Creek Parkway and Factoria Boulevard, Bellevue using fiber optic testing industry standards, acceptable to the Consortium. Label the splice case: Community Connectivity Consortium Purchased with 2010 UASI Funds Grant # E14-118 Contact: City of Bellevue IT 425.452.2886 Contact must be made 24 hours prior to opening. 6e. - Administrative Services Department recommends approval of an addendum Page 73 of 227 6 Label shall be machine generated and water/weather resistant, attached with adhesive appropriate for the application. 2. At the City of Tukwila vault adjacent to Building 2, Sabey Data Center, splice a 48 strand SM cable into the Consortium’s 288 strand backbone, as shown in the project splice table attached as Exhibit B to this agreement, leaving a service loop of 200 feet of both cables for future splicing. Install an appropriately sized splice case, labeled as noted above, to accommodate a future 288 strand fiber optic cable run going north. 3. The 72 strand cable shall be left unterminated in the City’s manhole adjacent to Building 2, Sabey Data Center. This cable will also be left unterminated in the originating manhole at SW Grady Way and Interurban Avenue South. 4. Test procedures shall follow industry standards, specifically TIA/EIA-455 and shall be submitted to the Consortium for approval prior to final invoicing. Test results shall be submitted on DVD. Testing shall be coordinated with the Consortium such that all splices are tested. 5. Additional splice section requirements may be added to this Agreement by an addendum after the fiber topology and fiber count and ownership have been fully negotiated. E. Fiber Apportionment One 288 count single-mode fiber optic cable will be installed for Consortium member use. Fiber allocation will be as follows: 1. Fibers 1 - 12 (12 fibers) will be owned and maintained by the City of Tukwila. 2. Fibers 13 – 72 will be held in trust by the Consortium for future use of Consortium members which may include: cities, school districts, fire districts, water districts, hospital districts and others. 3. Fibers 73 - 78 (6 fibers) will be owned and maintained by the City of Bellevue. 4. Fibers 79 - 80 (2 fibers) will be owned and maintained by the City of Renton. 5. Fibers 81 - 108 (28 fibers) will be held in trust by the Consortium for future use of Consortium members which may include: cities, school districts, fire districts, water districts, hospital districts and others. 6. Fibers 109 – 120 (12 fibers) will be owned and maintained by the University of Washington. 7. Fibers 121 – 132 (12 Fibers) will be held in trust by the Consortium for future use of Consortium members which may include: cities, school districts, fire districts, water districts, hospital districts and others. 8. Fibers 133 – 134 (2 Fibers) will be owned and maintained by the City of Kirkland. 9. Fibers 135 – 288 (154 Fibers) will be held in trust by the Consortium for future use of Consortium members which may include: cities, school districts, fire districts, water districts, hospital districts and others. One 72 count single-mode fiber optic cable, provided by the City of Tukwila, will be installed. 1. Fibers 1 - 72 will be owned and maintained by the City of Tukwila. 6e. - Administrative Services Department recommends approval of an addendum Page 74 of 227 7 F. Fiber Splice Details Splice details will be attached as Exhibit B of this agreement at a future date after approval of the project members. III. Project Budget A. Construction Budget Estimated Construction Budget Item Description Quantity Price Extended 72 count Single Mode Fiber Optic Cable (to be supplied by the City of Tukwila) 25,000 ft. $ .00 $0 288 count Single Mode Fiber Optic Cable (+20% slack) 25,000 ft. $5.00 $125,000 Four 1” inner duct within Tukwila on Interurban Ave S. 100,000 ft. $0.50 $50,000 One 4’x4’ TA-25 vault, installed to city standards 1 each $20,000 $20,000 Two manhole risers, installed to city standards 2 each $2,500 $5,000 Consumables, bonds, misc. 1 each $4,530 Toneable Mule Tape 25,000 ft. $ 0.75 $18,750 Fiber Installation Labor 25,000 ft. $ 1.50 $67,500 Flagging Costs 1 each $10,500 Splicing and Termination Materials and Labor 4 $ 2,500 $10,000 Allowance for unanticipated work 10% $39,000 Tax 9.5 % $34,323 Total $395,613 B. Construction Cost Apportionment Construction Cost Apportionment Table Participating Agency Cost City of Bellevue (2010 UASI Grant Funding) $395,613 Total $395,613 C. In-Kind Asset Contributions In-Kind Asset Contribution Table Participating Agency Cost City of Bellevue (Project Management) $65,000 City of Tukwila, 25,000’ 72 strand fiber Cable $81,250 City of Tukwila, 5 miles conduit $400,000 City of Bellevue, 2010 UASI Grant Funding $395,613 6e. - Administrative Services Department recommends approval of an addendum Page 75 of 227 8 Total $941,863 D. Maintenance Responsibilities and Costs, including Ongoing Maintenance and Responsibilities for Repairs and Relocations. Expected future maintenance of project facilities has been broken down into the categories below. If a maintenance issue arises that is not listed below, those costs will be proportionately split based on fiber ownership in each fiber segment by the participating agencies. Splice Case Access Access to Consortium splice cases must be preceded by notification to the Consortium, 48 hours in advance of the opening, at 425.452.2886. Locates Each participating agency agrees to perform or pay for all locates required and requested through Underground Utilities Locate Center (UULC) for the fiber and conduit installed as a result of this agreement that is on property owned by the affected City, in the City right-of-way and in the right-of-way in potential annexation areas. Relocation The cost of any and all relocations will be borne by the parties to this agreement. Cost shall be apportioned based on the percent of fiber owned by each Participating Agency. Repairs/Breaks The jurisdictions within which fiber optic cables are installed pursuant to this Agreement shall be responsible for immediate and timely repair of all breaks or outages of the subject fiber. The Community Connectivity Consortium and/or the City of Tukwila shall contract with a competent and qualified vendor to provide 7x24x365, four-hour response to any fiber breaks/outages that happen on the fiber segments subject to this agreement. The Community Connectivity Consortium and/or the City of Tukwila will determine cost apportionment of costs of repair using a formula based on the percentage of fiber owned by each Participating Agency to this agreement. Upon completion of the repair, the Community Connectivity Consortium and/or the City of Tukwila shall invoice each Participating Agency for their share of costs. 6e. - Administrative Services Department recommends approval of an addendum Page 76 of 227 9 IV. Apportionment of Liability During construction, the Contractor shall be responsible for the project work and the project site. In the event that the project work causes or contributes to any harm, damage, injury or loss to any person or property, whether during construction or after completion of the project, each party shall be responsible as set forth in Section VI, Indemnification and Limitation of Liability, of the Consortium Project Agreement Template Policy (adopted Feb. 2, 2012). Each Participating Agency to this agreement shall ensure that the Participating Agency and all persons performing the Work, including without limitation project suppliers and subcontractors, maintain in effect at all times during the Work, coverage or insurance in accordance with the applicable laws relating to worker’s compensation and employer’s liability insurance (including, but not limited to, the Washington Industrial Insurance Act and the laws of the state in which any such person was hired), regardless of whether such coverage or insurance is mandatory or merely elective under the law. The Lead Agency or contracting party shall furnish to Participating Agencies such assurance and evidence of such coverage or insurance (such as copies of insurance policies and Certificates of Compliance issued by the Washington State Department of Labor and Industries) as Participating Agencies may request. Each Participating Agency shall maintain in full force and effect throughout the term of this Agreement, a minimum of One Million Dollars ($1,000,000) liability insurance for property damage and bodily injury. In satisfying the insurance requirements set forth in this section, the participating agency may self-insure against such risks in such amounts as are consistent with good utility practice or shall obtain a coverage agreement through a Risk Pool authorized by Chapter 39.24 RCW which shall provide liability coverage to the Participating Agency for the liabilities contractually assumed by the Participating Agency in this Agreement. At the time of execution of this Agreement, and prior to commencement of performance of any of the Work, each Participating Agency shall furnish the other Participating Agencies, upon request, with a Certificate of Insurance as evidence that policies providing insurance (or self-insurance) with such provisions, coverage’s and limits are in full force and effect. V. Project Schedule Task Target Completion Date Circulate and sign copies of the Project May 2014 Agreement. Trench and install conduit and vault Summer 2014 Prep conduit and install fiber and toneable tape Fall 2014 Terminate and splice fibers Fall 2014 VI Changes or Addenda to Project Agreement Template Policy This Agreement shall run concurrent with and be considered an attachment to the Project Agreement Template Policy document and supersedes the Policy document to the extent it contains terms and conditions which change, modify, delete, add to, supplement or otherwise amend the terms and conditions of the Project Agreement Template Policy document. 6e. - Administrative Services Department recommends approval of an addendum Page 77 of 227 10 Approvals IN WITNESS WHEREOF, the parties hereto have executed this Fiber Optic Project Agreement on the respective dates indicated below. Approved as to Form: _________________________ ________ ____________________ Denis Law Date City Attorney Mayor City of Renton Approved as to Form: _________________________ ________ ____________________ Jim Haggerton Date City Attorney Mayor City of Tukwila _________________________ ________ Roland Rivera Date Director, Network Strategy and Telecommunications Information Technology University of Washington Approved as to Form: _________________________ ________ ____________________ Kirk Triplett Date City Attorney City Manager City of Kirkland Approved as to Form: _________________________ ________ _________________ Brad Miyake Date City Attorney City Manager City of Bellevue 6e. - Administrative Services Department recommends approval of an addendum Page 78 of 227 11 Appendix A Project Route Map 6e. - Administrative Services Department recommends approval of an addendum Page 79 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Cedar River Gabion Repair Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Issue Paper Agreement - A101-2007 General Conditions - A201-2007 Special Conditions Request for Quote Quotes Summary Submitting Data: Dept/Div/Board: Community Services Staff Contact: Leslie Betlach, Parks Planning and Natural Resources Director, Ext.-6619 Recommended Action: Refer to Finance Committee Fiscal Impact: Expenditure Required: $ 211,666.79 Transfer Amendment: $ Amount Budgeted: $ 230,529.28 Revenue Generated: $201,713.12 Total Project Budget: $ 269,346.79 City Share Total Project: $ 67,633.67 SUMMARY OF ACTION: In January 2009 the City incurred extensive flood damage to the gabions along the Cedar River located between the Bronson Way and Logan Avenue Bridges. In June 2011 the Gabion Repair Project was approved by FEMA in the amount of $230,529.28. FEMA and the State of Washington would reimburse the City for a combined 87.5 percent, ($201,713.12), and the City would be responsible for 12.5 percent ($28,816.16). The City contracted for design services and in February 2014 received its final permit. The Project was advertised and three quotes were received with all three higher than the Engineer's Estimate of $127,164.00. Jansen Inc. submitted the low quote of $192,424.35. Staff reviewed for completeness and accuracy, performed the necessary background research and is recommending to award to Jansen Inc. To date the City has encumbered $57,680.00 for design services and permits. The City estimates construction costs at $211,666.79 which includes the contract amount of $192,424.35 and a ten percent construction project contingency of $19, 242.44. The City estimates the total project expenditures at $269,346.79 ($57,680.000 + $211,666.79). The City's estimated share of the total project expenditures will be between $28,816.16 and $67,633.67. The final eligible amount for project reimbursement will be based on the actual project costs upon project completion and as allowed by FEMA. In the event FEMA does not allow the additional project costs of $38,817.51 ($269,346.79 - $230,529.28), the City will be required to fund the difference. Funding from the City's Grant Match Fund (316.332011.020.594.76.61.000) has been identified to cover the increased expenditures. Staff will return to Council upon project closeout for a final budget adjustment request. The estimated construction timeframe is August and September 2014. STAFF RECOMMENDATION: Approve the contract with Jansen Inc. in the amount of $192,076.68 for the Cedar River Gabion Repair project, and authorize the Mayor and City Clerk to execute the contract. 6f. - Community Services Department recommends approval of a contract with Page 80 of 227 COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE:June 6, 2014 TO:Don Persson, Council President Members of the City Council FROM:Terry Higashiyama, Community Services Administrator STAFF CONTACT:Leslie Betlach, Parks Planning and Natural Resources Director SUBJECT:Cedar River Gabion Repair ISSUE: Should the construction contract for gabion repairs be awarded to Jansen Inc. in the amount of $192,424.35? Should City staff be authorized to expend an amount not to exceed the estimated total project budget amount of $269,346.79? RECOMMENDATION: Award the construction contract to Jansen Inc. in the amount of $192,424.35 and authorize the Mayor and the City Clerk to execute the contract. Authorize staff to expend an amount not to exceed the estimated total project budget amount of $269,346.79. Upon project closeout staff will return to Council for project update and final budget adjustment request. BACKGROUND SUMMARY: On January 8, 2009, the City incurred extensive flood damage to the gabions (rock-filled wire baskets) along the right bank of the Cedar River located between the Bronson Way and Logan Avenue Bridges; the gabions help support the Cedar River Trail. On January 30, 2009, President Obama declared the event a disaster for King County (and eight other counties) allowing gabion repairs to be eligible for FEMA funding. In April 2009, the City submitted a Project Letter of Intent and on June 24, 2011, the Gabion Repair Project was approved by FEMA in the amount of $230,529.28. FEMA would reimburse the City at 75 percent ($172,896.96) and the State of Washington would reimburse the City at 12.5 percent, ($28,816.16) for a total combined reimbursement of 87.5 percent ($210,713.12). The City would be responsible for 12.5 percent ($28,816.16) of the approved project costs. The City contracted with NW Environmental Consulting, Inc. for design services and over the next three years the project went through two consultations for the federal Endangered Species Act and Essential Fish Habitat prior to receiving the final Hydraulic Permit in February 2014 from the state Department of Fish and Wildlife. The Project was advertised and three quotes were received with all three higher than the Engineer’s Estimate of $127,164.00. Jansen Inc. submitted the low quote of $192,424.35 and the high quote received was $285,076.68. Staff reviewed the Jansen Inc. quote for completeness and accuracy, performed the necessary background research and is recommending award to Jansen Inc. 6f. - Community Services Department recommends approval of a contract with Page 81 of 227 Don Persson, Council President Renton City Council Members Page 2 of 2 June 6, 2014 To date the City has encumbered $57,680.00 for design services and permits. The City estimates construction costs at $211,666.79 which includes the contract amount of $192,424.35 and a ten percent construction project contingency of $19,242.44. The City estimates the total project expenditures at $269,346.79 ($57,680.000 + $211,666.79). Staff estimates the City's share of the total project expenditures will be between $28,816.16 and $67,633.67. The exact amount will be determined upon project completion. Staff has been in regular contact with the State Regional Public Assistance Supervisor throughout this process and the final eligible amount for project reimbursement will be based on the actual project costs upon project completion and as allowed by FEMA. At a minimum, the City will continue to be obligated to contribute twelve and one-half percent of the total project costs. In the event FEMA does not allow the additional project costs of $38,817.51 ($269,346.79 - $230,529.28), the City will be required to fund the difference. Funding from the City's Grant Match Fund (316.332011.020.594.76.61.000) has been identified to cover the increased expenditures. The current balance of the Grant Match Fund is $250,000.00. The Grant Match Fund was specifically established to match other grant funding sources including the federal Hazard Mitigation Grant Programs. The estimated construction timeframe is August and September 2014, commencing after Renton River Days. In-water work will be in August and cleanup and trail repairs will be in September. The Cedar River Trail between the Bronson Way and Logan Avenue Bridges will be closed and trail users will be detoured. CONCLUSION: Awarding the contract to the lowest responsive contractor, Jansen, Inc. and authorizing staff to expend an amount not to exceed the estimated total project budget allows the City to move forward with repairing the gabions. The Cedar River Trail is a highly used facility and repairing the gabions will maintain the stability of the trail. An amount up to 87.5% of the cost of repairs will be reimbursed by the state and federal government. Cc:Jay Covington, Chief Administrative Officer Iwen Wang, FIT Administrator Jamie Thomas, Fiscal Services Director Misty Baker, Senior Finance Analyst Tracy Schuld, Accounting Supervisor Todd Black, Capital Project Coordinator Deborah Needham, Emergency Management Director 6f. - Community Services Department recommends approval of a contract with Page 82 of 227 6f. - Community Services Department recommends approval of a contract with Page 83 of 227 6f. - Community Services Department recommends approval of a contract with Page 84 of 227 6f. - Community Services Department recommends approval of a contract with Page 85 of 227 6f. - Community Services Department recommends approval of a contract with Page 86 of 227 6f. - Community Services Department recommends approval of a contract with Page 87 of 227 6f. - Community Services Department recommends approval of a contract with Page 88 of 227 6f. - Community Services Department recommends approval of a contract with Page 89 of 227 6f. - Community Services Department recommends approval of a contract with Page 90 of 227 6f. - Community Services Department recommends approval of a contract with Page 91 of 227 Document A201TM – 2007 General Conditions of the Contract for Construction Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 1 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. for the following PROJECT: (Name and location or address) Teasdale 2 THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 ARCHITECT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT 15 CLAIMS AND DISPUTES 6f. - Community Services Department recommends approval of a contract with Page 92 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 2 INDEX (Numbers and Topics in Bold are Section Headings) Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention 10 Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.4.2, 13.7.1, 14.1, 15.2 Addenda 1.1.1, 3.11.1 Additional Costs, Claims for 3.7.4, 3.7.5, 6.1.1, 7.3.7.5, 10.3, 15.1.4 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.5 Additional Insured 11.1.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.5 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8, 7.3.8 All-risk Insurance 11.3.1, 11.3.1.1 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.10, 11.1.3 Approvals 2.1.1, 2.2.2, 2.4, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10, 4.2.7, 9.3.2, 13.5.1 Arbitration 8.3.1, 11.3.10, 13.1.1, 15.3.2, 15.4 ARCHITECT 4 Architect, Definition of 4.1.1 Architect, Extent of Authority 2.4.1, 3.12.7, 4.1, 4.2, 5.2, 6.3.1, 7.1.2, 7.3.7, 7.4, 9.2.1, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4.1, 9.4.2, 9.5.3, 9.6.4, 15.1.3, 15.2 Architect’s Additional Services and Expenses 2.4.1, 11.3.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 Architect’s Administration of the Contract 3.1.3, 4.2, 3.7.4, 15.2, 9.4.1, 9.5 Architect’s Approvals 2.4.1, 3.1.3, 3.5.1, 3.10.2, 4.2.7 Architect’s Authority to Reject Work 3.5.1, 4.2.6, 12.1.2, 12.2.1 Architect’s Copyright 1.1.7, 1.5 Architect’s Decisions 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3.1, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.5.2, 15.2, 15.3 Architect’s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.5 Architect’s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5.2 Architect’s Interpretations 4.2.11, 4.2.12 Architect’s Project Representative 4.2.10 Architect’s Relationship with Contractor 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.4.2, 13.5, 15.2 Architect’s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3.7 Architect’s Representations 9.4.2, 9.5.1, 9.10.1 Architect’s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Asbestos 10.3.1 Attorneys’ Fees 3.18.1, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1, 5.2.1, 11.4.1 Binding Dispute Resolution 9.7.1, 11.3.9, 11.3.10, 13.1.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.4.1 Boiler and Machinery Insurance 11.3.2 Bonds, Lien 7.3.7.4, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.7.4, 9.6.7, 9.10.3, 11.3.9, 11.4 6f. - Community Services Department recommends approval of a contract with Page 93 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 3 Building Permit 3.7.1 Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5 Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.3 Certificates of Inspection, Testing or Approval 13.5.4 Certificates of Insurance 9.10.2, 11.1.3 Change Orders 1.1.1, 2.4.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11.1, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.3.1.2, 11.3.4, 11.3.9, 12.1.2, 15.1.3 Change Orders, Definition of 7.2.1 CHANGES IN THE WORK 2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 7.4.1, 8.3.1, 9.3.1.1, 11.3.9 Claims, Definition of 15.1.1 CLAIMS AND DISPUTES 3.2.4, 6.1.1, 6.3.1, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims 15.4.1 Claims for Additional Cost 3.2.4, 3.7.4, 6.1.1, 7.3.9, 10.3.2, 15.1.4 Claims for Additional Time 3.2.4, 3.7.46.1.1, 8.3.2, 10.3.2, 15.1.5 Concealed or Unknown Conditions, Claims for 3.7.4 Claims for Damages 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6 Claims Subject to Arbitration 15.3.1, 15.4.1 Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.3.1, 11.3.6, 11.4.1, 15.1.4 Commencement of the Work, Definition of 8.1.2 Communications Facilitating Contract Administration 3.9.1, 4.2.4 Completion, Conditions Relating to 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 13.7, 14.1.2 COMPLETION, PAYMENTS AND 9 Completion, Substantial 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 13.7 Compliance with Laws 1.6.1, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 10.2.2, 11.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, 6.1.4 Consent, Written 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.3.1, 13.2, 13.4.2, 15.4.4.2 Consolidation or Joinder 15.4.4 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 1.1.4, 6 Construction Change Directive, Definition of 7.3.1 Construction Change Directives 1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules, Contractor’s 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contingent Assignment of Subcontracts 5.4, 14.2.2.2 Continuing Contract Performance 15.1.3 Contract, Definition of 1.1.2 CONTRACT, TERMINATION OR SUSPENSION OF THE 5.4.1.1, 11.3.9, 14 Contract Administration 3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to 3.7.1, 3.10, 5.2, 6.1, 11.1.3, 11.3.6, 11.4.1 Contract Documents, The 1.1.1 Contract Documents, Copies Furnished and Use of 1.5.2, 2.2.5, 5.3 Contract Documents, Definition of 1.1.1 Contract Sum 3.7.4, 3.8, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.3.1, 14.2.4, 14.3.2, 15.1.4, 15.2.5 Contract Sum, Definition of 9.1 Contract Time 3.7.4, 3.7.5, 3.10.2, 5.2.3, 7.2.1.3, 7.3.1, 7.3.5, 7.4, 8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7.1, 10.3.2, 12.1.1, 14.3.2, 15.1.5.1, 15.2.5 Contract Time, Definition of 6f. - Community Services Department recommends approval of a contract with Page 94 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 4 8.1.1 CONTRACTOR 3 Contractor, Definition of 3.1, 6.1.2 Contractor’s Construction Schedules 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contractor’s Employees 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1, Contractor’s Liability Insurance 11.1 Contractor’s Relationship with Separate Contractors and Owner’s Forces 3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4 Contractor’s Relationship with Subcontractors 1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 11.3.1.2, 11.3.7, 11.3.8 Contractor’s Relationship with the Architect 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1 Contractor’s Representations 3.2.1, 3.2.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2 Contractor’s Responsibility for Those Performing the Work 3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1, 10.2.8 Contractor’s Review of Contract Documents 3.2 Contractor’s Right to Stop the Work 9.7 Contractor’s Right to Terminate the Contract 14.1, 15.1.6 Contractor’s Submittals 3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2 Contractor’s Superintendent 3.9, 10.2.6 Contractor’s Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3 Contractual Liability Insurance 11.1.1.8, 11.2 Coordination and Correlation 1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Copies Furnished of Drawings and Specifications 1.5, 2.2.5, 3.11 Copyrights 1.5, 3.17 Correction of Work 2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2 Correlation and Intent of the Contract Documents 1.2 Cost, Definition of 7.3.7 Costs 2.4.1, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3, 7.3.3.3, 7.3.7, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.3, 12.1.2, 12.2.1, 12.2.4, 13.5, 14 Cutting and Patching 3.14, 6.2.5 Damage to Construction of Owner or Separate Contractors 3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3, 12.2.4 Damage to the Work 3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4.1, 11.3.1, 12.2.4 Damages, Claims for 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6 Damages for Delay 6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2 Date of Commencement of the Work, Definition of 8.1.2 Date of Substantial Completion, Definition of 8.1.3 Day, Definition of 8.1.4 Decisions of the Architect 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 15.2, 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4, 9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4, 15.1, 15.2 Decisions to Withhold Certification 9.4.1, 9.5, 9.7, 14.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of 2.3.1, 2.4.1, 3.5.1, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Defective Work, Definition of 3.5.1 Definitions 1.1, 2.1.1, 3.1.1, 3.5.1, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 15.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 8.1, 9.1, 9.8.1 Delays and Extensions of Time 3.2., 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5 Disputes 6.3.1, 7.3.9, 15.1, 15.2 Documents and Samples at the Site 3.11 Drawings, Definition of 1.1.5 Drawings and Specifications, Use and Ownership of 3.11 Effective Date of Insurance 8.2.2, 11.1.2 Emergencies 10.4, 14.1.1.2, 15.1.4 Employees, Contractor’s 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1 Equipment, Labor, Materials or 6f. - Community Services Department recommends approval of a contract with Page 95 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 5 1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Execution and Progress of the Work 1.1.3, 1.2.1, 1.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1, 3.4.1, 3.5.1, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3.1, 15.1.3 Extensions of Time 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4.1, 9.5.1, 9.7.1, 10.3.2, 10.4.1, 14.3, 15.1.5, 15.2.5 Failure of Payment 9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2 Faulty Work (See Defective or Nonconforming Work) Final Completion and Final Payment 4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.3.1, 11.3.5, 12.3.1, 14.2.4, 14.4.3 Financial Arrangements, Owner’s 2.2.1, 13.2.2, 14.1.1.4 Fire and Extended Coverage Insurance 11.3.1.1 GENERAL PROVISIONS 1 Governing Law 13.1 Guarantees (See Warranty) Hazardous Materials 10.2.4, 10.3 Identification of Subcontractors and Suppliers 5.2.1 Indemnification 3.17.1, 3.18, 9.10.2, 10.3.3, 10.3.5, 10.3.6, 11.3.1.2, 11.3.7 Information and Services Required of the Owner 2.1.2, 2.2, 3.2.2, 3.12.4, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Initial Decision 15.2 Initial Decision Maker, Definition of 1.1.8 Initial Decision Maker, Decisions 14.2.2, 14.2.4, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Initial Decision Maker, Extent of Authority 14.2.2, 14.2.4, 15.1.3, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Injury or Damage to Person or Property 10.2.8, 10.4.1 Inspections 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.5 Instructions to Bidders 1.1.1 Instructions to the Contractor 3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2 Instruments of Service, Definition of 1.1.7 Insurance 3.18.1, 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 11 Insurance, Boiler and Machinery 11.3.2 Insurance, Contractor’s Liability 11.1 Insurance, Effective Date of 8.2.2, 11.1.2 Insurance, Loss of Use 11.3.3 Insurance, Owner’s Liability 11.2 Insurance, Property 10.2.5, 11.3 Insurance, Stored Materials 9.3.2, 11.4.1.4 INSURANCE AND BONDS 11 Insurance Companies, Consent to Partial Occupancy 9.9.1, 11.4.1.5 Insurance Companies, Settlement with 11.4.10 Intent of the Contract Documents 1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4 Interest 13.6 Interpretation 1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1 Interpretations, Written 4.2.11, 4.2.12, 15.1.4 Judgment on Final Award 15.4.2 Labor and Materials, Equipment 1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Labor Disputes 8.3.1 Laws and Regulations 1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13.1, 4.1.1, 9.6.4, 9.9.1, 10.2.2, 11.1.1, 11.3, 13.1.1, 13.4, 13.5.1, 13.5.2, 13.6.1, 14, 15.2.8, 15.4 Liens 2.1.2, 9.3.3, 9.10.2, 9.10.4, 15.2.8 Limitations, Statutes of 12.2.5, 13.7, 15.4.1.1 Limitations of Liability 2.3.1, 3.2.2, 3.5.1, 3.12.10, 3.17.1, 3.18.1, 4.2.6, 4.2.7, 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 10.2.5, 10.3.3, 11.1.2, 11.2.1, 11.3.7, 12.2.5, 13.4.2 Limitations of Time 2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7, 5.2, 5.3.1, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2.1, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7.1, 9.8, 9.9, 9.10, 11.1.3, 11.3.1.5, 11.3.6, 11.3.10, 12.2, 13.5, 13.7, 14, 15 Loss of Use Insurance 11.3.3 6f. - Community Services Department recommends approval of a contract with Page 96 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 6 Material Suppliers 1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 Materials, Hazardous 10.2.4, 10.3 Materials, Labor, Equipment and 1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2 Means, Methods, Techniques, Sequences and Procedures of Construction 3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 Mechanic’s Lien 2.1.2, 15.2.8 Mediation 8.3.1, 10.3.5, 10.3.6, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1 Minor Changes in the Work 1.1.1, 3.12.8, 4.2.8, 7.1, 7.4 MISCELLANEOUS PROVISIONS 13 Modifications, Definition of 1.1.1 Modifications to the Contract 1.1.1, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7.1, 10.3.2, 11.3.1 Mutual Responsibility 6.2 Nonconforming Work, Acceptance of 9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of 2.3.1, 2.4.1, 3.5.1, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Notice 2.2.1, 2.3.1, 2.4.1, 3.2.4, 3.3.1, 3.7.2, 3.12.9, 5.2.1, 9.7.1, 9.10, 10.2.2, 11.1.3, 11.4.6, 12.2.2.1, 13.3, 13.5.1, 13.5.2, 14.1, 14.2, 15.2.8, 15.4.1 Notice, Written 2.3.1, 2.4.1, 3.3.1, 3.9.2, 3.12.9, 3.12.10, 5.2.1, 9.7.1, 9.10, 10.2.2, 10.3, 11.1.3, 11.3.6, 12.2.2.1, 13.3, 14, 15.2.8, 15.4.1 Notice of Claims 3.7.4, 4.5, 10.2.8, 15.1.2, 15.4 Notice of Testing and Inspections 13.5.1, 13.5.2 Observations, Contractor’s 3.2, 3.7.4 Occupancy 2.2.2, 9.6.6, 9.8, 11.3.1.5 Orders, Written 1.1.1, 2.3, 3.9.2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1, 13.5.2, 14.3.1 OWNER 2 Owner, Definition of 2.1.1 Owner, Information and Services Required of the 2.1.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.3, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Owner’s Authority 1.5, 2.1.1, 2.3.1, 2.4.1, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3.1, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.3, 11.3.10, 12.2.2, 12.3.1, 13.2.2, 14.3, 14.4, 15.2.7 Owner’s Financial Capability 2.2.1, 13.2.2, 14.1.1.4 Owner’s Liability Insurance 11.2 Owner’s Loss of Use Insurance 11.3.3 Owner’s Relationship with Subcontractors 1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 Owner’s Right to Carry Out the Work 2.4, 14.2.2 Owner’s Right to Clean Up 6.3 Owner’s Right to Perform Construction and to Award Separate Contracts 6.1 Owner’s Right to Stop the Work 2.3 Owner’s Right to Suspend the Work 14.3 Owner’s Right to Terminate the Contract 14.2 Ownership and Use of Drawings, Specifications and Other Instruments of Service 1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, 3.11.1, 3.17.1, 4.2.12, 5.3.1 Partial Occupancy or Use 9.6.6, 9.9, 11.3.1.5 Patching, Cutting and 3.14, 6.2.5 Patents 3.17 Payment, Applications for 4.2.5, 7.3.9, 9.2.1, 9.3, 9.4, 9.5, 9.6.3, 9.7.1, 9.8.5, 9.10.1, 14.2.3, 14.2.4, 14.4.3 Payment, Certificates for 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 13.7, 14.1.1.3, 14.2.4 Payment, Failure of 9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2 Payment, Final 4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.4.1, 11.4.5, 12.3.1, 13.7, 14.2.4, 14.4.3 Payment Bond, Performance Bond and 7.3.7.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Payments, Progress 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 PAYMENTS AND COMPLETION 9 6f. - Community Services Department recommends approval of a contract with Page 97 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 7 Payments to Subcontractors 5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 11.4.8, 14.2.1.2 PCB 10.3.1 Performance Bond and Payment Bond 7.3.7.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Permits, Fees, Notices and Compliance with Laws 2.2.2, 3.7, 3.13, 7.3.7.4, 10.2.2 PERSONS AND PROPERTY, PROTECTION OF 10 Polychlorinated Biphenyl 10.3.1 Product Data, Definition of 3.12.2 Product Data and Samples, Shop Drawings 3.11, 3.12, 4.2.7 Progress and Completion 4.2.2, 8.2, 9.8, 9.9.1, 14.1.4, 15.1.3 Progress Payments 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 Project, Definition of the 1.1.4 Project Representatives 4.2.10 Property Insurance 10.2.5, 11.3 PROTECTION OF PERSONS AND PROPERTY 10 Regulations and Laws 1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 9.9.1, 10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14, 15.2.8, 15.4 Rejection of Work 3.5.1, 4.2.6, 12.2.1 Releases and Waivers of Liens 9.10.2 Representations 3.2.1, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.4.2, 9.5.1, 9.8.2, 9.10.1 Representatives 2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.1, 4.2.2, 4.2.10, 5.1.1, 5.1.2, 13.2.1 Responsibility for Those Performing the Work 3.3.2, 3.18, 4.2.3, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage 9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 Review of Contract Documents and Field Conditions by Contractor 3.2, 3.12.7, 6.1.3 Review of Contractor’s Submittals by Owner and Architect 3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 Review of Shop Drawings, Product Data and Samples by Contractor 3.12 Rights and Remedies 1.1.2, 2.3, 2.4, 3.5.1, 3.7.4, 3.15.2, 4.2.6, 4.5, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.2, 12.2.4, 13.4, 14, 15.4 Royalties, Patents and Copyrights 3.17 Rules and Notices for Arbitration 15.4.1 Safety of Persons and Property 10.2, 10.4 Safety Precautions and Programs 3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.4 Samples, Definition of 3.12.3 Samples, Shop Drawings, Product Data and 3.11, 3.12, 4.2.7 Samples at the Site, Documents and 3.11 Schedule of Values 9.2, 9.3.1 Schedules, Construction 1.4.1.2, 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Separate Contracts and Contractors 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 11.4.7, 12.1.2 Shop Drawings, Definition of 3.12.1 Shop Drawings, Product Data and Samples 3.11, 3.12, 4.2.7 Site, Use of 3.13, 6.1.1, 6.2.1 Site Inspections 3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.4.2, 9.10.1, 13.5 Site Visits, Architect’s 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Special Inspections and Testing 4.2.6, 12.2.1, 13.5 Specifications, Definition of the 1.1.6 Specifications, The 1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, 3.12.10, 3.17, 4.2.14 Statute of Limitations 13.7, 15.4.1.1 Stopping the Work 2.3, 9.7, 10.3, 14.1 Stored Materials 6.2.1, 9.3.2, 10.2.1.2, 10.2.4, 11.4.1.4 Subcontractor, Definition of 5.1.1 SUBCONTRACTORS 5 Subcontractors, Work by 1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7 Subcontractual Relations 5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 11.4.7, 11.4.8, 14.1, 14.2.1 6f. - Community Services Department recommends approval of a contract with Page 98 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 8 Submittals 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 Submittal Schedule 3.10.2, 3.12.5, 4.2.7 Subrogation, Waivers of 6.1.1, 11.4.5, 11.3.7 Substantial Completion 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 13.7 Substantial Completion, Definition of 9.8.1 Substitution of Subcontractors 5.2.3, 5.2.4 Substitution of Architect 4.1.3 Substitutions of Materials 3.4.2, 3.5.1, 7.3.8 Sub-subcontractor, Definition of 5.1.2 Subsurface Conditions 3.7.4 Successors and Assigns 13.2 Superintendent 3.9, 10.2.6 Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.3 Surety 5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2, 15.2.7 Surety, Consent of 9.10.2, 9.10.3 Surveys 2.2.3 Suspension by the Owner for Convenience 14.3 Suspension of the Work 5.4.2, 14.3 Suspension or Termination of the Contract 5.4.1.1, 11.4.9, 14 Taxes 3.6, 3.8.2.1, 7.3.7.4 Termination by the Contractor 14.1, 15.1.6 Termination by the Owner for Cause 5.4.1.1, 14.2, 15.1.6 Termination by the Owner for Convenience 14.4 Termination of the Architect 4.1.3 Termination of the Contractor 14.2.2 TERMINATION OR SUSPENSION OF THE CONTRACT 14 Tests and Inspections 3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 10.3.2, 11.4.1.1, 12.2.1, 13.5 TIME 8 Time, Delays and Extensions of 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5 Time Limits 2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2, 4.4, 4.5, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 11.4.1.5, 11.4.6, 11.4.10, 12.2, 13.5, 13.7, 14, 15.1.2, 15.4 Time Limits on Claims 3.7.4, 10.2.8, 13.7, 15.1.2 Title to Work 9.3.2, 9.3.3 Transmission of Data in Digital Form 1.6 UNCOVERING AND CORRECTION OF WORK 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 7.3.4 Use of Documents 1.1.1, 1.5, 2.2.5, 3.12.6, 5.3 Use of Site 3.13, 6.1.1, 6.2.1 Values, Schedule of 9.2, 9.3.1 Waiver of Claims by the Architect 13.4.2 Waiver of Claims by the Contractor 9.10.5, 11.4.7, 13.4.2, 15.1.6 Waiver of Claims by the Owner 9.9.3, 9.10.3, 9.10.4, 11.4.3, 11.4.5, 11.4.7, 12.2.2.1, 13.4.2, 14.2.4, 15.1.6 Waiver of Consequential Damages 14.2.4, 15.1.6 Waiver of Liens 9.10.2, 9.10.4 Waivers of Subrogation 6.1.1, 11.4.5, 11.3.7 Warranty 3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2, 13.7.1 Weather Delays 15.1.5.2 Work, Definition of 1.1.3 Written Consent 1.5.2, 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.4.1, 13.2, 13.4.2, 15.4.4.2 Written Interpretations 6f. - Community Services Department recommends approval of a contract with Page 99 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 9 4.2.11, 4.2.12 Written Notice 2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3.12.10, 5.2.1, 8.2.2, 9.7, 9.10, 10.2.2, 10.3, 11.1.3, 11.4.6, 12.2.2, 12.2.4, 13.3, 14, 15.4.1 Written Orders 1.1.1, 2.3, 3.9, 7, 8.2.2, 11.4.9, 12.1, 12.2, 13.5.2, 14.3.1, 15.1.2 6f. - Community Services Department recommends approval of a contract with Page 100 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 10 ARTICLE 1 GENERAL PROVISIONS § 1.1 BASIC DEFINITIONS § 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include the advertisement or invitation to bid, Instructions to Bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposals, the Contractor’s bid or proposal, or portions of Addenda relating to bidding requirements. § 1.1.2 THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contractor and the Architect or the Architect’s consultants, (2) between the Owner and a Subcontractor or a Sub-subcontractor, (3) between the Owner and the Architect or the Architect’s consultants or (4) between any persons or entities other than the Owner and the Contractor. The Architect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the Architect’s duties. § 1.1.3 THE WORK The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project. § 1.1.4 THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner and by separate contractors. § 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams. § 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services. § 1.1.7 INSTRUMENTS OF SERVICE Instruments of Service are representations, in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Architect and the Architect’s consultants under their respective professional services agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials. § 1.1.8 INITIAL DECISION MAKER The Initial Decision Maker is the person identified in the Agreement to render initial decisions on Claims in accordance with Section 15.2 and certify termination of the Agreement under Section 14.2.2. § 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results. 6f. - Community Services Department recommends approval of a contract with Page 101 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 11 § 1.2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. § 1.2.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. § 1.3 CAPITALIZATION Terms capitalized in these General Conditions include those that are (1) specifically defined, (2) the titles of numbered articles or (3) the titles of other documents published by the American Institute of Architects. § 1.4 INTERPRETATION In the interest of brevity the Contract Documents frequently omit modifying words such as "all" and "any" and articles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. § 1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE § 1.5.1 The Architect and the Architect’s consultants shall be deemed the authors and owners of their respective Instruments of Service, including the Drawings and Specifications, and will retain all common law, statutory and other reserved rights, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as publication in derogation of the Architect’s or Architect’s consultants’ reserved rights. § 1.5.2 The Contractor, Subcontractors, Sub-subcontractors and material or equipment suppliers are authorized to use and reproduce the Instruments of Service provided to them solely and exclusively for execution of the Work. All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers may not use the Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the specific written consent of the Owner, Architect and the Architect’s consultants. § 1.6 TRANSMISSION OF DATA IN DIGITAL FORM If the parties intend to transmit Instruments of Service or any other information or documentation in digital form, they shall endeavor to establish necessary protocols governing such transmissions, unless otherwise already provided in the Agreement or the Contract Documents. ARTICLE 2 OWNER § 2.1 GENERAL § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner’s approval or authorization. Except as otherwise provided in Section 4.2.1, the Architect does not have such authority. The term "Owner" means the Owner or the Owner’s authorized representative. § 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic’s lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the site, and the Owner’s interest therein. § 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER § 2.2.1 Prior to commencement of the Work, the Contractor may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract. Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments to the Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum; or (3) the Contractor identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or 6f. - Community Services Department recommends approval of a contract with Page 102 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 12 the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. § 2.2.2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents, including those required under Section 3.7.1, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities. § 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. § 2.2.4 The Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control and relevant to the Contractor’s performance of the Work with reasonable promptness after receiving the Contractor’s written request for such information or services. § 2.2.5 Unless otherwise provided in the Contract Documents, the Owner shall furnish to the Contractor one copy of the Contract Documents for purposes of making reproductions pursuant to Section 1.5.2. § 2.3 OWNER’S RIGHT TO STOP THE WORK If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents as required by Section 12.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Section 6.1.3. § 2.4 OWNER’S RIGHT TO CARRY OUT THE WORK If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including Owner’s expenses and compensation for the Architect’s additional services made necessary by such default, neglect or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the Architect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. ARTICLE 3 CONTRACTOR § 3.1 GENERAL § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The Contractor shall be lawfully licensed, if required in the jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have express authority to bind the Contractor with respect to all matters under this Contract. The term "Contractor" means the Contractor or the Contractor’s authorized representative. § 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. § 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect’s administration of the Contract, or by tests, inspections or approvals required or performed by persons or entities other than the Contractor. 6f. - Community Services Department recommends approval of a contract with Page 103 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 13 § 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. § 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing conditions related to that portion of the Work, and shall observe any conditions at the site affecting it. These obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor shall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the Contractor as a request for information in such form as the Architect may require. It is recognized that the Contractor’s review is made in the Contractor’s capacity as a contractor and not as a licensed design professional, unless otherwise specifically provided in the Contract Documents. § 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor shall promptly report to the Architect any nonconformity discovered by or made known to the Contractor as a request for information in such form as the Architect may require. § 3.2.4 If the Contractor believes that additional cost or time is involved because of clarifications or instructions the Architect issues in response to the Contractor’s notices or requests for information pursuant to Sections 3.2.2 or 3.2.3, the Contractor shall make Claims as provided in Article 15. If the Contractor fails to perform the obligations of Sections 3.2.2 or 3.2.3, the Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations. If the Contractor performs those obligations, the Contractor shall not be liable to the Owner or Architect for damages resulting from errors, inconsistencies or omissions in the Contract Documents, for differences between field measurements or conditions and the Contract Documents, or for nonconformities of the Contract Documents to applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities. § 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means, methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the Owner and Architect and shall not proceed with that portion of the Work without further written instructions from the Architect. If the Contractor is then instructed to proceed with the required means, methods, techniques, sequences or procedures without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any loss or damage arising solely from those Owner-required means, methods, techniques, sequences or procedures. § 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor’s employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for, or on behalf of, the Contractor or any of its Subcontractors. § 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work. § 3.4 LABOR AND MATERIALS § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other 6f. - Community Services Department recommends approval of a contract with Page 104 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 14 facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. § 3.4.2 Except in the case of minor changes in the Work authorized by the Architect in accordance with Sections 3.12.8 or 7.4, the Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect and in accordance with a Change Order or Construction Change Directive. § 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them. § 3.5 WARRANTY The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless the Contract Documents require or permit otherwise. The Contractor further warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects, except for those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not conforming to these requirements may be considered defective. The Contractor’s warranty excludes remedy for damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. § 3.6 TAXES The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor that are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. § 3.7 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit as well as for other permits, fees, licenses, and inspections by government agencies necessary for proper execution and completion of the Work that are customarily secured after execution of the Contract and legally required at the time bids are received or negotiations concluded. § 3.7.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to performance of the Work. § 3.7.3 If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction. § 3.7.4 Concealed or Unknown Conditions. If the Contractor encounters conditions at the site that are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, that differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, the Contractor shall promptly provide notice to the Owner and the Architect before conditions are disturbed and in no event later than 21 days after first observance of the conditions. The Architect will promptly investigate such conditions and, if the Architect determines that they differ materially and cause an increase or decrease in the Contractor’s cost of, or time required for, performance of any part of the Work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the Architect shall promptly notify the Owner and Contractor in writing, stating the reasons. If either party disputes the Architect’s determination or recommendation, that party may proceed as provided in Article 15. § 3.7.5 If, in the course of the Work, the Contractor encounters human remains or recognizes the existence of burial markers, archaeological sites or wetlands not indicated in the Contract Documents, the Contractor shall immediately suspend any operations that would affect them and shall notify the Owner and Architect. Upon receipt of such notice, the Owner shall promptly take any action necessary to obtain governmental authorization required to resume 6f. - Community Services Department recommends approval of a contract with Page 105 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 15 the operations. The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but shall continue with all other operations that do not affect those remains or features. Requests for adjustments in the Contract Sum and Contract Time arising from the existence of such remains or features may be made as provided in Article 15. § 3.8 ALLOWANCES § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable objection. § 3.8.2 Unless otherwise provided in the Contract Documents, .1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts; .2 Contractor’s costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; and .3 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor’s costs under Section 3.8.2.2. § 3.8.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness. § 3.9 SUPERINTENDENT § 3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor. § 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the name and qualifications of a proposed superintendent. The Architect may reply within 14 days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to the proposed superintendent or (2) that the Architect requires additional time to review. Failure of the Architect to reply within the 14 day period shall constitute notice of no reasonable objection. § 3.9.3 The Contractor shall not employ a proposed superintendent to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not change the superintendent without the Owner’s consent, which shall not unreasonably be withheld or delayed. § 3.10 CONTRACTOR’S CONSTRUCTION SCHEDULES § 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner’s and Architect’s information a Contractor’s construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work. § 3.10.2 The Contractor shall prepare a submittal schedule, promptly after being awarded the Contract and thereafter as necessary to maintain a current submittal schedule, and shall submit the schedule(s) for the Architect’s approval. The Architect’s approval shall not unreasonably be delayed or withheld. The submittal schedule shall (1) be coordinated with the Contractor’s construction schedule, and (2) allow the Architect reasonable time to review submittals. If the Contractor fails to submit a submittal schedule, the Contractor shall not be entitled to any increase in Contract Sum or extension of Contract Time based on the time required for review of submittals. § 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the Owner and Architect. 6f. - Community Services Department recommends approval of a contract with Page 106 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 16 § 3.11 DOCUMENTS AND SAMPLES AT THE SITE The Contractor shall maintain at the site for the Owner one copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to the Architect and shall be delivered to the Architect for submittal to the Owner upon completion of the Work as a record of the Work as constructed. § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES § 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. § 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work. § 3.12.3 Samples are physical examples that illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. § 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is to demonstrate the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents require submittals. Review by the Architect is subject to the limitations of Section 4.2.7. Informational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents. Submittals that are not required by the Contract Documents may be returned by the Architect without action. § 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and submit to the Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents in accordance with the submittal schedule approved by the Architect or, in the absence of an approved submittal schedule, with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors. § 3.12.6 By submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner and Architect that the Contractor has (1) reviewed and approved them, (2) determined and verified materials, field measurements and field construction criteria related thereto, or will do so and (3) checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. § 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by the Architect. § 3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect’s approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and (1) the Architect has given written approval to the specific deviation as a minor change in the Work, or (2) a Change Order or Construction Change Directive has been issued authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect’s approval thereof. § 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. In the absence of such written notice, the Architect’s approval of a resubmission shall not apply to such revisions. § 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of architecture or engineering unless such services are specifically required by the Contract Documents for a portion of the Work or unless the Contractor needs to provide such services in order to carry out the Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be 6f. - Community Services Department recommends approval of a contract with Page 107 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 17 required to provide professional services in violation of applicable law. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to the Architect. The Owner and the Architect shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or provided by such design professionals, provided the Owner and Architect have specified to the Contractor all performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect will review, approve or take other appropriate action on submittals only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Contractor shall not be responsible for the adequacy of the performance and design criteria specified in the Contract Documents. § 3.13 USE OF SITE The Contractor shall confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably encumber the site with materials or equipment. § 3.14 CUTTING AND PATCHING § 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the condition existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents. § 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor’s consent to cutting or otherwise altering the Work. § 3.15 CLEANING UP § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove waste materials, rubbish, the Contractor’s tools, construction equipment, machinery and surplus materials from and about the Project. § 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner shall be entitled to reimbursement from the Contractor. § 3.16 ACCESS TO WORK The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located. § 3.17 ROYALTIES, PATENTS AND COPYRIGHTS The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, if the Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect. 6f. - Community Services Department recommends approval of a contract with Page 108 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 18 § 3.18 INDEMNIFICATION § 3.18.1 To the fullest extent permitted by law the Contractor shall indemnify and hold harmless the Owner, Architect, Architect’s consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys’ fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), but only to the extent caused by the negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Section 3.18. § 3.18.2 In claims against any person or entity indemnified under this Section 3.18 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts, disability benefit acts or other employee benefit acts. ARTICLE 4 ARCHITECT § 4.1 GENERAL § 4.1.1 The Owner shall retain an architect lawfully licensed to practice architecture or an entity lawfully practicing architecture in the jurisdiction where the Project is located. That person or entity is identified as the Architect in the Agreement and is referred to throughout the Contract Documents as if singular in number. § 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect. Consent shall not be unreasonably withheld. § 4.1.3 If the employment of the Architect is terminated, the Owner shall employ a successor architect as to whom the Contractor has no reasonable objection and whose status under the Contract Documents shall be that of the Architect. § 4.2 ADMINISTRATION OF THE CONTRACT § 4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be an Owner’s representative during construction until the date the Architect issues the final Certificate For Payment. The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents. § 4.2.2 The Architect will visit the site at intervals appropriate to the stage of construction, or as otherwise agreed with the Owner, to become generally familiar with the progress and quality of the portion of the Work completed, and to determine in general if the Work observed is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Architect will not have control over, charge of, or responsibility for, the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work, since these are solely the Contractor’s rights and responsibilities under the Contract Documents, except as provided in Section 3.3.1. § 4.2.3 On the basis of the site visits, the Architect will keep the Owner reasonably informed about the progress and quality of the portion of the Work completed, and report to the Owner (1) known deviations from the Contract Documents and from the most recent construction schedule submitted by the Contractor, and (2) defects and deficiencies observed in the Work. The Architect will not be responsible for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or employees, or any other persons or entities performing portions of the Work. 6f. - Community Services Department recommends approval of a contract with Page 109 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 19 § 4.2.4 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall endeavor to communicate with each other through the Architect about matters arising out of or relating to the Contract. Communications by and with the Architect’s consultants shall be through the Architect. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner. § 4.2.5 Based on the Architect’s evaluations of the Contractor’s Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. § 4.2.6 The Architect has authority to reject Work that does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the Work in accordance with Sections 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees, or other persons or entities performing portions of the Work. § 4.2.7 The Architect will review and approve, or take other appropriate action upon, the Contractor’s submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Architect’s action will be taken in accordance with the submittal schedule approved by the Architect or, in the absence of an approved submittal schedule, with reasonable promptness while allowing sufficient time in the Architect’s professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect’s review of the Contractor’s submittals shall not relieve the Contractor of the obligations under Sections 3.3, 3.5 and 3.12. The Architect’s review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or procedures. The Architect’s approval of a specific item shall not indicate approval of an assembly of which the item is a component. § 4.2.8 The Architect will prepare Change Orders and Construction Change Directives, and may authorize minor changes in the Work as provided in Section 7.4. The Architect will investigate and make determinations and recommendations regarding concealed and unknown conditions as provided in Section 3.7.4. § 4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; issue Certificates of Substantial Completion pursuant to Section 9.8; receive and forward to the Owner, for the Owner’s review and records, written warranties and related documents required by the Contract and assembled by the Contractor pursuant to Section 9.10; and issue a final Certificate for Payment pursuant to Section 9.10. § 4.2.10 If the Owner and Architect agree, the Architect will provide one or more project representatives to assist in carrying out the Architect’s responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives shall be as set forth in an exhibit to be incorporated in the Contract Documents. § 4.2.11 The Architect will interpret and decide matters concerning performance under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Architect’s response to such requests will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. § 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of, and reasonably inferable from, the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and decisions, the Architect will endeavor to secure faithful performance by both Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions rendered in good faith. § 4.2.13 The Architect’s decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Documents. 6f. - Community Services Department recommends approval of a contract with Page 110 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 20 § 4.2.14 The Architect will review and respond to requests for information about the Contract Documents. The Architect’s response to such requests will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. If appropriate, the Architect will prepare and issue supplemental Drawings and Specifications in response to the requests for information. ARTICLE 5 SUBCONTRACTORS § 5.1 DEFINITIONS § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor. § 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub- subcontractor. § 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK § 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Work. The Architect may reply within 14 days to the Contractor in writing stating (1) whether the Owner or the Architect has reasonable objection to any such proposed person or entity or (2) that the Architect requires additional time for review. Failure of the Owner or Architect to reply within the 14 day period shall constitute notice of no reasonable objection. § 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable objection. § 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall propose another to whom the Owner or Architect has no reasonable objection. If the proposed but rejected Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before commencement of the substitute Subcontractor’s Work. However, no increase in the Contract Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. § 5.2.4 The Contractor shall not substitute a Subcontractor, person or entity previously selected if the Owner or Architect makes reasonable objection to such substitution. § 5.3 SUBCONTRACTUAL RELATIONS By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor’s Work, which the Contractor, by these Documents, assumes toward the Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement that may 6f. - Community Services Department recommends approval of a contract with Page 111 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 21 be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors. § 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS § 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided that .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Section 14.2 and only for those subcontract agreements that the Owner accepts by notifying the Subcontractor and Contractor in writing; and .2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the Contract. When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor’s rights and obligations under the subcontract. § 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor’s compensation shall be equitably adjusted for increases in cost resulting from the suspension. § 5.4.3 Upon such assignment to the Owner under this Section 5.4, the Owner may further assign the subcontract to a successor contractor or other entity. If the Owner assigns the subcontract to a successor contractor or other entity, the Owner shall nevertheless remain legally responsible for all of the successor contractor’s obligations under the subcontract. ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15. § 6.1.2 When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Owner-Contractor Agreement. § 6.1.3 The Owner shall provide for coordination of the activities of the Owner’s own forces and of each separate contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separate contractors and the Owner in reviewing their construction schedules. The Contractor shall make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until subsequently revised. § 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner’s own forces, the Owner shall be deemed to be subject to the same obligations and to have the same rights that apply to the Contractor under the Conditions of the Contract, including, without excluding others, those stated in Article 3, this Article 6 and Articles 10, 11 and 12. § 6.2 MUTUAL RESPONSIBILITY § 6.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor’s construction and operations with theirs as required by the Contract Documents. § 6.2.2 If part of the Contractor’s Work depends for proper execution or results upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that 6f. - Community Services Department recommends approval of a contract with Page 112 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 22 the Owner’s or separate contractor’s completed or partially completed construction is fit and proper to receive the Contractor’s Work, except as to defects not then reasonably discoverable. § 6.2.3 The Contractor shall reimburse the Owner for costs the Owner incurs that are payable to a separate contractor because of the Contractor’s delays, improperly timed activities or defective construction. The Owner shall be responsible to the Contractor for costs the Contractor incurs because of a separate contractor’s delays, improperly timed activities, damage to the Work or defective construction. § 6.2.4 The Contractor shall promptly remedy damage the Contractor wrongfully causes to completed or partially completed construction or to property of the Owner, separate contractors as provided in Section 10.2.5. § 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Section 3.14. § 6.3 OWNER’S RIGHT TO CLEAN UP If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the Owner may clean up and the Architect will allocate the cost among those responsible. ARTICLE 7 CHANGES IN THE WORK § 7.1 GENERAL § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. § 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor and Architect; a Construction Change Directive requires agreement by the Owner and Architect and may or may not be agreed to by the Contractor; an order for a minor change in the Work may be issued by the Architect alone. § 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive or order for a minor change in the Work. § 7.2 CHANGE ORDERS § 7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner, Contractor and Architect stating their agreement upon all of the following: .1 The change in the Work; .2 The amount of the adjustment, if any, in the Contract Sum; and .3 The extent of the adjustment, if any, in the Contract Time. § 7.3 CONSTRUCTION CHANGE DIRECTIVES § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusted accordingly. § 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order. § 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be based on one of the following methods: .1 Mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation; .2 Unit prices stated in the Contract Documents or subsequently agreed upon; .3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee; or 6f. - Community Services Department recommends approval of a contract with Page 113 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 23 .4 As provided in Section 7.3.7. § 7.3.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are materially changed in a proposed Change Order or Construction Change Directive so that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted. § 7.3.5 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved and advise the Architect of the Contractor’s agreement or disagreement with the method, if any, provided in the Construction Change Directive for determining the proposed adjustment in the Contract Sum or Contract Time. § 7.3.6 A Construction Change Directive signed by the Contractor indicates the Contractor’s agreement therewith, including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effective immediately and shall be recorded as a Change Order. § 7.3.7 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum, the Architect shall determine the method and the adjustment on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, including, in case of an increase in the Contract Sum, an amount for overhead and profit as set forth in the Agreement, or if no such amount is set forth in the Agreement, a reasonable amount. In such case, and also under Section 7.3.3.3, the Contractor shall keep and present, in such form as the Architect may prescribe, an itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Section 7.3.7 shall be limited to the following: .1 Costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers’ compensation insurance; .2 Costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; .3 Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work; and .5 Additional costs of supervision and field office personnel directly attributable to the change. § 7.3.8 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change that results in a net decrease in the Contract Sum shall be actual net cost as confirmed by the Architect. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change. § 7.3.9 Pending final determination of the total cost of a Construction Change Directive to the Owner, the Contractor may request payment for Work completed under the Construction Change Directive in Applications for Payment. The Architect will make an interim determination for purposes of monthly certification for payment for those costs and certify for payment the amount that the Architect determines, in the Architect’s professional judgment, to be reasonably justified. The Architect’s interim determination of cost shall adjust the Contract Sum on the same basis as a Change Order, subject to the right of either party to disagree and assert a Claim in accordance with Article 15. § 7.3.10 When the Owner and Contractor agree with a determination made by the Architect concerning the adjustments in the Contract Sum and Contract Time, or otherwise reach agreement upon the adjustments, such agreement shall be effective immediately and the Architect will prepare a Change Order. Change Orders may be issued for all or any part of a Construction Change Directive. § 7.4 MINOR CHANGES IN THE WORK The Architect has authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes will be effected by written order signed by the Architect and shall be binding on the Owner and Contractor. 6f. - Community Services Department recommends approval of a contract with Page 114 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 24 ARTICLE 8 TIME § 8.1 DEFINITIONS § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. § 8.1.2 The date of commencement of the Work is the date established in the Agreement. § 8.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Section 9.8. § 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. § 8.2 PROGRESS AND COMPLETION § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work. § 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely commence operations on the site or elsewhere prior to the effective date of insurance required by Article 11 to be furnished by the Contractor and Owner. The date of commencement of the Work shall not be changed by the effective date of such insurance. § 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the Contract Time. § 8.3 DELAYS AND EXTENSIONS OF TIME § 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner; or by changes ordered in the Work; or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the Contractor’s control; or by delay authorized by the Owner pending mediation and arbitration; or by other causes that the Architect determines may justify delay, then the Contract Time shall be extended by Change Order for such reasonable time as the Architect may determine. § 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Article 15. § 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of the Contract Documents. ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 CONTRACT SUM The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. § 9.2 SCHEDULE OF VALUES Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the Contractor shall submit to the Architect, before the first Application for Payment, a schedule of values allocating the entire Contract Sum to the various portions of the Work and prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor’s Applications for Payment. § 9.3 APPLICATIONS FOR PAYMENT § 9.3.1 At least ten days before the date established for each progress payment, the Contractor shall submit to the Architect an itemized Application for Payment prepared in accordance with the schedule of values, if required under Section 9.2., for completed portions of the Work. Such application shall be notarized, if required, and supported by such data substantiating the Contractor’s right to payment as the Owner or Architect may require, such as copies of requisitions from Subcontractors and material suppliers, and shall reflect retainage if provided for in the Contract Documents. 6f. - Community Services Department recommends approval of a contract with Page 115 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 25 § 9.3.1.1 As provided in Section 7.3.9, such applications may include requests for payment on account of changes in the Work that have been properly authorized by Construction Change Directives, or by interim determinations of the Architect, but not yet included in Change Orders. § 9.3.1.2 Applications for Payment shall not include requests for payment for portions of the Work for which the Contractor does not intend to pay a Subcontractor or material supplier, unless such Work has been performed by others whom the Contractor intends to pay. § 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner’s title to such materials and equipment or otherwise protect the Owner’s interest, and shall include the costs of applicable insurance, storage and transportation to the site for such materials and equipment stored off the site. § 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor’s knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. § 9.4 CERTIFICATES FOR PAYMENT § 9.4.1 The Architect will, within seven days after receipt of the Contractor’s Application for Payment, either issue to the Owner a Certificate for Payment, with a copy to the Contractor, for such amount as the Architect determines is properly due, or notify the Contractor and Owner in writing of the Architect’s reasons for withholding certification in whole or in part as provided in Section 9.5.1. § 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner, based on the Architect’s evaluation of the Work and the data comprising the Application for Payment, that, to the best of the Architect’s knowledge, information and belief, the Work has progressed to the point indicated and that the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to correction of minor deviations from the Contract Documents prior to completion and to specific qualifications expressed by the Architect. The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a Certificate for Payment will not be a representation that the Architect has (1) made exhaustive or continuous on- site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor’s right to payment, or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. § 9.5 DECISIONS TO WITHHOLD CERTIFICATION § 9.5.1 The Architect may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to protect the Owner, if in the Architect’s opinion the representations to the Owner required by Section 9.4.2 cannot be made. If the Architect is unable to certify payment in the amount of the Application, the Architect will notify the Contractor and Owner as provided in Section 9.4.1. If the Contractor and Architect cannot agree on a revised amount, the Architect will promptly issue a Certificate for Payment for the amount for which the Architect is able to make such representations to the Owner. The Architect may also withhold a Certificate for Payment or, because of subsequently discovered evidence, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be necessary in the Architect’s opinion to protect the Owner from loss for which the Contractor is responsible, including loss resulting from acts and omissions described in Section 3.3.2, because of .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicating probable filing of such claims unless security acceptable to the Owner is provided by the Contractor; 6f. - Community Services Department recommends approval of a contract with Page 116 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 26 .3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; .4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; .5 damage to the Owner or a separate contractor; .6 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or .7 repeated failure to carry out the Work in accordance with the Contract Documents. § 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts previously withheld. § 9.5.3 If the Architect withholds certification for payment under Section 9.5.1.3, the Owner may, at its sole option, issue joint checks to the Contractor and to any Subcontractor or material or equipment suppliers to whom the Contractor failed to make payment for Work properly performed or material or equipment suitably delivered. If the Owner makes payments by joint check, the Owner shall notify the Architect and the Architect will reflect such payment on the next Certificate for Payment. § 9.6 PROGRESS PAYMENTS § 9.6.1 After the Architect has issued a Certificate for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents, and shall so notify the Architect. § 9.6.2 The Contractor shall pay each Subcontractor no later than seven days after receipt of payment from the Owner the amount to which the Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of the Subcontractor’s portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar manner. § 9.6.3 The Architect will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and action taken thereon by the Architect and Owner on account of portions of the Work done by such Subcontractor. § 9.6.4 The Owner has the right to request written evidence from the Contractor that the Contractor has properly paid Subcontractors and material and equipment suppliers amounts paid by the Owner to the Contractor for subcontracted Work. If the Contractor fails to furnish such evidence within seven days, the Owner shall have the right to contact Subcontractors to ascertain whether they have been properly paid. Neither the Owner nor Architect shall have an obligation to pay or to see to the payment of money to a Subcontractor, except as may otherwise be required by law. § 9.6.5 Contractor payments to material and equipment suppliers shall be treated in a manner similar to that provided in Sections 9.6.2, 9.6.3 and 9.6.4. § 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract Documents. § 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum, payments received by the Contractor for Work properly performed by Subcontractors and suppliers shall be held by the Contractor for those Subcontractors or suppliers who performed Work or furnished materials, or both, under contract with the Contractor for which payment was made by the Owner. Nothing contained herein shall require money to be placed in a separate account and not commingled with money of the Contractor, shall create any fiduciary liability or tort liability on the part of the Contractor for breach of trust or shall entitle any person or entity to an award of punitive damages against the Contractor for breach of the requirements of this provision. § 9.7 FAILURE OF PAYMENT If the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after receipt of the Contractor’s Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount certified by the Architect or awarded by binding dispute resolution, then the Contractor may, upon seven additional days’ written notice to the Owner and Architect, 6f. - Community Services Department recommends approval of a contract with Page 117 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 27 stop the Work until payment of the amount owing has been received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor’s reasonable costs of shut- down, delay and start-up, plus interest as provided for in the Contract Documents. § 9.8 SUBSTANTIAL COMPLETION § 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. § 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Architect a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. § 9.8.3 Upon receipt of the Contractor’s list, the Architect will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Architect’s inspection discloses any item, whether or not included on the Contractor’s list, which is not sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Architect. In such case, the Contractor shall then submit a request for another inspection by the Architect to determine Substantial Completion. § 9.8.4 When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion that shall establish the date of Substantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. § 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate. Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents. § 9.9 PARTIAL OCCUPANCY OR USE § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented to by the insurer as required under Section 11.3.1.5 and authorized by public authorities having jurisdiction over the Project. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and submit a list to the Architect as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement between the Owner and Contractor or, if no agreement is reached, by decision of the Architect. § 9.9.2 Immediately prior to such partial occupancy or use, the Owner, Contractor and Architect shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. § 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute acceptance of Work not complying with the requirements of the Contract Documents. § 9.10 FINAL COMPLETION AND FINAL PAYMENT § 9.10.1 Upon receipt of the Contractor’s written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Architect will promptly make such inspection and, when the 6f. - Community Services Department recommends approval of a contract with Page 118 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 28 Architect finds the Work acceptable under the Contract Documents and the Contract fully performed, the Architect will promptly issue a final Certificate for Payment stating that to the best of the Architect’s knowledge, information and belief, and on the basis of the Architect’s on-site visits and inspections, the Work has been completed in accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor and noted in the final Certificate is due and payable. The Architect’s final Certificate for Payment will constitute a further representation that conditions listed in Section 9.10.2 as precedent to the Contractor’s being entitled to final payment have been fulfilled. § 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner’s property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed to expire until at least 30 days’ prior written notice has been given to the Owner, (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, including all costs and reasonable attorneys’ fees. § 9.10.3 If, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, and the Architect so confirms, the Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by the Contractor to the Architect prior to certification of such payment. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims. § 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from .1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. § 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment. ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 SAFETY PRECAUTIONS AND PROGRAMS The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. § 10.2 SAFETY OF PERSONS AND PROPERTY § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor’s Subcontractors or Sub- subcontractors; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 6f. - Community Services Department recommends approval of a contract with Page 119 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 29 § 10.2.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. § 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. § 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. § 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Sections 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or Architect or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor’s obligations under Section 3.18. § 10.2.6 The Contractor shall designate a responsible member of the Contractor’s organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor’s superintendent unless otherwise designated by the Contractor in writing to the Owner and Architect. § 10.2.7 The Contractor shall not permit any part of the construction or site to be loaded so as to cause damage or create an unsafe condition. § 10.2.8 INJURY OR DAMAGE TO PERSON OR PROPERTY If either party suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter. § 10.3 HAZARDOUS MATERIALS § 10.3.1 The Contractor is responsible for compliance with any requirements included in the Contract Documents regarding hazardous materials. If the Contractor encounters a hazardous material or substance not addressed in the Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to the Owner and Architect in writing. § 10.3.2 Upon receipt of the Contractor’s written notice, the Owner shall obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to cause it to be rendered harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor and Architect the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor and the Architect will promptly reply to the Owner in writing stating whether or not either has reasonable objection to the persons or entities proposed by the Owner. If either the Contractor or Architect has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Contractor and the Architect have no reasonable objection. When the material or substance has been rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. By Change Order, the Contract Time shall be extended appropriately and the Contract Sum shall be increased in the amount of the Contractor’s reasonable additional costs of shut-down, delay and start-up. 6f. - Community Services Department recommends approval of a contract with Page 120 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 30 § 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, Subcontractors, Architect, Architect’s consultants and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys’ fees, arising out of or resulting from performance of the Work in the affected area if in fact the material or substance presents the risk of bodily injury or death as described in Section 10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), except to the extent that such damage, loss or expense is due to the fault or negligence of the party seeking indemnity. § 10.3.4 The Owner shall not be responsible under this Section 10.3 for materials or substances the Contractor brings to the site unless such materials or substances are required by the Contract Documents. The Owner shall be responsible for materials or substances required by the Contract Documents, except to the extent of the Contractor’s fault or negligence in the use and handling of such materials or substances. § 10.3.5 The Contractor shall indemnify the Owner for the cost and expense the Owner incurs (1) for remediation of a material or substance the Contractor brings to the site and negligently handles, or (2) where the Contractor fails to perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner’s fault or negligence. § 10.3.6 If, without negligence on the part of the Contractor, the Contractor is held liable by a government agency for the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by the Contract Documents, the Owner shall indemnify the Contractor for all cost and expense thereby incurred. § 10.4 EMERGENCIES In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor’s discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Article 15 and Article 7. ARTICLE 11 INSURANCE AND BONDS § 11.1 CONTRACTOR’S LIABILITY INSURANCE § 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor’s operations and completed operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: .1 Claims under workers’ compensation, disability benefit and other similar employee benefit acts that are applicable to the Work to be performed; .2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor’s employees; .3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor’s employees; .4 Claims for damages insured by usual personal injury liability coverage; .5 Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; .6 Claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; .7 Claims for bodily injury or property damage arising out of completed operations; and .8 Claims involving contractual liability insurance applicable to the Contractor’s obligations under Section 3.18. § 11.1.2 The insurance required by Section 11.1.1 shall be written for not less than limits of liability specified in the Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from the date of commencement of the Work until the date of final payment and termination of any coverage required to be maintained after final payment, and, with respect to the Contractor’s completed operations coverage, until the expiration of the period for correction 6f. - Community Services Department recommends approval of a contract with Page 121 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 31 of Work or for such other period for maintenance of completed operations coverage as specified in the Contract Documents. § 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work and thereafter upon renewal or replacement of each required policy of insurance. These certificates and the insurance policies required by this Section 11.1 shall contain a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least 30 days’ prior written notice has been given to the Owner. An additional certificate evidencing continuation of liability coverage, including coverage for completed operations, shall be submitted with the final Application for Payment as required by Section 9.10.2 and thereafter upon renewal or replacement of such coverage until the expiration of the time required by Section 11.1.2. Information concerning reduction of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be furnished by the Contractor with reasonable promptness. § 11.1.4 The Contractor shall cause the commercial liability coverage required by the Contract Documents to include (1) the Owner, the Architect and the Architect’s Consultants as additional insureds for claims caused in whole or in part by the Contractor’s negligent acts or omissions during the Contractor’s operations; and (2) the Owner as an additional insured for claims caused in whole or in part by the Contractor’s negligent acts or omissions during the Contractor’s completed operations. § 11.2 OWNER’S LIABILITY INSURANCE The Owner shall be responsible for purchasing and maintaining the Owner’s usual liability insurance. § 11.3 PROPERTY INSURANCE § 11.3.1 Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder’s risk "all-risk" or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract Modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made as provided in Section 9.10 or until no person or entity other than the Owner has an insurable interest in the property required by this Section 11.3 to be covered, whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub- subcontractors in the Project. § 11.3.1.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect’s and Contractor’s services and expenses required as a result of such insured loss. § 11.3.1.2 If the Owner does not intend to purchase such property insurance required by the Contract and with all of the coverages in the amount described above, the Owner shall so inform the Contractor in writing prior to commencement of the Work. The Contractor may then effect insurance that will protect the interests of the Contractor, Subcontractors and Sub-subcontractors in the Work, and by appropriate Change Order the cost thereof shall be charged to the Owner. If the Contractor is damaged by the failure or neglect of the Owner to purchase or maintain insurance as described above, without so notifying the Contractor in writing, then the Owner shall bear all reasonable costs properly attributable thereto. § 11.3.1.3 If the property insurance requires deductibles, the Owner shall pay costs not covered because of such deductibles. § 11.3.1.4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work in transit. § 11.3.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or 6f. - Community Services Department recommends approval of a contract with Page 122 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 32 otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance. § 11.3.2 BOILER AND MACHINERY INSURANCE The Owner shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner; this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub-subcontractors in the Work, and the Owner and Contractor shall be named insureds. § 11.3.3 LOSS OF USE INSURANCE The Owner, at the Owner’s option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owner’s property due to fire or other hazards, however caused. The Owner waives all rights of action against the Contractor for loss of use of the Owner’s property, including consequential losses due to fire or other hazards however caused. § 11.3.4 If the Contractor requests in writing that insurance for risks other than those described herein or other special causes of loss be included in the property insurance policy, the Owner shall, if possible, include such insurance, and the cost thereof shall be charged to the Contractor by appropriate Change Order. § 11.3.5 If during the Project construction period the Owner insures properties, real or personal or both, at or adjacent to the site by property insurance under policies separate from those insuring the Project, or if after final payment property insurance is to be provided on the completed Project through a policy or policies other than those insuring the Project during the construction period, the Owner shall waive all rights in accordance with the terms of Section 11.3.7 for damages caused by fire or other causes of loss covered by this separate property insurance. All separate policies shall provide this waiver of subrogation by endorsement or otherwise. § 11.3.6 Before an exposure to loss may occur, the Owner shall file with the Contractor a copy of each policy that includes insurance coverages required by this Section 11.3. Each policy shall contain all generally applicable conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be canceled or allowed to expire, and that its limits will not be reduced, until at least 30 days’ prior written notice has been given to the Contractor. § 11.3.7 WAIVERS OF SUBROGATION The Owner and Contractor waive all rights against (1) each other and any of their subcontractors, sub- subcontractors, agents and employees, each of the other, and (2) the Architect, Architect’s consultants, separate contractors described in Article 6, if any, and any of their subcontractors, sub-subcontractors, agents and employees, for damages caused by fire or other causes of loss to the extent covered by property insurance obtained pursuant to this Section 11.3 or other property insurance applicable to the Work, except such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the Architect, Architect’s consultants, separate contractors described in Article 6, if any, and the subcontractors, sub- subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for validity, similar waivers each in favor of other parties enumerated herein. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. § 11.3.8 A loss insured under the Owner’s property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Section 11.3.10. The Contractor shall pay Subcontractors their just shares of insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make payments to their Sub-subcontractors in similar manner. § 11.3.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond for proper performance of the Owner’s duties. The cost of required bonds shall be charged against proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the 6f. - Community Services Department recommends approval of a contract with Page 123 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 33 Owner shall distribute in accordance with such agreement as the parties in interest may reach, or as determined in accordance with the method of binding dispute resolution selected in the Agreement between the Owner and Contractor. If after such loss no other special agreement is made and unless the Owner terminates the Contract for convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change in the Work in accordance with Article 7. § 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in interest shall object in writing within five days after occurrence of loss to the Owner’s exercise of this power; if such objection is made, the dispute shall be resolved in the manner selected by the Owner and Contractor as the method of binding dispute resolution in the Agreement. If the Owner and Contractor have selected arbitration as the method of binding dispute resolution, the Owner as fiduciary shall make settlement with insurers or, in the case of a dispute over distribution of insurance proceeds, in accordance with the directions of the arbitrators. § 11.4 PERFORMANCE BOND AND PAYMENT BOND § 11.4.1 The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically required in the Contract Documents on the date of execution of the Contract. § 11.4.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall authorize a copy to be furnished. ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 UNCOVERING OF WORK § 12.1.1 If a portion of the Work is covered contrary to the Architect’s request or to requirements specifically expressed in the Contract Documents, it must, if requested in writing by the Architect, be uncovered for the Architect’s examination and be replaced at the Contractor’s expense without change in the Contract Time. § 12.1.2 If a portion of the Work has been covered that the Architect has not specifically requested to examine prior to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate Change Order, be at the Owner’s expense. If such Work is not in accordance with the Contract Documents, such costs and the cost of correction shall be at the Contractor’s expense unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs. § 12.2 CORRECTION OF WORK § 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated, installed or completed. Costs of correcting such rejected Work, including additional testing and inspections, the cost of uncovering and replacement, and compensation for the Architect’s services and expenses made necessary thereby, shall be at the Contractor’s expense. § 12.2.2 AFTER SUBSTANTIAL COMPLETION § 12.2.2.1 In addition to the Contractor’s obligations under Section 3.5, if, within one year after the date of Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties established under Section 9.9.1, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after discovery of the condition. During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or Architect, the Owner may correct it in accordance with Section 2.4. 6f. - Community Services Department recommends approval of a contract with Page 124 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 34 § 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual completion of that portion of the Work. § 12.2.2.3 The one-year period for correction of Work shall not be extended by corrective Work performed by the Contractor pursuant to this Section 12.2. § 12.2.3 The Contractor shall remove from the site portions of the Work that are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner. § 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor’s correction or removal of Work that is not in accordance with the requirements of the Contract Documents. § 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to other obligations the Contractor has under the Contract Documents. Establishment of the one-year period for correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor’s liability with respect to the Contractor’s obligations other than specifically to correct the Work. § 12.3 ACCEPTANCE OF NONCONFORMING WORK If the Owner prefers to accept Work that is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. ARTICLE 13 MISCELLANEOUS PROVISIONS § 13.1 GOVERNING LAW The Contract shall be governed by the law of the place where the Project is located except that, if the parties have selected arbitration as the method of binding dispute resolution, the Federal Arbitration Act shall govern Section 15.4. § 13.2 SUCCESSORS AND ASSIGNS § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to covenants, agreements and obligations contained in the Contract Documents. Except as provided in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. § 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to a lender providing construction financing for the Project, if the lender assumes the Owner’s rights and obligations under the Contract Documents. The Contractor shall execute all consents reasonably required to facilitate such assignment. § 13.3 WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual, to a member of the firm or entity, or to an officer of the corporation for which it was intended; or if delivered at, or sent by registered or certified mail or by courier service providing proof of delivery to, the last business address known to the party giving notice. § 13.4 RIGHTS AND REMEDIES § 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. § 13.4.2 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach there under, except as may be specifically agreed in writing. 6f. - Community Services Department recommends approval of a contract with Page 125 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 35 § 13.5 TESTS AND INSPECTIONS § 13.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Contract Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspections are to be made so that the Architect may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Contractor. § 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require additional testing, inspection or approval not included under Section 13.5.1, the Architect will, upon written authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so that the Architect may be present for such procedures. Such costs, except as provided in Section 13.5.3, shall be at the Owner’s expense. § 13.5.3 If such procedures for testing, inspection or approval under Sections 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary by such failure including those of repeated procedures and compensation for the Architect’s services and expenses shall be at the Contractor’s expense. § 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Architect. § 13.5.5 If the Architect is to observe tests, inspections or approvals required by the Contract Documents, the Architect will do so promptly and, where practicable, at the normal place of testing. § 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid unreasonable delay in the Work. § 13.6 INTEREST Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. § 13.7 TIME LIMITS ON CLAIMS The Owner and Contractor shall commence all claims and causes of action, whether in contract, tort, breach of warranty or otherwise, against the other arising out of or related to the Contract in accordance with the requirements of the final dispute resolution method selected in the Agreement within the time period specified by applicable law, but in any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and Contractor waive all claims and causes of action not commenced in accordance with this Section 13.7. ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 TERMINATION BY THE CONTRACTOR § 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 consecutive days through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, for any of the following reasons: .1 Issuance of an order of a court or other public authority having jurisdiction that requires all Work to be stopped; .2 An act of government, such as a declaration of national emergency that requires all Work to be stopped; 6f. - Community Services Department recommends approval of a contract with Page 126 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 36 .3 Because the Architect has not issued a Certificate for Payment and has not notified the Contractor of the reason for withholding certification as provided in Section 9.4.1, or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Documents; or .4 The Owner has failed to furnish to the Contractor promptly, upon the Contractor’s request, reasonable evidence as required by Section 2.2.1. § 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, repeated suspensions, delays or interruptions of the entire Work by the Owner as described in Section 14.3 constitute in the aggregate more than 100 percent of the total number of days scheduled for completion, or 120 days in any 365-day period, whichever is less. § 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractor may, upon seven days’ written notice to the Owner and Architect, terminate the Contract and recover from the Owner payment for Work executed, including reasonable overhead and profit, costs incurred by reason of such termination, and damages. § 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor because the Owner has repeatedly failed to fulfill the Owner’s obligations under the Contract Documents with respect to matters important to the progress of the Work, the Contractor may, upon seven additional days’ written notice to the Owner and the Architect, terminate the Contract and recover from the Owner as provided in Section 14.1.3. § 14.2 TERMINATION BY THE OWNER FOR CAUSE § 14.2.1 The Owner may terminate the Contract if the Contractor .1 repeatedly refuses or fails to supply enough properly skilled workers or proper materials; .2 fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; .3 repeatedly disregards applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of a public authority; or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents. § 14.2.2 When any of the above reasons exist, the Owner, upon certification by the Initial Decision Maker that sufficient cause exists to justify such action, may without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor’s surety, if any, seven days’ written notice, terminate employment of the Contractor and may, subject to any prior rights of the surety: .1 Exclude the Contractor from the site and take possession of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor; .2 Accept assignment of subcontracts pursuant to Section 5.4; and .3 Finish the Work by whatever reasonable method the Owner may deem expedient. Upon written request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work. § 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall not be entitled to receive further payment until the Work is finished. § 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Architect’s services and expenses made necessary thereby, and other damages incurred by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damages exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The amount to be paid to the Contractor or Owner, as the case may be, shall be certified by the Initial Decision Maker, upon application, and this obligation for payment shall survive termination of the Contract. § 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE § 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. 6f. - Community Services Department recommends approval of a contract with Page 127 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 37 § 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by suspension, delay or interruption as described in Section 14.3.1. Adjustment of the Contract Sum shall include profit. No adjustment shall be made to the extent .1 that performance is, was or would have been so suspended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of the Contract. § 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE § 14.4.1 The Owner may, at any time, terminate the Contract for the Owner’s convenience and without cause. § 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner’s convenience, the Contractor shall .1 cease operations as directed by the Owner in the notice; .2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work; and .3 except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders. § 14.4.3 In case of such termination for the Owner’s convenience, the Contractor shall be entitled to receive payment for Work executed, and costs incurred by reason of such termination, along with reasonable overhead and profit on the Work not executed. ARTICLE 15 CLAIMS AND DISPUTES § 15.1 CLAIMS § 15.1.1 DEFINITION A Claim is a demand or assertion by one of the parties seeking, as a matter of right, payment of money, or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between the Owner and Contractor arising out of or relating to the Contract. The responsibility to substantiate Claims shall rest with the party making the Claim. § 15.1.2 NOTICE OF CLAIMS Claims by either the Owner or Contractor must be initiated by written notice to the other party and to the Initial Decision Maker with a copy sent to the Architect, if the Architect is not serving as the Initial Decision Maker. Claims by either party must be initiated within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. § 15.1.3 CONTINUING CONTRACT PERFORMANCE Pending final resolution of a Claim, except as otherwise agreed in writing or as provided in Section 9.7 and Article 14, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents. The Architect will prepare Change Orders and issue Certificates for Payment in accordance with the decisions of the Initial Decision Maker. § 15.1.4 CLAIMS FOR ADDITIONAL COST If the Contractor wishes to make a Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Section 10.4. § 15.1.5 CLAIMS FOR ADDITIONAL TIME § 15.1.5.1 If the Contractor wishes to make a Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor’s Claim shall include an estimate of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay, only one Claim is necessary. § 15.1.5.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction. 6f. - Community Services Department recommends approval of a contract with Page 128 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 38 § 15.1.6 CLAIMS FOR CONSEQUENTIAL DAMAGES The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to this Contract. This mutual waiver includes .1 damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; and .2 damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for losses of financing, business and reputation, and for loss of profit except anticipated profit arising directly from the Work. This mutual waiver is applicable, without limitation, to all consequential damages due to either party’s termination in accordance with Article 14. Nothing contained in this Section 15.1.6 shall be deemed to preclude an award of liquidated damages, when applicable, in accordance with the requirements of the Contract Documents. § 15.2 INITIAL DECISION § 15.2.1 Claims, excluding those arising under Sections 10.3, 10.4, 11.3.9, and 11.3.10, shall be referred to the Initial Decision Maker for initial decision. The Architect will serve as the Initial Decision Maker, unless otherwise indicated in the Agreement. Except for those Claims excluded by this Section 15.2.1, an initial decision shall be required as a condition precedent to mediation of any Claim arising prior to the date final payment is due, unless 30 days have passed after the Claim has been referred to the Initial Decision Maker with no decision having been rendered. Unless the Initial Decision Maker and all affected parties agree, the Initial Decision Maker will not decide disputes between the Contractor and persons or entities other than the Owner. § 15.2.2 The Initial Decision Maker will review Claims and within ten days of the receipt of a Claim take one or more of the following actions: (1) request additional supporting data from the claimant or a response with supporting data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) suggest a compromise, or (5) advise the parties that the Initial Decision Maker is unable to resolve the Claim if the Initial Decision Maker lacks sufficient information to evaluate the merits of the Claim or if the Initial Decision Maker concludes that, in the Initial Decision Maker’s sole discretion, it would be inappropriate for the Initial Decision Maker to resolve the Claim. § 15.2.3 In evaluating Claims, the Initial Decision Maker may, but shall not be obligated to, consult with or seek information from either party or from persons with special knowledge or expertise who may assist the Initial Decision Maker in rendering a decision. The Initial Decision Maker may request the Owner to authorize retention of such persons at the Owner’s expense. § 15.2.4 If the Initial Decision Maker requests a party to provide a response to a Claim or to furnish additional supporting data, such party shall respond, within ten days after receipt of such request, and shall either (1) provide a response on the requested supporting data, (2) advise the Initial Decision Maker when the response or supporting data will be furnished or (3) advise the Initial Decision Maker that no supporting data will be furnished. Upon receipt of the response or supporting data, if any, the Initial Decision Maker will either reject or approve the Claim in whole or in part. § 15.2.5 The Initial Decision Maker will render an initial decision approving or rejecting the Claim, or indicating that the Initial Decision Maker is unable to resolve the Claim. This initial decision shall (1) be in writing; (2) state the reasons therefor; and (3) notify the parties and the Architect, if the Architect is not serving as the Initial Decision Maker, of any change in the Contract Sum or Contract Time or both. The initial decision shall be final and binding on the parties but subject to mediation and, if the parties fail to resolve their dispute through mediation, to binding dispute resolution. § 15.2.6 Either party may file for mediation of an initial decision at any time, subject to the terms of Section 15.2.6.1. § 15.2.6.1 Either party may, within 30 days from the date of an initial decision, demand in writing that the other party file for mediation within 60 days of the initial decision. If such a demand is made and the party receiving the demand fails to file for mediation within the time required, then both parties waive their rights to mediate or pursue binding dispute resolution proceedings with respect to the initial decision. 6f. - Community Services Department recommends approval of a contract with Page 129 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 39 § 15.2.7 In the event of a Claim against the Contractor, the Owner may, but is not obligated to, notify the surety, if any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor’s default, the Owner may, but is not obligated to, notify the surety and request the surety’s assistance in resolving the controversy. § 15.2.8 If a Claim relates to or is the subject of a mechanic’s lien, the party asserting such Claim may proceed in accordance with applicable law to comply with the lien notice or filing deadlines. § 15.3 MEDIATION § 15.3.1 Claims, disputes, or other matters in controversy arising out of or related to the Contract except those waived as provided for in Sections 9.10.4, 9.10.5, and 15.1.6 shall be subject to mediation as a condition precedent to binding dispute resolution. § 15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction Industry Mediation Procedures in effect on the date of the Agreement. A request for mediation shall be made in writing, delivered to the other party to the Contract, and filed with the person or entity administering the mediation. The request may be made concurrently with the filing of binding dispute resolution proceedings but, in such event, mediation shall proceed in advance of binding dispute resolution proceedings, which shall be stayed pending mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order. If an arbitration is stayed pursuant to this Section 15.3.2, the parties may nonetheless proceed to the selection of the arbitrator(s) and agree upon a schedule for later proceedings. § 15.3.3 The parties shall share the mediator’s fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. § 15.4 ARBITRATION § 15.4.1 If the parties have selected arbitration as the method for binding dispute resolution in the Agreement, any Claim subject to, but not resolved by, mediation shall be subject to arbitration which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction Industry Arbitration Rules in effect on the date of the Agreement. A demand for arbitration shall be made in writing, delivered to the other party to the Contract, and filed with the person or entity administering the arbitration. The party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitration is permitted to be demanded. § 15.4.1.1 A demand for arbitration shall be made no earlier than concurrently with the filing of a request for mediation, but in no event shall it be made after the date when the institution of legal or equitable proceedings based on the Claim would be barred by the applicable statute of limitations. For statute of limitations purposes, receipt of a written demand for arbitration by the person or entity administering the arbitration shall constitute the institution of legal or equitable proceedings based on the Claim. § 15.4.2 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof. § 15.4.3 The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court having jurisdiction thereof. § 15.4.4 CONSOLIDATION OR JOINDER § 15.4.4.1 Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with any other arbitration to which it is a party provided that (1) the arbitration agreement governing the other arbitration permits consolidation, (2) the arbitrations to be consolidated substantially involve common questions of law or fact, and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s). § 15.4.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a common question of law or fact whose presence is required if complete relief is to be accorded in arbitration, provided that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an 6f. - Community Services Department recommends approval of a contract with Page 130 of 227 Init. / AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 40 additional person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question not described in the written consent. § 15.4.4.3 The Owner and Contractor grant to any person or entity made a party to an arbitration conducted under this Section 15.4, whether by joinder or consolidation, the same rights of joinder and consolidation as the Owner and Contractor under this Agreement. 6f. - Community Services Department recommends approval of a contract with Page 131 of 227 Additions and Deletions Report for AIA ® Document A201TM – 2007 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 13:50:39 on 04/30/2008. Additions and Deletions Report for AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 1 PAGE 1 Teasdale 2 6f. - Community Services Department recommends approval of a contract with Page 132 of 227 AIA Document D401™ – 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:39 on 04/30/2008 under Order No.1000347448_1 which expires on 3/11/2009, and is not for resale. User Notes: (4081387439) 1 Certification of Document’s Authenticity AIA® Document D401™ – 2003 I, Todd Black, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 13:50:39 on 04/30/2008 under Order No. 1000347448_1 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA® Document A201™ – 2007 - General Conditions of the Contract for Construction, as published by the AIA in its software, other than those additions and deletions shown in the associated Additions and Deletions Report. _____________________________________________________________ (Signed) _____________________________________________________________ (Title) _____________________________________________________________ (Dated) 6f. - Community Services Department recommends approval of a contract with Page 133 of 227 SPECIAL CONDITIONS TO THE GENERAL CONDITIONS OF THE CONTRACT A101 Incorporated by reference is the Standard Form of Agreement between the Owner and the Contractor Where the Basis of Payment is a Stipulated Sum, 2007, AlA Document A101, as follows, Articles 1through 9 inclusive. They are included as part of the contract. The Contractor and all subcontractors shall read and be governed by them. AlA Document A101- 2007 will be made available in its entirety to the successful bidder, or any bidder who specifically requests it during the bid period. GENERAL CONDITIONS Incorporated by reference are the General Conditions of the Contract for Construction, 2007, AlA Document A201, as follows, Articles 1through 14 inclusive. They are included as part of the contract. The Contractor and all subcontractors shall read and be governed by them, with enclosed modifications. AlA Document A201- 2007will be made available in its entirety to the successful bidder, or any bidder who specifically requests it during the bid period. SPECIAL CONDITIONS The following supplements modify the "General Conditions of the Contract for Construction", AlA Document A201, 2007 edition, as a part of these Contract Documents. ARTICLE 1- COMPLIANCE WITH WAGE RATES AND FILING OF "INTENT TO PAY PREVAILING WAGES" HEREINAFTER CALLED "INTENT" AND "AFFIDAVIT OF WAGES PAID" 1.1 {(Prevailing Wages on Public Works" -The Contractor and Subcontractors shall comply with 39.12 RCW and amendments "Prevailing Wages on Public Works." The prevailing rate wages to be paid to all workers, laborers, or mechanics employed in the performance of any part of this Contract shall be in accordance therewith. 1.2 Current prevailing wage data will be furnished by the Industrial Statistician upon request. Requests shall be made to the State of Washington Department of Labor and Industries. Wage data is also available at http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp The Contractor is responsible for paying the appropriate wage rates. 1.3 The Contractor, and all Subcontractors, on or before the date of commencement of work, shall file a statement under oath with the City and with the Director of Labor and Industries certifying the rate of hourly wages paid to each classification of laborers, workers, or mechanics 6f. - Community Services Department recommends approval of a contract with Page 134 of 227 employed to perform work under this Contract shall not be less than the prevailing rate of wages determined by the Washington State Labor and Industries. Such statement and any supplemental statements which may be necessary shall be filed in accordance with the practices and procedures required by the Department of Labor and Industries. 1.4 Copies of all 11 1ntents11 shall be on file with the Contractor, the Industrial Statistician, and the City. 1.5 "Affidavits of Wages Paid"- upon completion of project, the Contractor shall fully execute and file 11Affidavit of Wages Paid 11 with the Washington State Department of Labor and Industries and any other agencies required by law. Sample copy enclosed herein. Copies shall be provided to the City prior to Final Completion, Final Payment and release of Retainage. Each affidavit of wages paid must be certified by the Industrial Statistician of the Department of Labor and Industries before it is submitted. 1.6 All costs and fees for and associated with the 11 lntent to Pay Prevailing Wages11 and 11Affidavits of Wages Paid 11 are to be paid by the Contractor. ARTICLE 2 -STATE LICENSING LAW The Contractor agrees to comply with all requirements of Chapter 18.27 RCW. The Contractor agrees and covenants to furnish unto the Owner proper evidence that the Contractor has fully complied with the State Licensing Law of the State of Washington, Chapter 18.27 RCW, and a Contractor's Certificate of Registration shall be in full force and effect throughout the work project herein above enumerated, prior to starting work. ARTICLE 3 -NON-DISCRIMINATION The Contractor shall offer equal opportunity to all qualified employees and applicants for employment without regard to the race, creed, color, sex, national origin, age, or disability. ARTICLE 4- CITY OF RENTON BUSINESS LICENSE Prior to signing a contract the contractor agrees to purchase a City of Renton Business License and maintain the license in full force and effect throughout the work of the project. License may be purchased from the City Finance Department located on the First Floor of the City Hall Building, 1055 South Grady Way, Renton, WA. ARTICLE 5- SITE AND STREET CLEANING Contractors working dump trucks and/or other equipment on paved streets and roadways will be required to clean said streets at the conclusion of each day's operation or as directed by the City. If the area is not properly cleaned or the condition of the excavation warrants or if required by other City or State ordinances or requirements,the Owner shall direct the Contractor to provide facilities to remove clay or other deposits from the tires or between dual wheels before trucks and/or other equipment will be allowed to travel beyond the construction site. 6f. - Community Services Department recommends approval of a contract with Page 135 of 227 Any violation of the above requirements shall be sufficient ground for the Owner to order the area in question cleaned by others, the cost of the operation to be deducted from the Contract amount. It shall be the Contractor's responsibility to control dust at the construction site by watering as required or as directed by the Owner. All costs in connection with the above work shall be considered as incidental to the construction, and payment shall be considered to be included in the prices bid for the various items comprising this improvement. ARTICLE 6- PERFORMANCE BOND (CONTRACTOR'S CONTRACT BOND): The Contractor shall execute and deliver to the Owner a bond on the form included in this Contract Documents, with an approved surety company, as surety in the sum of the full amount of the contract price including the Washington State Sales Tax, in compliance with the Revised Codes of Washington, and any amendments thereto. The bond shall also guarantee the Contractor's material and workmanship on the project for a period of one (1) year from the date of the issuance of his Certificate of Substantial Completion by the Architect. ARTICLE 7- TRAFFIC SAFETY AND STREET USE: The Contractor shall be responsible for the provision of barricades and the safety guards and any other structures of improvement necessary for the complete protection of the public or workers including traffic study requirements as directed by the City in consultation with the Public Works and Police Departments. The Contractor shall further abide by all rules and regulations of OSHA as amended or supplemented by WISHA. Contractor shall be responsible for any permits required due to construction activity or staging in the public right-of-way including, but not limited to, traffic control and flaggers as required by City Public Works Department. All costs in connection with the above work shall be considered as incidental to the construction,and payment shall be considered to be included in the prices bid for the various items comprising this improvement. ARTICLE 8- PERMITS: It shall be the Contractor's responsibility to apply for and pay for the building and electrical permits and to secure all other Municipal,County, or State permits and licenses necessary or incident to the actual performance of the work under this Contract that have not been addressed in the contract documents, and shall, during the work progress,comply with all laws, ordinances, and governmental regulations pertaining to carrying out of the work. 6f. - Community Services Department recommends approval of a contract with Page 136 of 227 6f. - Community Services Department recommends approval of a contract with Page 137 of 227 6f. - Community Services Department recommends approval of a contract with Page 138 of 227 6f. - Community Services Department recommends approval of a contract with Page 139 of 227 6f. - Community Services Department recommends approval of a contract with Page 140 of 227 6f. - Community Services Department recommends approval of a contract with Page 141 of 227 6f. - Community Services Department recommends approval of a contract with Page 142 of 227 6f. - Community Services Department recommends approval of a contract with Page 143 of 227 6f. - Community Services Department recommends approval of a contract with Page 144 of 227 6f. - Community Services Department recommends approval of a contract with Page 145 of 227 6f. - Community Services Department recommends approval of a contract with Page 146 of 227 6f. - Community Services Department recommends approval of a contract with Page 147 of 227 6f. - Community Services Department recommends approval of a contract with Page 148 of 227 6f. - Community Services Department recommends approval of a contract with Page 149 of 227 6f. - Community Services Department recommends approval of a contract with Page 150 of 227 6f. - Community Services Department recommends approval of a contract with Page 151 of 227 6f. - Community Services Department recommends approval of a contract with Page 152 of 227 6f. - Community Services Department recommends approval of a contract with Page 153 of 227 6f. - Community Services Department recommends approval of a contract with Page 154 of 227 6f. - Community Services Department recommends approval of a contract with Page 155 of 227 6f. - Community Services Department recommends approval of a contract with Page 156 of 227 6f. - Community Services Department recommends approval of a contract with Page 157 of 227 6f. - Community Services Department recommends approval of a contract with Page 158 of 227 6f. - Community Services Department recommends approval of a contract with Page 159 of 227 6f. - Community Services Department recommends approval of a contract with Page 160 of 227 6f. - Community Services Department recommends approval of a contract with Page 161 of 227 6f. - Community Services Department recommends approval of a contract with Page 162 of 227 6f. - Community Services Department recommends approval of a contract with Page 163 of 227 6f. - Community Services Department recommends approval of a contract with Page 164 of 227 6f. - Community Services Department recommends approval of a contract with Page 165 of 227 6f. - Community Services Department recommends approval of a contract with Page 166 of 227 6f. - Community Services Department recommends approval of a contract with Page 167 of 227 6f. - Community Services Department recommends approval of a contract with Page 168 of 227 6f. - Community Services Department recommends approval of a contract with Page 169 of 227 6f. - Community Services Department recommends approval of a contract with Page 170 of 227 6f. - Community Services Department recommends approval of a contract with Page 171 of 227 6f. - Community Services Department recommends approval of a contract with Page 172 of 227 6f. - Community Services Department recommends approval of a contract with Page 173 of 227 6f. - Community Services Department recommends approval of a contract with Page 174 of 227 6f. - Community Services Department recommends approval of a contract with Page 175 of 227 6f. - Community Services Department recommends approval of a contract with Page 176 of 227 6f. - Community Services Department recommends approval of a contract with Page 177 of 227 6f. - Community Services Department recommends approval of a contract with Page 178 of 227 6f. - Community Services Department recommends approval of a contract with Page 179 of 227 6f. - Community Services Department recommends approval of a contract with Page 180 of 227 6f. - Community Services Department recommends approval of a contract with Page 181 of 227 6f. - Community Services Department recommends approval of a contract with Page 182 of 227 6f. - Community Services Department recommends approval of a contract with Page 183 of 227 6f. - Community Services Department recommends approval of a contract with Page 184 of 227 6f. - Community Services Department recommends approval of a contract with Page 185 of 227 6f. - Community Services Department recommends approval of a contract with Page 186 of 227 6f. - Community Services Department recommends approval of a contract with Page 187 of 227 6f. - Community Services Department recommends approval of a contract with Page 188 of 227 6f. - Community Services Department recommends approval of a contract with Page 189 of 227 6f. - Community Services Department recommends approval of a contract with Page 190 of 227 6f. - Community Services Department recommends approval of a contract with Page 191 of 227 6f. - Community Services Department recommends approval of a contract with Page 192 of 227 RFQ RESULTS SUMMARY City of Renton - Parks Planning & Natural Resources Project: Cedar River Gabion Repair 9-May-14 Bidder Base Bid WSST Total Gary Harper Construction, Inc. $ 260,344.00 $ 24,732.68 Jansen Inc. $ 175,730.00 $ 16,694.35 Road Construction NW, Inc. $ 184,940.00 $ 17,569.30 $ 285,076.68 $ 192,424.35 $ 202,509.30 6f. - Community Services Department recommends approval of a contract with Page 193 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Joint Interlocal Agreement for HOME Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Issue Paper Joint Agreement Resolution Submitting Data: Dept/Div/Board: Community Services Staff Contact: Karen Bergsvik, #6652 Recommended Action: Council Concur Fiscal Impact: Expenditure Required: $ N/A Transfer Amendment: $N/A Amount Budgeted: $ N/A Revenue Generated: $N/A Total Project Budget: $ N/A City Share Total Project: $ N/A SUMMARY OF ACTION: The City of Renton currently participates in the King County Consortium, for the purpose of receiving and allocating HOME funds. The three year interlocal agreement for 2015-2017 is up for renewal. Local jurisdictions eligible for at least $500,000 can get their allocation directly. There are no cities in King County that meet that threshold so this Agreement allows the cities to pool their funding with King county to meet the threshold. The Joint Recommendations Committee (JRC) makes recommendations to the King County Executive as to how the funds are spent. The cities of Renton, Shoreline, and Redmond have tow rotating representatives on the JRC, and Terry Higashiyama, the Community Services Administrator, is currently serving on it. STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to sign the HOME interlocal agreement. 6g. - Community Services Department recommends approval of a joint interlocal Page 194 of 227 H:\Human Services/ COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE:June 5, 2014 TO:Don Persson, Council President Members of Renton City Council VIA:Denis Law, Mayor FROM:Terry Higashiyama, Community Services Administrator STAFF CONTACT:Karen Bergsvik, Human Services Manager, Ext. 6652 SUBJECT:Interlocal Agreements with King County for Home Investment Partnership Program (HOME) ISSUE: Should the City of Renton continue to participate in the Interlocal Cooperation Agreement with King County for Home Investments Partnership Program? RECOMMENDATION: Authorize the Mayor to execute the proposed Interlocal Cooperation Agreement. BACKGROUND SUMMARY: It is a Federal Block Grant to state and local governments to create affordable housing for low income households, or provide direct rental assistance to low-income people. Program funds are allocated on a formula that considers the relative inadequacy of each jurisdictions housing supply, its incidence of poverty and other factors. Local jurisdictions eligible for at least $500,000 can get their allocation directly. There are no cities in King County that meet that threshold so this Agreement allows the cities to pool their funding with King County to meet the threshold. The pooled funds in King County totaled $2,300,000 in 2014. HOME holds a competitive application process in the fall to allocate HOME funds along with Veteran and Human Services Levy funds, Regional Affordable Housing Program (RAHP funds), and Housing Innovations for Persons with Developmental Disabilities funds. In 2013 the Renton Housing Authority was allocated $1,750,000 funds from HOME for the Townhouse Project. La Fortuna, Habitat’s project in Renton was allocated $800,000 for the Kirkland townhouses, and in 2011 got $1,900,000 for the Glennwood townhouses. Wonderland Estates, owned by King County Housing Authority, and La Fortuna (Habitat for Humanity) were allocated a combined $2,330,000 in 2010. 6g. - Community Services Department recommends approval of a joint interlocal Page 195 of 227 Terri Briere, Council President Members of Renton City Council Page 2 of 2 July 25, 2011 CONCLUSION Renton does not have the option of receiving HOME funds directly; it has to participate in the King County Consortium. Renewing this Interlocal Agreement will allow that to happen. cc:Jay Covington, Chief Administrative Officer Larry Warren, City Attorney Garmon Newson, Assistant City Attorney Iwen Wang, Administrator Finance/IS 6g. - Community Services Department recommends approval of a joint interlocal Page 196 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 197 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 198 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 199 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 200 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 201 of 227 6g. - Community Services Department recommends approval of a joint interlocal Page 202 of 227 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. ________ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER THE CITY OF RENTON INTO AN INTERLOCAL AGREEMENT WITH KING COUNTY ENTITLED “HOME INVESTMENT PARTNERSHIPS PROGRAM INTERLOCAL COOPERATION AGREEMENT”. WHEREAS, King County is an urban county, as defined by 24 CFR 92.2 and 24 CFR 570.3; and WHEREAS, a unit of general local government that is located within in an urban county may be part of a HOME consortium only through the urban county; and WHEREAS, Renton and King County agree that it is mutually desirable and beneficial to enter into a consortium arrangement for purposes of the HOME Investment Partnerships Program, hereinafter referred to as "HOME Program"; and WHEREAS, it is necessary to document the terms and conditions of the consortium arrangement; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above recitals are found to be true and correct in all respects. SECTION II. The Mayor and City Clerk are authorized to enter the City of Renton into an interlocal agreement with King County entitled “Home Investment Partnerships Program Interlocal Cooperation Agreement”. 6g. - Community Services Department recommends approval of a joint interlocal Page 203 of 227 RESOLUTION NO. _______ 2 PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2014. ______________________________ Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this ______ day of _____________________, 2014. ______________________________ Denis Law, Mayor Approved as to form: ______________________________ Lawrence J. Warren, City Attorney RES.16340:6/6/14:scr 6g. - Community Services Department recommends approval of a joint interlocal Page 204 of 227 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Conversion of a Fire Department Fire Lieutenant Position Meeting: Regular Meeting - 16 Jun 2014 Exhibits: Issue Paper Exhibit A Exhibit B Submitting Data: Dept/Div/Board: Fire & Emergency Services Staff Contact: Mark Peterson, Fire Chief Recommended Action: Refer to Finance Committee Fiscal Impact: Expenditure Required: $ $56,938.00 (base salary) Transfer Amendment: $NA Amount Budgeted: $ $50,386.00 (base salary)Revenue Generated: $NA Total Project Budget: $ $6,552.00 (base salary)City Share Total Project: $ NA SUMMARY OF ACTION: Due to the level of authority required to manage health and wellness programs, products and services commensurate with the requirements of the Fire Department, it is recommended that a Fire Lieutenant (f71) position be converted to a Fire Captain (f72) position. The high costs associated with injuries in the fire service warrant the need for training that specifically focuses on injury and time loss prevention. The purpose for this position is to reduce line of duty injuries and decrease both backfill and injury costs through evaluation and proper training. On the job injury costs will be reduced with an approximate savings of 20% in a three year period. STAFF RECOMMENDATION: Approve conversion of a Fire Lieutenant position to a Fire Captain position. 6h. - Fire & Emergency Services Department requests authorization to Page 205 of 227 FIRE & EMERGENCY SERVICES DEPARTMENT M E M O R A N D U M DATE:June 9, 2014 TO:Don Persson, Council President Members of Renton City Council VIA:Denis Law, Mayor FROM:Mark Peterson, Fire Chief/Emergency Services Administrator STAFF CONTACT:Mark Peterson, Fire Chief/Emergency Services Administrator SUBJECT:Conversion of Fire Department Lieutenant Position ISSUE: Should the City convert a Fire Lieutenant position in the Fire Department to a Fire Captain position? BACKGROUND: The Fire Department currently has a budgeted Fire Lieutenant position. The Fire Lieutenant cannot make certain decisions that could be made by a Fire Captain. In situations where issues exceed the Fire Lieutenant’s ability, recommendations need to be made to an officer of higher authority. A Fire Captain has a higher level of authority to manage programs, products and services commensurate with the requirements of the department. In working with Battalion Chiefs, directors and above on high profile projects, a Fire Captain has the authority to say “yes” or “no.” He is able to hold staff accountable without getting the Deputy Chief involved. Due to the high costs associated with injuries in the fire service, there is a need for training that specifically focuses on injury and time loss prevention. In conjunction with the duties and tasks required of a Fire Captain, this position will evaluate and investigate on the job injury cause, and determine what steps can be taken to prevent future mishaps and minimize time loss. A fitness component will be administered to address new hire and existing employee training. The wellness component will focus on insuring that employees returning to duty are provided with a fitness prescription. The Health and Wellness Captain (Exhibit B) will work with the individuals as an advocate to expedite their return to work. Injury prevention components will focus on functional movement training and proper lifting techniques applicable to firefighter safety and longevity. COST: Replace the Fire Lieutenant with a Fire Captain, resulting in a $6,552.00 (base salary) increase to budget in 2014. This increase will be absorbed through the reduction of injuries by providing programs and services that focus on accident prevention and longevity. 6h. - Fire & Emergency Services Department requests authorization to Page 206 of 227 Don Persson, Council President Page 2 of 2 June 9, 2014 Some of the highest costs associated with firefighter Injuries, include shoulder, back, knee and hip, possibly spanning over an undetermined period of time. Individuals may attempt to reopen a claim up to seven years from closure by their physician submitting an application to L&I. In some cases monetary awards are paid out to individuals who have suffered deficiencies and may not be 100% whole. The highest costs to the city are on the job injuries when a worker can no longer work and overtime replacement is necessary. This position will create a culture of safe practices which will determine circumstances leading up to all events, understand the causes and provide preventative recommendations for all occurrences. There will be a reduction in backfill costs to the city when the numbers of injuries are minimized. Actual costs related to five (5) Firefighter Injuries in 2013-2014 are indicated on the attached Exhibit A. These claims are currently still open. RECOMMENDATION: Staff recommends Council approve the conversion of one Fire Lieutenant position to a Fire Captain position for a higher level of authority and decision making in order to address and reduce the prevention of on the job injuries by providing adequate fitness programs and training. 6h. - Fire & Emergency Services Department requests authorization to Page 207 of 227 Exhibit A Firefighter A - Sustained a shoulder injury. Paid time loss to date: $15,835.04 Paid medical $18,312.11 Back Fill Costs: $13,589.28 Total costs to date: $47,736.43 Firefighter B - Sustained a back injury. Paid time loss to date: $26,476.80 Paid medical $7,455.43 Back Fill Costs: $8,171.04 Total costs to date: $42,103.27 Firefighter C - Sustained a knee injury. Paid time loss to date: $16,340.89 Paid medical $6,136.83 Back Fill Costs: $22,232.88 Total costs to date: $44,710.60 Firefighter D - Sustained a back injury. Paid time loss to date: $295.74 Paid medical $3,477.43 No back fill costs. Total costs to date: $3,773.17 Firefighter E - Sustained a hip injury. Paid time loss to date; $15,044.87 Paid medical $10,462.95 Back fill costs: $6,019.20 Total costs to date: $31,527.02 Total cost of injuries above:$169,850.49 Calculations based on: Average Officer OT rate per hr. $73.47 Average Firefighter OT rate per hr. $51.93 Average Firefighter STOT rate per hr. $37.73 Note: Paid time and paid medical losses were figures provided by Human Resources on 5-27-14. All claims may continue to incur costs. These costs are based on hourly averages. 6h. - Fire & Emergency Services Department requests authorization to Page 208 of 227 Exhibit B Health and Wellness Captain Assignment Description Injury Cause and Effects Review current and past injury reports to determine those injuries that are causing the most time loss for the organization. Determine, if possible, the cause and effect of these injuries specific to Renton FD. Determine the actual dollar loss amount paid in the past five years. Create direct solutions to prevent or minimize the time loss due to these injuries. Fitness Component Create fitness programs that address the prevention of targeted time loss injuries. Create fitness programs for at risk employees. Create a cultural change within the organization regarding fitness for duty and injury prevention. o New Hire Fitness Training o Existing Employee Fitness Training Wellness Component Scheduling of all annual medical physicals, hearing tests, immunizations, and specialize medical physicals (Haz-Mat, Dive). Provide light duty fitness prescriptions to assist employees in returning to work. Provide re-training fitness prescriptions to assist employees returning to operations from other work assignments. Provide individual fitness prescriptions to those individuals requesting assistance. Research and make recommendations regarding the combat challenge and the injuries associated with participation. Injury Prevention Components Functional Movement Training Nutrition Lifting Stretching Hydration Prevention Program Delivery On-line Training Programs Classroom Training Programs Emphasis Training 6h. - Fire & Emergency Services Department requests authorization to Page 209 of 227 8a. - Interlocal agreement with King County regarding HOME Investment Page 210 of 227 8a. - Interlocal agreement with King County regarding HOME Investment Page 211 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 212 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 213 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 214 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 215 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 216 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 217 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 218 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 219 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 220 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 221 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 222 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 223 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 224 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 225 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 226 of 227 8a. - Amend RMC 9-5, Latercomer's Agreements (See 7.b.) Page 227 of 227