Loading...
HomeMy WebLinkAbout03. FeeSchedule.pdfCity of Renton Fee Schedule 2023‐2024 Rev. January 2023 City of Renton Fee Schedule 2023‐2024 Table of Contents Page SECTION I. MISCELLANEOUS FEES 1 SECTION II. MAPLEWOOD GOLF COURSE 2 SECTION III. CITY CENTER PARKING FEES 2 SECTION IV. AQUATIC FEES 3 SECTION V. CARCO THEATER (REPEALED) 3 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 4 SECTION VIII. AIRPORT CHARGES 4 SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐24 SECTION X. BUSINESS LICENSES 4 SECTION XI. ADULT ENTERTAINMENT LICENSES 4 SECTION XII. DEVELOPMENT FEES 5 Building Fees:5 Land Use Review Fees:7 Site Work, Utilities, and Right of Way Fees: 9 Technology Surcharge Fee 13 Impact Fees: 13 Miscellaneous Fees: 14 SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA) 14 15SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER THE AUTHORITY OF CHAPTER 7.80 RCW  City of Renton Fee Schedule 2023‐2024 SECTION I. MISCELLANEOUS FEES1 2023 2024 1. Maps: a.$4 $4 b.  $12 $12 c.  $4 $4 d.  $12 $12 e.  $5 $5 2. Plat: a.  $2 $2 b.  $1 $1 3. Photocopies:  a.  $0.15 $0.15 b.  $0.20 $0.20 c.  $0.25 $0.25 4. Budget: a.  $10 $10 b.  N/C N/C 5. Audio or Video Recording Copies: a.$2 $2 b.$2 $2 6. Regulations and Plans: a.Comprehensive Plan and Map $30 $30 b.Title IV, Development Regulations: (i) Text and Zoning Map $110 $110 (ii) Text only $100 $100 c.Individual Chapters of Development Regulations $10 $10 d. Renton Municipal Code (two volumes)$400 $400 e.Code Supplements, per year: (i) Titles I ‐ III and VI ‐ X $70 $70 (ii) Title IV $70 $70 7. Miscellaneous Services: a.Certification and Notary Fees ‐ Clerk's Certification $10 $10 b.Notary Public Attestation or Acknowledgement or as $10 $10 otherwise provided for in RCW 42.28.090, per signature c.Hold Harmless Agreements and other similar documents $20 $20 not otherwise provided for d.Lamination of licenses, pictures $6 $6 e.Community Development Block Grants (CDBG) Loan Program: (i) Application Fee $200 $200 (ii) Loan Origination Fee $150 or 0.25% of loan amount,  whichever is greater $150 or 0.25% of loan amount,  whichever is greater (iii) Closing Costs (including any legal fees)50% of total actual costs 50% of total actual costs 8. Miscellaneous Charges for Police Services: a.Police Reports per page $0.15 $0.15 b.Record Checks (Written Response)$5 $5 c.Photographs ‐ Digital on CD $2 $2 d.Photographs ‐ black & white or color ‐ Cost of developing film Cost Cost e.Fingerprint Cards $5 $5 (i) Each additional card $1 $1 9. Charges for Fire Documents: a.Fire reports per page $0.15 $0.15 b.Fire investigative report on CD $2 $2 c.First copy ‐ black & white or color ‐ Cost of developing film Cost Cost d.Additional copy ‐ black & white or color ‐ Cost of developing film Cost Cost 10. Computer Listings: a.City of Renton new business list $10 $10 b.List of all business licenses $20 $20 c.Copies requested to be faxed, local number $3 $3 d.Copies requested to be faxed, long distance number (i) Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1 $10 $10 (ii) Six (6) or more pages (ten (10) page limit)$20 $20 11. Utility Fee: a.Special Request Water Meter Reading $30 $30 b.Utility New Account Setup $25 $25 c.Utility Billing Account Transfer (tenant billing form)$5 $5 d.Water utility outstanding balance search requested by $25 $25 fax, messenger, or letter 12. Schedule of Fines for False Alarms ‐ Security/Burglar: (effective February 1, 2019) a.$25 $25 b.N/C N/C c.N/C N/C d.$100 $100 e.$250 $250 f.$25 $25 g.$50 $50 1  A registration year shall mean January 1 thru December 31 each year. 13. NSF Check Fees $25 $25 14. Veteran Park Tile: Three lines $75 $75 Late Payment Fee Unregistered Alarm System Fee First False Alarm in a registration year1 One‐time Registration Fee Annual Registration Renewal Second False Alarm in a registration year1 Third or more False Alarm in a registration year1 Audio recording, each copy Video recording, each copy City's Budget to other municipality or quasi‐municipal corporation or other nonprofit charitable or education organization City's Budget Zoning maps ‐ standard 11 x 17 Zoning maps ‐ large 24 x 36 Comprehensive Plan map ‐ standard 11 x 17 Comprehensive Plan map ‐ large 24 x 36 Precinct maps First page Each additional page Each 8.5" x 11" or 8.5" x 14" Each 11" x 17" Each 8.5" x 11" or 8.5" x 14" color 1 City of Renton Fee Schedule 2023‐2024 SECTION I. MISCELLANEOUS FEES1 (CONTINUED)2023 2024 15. Electronic Records1,2,3: a.Photocopies or printed copies of electronic records, per page $0.15 $0.15 b.Scanning paper records, per page $0.10 $0.10 c.$0.05 $0.05 d.$0.10 $0.10 16. Document Recording Fees: a.Actual Costs Actual Costs b.Actual Costs Actual Costs 17. Publication Fees: Actual Costs Actual Costs SECTION II. MAPLEWOOD GOLF COURSE 2023 2024 1. a.Weekday: (i) 18 Hole $43 $43 (ii) 9 Hole $32 $32 (iii) 18 Hole, Senior $34 $34 (iv) 9 Hole, Senior $26 $26 (v) 18 Hole, Junior $25 $26 (vi) 9 Hole, Junior $19 $20 b.Weekend: (i) 18 Hole $50 $50 (ii) 9 Hole $32 $35 2. Club Rental1: a.Regular $30 $35 b.Premium $60 $65 3. Golf Cart Fees1: a.18 Hole $36 $38 b.18 Hole Single Rider $28 $28 c.9 Hole $24 $26 d.9 Hole Single Rider $18 $18 e.Trail Fee $15 $15 f.Half Cart, 18 Hole $19 g.Half Cart, 9 Hole $13 4. Driving Range Fees1: a.Large Bucket $13 $14 b.Small Bucket $10 $11 c.Warm‐up Bucket $6 $7 5. Lesson Fees: a.1/2 Hour Private $45 $60 b.1 Hour Private $65 $90 c.1/2 Hour Series Private $160 $220 d.1 Hour Series Private $240 $330 e.Group Series $100 $160 f.1/2 Hour Private, Junior $25 $40 g.Playing Lesson(3‐hole minimum/9‐hole maximum) per hole $15 $30 1 Rates include Washington State Sales Tax (WSST) SECTION III. City CENTER PARKING FEES 2023 2024 1. City Center Parking Garage Fees: Parking rates for retail parking will be as follows: a.Zero (0) ‐ two (2) hours N/C N/C b.Two (2) ‐ four (4) hours $2 $2 c.Four (4) ‐ six (6) hours $4 $4 d.Six (6) ‐ (10) hours $6 $6 e. 10 hours or more $10 $10 f.Monthly pass‐holders, tax included $35 $35 Green Fees1:  Transmission of records in an electronic format or for the use of agency equipment to send the records electronically, per  gigabyte (GB) Electronic files or attachments uploaded for electronic delivery (email, cloud‐based data storage service, or other means of  electronic delivery), for each four (4) files The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title  company for processing. Payment in full shall by submitted to the City before documents are sent for recording. 1  The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced in response to a particular  request. The actual cost of any digital storage media or device provided by the agency. Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the cost of uploading  and transmitting the electronic records is reasonably estimated to equal or exceed that amount. Only one $2 flat fee per request is authorized for electronic records produced in installments. When  records are provided electronically on a CD, DVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of the electronic storage device. The City may charge  an actual‐cost service charge for requests that require use of IT expertise to prepare data comilations or provide customized electronic access services when not used by the City for other purposes.  A cost estimate and explanation will be provided to the requestor before incurring the costs.2  Option to waive charges.  The City may waive charges associated with fulfilling a request.  The decision will be based on various factors, including the volume and format of the responsive  documents. The decision to assess fees for fulfilling a public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff time required for  copying, scanning, shipping, uploading, and/or transmitting the records associated with fulfilling a request. 3  Certified copies.  If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each complete document may be applied to cover the additional expense and time  required for certification. 1  Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department administrator may authorize to waive the entire amount due at their discretion. For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "Junior" shall mean ages 17 and under, "Senior"  shall mean ages 62 and over.  Off‐season and promotional rates determined by management; posted on website. The applicant shall pay all Publication fees charged by publication outlet used by the City (The Seattle Times or equivalent).  Payment in full shall be made to the City prior to public hearing, permit approval or issuance, whichever comes first. Miscellaneous charges associated with document recording, such as courier fees 2 City of Renton Fee Schedule 2023‐2024 SECTION IV. AQUATIC FEES 2023 2024 1. Admission for the Aquatic Center shall be as follows: a.Regular Session: (i) Infants ‐ under 1 year N/C N/C (ii) Youth ‐ 1 to 4 years $8 $8 (iii) Ages 5 and up $16 $16 (iv) Lap swim ‐ water walking only $5 $7 (v) Locker Rental $0.25 $0.25 b.Canopy Rental Fees1: (includes canopy and admission for one leisure swim session): (i) Henry Moses Party Tent #1  (10' x 20' for up to twenty‐five (25) guests on wave pool): (1) Resident Rate, per session $600 $600 (2) Non‐resident Rate, per session $700 $700 (ii) Henry Moses Party Tent #2  (10' x 20' for up to twenty‐five (25) guests): (1) Resident Rate $500 $500 (2) Non‐Resident Rate $600 $600 (iii) Henry Moses Party Tent #3 (10' x 10' for up to ten (10) guests): (1) Resident Rate, per session $200 $250 (2) Non‐resident Rate, per session $240 $300 c.Resident Rate all inclusive1 $1,800 $3,800 d.Non‐resident Rate all inclusive1 $2,300 $4,800 e.Swim Lesson Program: Fees and associated descriptions are published in the "What's Happening " Renton Activities Guide 1  Sales tax not included in the rental fee 2. Boat Launch Rates: a.Daily resident ‐ 7 days a week $10 $15 b.Daily Non‐resident ‐ 7 days a week $20 $25 c.Overnight resident ‐ 7 days a week $20 $25 d.Overnight Non‐resident ‐ 7 days a week $40 $45 e.Annual parking boat launch permit ‐ resident $60 $70 f.Annual parking boat launch permit ‐ non‐resident $120 $130 g. (i) $50 $75 (ii) $50 $90 SECTION V. CARCO THEATER (REPEALED)2023 2024 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 2023 2024 1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 50 people: a.Resident 10am‐7pm $150 $150 b.Non‐resident 10am‐7pm $290 $290 2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people: a.Resident 10am‐7pm $150 $150 b.Non‐resident 10am‐7pm $290 $290 e.South Shelters 1 & 2 Resident rate $310 $310 f.South Shelters 1 & 2 Non‐resident rate $610 $610 3. Gene Coulon Beach Park Shelters (North Shelter): a.Resident 10am‐7pm $200 $200 b.Non‐resident 10am‐7pm $360 $360 4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only): a.Tennis court (i) $10 $25 (ii) $10 $30 b.Park basketball court (i) $10 $25 (ii) $10 $30 c.Sand volleyball court (i) $10 $25 (ii) $10 $30 5. a.Resident rate per hour $10 $25 b.Non‐resident rate per hour $25 $30 c.Special Event Permit Fee $85 $85 6. Piazza Park Open Space Event Rental a.Full day rental  10am ‐ 7pm $500 $500 7. Photo Shoots per hour: a.Commercial Film and Photo Shoots per hour $300 $300 8. Electrical Spider Box rental: a. Electrical spider box rental per box, per event, with special event approval $100 $100 9. Athletic Field Rental, Lights and Prep Fees: a.Sports field rental per hour ‐ resident $25 $30 b.Sports field rental per hour ‐ non‐resident $30 $36 c.Renton Area Youth Sports Agencies, per hour $6 $8 d.Field prep for softball/baseball ‐ resident per occurrence $30 $35 e.Field prep for soccer ‐ resident per occurrence $45 $50 f.Custom Field prep ‐ resident per occurrence $100 $100 g.Field prep for softball/baseball ‐ non‐resident per occurrence $35 $40 h.Field prep for soccer ‐ non‐resident per occurrence $50 $55 i.Custom Field prep ‐ non‐resident per occurrence $100 $100 j.Field lights all sports ‐ resident per hour $25 $30 k.Field lights all sports ‐ non‐resident per hour $30 $36 Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the current  rental rate) per event Resident rate Non‐resident rate Resident rate Non‐resident rate Resident rate Non‐resident rate Non‐resident rate Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale  Lions, Sunset, and Riverview Parks): Resident rate 3 City of Renton Fee Schedule 2023‐2024 SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2023 2024 10. Banquet & Classroom Rental ‐ Community Center & Senior Activity Center: a.Friday evening 5 hour minimum ‐ resident $650 $750 b.Weekend Rates 10 hour minimum ‐ resident $1,300 $1,500 c.Extra hours ‐ per hour ‐ resident $130 $150 d.Friday 5 hour minimum ‐ non‐resident $750 $900 e.Weekend Rates 10 hour minimum ‐ non‐resident $1,500 $1,800 f.Extra hours ‐ per hour ‐ non‐resident $150 $180 g.Kitchen charge ‐ per hour $100 $100 h.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ resident/hr 3 hour min $85 $100 i.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ non‐resident/hr 3 hour min $90 $120 j.Damage deposit $550 $550 k.Contract violation fee ‐ per hour ‐ resident $200 $300 l.Contract violation fee ‐ per hour ‐ non‐resident $200 $360 m.Cancellation Fee ‐ Less than 90 days $550 $550 11. Classroom and Gymnasium Rental ‐ Renton Community Center: a.Resident single gym athletic ‐ per hour $45 $50 b.Non‐resident single gym athletic ‐ per hour $50 $60 c.Resident double gym athletic ‐ per hour $90 $100 d.Non‐resident double gym athletic ‐ per hour $100 $120 e.Resident single gym non‐athletic $550 $1,000 f.Non‐resident single gym non‐athletic $675 $1,200 g.Resident double gym non‐athletic $1,100 $2,000 h.Non‐resident double gym non‐athletic $1,350 $2,400 i.Carpet fee single gym ‐ resident & non‐resident $325 $325 j.Carpet fee double gym ‐ resident & non‐resident $650 $650 k.Classroom resident $35 $40 l.Classroom Non‐resident $40 $48 12. Facility Rental ‐ Neighborhood Center: a.Meeting room ‐ resident $35 $40 b.Gymnasium ‐ resident $35 $40 c.Meeting room ‐ non‐resident $40 $48 d.Gymnasium ‐ non‐resident $40 $48 13. Farmer's Market a.10x10 Lot $40 $40 b.Half Lot $20 $20 c.Application fee $30 $30 d.Electrical fee $5 $5 14. Parklet Rentals  a. Parklet Rental including Installation per Occurrence1 $500 $500 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 2023 2024 Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Guide. SECTION VIII. AIRPORT CHARGES 2023 2024 1.Airport Fuel Flow Charge:  per gallon $0.08 $0.08 2.JetA Fuel Flow Charge:  per gallon $0.10 $0.10 3.Transient airplane parking daily $8 $8 4.Hangar wait list, one time fee $100 $100 5.Tie‐down wait list, one time fee $25 $25 6.Lost gate card fee per occurrence $50 $50 7.T‐Hangar, Non‐Refundable Move‐in Fee $250 $250 8.Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence)$500 $500 9.Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $500 $500 SECTION IX. ANIMAL LICENSES FEES1 ‐ RMC 5‐4‐2 2023 2024 1.Altered Animal Annual License $30 $30 2.Unaltered Animal Annual License $50 $50 3.Economically Qualified Resident Special Lifetime License $0 $0 4.Duplicate Tag $10 $10 SECTION X. BUSINESS LICENSES 2023 2024 1. General Business License: a.Registration Fee $150 $150 b.Appeal of Business License Decision $250 $250 2. Penalties: a.The penalty to reinstate an expired business license $50 $50 b.The penalty  for failure to obtain a business license $250 $250 c. SECTION XI. ADULT ENTERTAINMENT LICENSES 2023 2024 1. Every person applying for a adult entertainment license  shall pay the applicable nonrefundable application fee: a.Adult Entertainment Business License $750 $750 b.Entertainer $75 $75 c.Manager $75 $75 d.License Replacement $10 $10 2. Penalties: a.Civil Penalty, per violation $1,000 $1,000 Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of Chapter  5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for the first  month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, but not exceeding a  total penalty of (15%) of the amount of such license fee. 5%‐15%5%‐15% 1  Long‐Term Right of Way Permit will be required if located within the City Right of Way.  See Section XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection e of subsection  3, Site Work, Utilities, and Right of Way Fees 1  Please note, impounded animals are subject to license fees, microchipping costs, and other out‐of‐pocket costs as specified in RMC 6‐6‐2. 4 City of Renton Fee Schedule 2023‐2024 SECTION XII. DEVELOPMENT FEES 2023 2024 1. a. (i)$42 $42 b. (i)$317 $317 (ii)$348 $348 (iii)$254 $254 (iv)$285 $285 (v)$285 $285 (vi)$348 $348 c. (i)65% of permit fee 65% of permit fee (ii)50% of initial plan Check Fee 50% of initial plan Check  d. (i)$25 $25 (ii) (1)$6.50 $6.50 (2)$2 $2 e. (i) (1) (a)$269 $269 (b)$285 $285 (2) (a)$209 $209 (b)$221 $221 (c)$26 $26 (d)$209 $209 (e)$93 $93 (ii) (1)$82 $82 (2)$82 + 4.89% of value $82 + 4.89% of value (3)$106.45 + 4.93% of value $106.45 + 4.93% of value Mult $303.78 + 2.58% of value $303.78 + 2.58% of value (5)$1,463.10 + 1.70% of value $1,463.10 + 1.70% of value (6)$4,870.92 + 1.45% of value $4,870.92 + 1.45% of value (7)$15,775.97 + 0.53% of value $15,775.97 + 0.53% of value (iii)$209 $209 (iv) (1)$209 $209 (2)$209 $209 (3)$209 $209 (5) (a)$135 $135  (b)$209 $209  f.$190 $190 Review Fee Temporary Electrical Services Miscellaneous Electrical Fees Multi‐Family, Commercial and Industrial Fees: Fees based on value of work. Residential Fees ‐ Single ‐Family and Duplex State Building Code Fee: Electrical Permit Fees2: Non‐residential projects $1.00 to $500.00 Signs per each Mobile Homes Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable  television, etc.) (4) $1,000,000.01 and up Job Trailers Building Plan Check Fee1 Building and Demolition Permit Fees:1 Building Fees: (viii) (vii) (vi) (ii) (iii) (iv) (v) Base Fee/Valuation $1.00 to $500.00 Valuation $501.00 to $2,000.00 Valuation $2001.00 to 25,000.00 Valuation $25,001.00 to $50,000.00 Valuation $50,001.00 to $100,000.00 Valuation $100,001.00 to $500,000.00 Valuation $500,001.00 to $1,000,000.00   Valuation $1,000,001.00 and up Combination Building Permit Fees1,2 Permit fee 1  This fee shall be $0 for Accessory Dwelling Units (ADU). $500.01 to $1,000.00 $1,000.01 to 5,000.00 $5,000.01 to $50,000.00 $50,000.01 to $250,000.00 $250,000.01 to $1,000,000.00 House Moving1 ‐ minimum per hour Inspection Fee: Cooling system circuit for new or replaced appliance  Up to 200 AMP Over 200  AMP 2  Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1  This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual house  move permit. A building permit is also required in order to site the structure on the new site. Base Residential Fee Each additional unit after first unit Residential projects: Residential Photovoltaic (PV) Solar Panel New Service ‐ Single Family and Duplex1 Service Changes/New Circuits ‐ Single Family and Duplex: Change up to 200 AMP Change over 200 AMP Any new circuits added to above price is per each up to a maximum of $80.00 Minimum fee for remodel/addition of new circuits without a service charge Initial Building Plan Check Fee2 Additional Building Plan Check Fee Plumbing up to 3,000 sq ft Plumbing over 3,000 sq ft Mechanical up to 3,000 sq ft Mechanical over 3,000 sq ft Electrical up to 3,000 sq ft Electrical over 3,000 sq ft 50% of commercial fees  Minimum $209 50% of commercial fees  Minimum $209 2  Building Plan Check Fee is in addition to the building permit fees, demolition permit fees, and combination building permit fees.  The plan check fee is equal to 65% of the building permit  fee, or the demolition permit fee, or the combination building permit fee.  Includes three (3) review cycles. 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 2 Combination Building Permit fees are required for each new single family residential structure. $42 + $4.70 x each  $100 value $42 + $4.70 x each  $100 value $112.57 + $21.63 x each  $1,000 value $112.57 + $21.63 x each  $1,000 value $610.06 + $15.57 x each  $1,000 value $610.06 + $15.57 x each  $1,000 value $999.31 + $10.85 x each  $1,000 value $999.31 + $10.85 x each  $1,000 value $1,541.81 + $8.63 x each  $1,000 value $1,541.81 + $8.63 x each  $1,000 value $4,993.81 + $7.33 x each  $1,000 value $4,993.81 + $7.33 x each  $1,000 value $8,659.81 + $5.66 x each  $1,000 value $8,659.81 + $5.66 x each  $1,000 value $190 on 1st unit / $24 each  add'l unit $190 on 1st unit / $24 each  add'l unit Inspection Fee For Condominium Conversionsg. 5 City of Renton Fee Schedule 2023‐2024 SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024 1. h. (i)$190 $190 (ii)Building Permit Fees Building Permit Fees i. (i)$65 $65 (1)$26 $26 (2) Boiler or Compressor $26 $26 (3)$26 $26 (4) Ventilation/exhaust fan $26 $26 (5) Fuel Gas Piping (each gas piping system up to 6 outlets)$26 $26 (ii)$96 $96 (1)$45 $45 (2) Boiler or Compressor $96 $96 (3) Refrigeration System $96 $96 (4)$96 $96 (5) Incinerator: Installation or relocation of each $127 $127 (6)$45 $45 (7) Fuel Gas Piping (each gas piping system up to 6 outlets)$45 $45 j. (i) Residential ‐ Plumbing Permit base fee plus itemized fees below $65 $65 (1)$12 $12 (2) Water Service: For meter to house $12 $12 (3) Per fixture for repair or alteration of drainage or vent piping $12 $12 (4) Per drain for rainwater systems $12 $12 (5) Per lawn sprinkler system, includes backflow prevention $12 $12 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc.$12 $12 (7) Per interceptor for industrial waste pretreatment $12 $12 (8) Fuel Gas Piping: (each gas piping system up to 6 outlets)$26 $26 (ii) Commercial or Multi‐Family: Plumbing Permit base fee plus itemized fees below $96 $96 (1)$19 $19 (2)$19 $19 (3)$19 $19 (4)$19 $19 (5)$19 $19 (6)$19 $19 (7)$19 $19 (8)$33 $33 (9)$96 $96 k. (i) (1)$317 $317 (2)$317 $317 (ii) (1)$96 $96 (2)$96 $96 (3)$63 $63 (4)$158 $158 (5)$96 $96 (6)$96 $96 l. (i) (1)$158 $158 (2)$158 $158 (3)$158 $158 (ii) (1)40%40% (2)50%50% (3)$158/hr $158/hr (4)5% of Permit Fee 5% of Permit Fee (5)5% of Permit Fee 5% of Permit Fee  (iii)2 X Permit Fee 2 X Permit Fee Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.).  A/C system (air  conditioner, chiller or Air Handling Unit (VAV) including ducts and vents Decorative Flags fee is per entrance and valid until flag(s) are removed Roof, projecting, awning, canopy, marquee, and wall signs Freestanding ground and pole signs   Temporary and Portable Signs: Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap Water Service: For meter to building Mechanical Permit Fees:1 Residential ‐ Mechanical Permit base fee plus itemized fees below: Commercial or Multi‐Family ‐ Mechanical Permit base fee plus itemized fees below: Within a manufactured home park Manufactured/Mobile Home Installation Fees1: Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for  which no other fee is listed in this code Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for  which no other fee is listed in this code Outside of a manufactured home park Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.).  A/C system (air  conditioner, chiller or Air Handling Unit (VAV) including ducts and vents Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each  Site Plan/Zoning Review1 Engineering Review1 Fuel Gas Piping: (each gas piping system up to 6 outlets) Medical Gas Piping: (each gas piping system up to 6 outlets) Sign Permit Fees: Plumbing Permit Fees:1 Per fixture for repair or alteration of drainage or vent piping Per drain for rainwater systems    Per lawn sprinkler system, includes backflow prevention  Per vacuum breaker or backflow protection device on tanks, vats, etc. Per interceptor for industrial waste pretreatment Miscellaneous Fees: Minimum Housing Inspection Building Fees: (Continued) 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1 Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amounts). WABO ‐ Adult Family Home; Misc building inspection Reinspection Fee; Misc building inspection Electrical, Plumbing, or Mechanical Permits (percentage of permit fee) Additional Plan Review Fees: Over three review cycles (percentage of plan review fee) Miscellaneous Plan Review: hourly fee. Real Estate Directional Signs, pursuant to RMC 4‐4‐100J2, permit valid for a 12‐months period Grand Opening Event Signs, pursuant to RMC 4‐4‐100J6d(i)  Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap Work commencing before permit Issuance:  Where work for which the permit is required is started prior to obtaining  the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The special  investigation fee shall be paid in addition to the required permit fees Permanent Signs: Inspection Fees: Plan Review Fees: Event Signs, pursuant to RMC 4‐4‐100J6d(ii) and (iii) per sign, per promotion A‐Frame Signs, pursuant to RMC 4‐4‐100J5 Charge is for the first sign, all subsequent signs are $50.00 Commercial Property Real Estate Banner each sign permit is valid for 12 months. 6 City of Renton Fee Schedule 2023‐2024 SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024 2. (i)$56 $56 (ii)$120 $120 (iii) (1)$5,900 $5,900 (2)$5,900 $5,900 (iv) (1)$560 $560 (2)$560 $560 (3)$560 $560 (v)$5,930 $5,930 (vi) (vii)$5,900 $5,900 (viii) (1)$3,710 $3,710 (2)$1,800 $1,800 (3)50% of Application Fee 50% of Application Fee (4)Application Fee Application Fee (ix)N/C N/C (x)$1,410 $1,410 (xii)$11,240 $11,240 (xiii)100% of cost 100% of cost (xiv)$1,800 $1,800 (xv)$1,800 $1,800 (xvi)$180 $180 (xvii)$6,080 $6,080 (xviii)$180 $180 (xix)N/C N/C (xx)$570 $570 (xxi)$1,230 $1,230 (xxii) (1)$1,230 $1,230 (2)$3,650 $3,650 (3)$1,800 $1,800 (xxiii)$170 $170 (xxiv) (1)$6,080 $6,080 (2)$3,040 $3,040 (3)$12,170 $12,170 (4)$6,080 $6,080 (5)50% of Application Fee 50% of Application Fee (6)Application Fee Application Fee (xxv) (1)$6,080 $6,080 (2)$3,030 $3,030 (xxvi) (1)$570 $570 (2)$1,730 $1,730 (xxvii)N/C N/C (xxviii)$5,900 $5,900 (xxix)$120 $120 (xxx) (1)N/C N/C (2)$3,030 $3,030 Mult $3,650 $3,650 (4)$3,650 $3,650 (xxxi) (1)$4,270 $4,270 (2)$3,030 $3,030 (3)50% of Application Fee 50% of Application Fee (4)Application Fees Application Fees (xxxii)$570 $570  (xxxiii)$3,030 $3,030 (xxxiv) (1)$280 $280 (2)$280 $280 (xxxv) (1)$120 $120 (2)$230 $230 (xxxvi)$1,490 $1,490 (xxxvii)$290 $290 (xxxviii)$540 $540 Waiver or Modification of Code Requirements cost is per request Zoning Compliance Letter Installation Temporary Use Permits: Tier 1 Tier 2 Variance (per each variance requested) Administrative or Hearing Examiner Application Conditional Use Permit Variance Hearing Examiner Review Administrative Review   Site Development Plan (Site Plan or Master Plan which includes design review fee for projects subject to RMC 4‐3‐100): Modification (minor, administrative)  Modification (major) required new application and repayment of fee required Small Cell Permit, per site4 Special Permit (Hearing Examiner)  Street Naming (Honorary) Substantial Development Permit  Planned Urban Development: Preliminary Plan Final Plan Reasonable Use Exception: In conjunction with land use permit Stand alone Public Arts Exemption Rezone   Routine Vegetation Management Permit without Critical Areas   Shoreline‐Related Permits: Shoreline Permit Exemption  Landscape Review Fee Legal Lot Segregation Lot Consolidation Major Plat Amendment  Manufactured/Mobile Home Park: Tentative Preliminary Final Open Space Classification Request Plats: Preliminary Short Plat  Final Short Plat  Preliminary Plat  Final Plat Minor Plat Amendment  Development Agreement Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final3 Environmental Checklist Review 100% of contract cost 100% of contract cost General Land Use Review1: Additional Animals Permit  Address Change Annexation: Less than 10 acres Administrative Appeal of: Hearing Examiner's Decision Administrative Decision Environmental Decision Binding Site Plan (total fee for both preliminary and final phases) Code Text Amendment Comprehensive Plan Map or Text Amendment (each) Conditional Use Permit: 10 acres or more Land Use Review Fees:  HEX Revision (minor, administrative)  Revision (major) Critical Areas Exemption Critical Areas Permit (xi)Critical Areas Review Fee:  for those projects that propose impacts to critical areas and will be billed at the cost of contract biologist’s review.2 Lot Line Adjustment Environmental (SEPA) Addendum Fence Permit (special) Grading and Filling Permit (Hearing Examiner) 7 City of Renton Fee Schedule 2023‐2024 SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024 2. a. b. (i) Land Use Review Fees:  (Continued) Miscellaneous Fees1: General Land Use Review1:  (Continued) SECTION XII. DEVELOPMENT FEES (CONTINUED ON THE NEXT PAGE) 1  Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review  Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public review. 1  Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review  Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public review. 2  Per RMC 4‐3‐050F7, the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other documents related to  evaluation of impacts to or hazards from critical areas and subsequent code‐required monitoring. 3  When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be  prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of the projected  costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a  consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City  and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after incurred  costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant’s proposal. The City  shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a  manner provided by chapter 42.17 RCW. 4  Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application,  including plan inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended. Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on  Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of  city  staff regular work schedule) $175/hr $175/hr 8 City of Renton Fee Schedule 2023‐2024 2023 2024 3. a. (i) Grade and Fill Quantity Cleared or Disturbed Area < 50 cy < 7,000 sf 50 cy ‐ 499 cy 7,000 sf ‐ < 3/4 acre 500 cy ‐ 4,999 cy 3/4 ac ‐ < 1 ac 5,000 cy ‐ 49,999 cy 1 ac ‐ < 2.5 ac 50,000 cy ‐ 99,999 cy 2.5 ac ‐ < 5 ac 100,000 cy and larger 5 ac and larger (1) (a)N/A N/A (b)$520 $520  (c)$700 $700  (d)$1,050 $1,050  (f)$1,400 $1,400  (e)$1,750 $1,750  (2) (a)N/A N/A (b)$500 $500  (c)$1,000 $1,000  (d)$1,330 $1,330  (f)$2,660 $2,660  (e)$3,990 $3,990  (3)1.5 x Review/Intake Fee 1.5 x Review/Intake Fee (4)1.5 x Review/Intake Fee 1.5 x Review/Intake Fee (ii) (1)6% of cost 6% of cost (2)$9,000 + 5% over $150,000 $9,000 + 5% over $150,000 (3)$17,500 + 4% over $350,000 $17,500 + 4% over $350,000 (iii)0.5% of cost 0.5% of cost (iv) $280 $280  (2)$1,700 $1,700  (v)$3,000 $3,000  b. (i) (1)$1,120 $1,120  (2)$2,250 $2,250  (3)$4,500 $4,500  (ii) (1)15% of total 15% of total (2)10% of total 10% of total (3)5% of total 5% of total (iii)$840 $840  c. (i) (1) (a)$4,850 $4,850 (b)$648 $648 (c)$3,650 $3,650 (2) (a)$24,250 $24,250 (b)$3,238 $3,238 (c)$18,250 $18,250 (3) (a)$38,800 $38,800 (b)$5,181 $5,181 (c)$29,200 $29,200 $150,000.00 or less Over $150,000.00 but less than $350,000.00 $350,000.00 and over Site Plan/Zoning Review and Inspection Fee6,7 1  Fees are based on the amount covered by the Latecomers'. Water service fee1,4 Fire sprinkler service fee 2,3 Wastewater fee1,4 $200,000 and over Annual Licenses of Solid Waste Fills Review Fee1,2:   SECTION XII. DEVELOPMENT FEES (CONTINUED) New or Replaced Hard Surface < 2,000 sf 2,000 sf ‐ 4,999 sf 5,000 sf ‐ < 1 ac 1 ac ‐ < 2.5 ac 2.5 ac ‐ < 5 ac 5 ac and larger Site Work, Utilities, and Right of Way Fees: Site Work and Civil Construction Fees:   Tier 0 1 2 3 4 5 Clearing, Grading, Excavation, and Mining Permits and License Fees: Fees shall be based on the highest tier  7  Cost of improvements shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all costs required to construct the  following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets;  public and private sanitary sewers; public water main improvements; required off‐site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and site  grading and mobilization costs.  The applicant may elect to submit a separate, itemized cost estimates for each item of improvement subject to the approval by the City. 1‐1/2 inch: Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1 $50,000 or less  Wastewater fee4 2 inch: Water service fee4 Water service fee4 Civil construction plan review and inspection fees6,7,8:  8  Fifty Percent (50%) of the fee is due at Civil Construction Permit Application and the remaining shall be due prior to permit issuance. Wet weather (annual fee) 5  If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related costs and expenses payable by the applicant. 3  All developers, municipal or quasi‐municipal entities, or utility corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include City‐franchised cable TV, cable  modem, natural gas, telecommunications, and electrical power.  Plan Revision following Permit Issuance: (1)Minor (Results in a change 10% or less than the cost of improvements7. Excludes minor adjustments that are  approved by the City to be shown on record drawings.) Major (Results in a change of greater than 10% of the cost of improvements 7.) 6  The fee shall be based up percentage of the estimated cost of improvements.   1  The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project.  2  Any unused fee may be carried forward to the next year. If any work is done before the license is issued, the grading license fee shall be doubled. Segregation processing fee, if applicable  Over $50,000 but less than $200,000 4  Includes three (3) review cycles. Additional reviews will be charged $1,700 each. 5/8 x 3/4 inch and 1 inch: Water and Wastewater System Development Charges (SDC): Utility System Development Charges (SDC): 2  The administration and collection fee is deducted from each individual latecomer fee payment and the balance forwarded to the holder of the latecomer’s agreement pursuant to RMC 9‐5, Tender of Fee. Latecomers' Agreement Application Fees1: Processing fee2 (Nonrefundable)  $50,000 or less  Over $50,000 but less than $200,000 $200,000 and over Fire sprinkler service fee 2,3 Wastewater fee4 Fire sprinkler service fee 2,3 Solid Waste Fills Review Fee1: Inspection/Issuance Fee: Review/Intake Fee: Tier 0 (no permit required) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Tier 0 (no permit required) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 9 City of Renton Fee Schedule 2023‐2024 2023 2024 3. c. (4) (a)$77,600 $77,600 (b)$10,362 $10,362 (c)$58,400 $58,400 (5) (a)$121,250 $121,250 (b)$16,191 $16,191 (c)$91,250 $91,250 (6) (a)$242,500 $242,500 (b)$32,383 $32,383 (c)$182,500 $182,500 (7) (a)$388,000 $388,000 (b)$51,812 $51,812 (c)$292,000 $292,000 (ii) (1)$2,300 $2,300 (3)$0.920 per sq foot $0.920 per sq foot (iii)$840 + administrative costs $840 + administrative costs (iv) d. (i) (1) (a)$50 $50  (c)Time and materials Time and materials (d)$275 $275  (e)$95 $95  (f)$250 $250  (g)$560 $560  (h)$1,025 $1,025  (i)$80 $80  (k)$185 $185  (n)Time and materials Time and materials (o)$50 $50  (p)$200 $200  (2) (a) (i)$2,875 $2,875  (ii)$400 $400  (b) (i)$2,935 $2,935  (ii)$400 $400  (c) (i)$2,875 $2,875  (ii)$460 $460  (d) (i)$4,605 $4,605  (ii)$750 $750  6  Temporary connection may be granted for a one‐time, temporary, short‐term use of a portion of the property for a period not to exceed three (3) consecutive years.  Fee shall be paid annually (non‐prorated), and shall be  nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system development charge due at the time of permanent use of the utility system. The application for  temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination. (b) (j) $250 + $0.15 per lineal foot Cost of test +  $70 processing fee Cost of test +  $70 processing fee $60 deposit +  time and materials $60 deposit +  time and materials Water meter tests on meters 2" or larger Specialty water tests (lead, copper, etc) Water main connections $2,000 deposit +  time and materials Installation of isolation valve.  Open and close fire hydrants for fire flow tests conducted by others.  Water service disconnection (cut at main) Water Construction Permit Fees: 30% of SDC 30% of SDC 30% of SDC Fire sprinkler service fee 2,3 Wastewater fee4 4 inch: Storm Water System Development Charges (SDC): New single family residence (including mobile/manufactured homes) & Accessory Dwelling Unit (ADU)1 Storm Water Fee; Fee equal to thirty percent (30%) of the current SDC applicable to that portion of the  property. Water service fee4 6 inch: $0.920 per sq foot Wastewater Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the  temporary domestic water meter(s). Utility SDC Segregation Request5 Meter resets Repair of damage to service Water meter tests for 3/4” to 2" meter Water Testing, Construction, and Administration Fees: Drop in meter only Drop in meter only Drop in meter only Drop in meter only Water Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the temporary  water meter(s). (2) (3) (1) Utility Construction Permit Fees:   5  The applicant shall pay the City’s administrative costs for the preparation, processing and recording of the partial payment of the fee(s). If the same segregation is used for more than one utility’s special assessment district,  and/or latecomer’s charge, then only one administrative fee is collected. Utility System Development Charges (SDC):  (Continued) 30% of SDC 30% of SDC 30% of SDC Fire sprinkler service fee 2,3 Wastewater fee4 8 inch: $0.920 per sq footAddition to existing single family residence greater than 500 square feet (including mobile/manufactured  homes) Fee not to exceed $2,300 3 inch: Water service fee4 All other uses charge per square foot of new impervious surface, but not less than $2,300 Fire sprinkler service fee 2,3 Wastewater fee4 Water service fee4 Fire sprinkler service fee 2,3 Wastewater fee4 Water service fee4 2  Based upon the size of the fire sprinkler service (NOT detector bypass meter) Temporary Utility Connection6: (2) $2,000 deposit +  time and materials Water main cut and cap Installation of stub service and meter setter only. $250 + $0.15 per lineal foot Water meter installation fees – City installed:  Installation fees for ring and cover castings 1  This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU). 4  Any parcel that currently has water and or sewer service is eligible for a prorated system development charge is eligible for credit of the existing connection.  Fee(s) based upon meter(s) proposed for final project will be  reduced by the fee(s) based upon meter existing on site. 3  Unless a separate fire sprinkler service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate Fire sprinkler service fee will not be charged. (l) (m) Water quality/inspection/purity tests Water turn ons/offs after hours New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after the first two hundred  fifty (250) lineal feet Miscellaneous water installation fees.  Service size reductions Installation of stub service and meter setter only. Installation of stub service and meter setter only. 1” meter installed by the City.2 Installation of stub service and meter setter only. 1‐1/2" meter installed by the City. 3/4” meter installed by City outside City limits2 3/4” meter installed by City within City limits.2 SECTION XII. DEVELOPMENT FEES (CONTINUED) Site Work, Utilities, and Right of Way Fees:   (Continued) 10 City of Renton Fee Schedule 2023‐2024 2023 2024 3. d. (e) (i)$4,735 $4,735  (ii)$950 $950  (4) (a)$50 $50 (b) (i)$500 $500 (ii)$2,000 $2,000 (iii)$25 $25 (c) (i)$50 $50 (ii)$250 $250 (ii) (1) (a)$375 $300 (b)$375 $300 (2) (a)$375 $300 (b)$375 $300 (3) (a)$375 $300 (b)$375 $300 (4) (a)$375 $300 (b)$375 $300 (5) (a)$375 $300 (b)$375 $300 (6)$375 $300 $375 $300 (iv)$525 $525 (v) (1)$500 $500 (2)$1,000 $1,000 e. (i) (1)$5,620 $5,620  (2) (a)$670 $670  (b)$670 + Time and Materials $670 + Time and Materials (c)$670 $670  (3) (a)Time and Materials Time and Materials (b)$135 $135  (c)$850 deposit + Time and Materials $850 deposit + Time and Materials (i) (1)$715.38 $715.38  (2)$1,430.76 $1,430.76  (3)$2,146.14 $2,146.14  (4)$2,861.51 $2,861.51  (5)$3,576.89 $3,576.89  (ii)Actual cost Actual cost (e)$270 $270  (f)Actual cost Actual cost (4) (a)$10.00 $10.00  (b)$20.00 $20.00  (c)$30.00 $30.00  (ii) (1)$370 $370 (2)$700 $700 (3)$375 $375 Street light system fee, per new connection to power system  Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45‐day locate ticket) Ground water discharge (temporary connection to wastewater system for discharge of contaminated ground  water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged  amount (meter provided by property owner) Drop in meter only Hydrant Meter fees: Hydrant meter permit fee Deposits: 2” meter installed by the City. Surface water permit fee Repair or modification of any of the above Wastewater permit fee $220 (3) Water meter processing fees – Applicant installed: For meters larger than 2”, the applicant must provide materials and install the meter. $220  Installation of stub service and meter setter only. SECTION XII. DEVELOPMENT FEES (CONTINUED) Site Work, Utilities, and Right of Way Fees:   (Continued) Utility Construction Permit Fees:   (Continued) Large project locate Surface water permit fee 3/4” meter and backflow prevention assembly. 3” meter and backflow prevention assembly. Deposit processing charge, nonrefundable. Meter rental (begins on day of pickup): 3/4” meter and backflow prevention assembly. Per month. Right of Way (ROW) Use Permits Fees1 Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles 1  This fee shall be $0 for Accessory Dwelling Units (ADU). Master Service Agreement Application Fee3 (7) 2  This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU). Cut and Cap/Demolition Permit: Wastewater permit fee Surface water permit fee Reinspection for Wastewater or Surface Water Permits 3” meter and backflow prevention assembly. Per month. Wastewater and Surface Water Construction Permit Fees1: Residential: Wastewater permit fee All other reimbursement  Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks Short‐Term ROW Permit Fees  (duration 30 days or less)2,7: Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or  operation of site equipment) All other fees6 Tier 1, Daily peak kWh <20 Tier 2, Daily peak kWh 21 ‐ 40 Tier 3, Daily peak kWh 41 ‐ 60 Tier 4, Daily peak kWh 61 ‐ 80 Tier 5, Daily peak kWh >81 (d) Site License Addendum Rent Conduit Lease Rates per Lineal Foot (annual fee): Tier 1, conduit in existing planter strips Electrical service (annual fee)  Single family residence, one unit only All other uses, excluding those listed Wastewater or storm water service Tier 3, conduit within signalized intersection crossings, bridges and train tracks All other work, permit fee plus staff inspection per hour6  Other public agencies constructing utilities within City right‐of‐way Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits Master Lease Agreement Administrative Costs, Staff time per hour and/or cost of materials.6 Pole Reservation, per pole  Administrative Fee, Base plus time and/or cost of materials.6  plus King County sewer rate on discharged amount plus King County sewer rate on discharged  amount Franchise Permit Fees: 4,5 Surface water permit fee Commercial: Wastewater permit fee Surface water permit fee Industrial: Wastewater permit fee Standard locate Franchise Permit Fees: 11 City of Renton Fee Schedule 2023‐2024 2023 2024 3. e. (iii) (1) (b) (i)$1,025 $1,025 (ii)$1,025 $1,025 (2) (i) (iv)$10 $10 f. (i)$280 $280  (ii)$280 $280  g. (i)$560 $560  (ii) (1)$840 $840  (2)$1,410 $1,410  (3)$2,250 $2,250  h. (i) (1) (a)$130/LF $130/LF (b)$150/LF $150/LF (ii)$158 $158  (iii)$158 $158  (iv)$158/hr $158/hr (v)$175/hr $175/hr (vi)$175/hr $175/hr (vii)Actual cost Actual cost (viii)$670 $670  2  Unscheduled work includes, but is not limited to, site work that is found to be occurring, or did occur, for which an inspection was not scheduled. Fee is subject to be applied for each occurrence but does not replace a stop  work order or other code violation as determined applicable by the City. The fee is in addition to any other applicable inspection fees. The fee may provide day of inspection at the discretion and availablility of the City inspector. Miscellaneous Fees: Street with existing conveyance ditch 2  Work and/or use of the right of way, including those associated with a Civil Construction Permit and excludes utilities from other public agencies and service providers which shall be considered under a franchise permit. Short‐Term ROW  Permit Fee + LET9 Short‐Term ROW  Permit Fee + LET9 Within City Limits8; Short‐Term ROW Permit Fee associated with use plus leasehold excise tax (LET)9 Service Installation Only Utility Extension per 100' of Length (Min 200' Length) All uses without public benefit; fee is a per month charge assessed annually based on property value 12  of land to be utilized, plus leasehold excise tax9, if applicable.  (a) Long Term ROW Permit Fees (duration over 30 days)2: SECTION XII. DEVELOPMENT FEES (CONTINUED) Site Work, Utilities, and Right of Way Fees:   (Continued) Right of Way Use Permits Fees1 (Continued) 10  Insurance Required: Public Liability and property damage insurance is also required pursuant to RMC 9‐2‐5B, Minimum Permit Requirements for Excess Right‐of‐Way Use. King County ROW Permits/Inspections: Single family and two family uses11; fee assessed annually plus leasehold excise tax (LET)9,  if  applicable Duration greater than thirty (30) days but no more than one (1) year: Duration greater than one (1) year8,10: 0.5% x Value12 + LET9 0.5% x Value12 + LET9(ii) $50 + LET9 $50 + LET9 5  Applies only if permit review is requested by the applicant to be performed on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of  city staff regular work schedule 6  Any work performed by City forces or under City contract on behalf of a permit applicant to repair damage to the City infrastructure or caused by the permit applicant or contractor under its control, or any and all roadway or  right‐of‐way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit applicant or contractors under its control. 1  Bond required pursuant to RMC 9‐10‐5 3  The fixed application fee established herein is intended to cover the City’s internal administrative costs in processing and administering the franchise.  In addition to the fixed application fee, the City may require applicants to  either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement.  The City may require applicants to deposit funds in advance to cover legal  and/or other professional services fees as they are incurred. 4  The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. 5  If a franchise agreement does not specify the fee amount, the generic fee, as identified in this fee schedule, shall be collected. 6  Regular hours and standard after hour and overtime fees apply. 11  Except those single family and two family uses that utilize right of way along a waterfront. 12  Right‐of‐way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor. Street with existing storm drainage main line Public Works Reimbursement6 Standard or minor drainage adjustment review All eligible uses except Single Family Additions less than 1,160 sq ft: 7A no fee permit may be issued for the following: individual homeowners performing work in street ROW for street tree or parking strip irrigation systems; residential moving pods or moving trucks provided that they are in the  ROW for no more than three (3) days; use in CD zone provided ground disturbing activity is not proposed; and work associated with City of Renton capital improvement projects or City funded projects. 8  A no fee permit may be issued for the following: A public agency and when the proposed use of the right‐of‐way provides a direct service to the public (e.g., Metro applications for right‐of‐way for bus shelters); and work  associated with City of Renton capital improvement projects or City funded projects. 9  Leasehold excise tax (LET) imposed pursuant to Chapter 82.29A RCW on leasehold interests for the use of real or personal public property shall be collected from the permittee at a rate established by the State of Washington. 3  Applies only to those fees that are noted as time and materials and performed during city staff regular work schedule. Single Family Additions less than 1,160 Sq Ft:  Proportional share of the fee in lieu of all eligible uses fee based  on square footage of addition. (2)(Sq Ft of addition / 1,160 sq ft) of Fee‐in‐lieu (Sq Ft of addition / 1,160 sq ft) of Fee‐in‐lieu Permit review staff overtime5 Regular Staff Review and Inspection Hours3 4  Applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside the hours of 7:00am to 3:30pm. Inspection for Unscheduled Work2 After hours inspection4 1   This fee shall be $0 for Accessory Dwelling Units (ADU). Oversize Load Permits (iii)All other uses;  fee is a per year charge of assessed value of land adjoining the property12, plus leasehold excise tax9, if applicable. In no case less than $50.00.  0.5% x Value12 + LET9 0.5% x Value12 + LET9 Processing and completion fee, payable upon Council approval of the vacation and upon administrative  determination of appraised value of vacated right‐of‐way.  Appraised Value of Vacated right‐of‐way: Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in  chapter 9‐14 RMC, Vacations. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in  chapter 9‐1 RMC, Easements. Filing fee Processing fee  Filing fee Less than $25,000 $25,000 to $75,000 Re‐inspection Fee Over $75,000 Street Frontage Improvements Fee‐In‐Lieu:1 12 City of Renton Fee Schedule 2023‐2024 2023 2024 4. 5.0% 5.0% 5. a.  (i) (1)$11,377 $11,377  (2)$4,718 $4,718  (ii) (1)$0.00 $0.00  (2)$0.00 $0.00  (iii) (1)$2,911 $2,911  (2)$3,697 $3,697  (iv)5% x School Impact Fee 5% x School Impact Fee b.  (i)$10.68 $10.68 (ii)$7,550.02 $7,550.02 (iii)$6.02 $6.02 (iv)$248.51 $248.51 (v)$261.04 $261.04 (vi)$6,345.23 $6,345.23 (vii)$249.31 $249.31 (viii)$54.94 $54.94 (ix)$69.16 $69.16 (x)$157.10 $157.10 (xi)$159.44 $159.44 (xii)$203.13 $203.13 (xiii)$73,411.90 $73,411.90 (xiv)$98,150.27 $98,150.27 (xv)$16.39 $16.39 (xvi)$40.49 $40.49 (xvii)$8.76 $8.76 (xviii)$4,819.16 $4,819.16 (xix)$8.04 $8.04 (xx)$2,570.22 $2,570.22 (xxi)$37.02 $37.02 (xxii)$2.89 $2.89 (xxiii)$7,228.75 $7,228.75 (xxiv)$4,417.57 $4,417.57 (xxv)$722.88 $722.88 (xxvi)$2,007.98 $2,007.98 (xxvii)$68.51 $68.51 (xxviii)$3,293.10 $3,293.10 (xxix)$29.88 $29.88 (xxx)$12,208.54 $12,208.54 (xxxi)$73.97 $73.97 (xxxii)$8,031.94 $8,031.94 c. (i)$3,276.44 $3,276.44 (ii)$2,659.70 $2,659.70 (iii)$2,531.21 $2,531.21 (iv)$2,222.84 $2,222.84 (v)$2,325.63 $2,325.63 d. (i)$829.77 $829.77 (ii)$964.53 $964.53 (iii)$1.29 $1.29 (iv)$3.92 $3.92 (v)$0.26 $0.26 (vi)$1.99 $1.99 (vii)$1.25 $1.25 (viii)$2.36 $2.36 (ix)$5.92 $5.92 (x)$0.15 $0.15 (xi)$0.56 $0.56 (xii)$0.72 $0.72 (xiii)$4.48 $4.48 Technology Surcharge Fee Impact Fees: SECTION XII. DEVELOPMENT FEES (CONTINUED) Transportation Impact Fees: School Impact Fees: Issaquah School District Single Family Fee Multi Family, Duplex, & Accessory Dwelling Fee (ADU) Kent School District Single Family Fee Multi Family, Duplex, & Accessory Dwelling Fee (ADU) Renton School District Single Family Fee Multi Family, Duplex, & Accessory Dwelling Fee (ADU)1 School Impact Fee Administration An additional technology surcharge shall be required for all fees included in the  following Subsections of Section XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection a, except for appeals, critical areas  review fee, and direct EIS costs, of subsection 2, Land Use Review Fees; Subsections a, b, c(iii), d, and e, except Master  Franchise/Small Cell Permit Application Fee and Long Term ROW Permit Fees (duration over one year), of subsection 3, Site Work,  Utilities, and Right of Way Fees; and Section XIII, Fire Department Fire Marshall Fees 1  This fee shall be $0 for Accessory Dwelling Units (ADU). Fast food, with drive‐up, per sq foot Light Industrial, per sq foot Apartment, per dwelling & Accessory Dwelling Unit (ADU)1 Church, per sq foot Coffee/Donut Shop, no drive up, per sq foot Coffee/Donut Shop, with drive up, per sq foot Condominium & Duplexes per dwelling Convenience market ‐ 24 hour, per sq foot Daycare, per sq foot Drinking Place, per sq foot Drive‐in bank, per sq foot Fast food, no drive‐up, per sq foot Park Impact Fees: Single family Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1 Motel, per room Gas station with convenience store, per pump Gas station, per pump General office, per sq foot Health/fitness club, per sq foot Hospital, per sq foot Hotel, per room Manufacturing, per sq foot Marina, per boat berth Medical office, per sq foot Mini‐warehouse, per sq foot Mobile home, per dwelling Movie theater, per seat Nursing home, per bed Restaurant: sit‐down, per sq foot Senior housing ‐ detached, per dwelling Shopping center, per sq foot Single family house, per dwelling Supermarket, per sq foot 1  This fee shall be $0 for Accessory Dwelling Units (ADU). Net New PM Peak Hour Person Vehicle Trip (Proposed ‐ Existing), per PM Peak Hour Person Vehicle Trip  Hotel/motel/resort, per sq foot Medical care facility, per sq foot Office, per sq foot Medical/dental office, per sq foot Retail, per sq foot Leisure facilities, per sq foot Industrial/manufacturing, per sq foot Church, per sq foot Education, per sq foot Special public facilities, per sq foot *(i)‐(ii) is per unit *(iii)‐(xiii) is per square foot 1  This fee shall be $0 for Accessory Dwelling Units (ADU). 1  This fee shall be $0 for Accessory Dwelling Units (ADU). Restaurant/lounge, per sq foot Multi‐family: 5 or more units Mobile home Fire Impact Fees: Residential ‐ single family (detached dwellings & duplexes), per dwelling unit Residential ‐ multi family & Accessory Dwelling Unit (ADU)1, per dwelling unit Multi‐family: 3 or 4 units 13 City of Renton Fee Schedule 2023‐2024 2023 2024 5. e.$560 $560 f. (i)$100 $100 (ii)$100 $100 6. a.$1,000.00 $1,000.00  b. (i)$225.00 $225.00  (ii)$500.00 $500.00  SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)2023 2024 a. (i)$50 $50 (ii)$50 + 2% of the cost $50 + 2% of the cost (iii)$75 + 2% of the cost $75 + 2% of the cost (iv)$200 + 1.5% of the cost $200 + 1.5% of the cost (v)$450 + 1.2% of the cost $450 + 1.2% of the cost (vi)$950 + .75% of the cost $950 + .75% of the cost (vii) (viii) (ix) (x) (1)N/C N/C (2)$75 $75 (3)$150 $150 (xi)$35 $35 b. $150 $150 $75 $75 (iii)$250 $250 (vii)$200 $200 (ix)WFC Current Wage and  Equipment Rate WFC Current Wage and  Equipment Rate (x)$25 $25 $175 $150 $150 Multifamily Tax Exemption Application Tree Fee in lieu  Per diameter inch measured at 4.5 feet above grade Labor cost for each 2" caliper (or 6ft tall) tree to be planted Miscellaneous Fees $250 $250 (xi) (viii) Underground tank removal or abandonment‐in‐ place permit (residential) (vi) Impact Fee Deferral Administration: Each Lot, Single Family Dwelling, or Condominium Each Multi‐family Building $175 Fire plan review and inspection fees: $100,000.00 and above  Construction Re‐inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if the  requested inspection does not meet the approval of the inspector. $0 to $249.99 $250.00 to $999.99  $1,000.00 to $4,999.99  $5,000.00 to $49,999.99  $50,000.00 to $99,999.99  Independent Fee Calculation Review (or unless otherwise established by School District or Renton Regional Fire Authority) SECTION XII. DEVELOPMENT FEES (CONTINUED) Impact Fees: (Continued) (iv) $175 $175 5% 5% Other requested inspection when not required by the fire code.  Fee is per hour with a minimum 1 hr when  approved by the Fire Marshal, such as home daycares RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and  subsection b. (iii) NSF check fees 20% of plan review fee ‐  Min. $75 20% of plan review fee ‐  Min. $75 $250 $250 See Fire plan review and  construction permit fees See Fire plan review and  construction permit fees Underground tank removal permit (commercial) Hazardous production materials permit (for businesses storing, handling, or using hazardous production materials  as regulated in the fire code) permit is yearly (v) (VIII) Non‐emergency Billable Services (ie: boat assists, etc) Rates published at:   www.washingtonfirechiefs.com Third and subsequent re‐Inspection/Pre‐Citation Follow‐Up Inspection when re‐inspections are required beyond  the first and second re‐inspections Construction permit:  Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes items such  as fire special events, covered stages, mobile food facilities, hot works, etc.) Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that has  reciprocity with Renton RFA Hazardous materials and HPM facilities yearly Late Payment Penalty Violation/Second Re‐Inspection after 30‐day period (whenever 30 days or more have passed since Fire Department  notification of a violation, which required a first re‐inspection, and such violation has not been remedied or  granted an extension) Preventable Fire alarm fee: First, second, and third preventable alarms Fourth and fifth preventable alarms in a calendar year, fee is per each alarm. Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm. Fire Permit type: (i) (ii) 14 City of Renton Fee Schedule 2023‐2024 2023 2024 3. a.RMC 2‐9‐8.C $73 $73 i. RMC 2‐9‐8.C.1 $73 $73 ii.RMC 2‐9‐8.C.2 $73 $73 iii.RMC 2‐9‐8.C.3 $73 $73 iv.RMC 2‐9‐8.C.4 $73 $73 v.RMC 2‐9‐8.C.5 $73 $73 vi.RMC 2‐9‐8.C.6 $73 $73 vii.RMC 2‐9‐8.C.7 $73 $73 viii.RMC 2‐9‐8.C.8 $73 $73 ix.RMC 2‐9‐8.C.9 $73 $73 x.RMC 2‐9‐8.C.10 $73 $73 xi.RMC 2‐9‐8.C.11 $73 $73 xii.RMC 2‐9‐8.C.12 $73 $73 xiii.RMC 2‐9‐8.C.13 $73 $73 xiv.RMC 2‐9‐8.C.14 $73 $73 xv.RMC 2‐9‐8.C.15 $73 $73 xvi.RMC 2‐9‐8.C.16 $73 $73 xvii.RMC 2‐9‐8.C.17 $73 $73 xviii.RMC 2‐9‐8.C.17 $73 $73 b.RMC 4‐5‐070.C.102 $49 $49 c.RMC 5‐4‐1 $49 $49 d.RMC 6‐14‐22 $50 $50 i. RMC 6‐14‐3 $50 $50 ii.RMC 6‐14‐4 $50 $50 iii.RMC 6‐14‐5 $50 $50 iv.RMC 6‐14‐6 $50 $50 v.RMC 6‐14‐7 $50 $50 vi.RMC 6‐14‐8 $50 $50 vii.RMC 6‐14‐10 $50 $50 viii.RMC 6‐14‐11 $50 $50 ix.RMC 6‐14‐12 $50 $50 x.RMC 6‐14‐13 $50 $50 xi.RMC 6‐14‐14 $50 $50 xii.RMC 6‐14‐15 $50 $50 xiii.RMC 6‐14‐16 $50 $50 xiv.RMC 6‐14‐17 $50 $50 xv.RMC 6‐14‐18 $50 $50 xvi.RMC 6‐14‐19 $50 $50 xvii.RMC 6‐14‐20 $50 $50 e.RMC 6‐6‐1.A $49 $49 f.RMC 6‐6‐5.A $49 $49 g.RMC 9‐17‐10 $100 $100 h.RMC 9‐3‐5 $42 $42 i.RMC 9‐3‐7 $42 $42 j.RMC 9‐3‐10 $122 $122 k.RMC 9‐3‐26 $42 $42 l.RMC 9‐3‐31 $42 $42 m.RMC 10‐12‐25 $67 $67 n.RMC 10‐12‐26 $42 $42 o.RMC 10‐12‐27 $42 $42 p.RMC 10‐12‐28.C $42 $42 q.RMC 10‐12‐28.D $42 $42 r.RMC 10‐12‐28.E.1 $42 $42 s.RMC 10‐12‐28.E.2 $42 $42 t.RMC 10‐12‐28.F $42 $42 u.RMC 10‐12‐28.G $42 $42 v.RMC 10‐12‐28.H $42 $42 w.RMC 10‐2‐5 $47 $47  $48 $48 Owner to Maintain Premises Free of Litter Litter of Vacant Lots Unsafe Use of Scooter Operating Scooter When Prohibited Use of Scooter Where Prohibited Use of Scooter Without a Helmet No Reflectors on Scooter No Muffler on Scooter Scooter Operator Under Age 13 Prohibiting Distribution of Handbills Where  Properly Posted Distributing Handbills at Inhabited Private Premises Dropping Litter from Aircraft Posting Notices Prohibited Litter on Occupied Private Property Truck Loads Causing Litter Litter in Lakes and Fountains Throwing/Distributing Commercial Handbills in  Public Places Placing Handbills on Vehicles Depositing Handbills on Uninhabited/Vacant  Premises Smoking in Park Litter in Public Spaces Placement of Litter in Receptacles Sweeping Litter in Gutters Merchants’ Duty Glass Container in Park with Swimming Area Group Rally/Special Use Permit Parking & Mooring Violation City Events Violation Alcohol in Park Vehicle/Boat Repair in Park Racing in Park SCUBA Diving in Park Camping/Overnight Stay in Parks Metal Detecting All other violations identified by Renton Municipal Code as an infraction not listed or otherwise specified by court rule or law. Animal Control – No License  Littering  Animal Control – Animal at Large  Animal Control – Animal/Fowl Habitual Noise  Violation of ATV Ordinance  Inattentive Driving  Truck Route Violation  Avoiding Intersection  Encroachment on Public Property  Negligent Operation of Watercraft  Speed Regulations of Watercraft  Obstructions of Waterways  Equipment Numbering Violation  Violation of Rules of the Road  Litter Thrown By Persons in Vehicles Violation of Park Rules (Civil Infraction)  Possession/Sale/Discharge of Fireworks  SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER THE AUTHORITY OF CHAPTER 7.80  Effect of Schedule. This schedule establishes default base penalties for violations of the Renton Municipal Code that are issued as infractions under the authority of RCW 7.80 RCW, but these  penalties do not include any state‐imposed statutory assessments. Except as otherwise prohibited by law or court rule, a court with jurisdiction over the infraction may impose on a defendant a lesser  penalty in an individual case. Provided that, whenever the base penalty plus mandatory statutory assessments results in a total payment that is not an even dollar amount, the base penalty is deemed  to be amended to a higher amount which produces the next greatest even dollar total Penalties Established by Court Rule or Specific Penalty Established by Law. This schedule does not apply to penalties established by state or local court rule or to a penalty that is established in law  with a specific amount (i.e. ordinance or statute setting a penalty equal to a specified amount rather than a penalty up to a maximum amount). To the extent a penalty scheduled herein conflicts with  a state or local court rule or a penalty that is established in law, this schedule shall be deemed preempted by the court rule or penalty established in law Penalties: The following violations shall carry the following listed default base penalty, not including statutory assessments: 1. 2. Fire/Barbeque in Park Activities Prohibited in a Park Disregard Park Trail Sign Unauthorized Vehicle in a Park Operating Motorized Vehicle on Park Trail Dismount Zone Violation Speeding on Trails 15