HomeMy WebLinkAboutCascade Hills SCWSD permit for water main replacement C18001407DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ROW Permit: C18001407
IVR Number: 18001407
Permit Informaton
Permit Name: CASCADE HILLS- Soos Creek Water District Water Main Replacement
Address/Locaton:03/20/2018Application Date:1423800340Parcel Number: 16544 119TH AVE SE
Permit Type:05/18/2018Issue Date:Engineering
Permit Work Class:05/18/2019Expiration Date:ROW
Inspector: Pat Miller 206-794-6162 Plan Reviewer: Rohini Nair 425-430-7298
Description: SOOS CREEK Water District CIP CASCADE HILLS INSTALL APPROX. 13,000 LINEAR FEET OF DI WATER MAIN IN
CITY ROW. Plan No: 3944. Preconstruction Meeting with City staff should be done prior to start of work.
Contacts
Name Address PhoneTypeBilling
Ken Den Bergh
SOOS CREEK WATER & SEWER
14616 SE 192nd Street
Renton, WA 98058
B: (253) 630-9900ApplicantX
Linda Hardman
Stantec Consulting Services Inc
11130 NE 33rd Pl, Suite 200
Bellevue, WA 98004-1465
B: (425) 289-7336Engineer
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES