HomeMy WebLinkAboutM_Construction Cost Estimate_170815_v1Opinion of Construction Cost
Vantage Glen 17-030
Prepared 8-2-17 by Innova Architects
Description of Work Quantity Units Unit Cost Total
6" PVC (to include trenching and backfill)378 LF 45.00$ 17,010.00$
10" PVC (to include trenching and backfill)226 LF 55.00$ 12,430.00$
Sawcut 275 LF 2.50$ 687.50$
Asphalt Patching 34 TON 80.00$ 2,720.00$
Cleanouts 21 EACH 250.00$ 5,250.00$
Connect to Existing 1 EACH 600.00$ 600.00$
Catch Basins 2 EACH 1,500.00$ 3,000.00$
Catch Basin Protection 3 EACH 55.00$ 165.00$
Curb (removal and replacement)55 LF 40.00$ 2,200.00$
Stormwater Subtotal 38,455.00$
Roadway Subtotal 5,607.50$
Total of Improvements 44,062.50$