Loading...
HomeMy WebLinkAboutVantage Glen Construction Costs_171121Opinion of Construction Cost Vantage Glen 17-030 Prepared 11-21-17 by Innova Architects Description of Work Quantity Units Unit Cost Total 6" PVC (to include trenching and backfill)397 LF 35.00$ 13,895.00$ 8" PVC (to include trenching and backfill)18 LF 45.00$ 810.00$ 10" PVC (to include trenching and backfill)225 LF 55.00$ 12,375.00$ Sawcut 275 LF 2.50$ 687.50$ Asphalt Patching 34 TON 80.00$ 2,720.00$ Cleanouts 24 EACH 250.00$ 6,000.00$ Connect to Existing 1 EACH 600.00$ 600.00$ Catch Basins 3 EACH 1,500.00$ 4,500.00$ Catch Basin Protection 4 EACH 55.00$ 220.00$ Curb (removal and replacement)78 LF 40.00$ 3,120.00$ Stormwater Subtotal 24,505.00$ Roadway Subtotal 6,527.50$ Total of Improvements 31,032.50$