gas main will need to be located on the south side
of the sewer main
2 (1)
Subject: Callout
Page Label: 5
Page Index: 5
Date: 1/31/2019 1:24:41 PM
Status:
Color:
Layer:
Space:
ADD: 8" VERTICAL CROSS PER STD PLAN NO.
300.6 FOR REMOVAL OF POLYPIG
5 (2)
Subject: Text Box
Page Label: 5
Page Index: 5
Date: 1/31/2019 4:35:59 PM
Status:
Color:
Layer:
Space:
CONTRACTOR SHALL PROTECT ALL EXISTING
WATER SERVICES LINES WITHIN ACCESS
ROAD DURING CONSTRUCTION OF NEW
WATER MAIN AND OTHER UTILITIES. A
TEMPORARY 2-INCH WATER LINE MAY BE
REQUIRED DURING CONSTRUCTION OF THE
NEW WATER MAIN.
gas main will need tobe located on thesouth side of thesewer main
°
ADD: 8" VERTICAL
CROSS PER STD PLANNO. 300.6 FOR REMOVALOF POLYPIG
E N G I N E E R I N G
CONTRACTOR SHALL PROTECT ALL EXISTING WATER SERVICES LINESWITHIN ACCESS ROAD DURING CONSTRUCTION OF NEW WATER MAIN ANDOTHER UTILITIES. A TEMPORARY 2-INCH WATER LINE MAY BE REQUIREDDURING CONSTRUCTION OF THE NEW WATER MAIN.
E N G I N E E R I N G
E N G I N E E R I N Ggas main will need tobe located on thesouth side of thesewer main
E N G I N E E R I N G
E N G I N E E R I N G
°°°°E N G I N E E R I N GADD: 8" VERTICALCROSS PER STD PLANNO. 300.6 FOR REMOVALOF POLYPIGCONTRACTOR SHALL PROTECT ALL EXISTING WATER SERVICES LINESWITHIN ACCESS ROAD DURING CONSTRUCTION OF NEW WATER MAIN ANDOTHER UTILITIES. A TEMPORARY 2-INCH WATER LINE MAY BE REQUIREDDURING CONSTRUCTION OF THE NEW WATER MAIN.
E N G I N E E R I N G
E N G I N E E R I N G