HomeMy WebLinkAboutVantage Glen Construction Costs (002)Opinion of Construction Cost
Vantage Glen 17-030
Prepared 8-2-17 by Innove Architects
Description of Work
8" PVC (to include trenching and backfill)
10" PVC (to include trenching and backfill)
Sawcut
Asphalt Patching
Cleanouts
Connect to Existing
Catch Basins
Catch Basin Protection
Curb (removal and replacement)
Stormwater Subtotal
Roadway Subtotal
Total of Improvements
Quantity
378
226
275
34
21
1
2
3
55
Units
LF
LF
LF
TON
EACH
EACH
EACH
EACH
LF
Unit Cost
45
55
2.5
80
250
600
1500
55
40
Total
17010
12430
687.5
2720
5250
600
3000
165
2200
38455
5607.5
44062.5