Loading...
HomeMy WebLinkAboutVantage Glen Construction Costs (002)Opinion of Construction Cost Vantage Glen 17-030 Prepared 8-2-17 by Innove Architects Description of Work 8" PVC (to include trenching and backfill) 10" PVC (to include trenching and backfill) Sawcut Asphalt Patching Cleanouts Connect to Existing Catch Basins Catch Basin Protection Curb (removal and replacement) Stormwater Subtotal Roadway Subtotal Total of Improvements Quantity 378 226 275 34 21 1 2 3 55 Units LF LF LF TON EACH EACH EACH EACH LF Unit Cost 45 55 2.5 80 250 600 1500 55 40 Total 17010 12430 687.5 2720 5250 600 3000 165 2200 38455 5607.5 44062.5