Loading...
HomeMy WebLinkAboutExhibit_2_-_Project_Narrative_and_Justification1 | P a g e August 30, 2023 PROJECT NARRATIVE Petrovitsky Apartments PRE21-000308 Owner/Developer: Capstone Real Estate LLC Site Address: 11204 SE Petrovitsky Road Renton, WA Current Zoning: R-14 as are the surrounding properties Site Area: 30,288 sf Current use of Site: Single Family Residence. Special Features: None Site Characteristics: The existing site contains a single family home. The site cover is lawn and landscaping. The on-site soils have been identified as a silty sand. The lot itself has gentle slopes with all runoff draining the north-west corner of the site. Proposed use: The site will contain two new apartment buildings with a total of nine units. The hight of the untints will be approximately 30-feet with a square footing of 8,752 sf. And a total lot coverage of 18,644 sf of impervious area or approximately 61%. Parking will be under the units along with 5-exterior stalls. Proposed Off-Site Improvements. Modification Request: SE Petrovitsky Road lies within the adopted Renton Trails and Bicycle Master Plan. This plan calls for a shared use path on the north side of Petrovitsky Road. Additionally, the Transportation department has indicated that the existing curb- curb width is sufficient. Therefore, we are requesting that half street improvements include retaining the existing pavement width (approximately 30 feet from centerline), a 0.5 foot curb, an 8-foot planting strip, a 12 foot wide shared use path, a 2-foot clear space at the back of walk, street trees and storm drainage improvements. Along with a dedication of approximately 10.5 feet is required for the improvements pending final survey. Construction costs: The total estimated construction cost is approximately $1.5 million with a value of $2.0 million. Grading quantities: The estimated cut and fill for the site is 400 cyds each. Trees: Only 1 cherry tree (8” caliper section) with-in the right of way which will need to be removed for the frontage improvements. DocuSign Envelope ID: 5FF624D7-6A60-487A-A34F-3FB088776CBF 2 | P a g e Right of Way Dedication: Approximately 10.5-ft wide or 1,400 sf of the frontage will be dedicated to the city for the street improvements. 5.) Justification for the Modification Request A Per City code 4-6-060 frontage improvements are required for new construction in excess of $150,000. The proposed project fronts SE Petrovitsky Road along the south property line. SE Petrovitsky Road is classified as a 5 lane Principal Arterial with an existing paved width of approximately 60 feet consisting of four travel lanes and center turn lane. Existing Right-of-Way (ROW) width is approximately 92 feet however the road centerline is offset and there is approximately 42 feet of ROW from the centerline to property line per the King Conty Assessors map. To meet the City’s complete street standards for 5 lane Principal Arterial streets, minimum ROW is 103 feet. Per City code 4-6-060 half street improvements shall include a pavement width of 66 feet (33 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, a 2-foot clear space at back of walk, street trees and storm drainage improvements. Modification Request: However, SE Petrovitsky Road lies within the adopted Renton Trails and Bicycle Master Plan. This plan calls for a shared use path on the north side of Petrovitsky Road. Additionally, the Transportation department has indicated that the existing curb-curb width is sufficient. Therefore, we are requesting that half street improvements include retaining the existing pavement width (approximately 30 feet from centerline), a 0.5 foot curb, an 8-foot planting strip, a 12 foot wide shared use path, a 2-foot clear space at the back of walk, street trees and storm drainage improvements. Along with a dedication of approximately 10.5 feet is required for the improvements pending final survey. B The propose is just to keep the existing curb line and modify the street section to a 12-ft walk. C. Since the sidewalks are required they will meet the City standards and are consistent with frontage improvements required by any other development. D The frontage will conform to the required City standards. E The proposed improvements are justified based on the city staff comments for the project. F The proposal is for modifications to the frontage improvements (Curb, gutter, and sidewalk which will have no impacts on the neighboring properties. DocuSign Envelope ID: 5FF624D7-6A60-487A-A34F-3FB088776CBF DocuSign Envelope ID: 5FF624D7-6A60-487A-A34F-3FB088776CBF