Soos Creek W&S District PRV Replacement
DEVELOPMENT ENGINEERING
rnair 02/01/2018Soos Creek W&S District PRV Replacement
(2 BUSINESS WORKING DAYS)
FOR APPROVAL.
IF THE 24" DIAMETER
STORMWATER PIPE IS REMOVED
FOR THE PRV INSTALLATION, IT
SHOULD BE REPLACED IN KIND
AFTERWARDS.
the contractor should provide a separate bypass
system for the temporary removal of storm pipe
for construction, with equivalent capacity of
existing storm system to prevent upstream
flooding. the contractor should submit the bypass
system information to city for approval minimum of
48 business working hours prior to work.
at utility crossings, MINIMUM12 inches of
vertical separation is required. provide
ethofoam pad if the 12 inches vertical
separation is not available.
DEVELOPMENT ENGINEERING
rnair 02/01/2018 SURFACE WATER UTILITY
rstraka 02/05/2018Soos Creek W&S District PRV Replacement
DEVELOPMENT ENGINEERING
rnair 02/01/2018Soos Creek W&S District PRV ReplacementPAVEMENT RESTORATION SHALL BE AS
PER CITY OF RENTON STANDARD TRENCH
AND PAVEMENT OVERLAY REQUIREMENTS
RENTON STD PLAN 110 AND 110.1REFER TO
SE 174TH STREET IS A RESIDENTIAL STREET..
minimum
use city of renton std plan 106 for utility
adjustment within city right-of-way
DEVELOPMENT ENGINEERING
rnair 02/01/2018Soos Creek W&S District PRV ReplacementPAVEMENT RESTORATION SHALL BE
AS PER CITY OF RENTON STANDARD
TRENCH AND PAVEMENT OVERLAY
REQUIREMENTS
DEVELOPMENT ENGINEERING
rnair 02/01/2018
SURFACE WATER UTILITY
rstraka 02/05/2018Soos Creek W&S District PRV Replacement
DEVELOPMENT ENGINEERING
rnair 02/01/2018
SURFACE WATER UTILITY
rstraka 02/05/2018Soos Creek W&S District PRV Replacement
DEVELOPMENT ENGINEERING
rnair 02/01/2018
SURFACE WATER UTILITY
rstraka 02/05/2018Soos Creek W&S District PRV Replacement
DEVELOPMENT ENGINEERING
rnair 02/01/2018
a maximum extend feasibility report was
submitted by the applicant. an as-built
information updated report shall be
provided by soos creek to the city OF
RENTON after construction.Soos Creek W&S District PRV Replacement