Loading...
HomeMy WebLinkAboutRedlines Returned to Applicant_v1Markup Summary Subject: Cloud+ Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:10:57 PM Color: Layer: Space: please reference the 2 horizontal and 1 vertical city of renton control monuments used 1 (7) Subject: Text Box Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:40:51 PM Color: Layer: Space: W-403301 Subject: Text Box Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:39:04 PM Color: Layer: Space: WTR-27-4033 Subject: Callout Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:57:47 PM Color: Layer: Space: C18005570 Subject: Callout Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:39:16 PM Color: Layer: Space: NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED please reference the 2horizontal and 1 vertical city ofrenton control monuments used W-403301 WTR-27-4033C18005570 NOTE THESE NUMBERSTO BE INPUT ON THECOR TITLE BLOCK. SEE TITLE BLOCK EXAMPLESHEET PROVIDED Subject: Callout Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:40:40 PM Color: Layer: Space: NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED Subject: Text Box Page Label: 1 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:27:57 PM Color: Layer: Space: update plans to include new surface water standard plans Subject: Callout Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:29:23 PM Color: Layer: Space: Is there a driveway cut for the sidewalk? 2 (6) Subject: Cloud+ Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 10:16:03 AM Color: Layer: Space: unclear what this is trying to show. if gas line is within area please show it on the plans Subject: Callout Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:57:53 PM Color: Layer: Space: C18005570 Subject: Text Box Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:41:01 PM Color: Layer: Space: W-403302 NOTE THESENUMBERS TO BEINPUT ON THE CORTITLE BLOCK. SEETITLE BLOCK EXAMPLESHEET PROVIDED update plans to include new surface waterstandard plans Is there a drivewaycut for the sidewalk? unclear what this istrying to show. ifgas line is withinarea please show iton the plans C18005570 W-403302 Subject: Text Box Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:59 PM Color: Layer: Space: WTR-27-4033 Subject: Callout Page Label: 2 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 1:27:08 PM Color: Layer: Space: Provide Subject: Text Box Page Label: 3 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:41:22 PM Color: Layer: Space: W-403303 3 (4) Subject: Text Box Page Label: 3 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:15 PM Color: Layer: Space: WTR-27-4033 Subject: Callout Page Label: 3 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 2:03:05 PM Color: Layer: Space: update all details Subject: Cloud+ Page Label: 3 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 1:58:44 PM Color: Layer: Space: Update NotesWTR-27-4033Provide W-403303 WTR-27-4033update all details Update Notes Subject: Text Box Page Label: 4 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:41:32 PM Color: Layer: Space: W-403304 4 (4) Subject: Text Box Page Label: 4 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:15 PM Color: Layer: Space: WTR-27-4033 Subject: Callout Page Label: 4 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:58:17 PM Color: Layer: Space: C18005570 Subject: Callout Page Label: 4 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 1:57:02 PM Color: Layer: Space: Replace with STD plan 267.00 and 267.10 Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:17:57 AM Color: Layer: Space: 5 (32) Subject: Group Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:08:48 AM Color: Layer: Space: W-403304 WTR-27-4033C18005570 Replace with STDplan 267.00 and267.10 Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:07:35 PM Color: Layer: Space: clarify call out Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:05:10 PM Color: Layer: Space: what is this water line? Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:00:43 PM Color: Layer: Space: PRV required due to water pressure over 80 PSI Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:57:58 PM Color: Layer: Space: C18005570 Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:21:33 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:07:05 PM Color: Layer: Space: clarify clarify call out what is this waterline? PRV required due towater pressure over80 PSI C18005570 clarify Subject: PolyLine Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:20:51 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:07:51 PM Color: Layer: Space: Clarify call out Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:09:13 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:13:19 PM Color: Layer: Space: protect existing water service lines during construction until new meters are installed. Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:03:01 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:49:59 PM Color: Layer: Space: label gas line on plan set SS (E) SS (E)SS (E)SS (E) SS (E) SS (E) SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E) Clarify call out protect existingwater service linesduring constructionuntil new meters areinstalled. label gas line on planset Subject: Text Box Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:41:43 PM Color: Layer: Space: W-403305 Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:59:45 PM Color: Layer: Space: all water meters shall be located on the east side of the hydrant Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 1:32:35 PM Color: Layer: Space: include thrust block in clearing limits. will need a temp construction easement from the neighbor Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/1/2018 10:51:11 AM Color: Layer: Space: show hammer head turnaround Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:21:34 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:04:25 PM Color: Layer: Space: Provide all easements within the proposed corridor for all three properties. W-403305 all water metersshall be located onthe east side of thehydrant include thrust blockin clearing limits. willneed a tempconstructioneasement from theneighbor show hammer headturnaround Provide all easements within the proposedcorridor for all three properties. Subject: Line Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:03:05 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:06:54 PM Color: Layer: Space: clarify Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:58:03 AM Color: Layer: Space: applicant needs to show proposed building footprint Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:19:56 AM Color: Layer: Space: Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:10:50 PM Color: Layer: Space: Adjust all line work to show existing utilities and proposed utilities in the correct locations. Subject: Text Box Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:49 PM Color: Layer: Space: WTR-27-4033 clarify applicant needs toshow proposedbuilding footprint Adjust all line workto show existingutilities andproposed utilities inthe correctlocations.WTR-27-4033 Subject: Text Box Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:19:44 AM Color: Layer: Space: OR END THE EW WATER LINE 5 FT EAST OF THE PROPERTY LINE. Subject: Arrow Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:09:21 AM Color: Layer: Space: Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:23:11 PM Color: Layer: Space: establish location for new service meter Subject: Polygon Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 11/2/2018 9:18:25 AM Color: Layer: Space: Subject: Cloud+ Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:02:49 PM Color: Layer: Space: show only one branch valve not 3 valves Subject: Callout Page Label: 5 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:03:58 PM Color: Layer: Space: clarify line work OR END THE EW WATER LINE 5 FT EAST OFTHE PROPERTY LINE. establish locationfor new service meter show only onebranch valve not 3valves clarify line work Subject: Text Box Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:41:55 PM Color: Layer: Space: W-403306 6 (2) Subject: Text Box Page Label: 6 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:34 PM Color: Layer: Space: WTR-27-4033 Subject: Callout Page Label: 7 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:57:58 PM Color: Layer: Space: C18005570 7 (3) Subject: Text Box Page Label: 7 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:08 PM Color: Layer: Space: W-403307 Subject: Text Box Page Label: 7 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:42:28 PM Color: Layer: Space: WTR-27-4033 W-403306 WTR-27-4033C18005570 W-403307 WTR-27-4033 Subject: Text Box Page Label: 13 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 9:01:01 AM Color: Layer: Space: Soils report required as described in section C.1.3 13 (2) Subject: Text Box Page Label: 13 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:25:32 PM Color: Layer: Space: TIR needs to be updated to account for the complete project that includes both the new Homes and roadway widening Subject: Callout Page Label: 21 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:26:35 PM Color: Layer: Space: Flow control applies to both the roadway improvement and new homes to be constructed 21 (2) Subject: Callout Page Label: 21 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:26:21 PM Color: Layer: Space: Project consists of new home + roadway improvments Subject: Text Box Page Label: 22 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 8:59:31 AM Color: Layer: Space: provide proposed flow control BMP's for both home and roadway. 22 (4) Soils report required asdescribed in section C.1.3 TIR needs to beupdated to accountfor the completeproject that includesboth the new Homesand roadway widening Flow control appliesto both the roadwayimprovement and newhomes to beconstructed Project consists ofnew home + roadway improvments provide proposed flow control BMP's for both home and roadway. Subject: Cloud+ Page Label: 22 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:08:21 PM Color: Layer: Space: the home impervious surface should be accounted for since it is part of the same project. the impervious surface is going to be greater than 2000 sq feet of new impervious surface. Subject: Callout Page Label: 22 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 2:26:48 PM Color: Layer: Space: Water qaulity requirements applies to both the roadway improvement and new homes to be constructed Subject: Cloud+ Page Label: 22 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 4:39:17 PM Color: Layer: Space: This only addresses erosion control not water quality as specified by core requirement 8. if project is exempt specify what exemption criteria should apply and show it. Subject: Callout Page Label: 24 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/30/2018 8:19:36 AM Color: Layer: Space: verify if the water sheet flows or infiltrates into the soil. 24 (2) Subject: Callout Page Label: 24 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 5:27:53 PM Color: Layer: Space: provide photo's from the field inspection Subject: Cloud+ Page Label: 25 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 1:09:22 PM Color: Layer: Space: correct map 25 (1) the home impervioussurface should beaccounted for sinceit is part of the sameproject. theimpervious surface isgoing to be greaterthan 2000 sq feet ofnew impervioussurface. Water qaulityrequirements appliesto both the roadwayimprovement and newhomes to beconstructed This only addresses erosion control not water quality as specified by core requirement8. if project is exempt specify what exemption criteria should apply and show it. verify if the watersheet flows orinfiltrates into thesoil. provide photo's fromthe field inspection correct map Subject: Cloud+ Page Label: 62 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:13:43 PM Color: Layer: Space: Parcel number is incorrect 62 (1) Subject: Cloud+ Page Label: 65 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:16:08 PM Color: Layer: Space: doesn't match exhibit 65 (4) Subject: Cloud+ Page Label: 65 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:18:15 PM Color: Layer: Space: east Subject: Text Box Page Label: 65 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:17:27 PM Color: Layer: Space: This is calling out 22.5 feet of width and the exhibit is showing 15 feet of width Subject: Cloud+ Page Label: 65 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/12/2018 3:18:00 PM Color: Layer: Space: south Parcel number isincorrect doesn't match exhibit east This is calling out22.5 feet of widthand the exhibit isshowing 15 feet of width south Subject: Callout Page Label: 66 Lock: Unlocked Status: Checkmark: Unchecked Date: 10/29/2018 1:30:30 PM Color: Layer: Space: property owners need to provide easement as well. 66 (1) property owners needto provide easementas well. please reference the 2 horizontal and 1 vertical city of renton control monuments usedWTR-27-4033NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED W-403301 NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED C18005570 update plans to include new surface water standard plans W-403302WTR-27-4033unclear what this is trying to show. if gas line is within area please show it on the plans Provide C18005570 Is there a driveway cut for the sidewalk? W-403303WTR-27-4033update all details Update Notes W-403304WTR-27-4033Replace with STD plan 267.00 and 267.10 C18005570 W-403305WTR-27-4033include thrust block in clearing limits. will need a temp construction easement from the neighbor Provide all easements within the proposed corridor for all three properties. what is this water line? Clarify call out clarify clarify clarify call out label gas line on plan set C18005570 all water meters shall be located on the east side of the hydrant PRV required due to water pressure over 80 PSI show only one branch valve not 3 valves clarify line work Adjust all line work to show existing utilities and proposed utilities in the correct locations. protect existing water service lines during construction until new meters are installed. establish location for new service meter show hammer head turnaround OR END THE EW WATER LINE 5 FT EAST OFTHE PROPERTY LINE.SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E)SS (E) applicant needs to show proposed building footprint W-403306WTR-27-4033 W-403307WTR-27-4033C18005570 Soils report required as described in section C.1.3 TIR needs to be updated to account for the complete project that includes both the new Homes and roadway widening Project consists of new home + roadway improvments Flow control applies to both the roadway improvement and new homes to be constructed This only addresses erosion control not water quality as specified by core requirement 8. if project is exempt specify what exemption criteria should apply and show it. the home impervious surface should be accounted for since it is part of the same project. the impervious surface is going to be greater than 2000 sq feet of new impervious surface. provide proposed flow control BMP's for both home and roadway. Water qaulity requirements applies to both the roadway improvement and new homes to be constructed provide photo's from the field inspection verify if the water sheet flows or infiltrates into the soil. correct map Parcel number is incorrect doesn't match exhibit This is calling out 22.5 feet of width and the exhibit is showing 15 feet of width south east property owners need to provide easement as well.