Loading...
HomeMy WebLinkAboutApproved _dwg_Cascade Hills SoosCreek water CIPpermit plan_C18001407SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 SURFACE WATER UTILITY rstraka 05/17/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 DEVELOPMENT ENGINEERING rnair 05/16/2018 1.The District will continue to maintain ownership of the abandoned asbestos cement pipes. 2.Provide the City with a copy of the project record drawings with all abandoned pipelines clearly marked. 3.If and when required by the City, the District shall remove the abandoned asbestos pipes and restore the roadways and rights-of-way to the same or better condition at its own expense. The District shall follow all State and Federal regulations and guidelines regarding the removal and disposal of the abandoned asbestos pipes. 4.All abandoned AC pipes shall be completely filled with controlled density fill (CDF).