HomeMy WebLinkAboutApproved _dwg_Cascade Hills SoosCreek water CIPpermit plan_C18001407SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
SURFACE WATER UTILITY
rstraka 05/17/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
DEVELOPMENT ENGINEERING
rnair 05/16/2018
1.The District will continue to maintain ownership
of the abandoned asbestos cement pipes.
2.Provide the City with a copy of the project
record drawings with all abandoned pipelines
clearly marked.
3.If and when required by the City, the District
shall remove the abandoned asbestos pipes and
restore the roadways and rights-of-way to the
same or better condition at its own expense. The
District shall follow all State and Federal
regulations and guidelines regarding the removal
and disposal of the abandoned asbestos pipes.
4.All abandoned AC pipes shall be completely
filled with controlled density fill (CDF).