Loading...
HomeMy WebLinkAboutredline Creek PRV2 Plans_171005_v2_SummaryMarkup P_Soos Creek PRV2 Plans_171005_v2.pdf Markup Summary Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:25:28 PM Color: Label: Layer: Arrow (6) Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:12:30 PM Color: Label: Layer: Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:18:15 PM Color: Label: Layer: Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:15:50 PM Color: Label: Layer: Subject: Arrow Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:12:16 PM Color: Label: Layer: Subject: Arrow Page Label: 11 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:02:13 PM Color: Label: Layer: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:17:01 PM Color: Label: Layer: LABEL AS 'PRIVATE' PIPE MAINTAINED BY SOOS CREEK Callout (24) Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:13:18 PM Color: Label: Layer: AND APPROVAL SHOULD BE OBTAINED FROM THE OWNER Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/09/2017 5:37:22 PM Color: Label: Layer: sewer discharge permit will be required. Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rstraka Date: 11/08/2017 4:10:11 PM Color: Label: Layer: discharge of chlorinate water to storm system is an illicit discharge unless the water has been dechlorinated per the NPDES Municipal Stormwater Permit. The discharge should be routed to the sanitary sewer system unless a dechlorination system will be installed to meet NPDES Permit requirements LABEL AS 'PRIVATE'PIPE MAINTAINED BYSOOS CREEK AND APPROVALSHOULD BEOBTAINED FROM THEOWNER sewer dischargepermit will berequired. discharge ofchlorinate water tostorm system is anillicit dischargeunless the water hasbeen dechlorinatedper the NPDESMunicipalStormwater Permit. The discharge shouldbe routed to thesanitary sewer systemunless adechlorinationsystem will beinstalled to meetNPDES Permitrequirements Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:39:33 PM Color: Label: Layer: LABEL private type 2 CB AS PER CITY OF RENTON STD PLAN 201.00. ADD CALL OUT AND INCLUDE THE STANDARD PLAN IN THE PLAN SET. Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/09/2017 5:36:50 PM Color: Label: Layer: label as private pipe MAINTAINED BY SOOS CREEK Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rstraka Date: 11/08/2017 4:04:00 PM Color: Label: Layer: Replace with a new pipe from structure to structure Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/09/2017 5:36:32 PM Color: Label: Layer: MINIMUM 12 INCHES OF VERTICAL CLEARANCE IS REQUIRED FROM STORMWATER MAIN AT CROSSING. provide the crossing information. Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/08/2017 3:53:40 PM Color: Label: Layer: extend curb and gutter on se 174th street till the project limit. currently people park in the gravel portion. the curb and gutter will prevent vehicles parked over the prv unit. LABEL private type 2CB AS PER CITY OFRENTON STD PLAN201.00. ADD CALLOUT AND INCLUDETHE STANDARD PLANIN THE PLAN SET. label asprivate pipeMAINTAINEDBY SOOSCREEK Replace with a new pipe from structureto structure MINIMUM 12 INCHESOF VERTICALCLEARANCE ISREQUIRED FROMSTORMWATER MAINAT CROSSING.provide the crossinginformation. extend curb andgutter on se 174thstreet till the project limit. currently peoplepark in the gravelportion. the curb andgutter will preventvehicles parked overthe prv unit. Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/08/2017 3:52:57 PM Color: Label: Layer: Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/08/2017 3:52:30 PM Color: Label: Layer: extend curb and gutter on se 174th street till the project limit. currently people park in the gravel portion. the curb and gutter will prevent vehicles parked over the prv unit. Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/07/2017 3:29:23 PM Color: Label: Layer: label maximum 1.5 feet high Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:06:47 PM Color: Label: Layer: label the pipe size and the pipe material. Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:06:59 PM Color: Label: Layer: label new type 2 CB 'PRIVATE' extend curb andgutter on se 174thstreet till the project limit. currently peoplepark in the gravelportion. the curb andgutter will preventvehicles parked overthe prv unit. label maximum 1.5 feethigh label the pipe size and the pipe material. label new type 2 CB'PRIVATE' Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:37:26 PM Color: Label: Layer: also add the note pavement restoration as per the city of renton standard trench and pavement overlay standards is applicable. Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:03:45 PM Color: Label: Layer: label pipe size, material, & 'PRIVATE' Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: bmahn Date: 11/07/2017 3:59:56 PM Color: Label: Layer: REMOVE AMND REPLCE (?) EXISTING BOULDERS. Protect EXISTING TREE AND ROOTS> Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:12:04 PM Color: Label: Layer: if the work is not touching this ramp, it can remain as is Subject: Callout Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:11:19 PM Color: Label: Layer: label that this will be built as per manufacturer instructions and specifications. also add the notepavement restorationas per the city ofrenton standardtrench and pavementoverlay standards isapplicable. label pipe size,material, & 'PRIVATE' REMOVE AMND REPLCE (?) EXISTINGBOULDERS. Protect EXISTING TREE AND ROOTS> if the work is nottouching this ramp, itcan remain as is label that this will bebuilt as permanufacturerinstructions andspecifications. Subject: Callout Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rwmarshall Date: 11/08/2017 2:44:37 PM Color: Label: Layer: Connect to sanitary sewer Subject: Callout Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/09/2017 5:33:42 PM Color: Label: Layer: since water from PRV is chlorinated water Subject: Callout Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rwmarshall Date: 11/03/2017 10:37:22 AM Color: Label: Layer: REPLACE WITH COR STANDARD DETAIL 106.0 IF IN ROW Subject: Callout Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rwmarshall Date: 11/03/2017 10:38:55 AM Color: Label: Layer: WATER FROM PRV MUST BE DE CHLORINATED Subject: Callout Page Label: 11 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/07/2017 12:52:53 PM Color: Label: Layer: Since the slopes are greater than allowed , but it is the maximum extend feasible, the engineer should provide the city with a Maximum extend feasible letter using the WSDOT form. Connect to sanitarysewer since water from PRVis chlorinated water REPLACE WITH CORSTANDARD DETAIL106.0 IF IN ROW WATER FROM PRVMUST BE DECHLORINATED Since the slopes aregreater than allowed, but it is the maximumextend feasible, theengineer shouldprovide the city witha Maximum extendfeasible letter usingthe WSDOT form. Subject: Cloud Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:12:02 PM Color: Label: Layer: Cloud (4) Subject: Cloud Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:18:27 PM Color: Label: Layer: Subject: Cloud Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:41:20 PM Color: Label: Layer: Subject: Cloud Page Label: 11 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:01:59 PM Color: Label: Layer: Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rstraka Date: 11/08/2017 3:53:59 PM Color: Label: Layer: Plan information needs to be verified if this is a 12" or 24" pipe. Cloud+ (9) Plan informationneeds to be verifiedif this is a 12" or 24"pipe. Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:15:25 PM Color: Label: Layer: provide minimum 5 feet separation of structure from stormwater line. lable the separaation. Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:17:38 PM Color: Label: Layer: provide minimum 12 inches vertical separation from stormwater line at crossing Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/07/2017 4:21:39 PM Color: Label: Layer: PROVIDE A BLOWUP LABELING THE SEPARATION OF THE PRV FROM THE EXISITNG STORM WATER MAIN ON SE 174TH STREET Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:13:55 PM Color: Label: Layer: PRIOR APPROVAL SHOULD BE OBTAINED FROM CITY PRIOR TO REMOVAL OF ANY CITY STORMWATER element including pipe. Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/09/2017 5:35:49 PM Color: Label: Layer: if the 24" diameter stormwater pipe is removed for the prv installation, it will need to be replaced in kind afterwards. provide minimum 1 feet separation from stormwater main to proposed prv. provide minimum 5feet separation ofstructure fromstormwater line. lable theseparaation. provide minimum 12inches verticalseparation fromstormwater line atcrossing PROVIDE A BLOWUP LABELING THESEPARATION OF THE PRV FROMTHE EXISITNG STORM WATER MAINON SE 174TH STREET PRIOR APPROVALSHOULD BEOBTAINED FROMCITY PRIOR TOREMOVAL OF ANYCITY STORMWATER element includingpipe. if the 24" diameterstormwater pipe isremoved for the prvinstallation, it willneed to be replacedin kind afterwards.provide minimum 1feet separation fromstormwater main to proposed prv. Subject: Cloud+ Page Label: 11 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/07/2017 5:11:42 PM Color: Label: Layer: city of renton std plan 101 Subject: Cloud+ Page Label: 11 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 12:02:25 PM Color: Label: Layer: if the proposed work is not touching this curb ramp. then the existing curb ramp can be left as is Subject: Cloud+ Page Label: 12 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 8:33:12 AM Color: Label: Layer: traffic control plan using city standard application form should be submitted separately for review (the form is available at the city of renton website). traffic control plan is not reviewed with this plan set. Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/03/2017 12:48:29 PM Color: Label: Layer: PolyLine (5) Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 1:08:34 PM Color: Label: Layer: city of renton stdplan 101 if the proposed workis not touching thiscurb ramp. then theexisting curb rampcan be left as is traffic control planusing city standardapplication formshould be submittedseparately forreview (the form isavailable at the cityof renton website). traffic control planis not reviewed withthis plan set. Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/03/2017 12:49:03 PM Color: Label: Layer: Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/03/2017 12:48:37 PM Color: Label: Layer: Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/03/2017 12:50:43 PM Color: Label: Layer: Subject: Text Box Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:35:13 PM Color: Label: Layer: show locations where the silt fence will be provided. Text Box (8) Subject: Text Box Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:35:31 PM Color: Label: Layer: label the center line stationing on this sheet for the the extent of pavement restoration . show locations where the silt fence will be provided. label the center line stationing on this sheet for the the extent of pavement restoration . Subject: Text Box Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:37:32 PM Color: Label: Layer: informational comment - walls 4 feet and taller require separate building permit. Subject: Text Box Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:23:44 PM Color: Label: Layer: type 2 catch basin to be as per city of renton std plan 201.00. include std plan in plan set. Subject: Text Box Page Label: 9 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:01:52 PM Color: Label: Layer: use and include the city of renton std plan 106 Subject: Text Box Page Label: 10 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:29:36 PM Color: Label: Layer: provide silt fence detail city of renton std plan 214.00 Subject: Text Box Page Label: 10 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:29:42 PM Color: Label: Layer: provide catch basin filter city of renton std plan 216.30 informational comment - walls4 feet and taller requireseparate building permit. type 2 catch basin to be as per city ofrenton std plan 201.00. include stdplan in plan set. use and include the city of renton std plan 106 provide silt fence detail city of renton std plan 214.00 provide catch basin filter city ofrenton std plan 216.30 Subject: Text Box Page Label: 10 Lock: Unlocked Status: Checkmark: Unchecked Author: rnair Date: 11/01/2017 4:30:17 PM Color: Label: Layer: provide city of renton silt fence installation by slicing detail std plan 214.10provide city of renton silt fence installation byslicing detail std plan 214.10