Loading...
HomeMy WebLinkAboutCascade Hills SCWSD permit for water main replacement C18001407DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ROW Permit: C18001407 IVR Number: 18001407 Permit Informaton Permit Name: CASCADE HILLS- Soos Creek Water District Water Main Replacement Address/Locaton:03/20/2018Application Date:1423800340Parcel Number: 16544 119TH AVE SE Permit Type:05/18/2018Issue Date:Engineering Permit Work Class:05/18/2019Expiration Date:ROW Inspector: Pat Miller 206-794-6162 Plan Reviewer: Rohini Nair 425-430-7298 Description: SOOS CREEK Water District CIP CASCADE HILLS INSTALL APPROX. 13,000 LINEAR FEET OF DI WATER MAIN IN CITY ROW. Plan No: 3944. Preconstruction Meeting with City staff should be done prior to start of work. Contacts Name Address PhoneTypeBilling Ken Den Bergh SOOS CREEK WATER & SEWER 14616 SE 192nd Street Renton, WA 98058 B: (253) 630-9900ApplicantX Linda Hardman Stantec Consulting Services Inc 11130 NE 33rd Pl, Suite 200 Bellevue, WA 98004-1465 B: (425) 289-7336Engineer CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Conditons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES