Loading...
HomeMy WebLinkAboutSECO Banner Traffic Control PlanReset FormPrint Form LkWashingtonBlvd.Sidew al k SidewalkSidewalkSidewalkSidewalkA B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face Date:10/6/2017Author:Chris BarransComments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com Job Notes *All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits andegresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas*Police Officer on-site if necessary *Flagger/s and spotter/s to assist pedestrians throughout each work zone*"28 cones required *Sidewalk closure signage to be taken down after working hours *ADA pedestrian accommodations must be addressed and considered for all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior toimplementing any closures. *Signage to be moved with each work zone as completed VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017Hours:TBD Legend Cone RS-031 Bus Stop Spotter ROADWORKAHEAD W20-1 road work ahead RIGHT LANECLOSEDAHEAD W20-5 right lane closed ahead W4-2 road narrows Work Area NE Park D r Park Ave N VECA Project (Lake WA Blvd.) X Pole location 1 2 3 123W4-2 ROADWORKAHEAD W20-1 RIGHT LANECLOSEDAHEAD W20-5 X Spotter to assist pedestrians www.invarion.com LkWashingtonBlvd.Sidew al k SidewalkSidewalkSidewalkSidewalkA B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face Date:10/6/2017Author:Chris BarransComments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com Job Notes *All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits andegresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas*Police Officer on-site if necessary *Flagger/s and spotter/s to assist pedestrians throughout each work zone*"28 cones required *Sidewalk closure signage to be taken down after working hours *ADA pedestrian accommodations must be addressed and considered for all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior toimplementing any closures. *Signage to be moved with each work zone as completed VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017Hours:TBD Legend BIKESMERGEWITH TRAFFIC Bikes merge with traffic Cone SLOWSTOP Flagger/spotter RS-031 Bus Stop ROADWORKAHEAD W20-1 road work ahead W20-7a flagger BE PREPAREDTO STOP W20-7b be prepared to stop Work Area NE Park D r Park Ave N VECA Project (Lake WA Blvd.) X X Pole locationsBIKESMERGEWITH TRAFFIC 1 2 3 ROADWORKAHEAD W20-1 BE PREPAREDTO STOP W20-7bW20-7a 123 SLOWSTOP X ROAD WORKAHEAD W20-1 ROADWORKAHEAD W20-1 Flagger to assist with pedestrians www.invarion.com A B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face Date:10/6/2017Author:Chris BarransComments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017Hours:TBD VECA Project (Lake WA Blvd.)LkWashingtonBlvd.Sidew al k Sidewalk NE Park D r Job Notes*All signs and spacing to conform to the MUTCD and City of Renton in street manual*All sidewalks, driveways, exits and egresses shall be clear unless otherwise indicated*Alert all businesses affected by construction *No Parking signs shall be placed 72 hours in advance if necessaryof work, and placed in/or around possible work zone areas *Police Officer on-site if necessary *Flagger/s and spotter/s to assist pedestrians throughout each work zone*"28 cones required *Sidewalk closure signage to be taken down after working hours*ADA pedestrian accommodations must be addressed and considered for all work operations. Existing ADA facilities must be maintained.*Contact and coordinate impacted transit agencies prior to implementing any closures.*Signage to be moved with each work zone as completed X 1 2 3 X Pole location W4-2 ROADWORKAHEAD W20-1 RIGHT LANECLOSEDAHEAD W20-512 3 Legend Arrowboard (Single) Cone RS-031 Bus Stop Spotter ROADWORKAHEAD W20-1 road work ahead RIGHT LANECLOSEDAHEAD W20-5 right lane closed ahead W4-2 road narrows Work Area Spotter to assist pedestrians www.invarion.com R RX R R XR RXSidewalkSidewalk Date:10/6/2017Author:Chris BarransComments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle [D] 206.696.7440ariana.corpuz@veca.comwww.veca.com 24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK: Banner hanging Project Date: 10/16/2017Hours:TBD Job Notes*All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits and egresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas*Police Officer on-site if necessary *Flagger/s and spotter/s to assist pedestrians throughout each work zone*"28 cones required *Sidewalk closure signage to be taken down after working hours*ADA pedestrian accommodations must be addressed and considered for all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior to implementing any closures. *Signage to be moved with each work zone as completed A B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face VECA Project (Lake WA Blvd.)LkWashi n gtonBlvdCoulonBeachAcr dHouser Way NSidewalkX 1 1 2 2 3 3 ROADWORKAHEAD W20-1 BE PREPAREDTO STOP W20-7b W20-7a ROADWORKAHEAD W20-1 BE PREPAREDTO STOP W20-7b W20-7a 1 2 3 ROADWORKAHEAD W20-1 BE PREPAREDTO STOP W20-7b W20-7a 1 2 3 SLOWSTOP Legend BE PREPAREDTO STOP W20-7b Be prepared to stop W20-7b BIKESMERGEWITH TRAFFIC Bikes merge with traffic SLOWSTOP Flagger W20-7a Flagger W20-7a ROADWORKAHEAD W20-1 Road work ahead W20-1 Work Area Police officer to control intersection with light turned to blinking red advisory X X Pole location Pole location BIKESMERGEWITH TRAFFIC www.invarion.com VECA Project (Lake WA Blvd.) Date:10/6/2017Author:Chris Barrans Comments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com 24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017 Hours:TBD Job Notes *All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits andegresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas *Police Officer on-site if necessary*Flagger/s and spotter/s to assist pedestrians throughout each work zone *"28 cones required*Sidewalk closure signage to be taken down after working hours *ADA pedestrian accommodations must be addressed and consideredfor all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior toimplementing any closures. *Signage to be moved with each work zone as completed A B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face X X Si d e w a l k Southport Gene Coulon Memorial Park conn e ct s t o C o ulo n B e ach Pr k Dr W20-7a ONE LANEROADAHEAD W20-4 ONE LANEROADAHEAD W20-4 W20-7a ROAD WORKAHEAD W20-1 ROAD WORKAHEAD W20-1 W20-7aSLOW STOP SLOW STOP X X Legend Cone SLOWSTOP Flagger W20-7a Flagger W20-7a ONE LANEROADAHEAD W20-4 One lane road ahead W20-4 ROADWORKAHEAD W20-1 Road Work Ahead W20-1 Work Area Pole locations www.invarion.com VECA Project (Lake WA Blvd.) Date:10/6/2017Author:Chris Barrans Comments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com 24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017 Hours:TBD Job Notes *All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits andegresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas *Police Officer on-site if necessary*Flagger/s and spotter/s to assist pedestrians throughout each work zone *"28 cones required*Sidewalk closure signage to be taken down after working hours *ADA pedestrian accommodations must be addressed and consideredfor all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior toimplementing any closures. *Signage to be moved with each work zone as completed A B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face X X Si d e w a l k Southport Gene Coulon Memorial Park conn e ct s t o C o ulo n B e ach Pr k Dr Pole locations X X ROADWORK AHEAD W20-1 ROADWORK AHEAD W20-1 ONE LANEROADAHEAD W20-4 ONE LANEROADAHEAD W20-4 W20-7a W20-7a SLOWSTOP SLOW STOP Legend Cone SLOWSTOP Flagger W20-7a Flagger W20-7a ONE LANEROADAHEAD W20-4 One lane road ahead W20-4 ROADWORKAHEAD W20-1 Road work ahead W20-1 Work Area www.invarion.com VECA Project (Lake WA Blvd.) Date:10/6/2017Author:Chris Barrans Comments: TCS # 008862PHONE # (425)658-3655FAX # (425)658-3658CELL# (425) 445-8378E-MAIL: Chrisb@trafficcontrolservices.netchris.p.barrans@gmail.com VECA Electric & Technologies PROJECT LOCATED:Lake Washington Blvd.Renton, WA Project Manager: Ariana CorpuzService Dept. Associate Project ManagerVECA Electric & Technologies | Seattle[D] 206.696.7440ariana.corpuz@veca.comwww.veca.com 24/7 Emergency Service 206.436.5200 / 800.974.8322 Project#: 820018 TYPE OF WORK:Banner hanging Project Date: 10/16/2017 Hours:TBD Job Notes *All signs and spacing to conform to the MUTCD and City of Renton in street manual *All sidewalks, driveways, exits andegresses shall be clear unless otherwise indicated *Alert all businesses affected by construction*No Parking signs shall be placed 72 hours in advance if necessary of work, and placed in/or around possible work zone areas *Police Officer on-site if necessary*Flagger/s and spotter/s to assist pedestrians throughout each work zone *"28 cones required*Sidewalk closure signage to be taken down after working hours *ADA pedestrian accommodations must be addressed and consideredfor all work operations. Existing ADA facilities must be maintained. *Contact and coordinate impacted transit agencies prior toimplementing any closures. *Signage to be moved with each work zone as completed A B C D 200' 200' 200'X X350'350'350' 500'500'500'500' 800'800'800' 800' 1500'1500' 1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYSEXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEEDROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT N Not drawn to actual scaleSigns not spaced according to scale CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 Sign face X X Si d e w a l k Southport Gene Coulon Memorial Park conn e ct s t o C o ulo n B e ach Pr k Dr Pole locations X X ROAD WORKAHEAD W20-1 ROAD WORKAHEAD W20-1ONE LANE ROADAHEAD W20-4 ONE LANEROADAHEAD W20-4 W20-7a W20-7a SLOWSTOP SLOW STOP Legend Cone SLOWSTOP Flagger W20-7a Flagger W20-7a ONE LANEROADAHEAD W20-4 One lane road ahead W20-4 ROADWORKAHEAD W20-1 Road work ahead W20-1 Work Area www.invarion.com