GEOTECHNICAL ENGINEERING NOTES
THE FOLLOWING IS EXCERPTED FROM SECTION 4.0 OF THE GEOTECHNICAL ENGINEERING REPORT
PREPARED BY MIGIZI GROUP, INC., PROJECT Z0363, DATED 9/26/22.
4.0 CONCLUSIONS AND RECOMMENDATIONS
IMPROVEMENT PLANS INVOLVE THE CONSTRUCTION OF A NEW 2—STORY ADDITION TO THE NORTHWEST
CORNER OF THE EXISTING BUILDING. THE NEWLY ADDED SPACE WILL BE 695 SF FOR BOTH THE FIRST
AND SECOND FLOORS WHICH TOTALS 1,390 SF. SPECIFICALLY, A NEW STAIRWELL, ELEVATOR SHAFT, AND
STORAGE ROOMS WILL MAKE UP THE ADDITION. THE ADDITION IS TO BE BUILT WITH SLAB —ON —GRADE AT
THE EXISTING GRADE OF THE SITE. WE OFFER THE FOLLOWING RECOMMENDATIONS:
• FEASIBILITY: BASED ON OUR FIELD EXPLORATIONS, RESEARCH AND EVALUATIONS, THE
PROPOSED IMPROVEMENTS AND PAVEMENTS APPEAR FEASIBLE FROM A
GEOTECHNICAL STANDPOINT.
• FOUNDATION OPTIONS: OVER —EXCAVATION OF SPREAD FOOTING SUBGRADES TO A
DEPTH OF 3 TO 5 FEET AND CONSTRUCTION OF STRUCTURAL FILL BEARING PADS
WILL BE NECESSARY FOR FOUNDATION SUPPORT OF THE PROPOSED ADDITION. IF
FOUNDATION CONSTRUCTION OCCURS DURING WET CONDITIONS, IT IS LIKELY THAT A
GEOTEXTILE FABRIC AND/OR A PACKED LAYER OF QUARRY SPALL ROCK, PLACED
BETWEEN BEARING PADS AND NATIVE SOILS, WILL ALSO BE NECESSARY.
RECOMMENDATIONS FOR SPREAD FOOTINGS ARE PROVIDED IN SECTION 4.2.
• FLOOR OPTIONS: BASED ON EXPLORATIONS ACROSS THE SITE, WE RECOMMEND THAT
FLOOR SECTIONS BE OVER —EXCAVATED TO A MINIMUM DEPTH OF 1 % FEET, THEN
PLACEMENT OF SUITABLE AND PROPERLY COMPACTED STRUCTURAL FILL AS A FLOOR
SUBBASE. RECOMMENDATIONS FOR SLAB —ON —GRADE FLOORS ARE INCLUDED IN
SECTION 4.3. IF FLOOR CONSTRUCTION OCCURS DURING WET CONDITIONS, IT IS
LIKELY THAT A GEOTEXTILE FABRIC AND/OR A PACKED LAYER OF QUARRY SPALL
ROCK, PLACED BETWEEN BEARING PADS AND NATIVE SOILS, WILL ALSO BE
NECESSARY. FILL UNDERLYING FLOOR SLABS SHOULD BE COMPACTED TO 95 PERCENT
(ASTM: D-1 557).
• PAVEMENT SECTIONS: AFTER REMOVAL OF ANY ORGANIC —RICH MATERIALS
UNDERLYING PAVEMENT AREAS, WE RECOMMEND A CONVENTIONAL PAVEMENT SECTION
COMPRISING AN ASPHALT CONCRETE PAVEMENT OVER A CRUSHED ROCK BASE
COURSE OVER PROPERLY PREPARED (COMPACTED) SUBGRADE OR GRANULAR
SUBBASE. GIVEN THE RELATIVE LOOSE/SOFT CONDITION OF NATIVE ONSITE SOILS, WE
RECOMMEND AN OVER —EXCAVATION IN PROPOSED CONCRETE AND ASPHALT AREAS
OF 2 FEET, WITH THE PLACEMENT AND COMPACTION OF A SUITABLE STRUCTURAL
FILL SUBBASE.
ALL SOIL SUBGRADES BELOW 2 FEET SHOULD BE THOROUGHLY COMPACTED THEN
PROOF —ROLLED WITH A LOADED DUMP TRUCK OR HEAVY COMPACTOR. ANY
LOCALIZED ZONES OF YIELDING SUBGRADE DISCLOSED DURING THIS PROOF —ROLLING
OPERATION SHOULD BE OVER —EXCAVATED TO A DEPTH OF 12 INCHES AND
REPLACED WITH A SUITABLE STRUCTURAL FILL MATERIAL.
• GEOLOGIC HAZARDS: DURING OUR SITE RECONNAISSANCE, ADVANCEMENT OF
SUBSURFACE EXPLORATIONS, AND GENERAL EVALUATION OF THE PROPOSED
DEVELOPMENT, WE DID NOT OBSERVE ANY EROSIONAL, LANDSLIDE, SEISMIC,
SETTLEMENT, OR OTHER FORMS OF GEOLOGIC HAZARDS WITHIN THE SUBJECT
PROPERTY. GIVEN THIS FACT, WE RECOMMEND THAT NO BUFFERS, SETBACKS, OR
OTHER FORMS OF SITE RESTRAINTS BE IMPLEMENTED TO ADDRESS THESE POTENTIAL
HAZARDS.
THE FOLLOWING SECTIONS PRESENT OUR SPECIFIC GEOTECHNICAL CONCLUSIONS AND RECOMMENDATIONS
CONCERNING SITE PREPARATION, SPREAD FOOTINGS, SLAB —ON —GRADE FLOORS, DRAINAGE SYSTEMS, AND
STRUCTURAL FILL. THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD
SPECIFICATIONS AND STANDARD PLANS CITED HEREIN REFER TO WSDOT PUBLICATIONS M41-10,
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION, AND M21-01, STANDARD
PLANS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION, RESPECTIVELY.
4.1 SITE PREPARATION
PREPARATION OF THE PROJECT SITE SHOULD INVOLVE EROSION CONTROL, TEMPORARY DRAINAGE,
CLEARING, STRIPPING, EXCAVATIONS, CUTTING, SUBGRADE COMPACTION, AND FILLING.
EROSION CONTROL: BEFORE NEW CONSTRUCTION BEGINS, AN APPROPRIATE EROSION CONTROL SYSTEM
SHOULD BE INSTALLED. THIS SYSTEM SHOULD COLLECT AND FILTER ALL SURFACE WATER RUNOFF
THROUGH SILT FENCING. WE ANTICIPATE A SYSTEM OF BERMS AND DRAINAGE DITCHES AROUND
CONSTRUCTION AREAS WILL PROVIDE AN ADEQUATE COLLECTION SYSTEM. SILT FENCING FABRIC SHOULD
MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION 9-33.2 TABLE 6. IN ADDITION, SILT
FENCING SHOULD EMBED A MINIMUM OF 6 INCHES BELOW EXISTING GRADE. AN EROSION CONTROL
SYSTEM REQUIRES OCCASIONAL OBSERVATION AND MAINTENANCE. SPECIFICALLY, HOLES IN THE FILTER
AND AREAS WHERE THE FILTER HAS SHIFTED ABOVE GROUND SURFACE SHOULD BE REPLACED OR
REPAIRED AS SOON AS THEY ARE IDENTIFIED.
TEMPORARY DRAINAGE: WE RECOMMEND INTERCEPTING AND DIVERTING ANY POTENTIAL SOURCES OF
SURFACE OR NEAR —SURFACE WATER WITHIN THE CONSTRUCTION ZONES BEFORE STRIPPING BEGINS.
BECAUSE THE SELECTION OF AN APPROPRIATE DRAINAGE SYSTEM WILL DEPEND ON THE WATER
QUANTITY, SEASON, WEATHER CONDITIONS, CONSTRUCTION SEQUENCE, AND CONTRACTOR'S METHODS,
FINAL DECISIONS REGARDING DRAINAGE SYSTEMS ARE BEST MADE IN THE FIELD AT THE TIME OF
CONSTRUCTION. BASED ON OUR CURRENT UNDERSTANDING OF THE CONSTRUCTION PLANS, SURFACE, AND
SUBSURFACE CONDITIONS, WE ANTICIPATE THAT CURBS, BERMS, OR DITCHES PLACED AROUND THE WORK
AREAS WILL ADEQUATELY INTERCEPT SURFACE WATER RUNOFF.
CLEARING AND STRIPPING: AFTER SURFACE AND NEAR —SURFACE WATER SOURCES HAVE BEEN
CONTROLLED, SOD, TOPSOIL, AND ROOT —RICH SOIL SHOULD BE STRIPPED FROM THE SITE. THE MAJORITY
OF THE SITE IS PAVED, AND MINIMAL TO NO STRIPPING IS ANTICIPATED FOR THIS PROJECT.
SITE EXCAVATIONS: BASED ON OUR FIELD EXPLORATIONS, WE ANTICIPATE THAT EXCAVATIONS WILL
ENCOUNTER DENSE FILL SOILS IN CLOSE PROXIMITY TO EXISTING GRADE, AND LOOSE/SOFT FINE—GRAINED
ALLUVIAL SOILS WITH DEPTH. THIS MATERIAL CAN BE EASILY EXCAVATED UTILIZING STANDARD
EXCAVATION EQUIPMENT.
DEWATERING: WE ANTICIPATE THAT SITE EXCAVATIONS WILL ENCOUNTER GROUNDWATER AT SHALLOW
DEPTHS DURING PERIODS OF EXTENDED PRECIPITATION. IN ADDITION, IF EXCAVATIONS OF TRENCH LINES
ARE LEFT OPEN FOR AN EXTENDED PERIOD, SLOW SEEPAGE OF GROUNDWATER MAY BE OBSERVED. IF
GROUNDWATER IS ENCOUNTERED DURING REGULAR EARTHWORK ACTIVITIES, WE ANTICIPATE THAT AN
INTERNAL SYSTEM OF DITCHES, SUMPHOLES, AND PUMPS WILL BE ADEQUATE TO TEMPORARILY DEWATER
SHALLOW EXCAVATIONS.
TEMPORARY CUT SLOPES: AT THIS TIME, FINAL DESIGNS AND CONSTRUCTION SEQUENCING HAVE NOT
BEEN COMPLETED. TO FACILITATE PROJECT PLANNING WE PROVIDE THE FOLLOWING GENERAL COMMENTS
REGARDING TEMPORARY SLOPES:
• ALL TEMPORARY SOIL SLOPES ASSOCIATED WITH SITE CUTTING OR EXCAVATIONS
SHOULD BE ADEQUATELY INCLINED AND COVERED IN PLASTIC SHEETING TO PREVENT
SLOUGHING AND COLLAPSE,
• TEMPORARY CUT SLOPES IN SITE SOILS SHOULD BE NO STEEPER THAN 11hH:1V, AND
• TEMPORARY SLOPES SHOULD CONFORM TO WASHINGTON INDUSTRIAL SAFETY AND
HEALTH ACT (WISHA) REGULATIONS.
THESE GENERAL GUIDELINES ARE NECESSARILY SOMEWHAT CONSERVATIVE (STEEPER TEMPORARY SLOPES
MAY BE POSSIBLE). AS THE PROJECT PROGRESSES, TEMPORARY GRADING PLANS ARE DEVELOPED, FINAL
SITE FEATURES ARE BETTER DEFINED, AND A CONTRACTOR IS ENGAGED, MGI MAY MODIFY THESE
GENERAL GUIDELINES TO ALLOW STEEPER SLOPES.
SUBGRADE COMPACTION: EXPOSED SUBGRADES FOR THE FOUNDATIONS OF THE PLANNED ADDITION
SHOULD BE COMPACTED TO A FIRM, UNYIELDING STATE BEFORE NEW CONCRETE OR FILL SOILS ARE
PLACED. ANY LOCALIZED ZONES OF LOOSER GRANULAR SOILS OBSERVED WITHIN A SUBGRADE SHOULD
BE COMPACTED TO A DENSITY COMMENSURATE WITH THE SURROUNDING SOILS. IN CONTRAST, ANY
ORGANIC, SOFT, OR PUMPING SOILS OBSERVED WITHIN A SUBGRADE SHOULD BE OVER —EXCAVATED AND
REPLACED WITH A SUITABLE STRUCTURAL FILL MATERIAL.
SITE FILLING: OUR CONCLUSIONS REGARDING THE REUSE OF ONSITE SOILS AND OUR COMMENTS
REGARDING WET— WEATHER FILLING ARE PRESENTED SUBSEQUENTLY. REGARDLESS OF SOIL TYPE, ALL
FILL SHOULD BE PLACED AND COMPACTED ACCORDING TO OUR RECOMMENDATIONS PRESENTED IN THE
STRUCTURAL FILL SECTION OF THIS REPORT. SPECIFICALLY, BUILDING PAD FILL SOIL SHOULD BE
COMPACTED TO A UNIFORM DENSITY OF AT LEAST 95 PERCENT (BASED ON ASTM: D-1557).
ONSITE SOILS: WE OFFER THE FOLLOWING EVALUATION OF THESE ONSITE SOILS IN RELATION TO
POTENTIAL USE AS STRUCTURAL FILL:
• SURFICIAL ORGANIC SOIL AND ORGANIC —RICH TOPSOIL: WHERE ENCOUNTERED,
SURFICIAL ORGANIC SOILS, LIKE DUFF, TOPSOIL, ROOT —RICH SOIL, AND ORGANIC —RICH
FILL SOILS, ARE NOT SUITABLE FOR USE AS STRUCTURAL FILL UNDER ANY
CIRCUMSTANCES, DUE TO HIGH ORGANIC CONTENT. CONSEQUENTLY, THIS MATERIAL
CAN BE USED ONLY FOR NON—STRUCTURAL PURPOSES, SUCH AS IN LANDSCAPING
AREAS.
• ALLUVIAL SILT AND SILTY SAND: THE ALLUVIAL SILTY SAND THAT UNDERLIES THE
SITE IS VERY MOISTURE SENSITIVE AND WILL BE DIFFICULT TO IMPOSSIBLE TO REUSE
DURING MOST WEATHER CONDITIONS. THE MAJORITY OF THIS SOIL TYPE IS
CURRENTLY ABOVE THE OPTIMUM MOISTURE CONTENT AND WILL NOT COMPACT
ADEQUATELY UNLESS EXTENSIVELY AERATED OR TREATED WITH CEMENT.
PERMANENT SLOPES: ALL PERMANENT CUT SLOPES AND FILL SLOPES SHOULD BE ADEQUATELY INCLINED
TO REDUCE LONG—TERM RAVELING, SLOUGHING, AND EROSION. WE GENERALLY RECOMMEND THAT NO
PERMANENT SLOPES BE STEEPER THAN 2H:1V. FOR ALL SOIL TYPES, THE USE OF FLATTER SLOPES
(SUCH AS 2%H:1V) WOULD FURTHER REDUCE LONG—TERM EROSION AND FACILITATE REVEGETATION.
SLOPE PROTECTION: WE RECOMMEND THAT A PERMANENT BERM, SWALE, OR CURB BE CONSTRUCTED
ALONG THE TOP EDGE OF ALL PERMANENT SLOPES TO INTERCEPT SURFACE FLOW. ALSO, A HARDY
VEGETATIVE GROUNDCOVER SHOULD BE ESTABLISHED AS SOON AS FEASIBLE, TO FURTHER PROTECT THE
SLOPES FROM RUNOFF WATER EROSION. ALTERNATIVELY, PERMANENT SLOPES COULD BE ARMORED WITH
QUARRY SPALLS OR A GEOSYNTHETIC EROSION MAT.
4.2 SPREAD FOOTINGS
IN OUR OPINION, CONVENTIONAL SPREAD FOOTINGS WILL PROVIDE ADEQUATE SUPPORT FOR THE
PROPOSED ADDITION, IF THE SUBGRADES ARE PROPERLY PREPARED. DUE TO THE SOFT SOILS THAT
UNDERLIE THE SITE, OVER— EXCAVATION OF SPREAD FOOTING SUBGRADES, TO A DEPTH OF 3 TO 5
FEET, AND THE CONSTRUCTION OF STRUCTURAL FILL BEARING PADS, WILL BE NECESSARY FOR
FOUNDATIONAL SUPPORT OF THE NEW ADDITION. WE OFFER THE FOLLOWING COMMENTS AND
RECOMMENDATIONS FOR SPREAD FOOTING DESIGN.
FOOTING DEPTHS AND WIDTHS: FOR FROST AND EROSION PROTECTION, THE BASES OF ALL EXTERIOR
FOOTINGS SHOULD BEAR AT LEAST 18 INCHES BELOW ADJACENT OUTSIDE GRADES, WHEREAS THE BASES
OF INTERIOR FOOTINGS NEED BEAR ONLY 12 INCHES BELOW THE SURROUNDING SLAB SURFACE LEVEL.
TO REDUCE POST— CONSTRUCTION SETTLEMENTS, CONTINUOUS (WALL) AND ISOLATED (COLUMN)
FOOTINGS SHOULD BE AT LEAST 18 AND 24 INCHES WIDE, RESPECTIVELY.
BEARING SUBGRADES: FOOTINGS SHOULD BEAR ON MEDIUM DENSE OR DENSER, UNDISTURBED NATIVE
SOILS OR PROPERLY COMPACTED STRUCTURAL FILL WHICH BEARS ON UNDISTURBED MEDIUM DENSE TO
VERY DENSE NATIVE SOILS. STRUCTURAL FILL BEARING PADS, 3 TO 5 FEET THICK AND COMPACTED TO
A DENSITY OF AT LEAST 95 PERCENT (BASED ON ASTM: D-1557), SHOULD UNDERLIE SPREAD FOOTINGS
FOR THE PROPOSED CONSTRUCTION. IF FOUNDATION WORK OCCURS DURING WET CONDITIONS, IT IS
POSSIBLE THAT A GEOTEXTILE FABRIC, PLACED BETWEEN THE BEARING PAD AND NATIVE SOIL, WILL BE
NECESSARY. REFER TO THE STRUCTURAL FILL SECTION OF THIS REPORT.
IN GENERAL, BEFORE FOOTING CONCRETE IS PLACED, ANY LOCALIZED ZONES OF LOOSE SOILS EXPOSED
ACROSS THE FOOTING SUBGRADES SHOULD BE COMPACTED TO A FIRM, UNYIELDING CONDITION, AND ANY
LOCALIZED ZONES OF SOFT, ORGANIC, OR DEBRIS —LADEN SOILS SHOULD BE OVER —EXCAVATED AND
REPLACED WITH SUITABLE STRUCTURAL FILL. STRUCTURAL FILL BEARING PADS SHOULD BE COMPACTED
TO A DENSITY OF AT LEAST 95 PERCENT (BASED ON ASTM: D-1557).
LATERAL OVER —EXCAVATIONS: BECAUSE FOUNDATION STRESSES ARE TRANSFERRED OUTWARD AS WELL
AS DOWNWARD INTO THE BEARING SOILS, ALL STRUCTURAL FILL PLACED UNDER FOOTINGS, SHOULD
EXTEND HORIZONTALLY OUTWARD FROM THE EDGE OF EACH FOOTING. THIS HORIZONTAL DISTANCE
SHOULD BE EQUAL TO THE DEPTH OF PLACED FILL. THEREFORE, PLACED FILL THAT EXTENDS 3 FEET
BELOW THE FOOTING BASE SHOULD ALSO EXTEND 3 FEET OUTWARD FROM THE FOOTING EDGES.
SUBGRADE OBSERVATION: ALL FOOTING SUBGRADES SHOULD CONSIST OF FIRM, UNYIELDING, NATIVE
SOILS OR STRUCTURAL FILL MATERIALS THAT HAVE BEEN COMPACTED TO A DENSITY OF AT LEAST 95
PERCENT (BASED ON ASTM: D-1557). FOOTINGS SHOULD NEVER BE CAST ATOP LOOSE, SOFT, OR FROZEN
SOIL, SLOUGH, DEBRIS, EXISTING UNCONTROLLED FILL, OR SURFACES COVERED BY STANDING WATER.
BEARING PRESSURES: IN OUR OPINION, FOR STATIC LOADING, FOOTINGS THAT BEAR ON DENSE,
PROPERLY PREPARED BEARING PADS CAN BE DESIGNED FOR MAXIMUM ALLOWABLE SOIL BEARING
PRESSURES LISTED IN THE FOLLOWING TABLE:
BEARING PAD THICKNESS (FEET) ALLOWABLE BEARING PRESSURE (PSF)
3 1,500
4 2,000
5 2,500
A ONE—THIRD INCREASE IN ALLOWABLE SOIL BEARING CAPACITY MAY BE USED FOR SHORT—TERM LOADS
CREATED BY SEISMIC OR WIND RELATED ACTIVITIES.
FOOTING SETTLEMENTS: ASSUMING THAT STRUCTURAL FILL SOILS ARE COMPACTED TO A DENSE OR
DENSER STATE, WE ESTIMATE THAT TOTAL POST —CONSTRUCTION SETTLEMENTS OF PROPERLY DESIGNED
FOOTINGS BEARING ON PROPERLY PREPARED SUBGRADES WILL NOT EXCEED 1 INCH, UNDER STATIC
CONDITIONS. DIFFERENTIAL SETTLEMENTS FOR COMPARABLY LOADED ELEMENTS MAY APPROACH
ONE—HALF OF THE ACTUAL TOTAL SETTLEMENT OVER HORIZONTAL DISTANCES OF APPROXIMATELY 50
FEET.
FOOTING BACKFILL: TO PROVIDE EROSION PROTECTION AND LATERAL LOAD RESISTANCE, WE RECOMMEND
THAT ALL FOOTING EXCAVATIONS BE BACKFILLED ON BOTH SIDES OF THE FOOTINGS AND STEM WALLS
AFTER THE CONCRETE HAS CURED. EITHER IMPORTED STRUCTURAL FILL OR NON —ORGANIC ONSITE SOILS
CAN BE USED FOR THIS PURPOSE, CONTINGENT ON SUITABLE MOISTURE CONTENT AT THE TIME OF
PLACEMENT. REGARDLESS OF SOIL TYPE, ALL FOOTING BACKFILL SOIL SHOULD BE COMPACTED TO A
DENSITY OF AT LEAST 90 PERCENT (BASED ON ASTM: D— 1557).
LATERAL RESISTANCE: FOOTINGS THAT HAVE BEEN PROPERLY BACKFILLED AS RECOMMENDED ABOVE
WILL RESIST LATERAL MOVEMENTS BY MEANS OF PASSIVE EARTH PRESSURE AND BASE FRICTION. WE
RECOMMEND USING AN ALLOWABLE PASSIVE EARTH PRESSURE OF 250 PSF AND AN ALLOWABLE BASE
FRICTION COEFFICIENT OF 0.35 FOR BOTH SOIL TYPES.
4 • Call 811
• ® two business days
before you dig NO.
4.3 SLAB —ON —GRADE FLOORS
IN OUR OPINION, SOIL —SUPPORTED SLAB —ON —GRADE FLOORS CAN BE USED IN THE PROPOSED ADDITION
IF THE SUBGRADES ARE PROPERLY PREPARED. WE OFFER THE FOLLOWING COMMENTS AND
RECOMMENDATIONS CONCERNING SLAB —ON —GRADE FLOORS.
FLOOR SUBBASE: FOR THE PROPOSED ADDITION, WE RECOMMEND OVER —EXCAVATION OF
SLAB —ON —GRADE FLOOR SUBGRADES TO A MINIMUM DEPTH OF 11,E FEET, THEN PLACEMENT OF
PROPERLY COMPACTED STRUCTURAL FILL AS A FLOOR SUBBASE. IF FLOOR CONSTRUCTION IS TO OCCUR
DURING WET CONDITIONS, IT IS LIKELY THAT A GEOTEXTILE FABRIC AND/OR COMPACTED LAYER OF
QUARRY SPALL ROCK, PLACED BETWEEN THE STRUCTURAL FILL FLOOR SUBBASE AND NATIVE SOILS, WILL
BE NECESSARY. ALL SUBBASE SHOULD BE COMPACTED TO A DENSITY OF AT LEAST 95 PERCENT (BASED
ON ASTM: D-1557).
CAPILLARY BREAK AND VAPOR BARRIER: TO RETARD THE UPWARD WICKING OF MOISTURE BENEATH THE
FLOOR SLAB, WE RECOMMEND THAT A CAPILLARY BREAK BE PLACED OVER THE SUBGRADE. IDEALLY,
THIS CAPILLARY BREAK WOULD CONSIST OF A 4—INCH—THICK LAYER OF PEA GRAVEL OR OTHER CLEAN,
UNIFORM, WELL—ROUNDED GRAVEL, SUCH AS "GRAVEL BACKFILL FOR DRAINS" PER WSDOT STANDARD
SPECIFICATION 9-03.12(4). ALTERNATIVELY, ANGULAR GRAVEL OR CRUSHED ROCK CAN BE USED IF IT IS
SUFFICIENTLY CLEAN AND UNIFORM TO PREVENT CAPILLARY WICKING. IN ADDITION, A LAYER OF PLASTIC
SHEETING (SUCH AS CROSSTUFF, MOISTOP, OR VISQUEEN) BE PLACED DIRECTLY BETWEEN THE
CAPILLARY BREAK AND THE FLOOR SLAB TO PREVENT GROUND MOISTURE VAPORS FROM MIGRATING
UPWARD THROUGH THE SLAB. DURING SUBSEQUENT CASTING OF THE CONCRETE SLAB, THE CONTRACTOR
SHOULD EXERCISE CARE TO AVOID PUNCTURING THE VAPOR BARRIER
4.4 DRAINAGE SYSTEMS
WE OFFER THE FOLLOWING RECOMMENDATIONS AND COMMENTS FOR DRAINAGE DESIGN FOR
CONSTRUCTION PURPOSES.
PERIMETER DRAINS: WE RECOMMEND THAT THE PROPOSED ADDITION, WHERE APPLICABLE, BE ENCIRCLED
WITH A PERIMETER DRAIN SYSTEM TO COLLECT SEEPAGE WATER. THIS DRAIN SHOULD CONSIST OF A
4—INCH— DIAMETER PERFORATED PIPE WITHIN AN ENVELOPE OF PEA GRAVEL OR WASHED ROCK,
EXTENDING AT LEAST 6 INCHES ON ALL SIDES OF THE PIPE, AND THE GRAVEL ENVELOPE SHOULD BE
WRAPPED WITH FILTER FABRIC TO REDUCE THE MIGRATION OF FINES FROM THE SURROUNDING SOILS.
IDEALLY, THE DRAIN INVERT WOULD BE INSTALLED NO MORE THAN 8 INCHES ABOVE THE BASE OF THE
PERIMETER OF THE FOUNDATION.
DISCHARGE CONSIDERATIONS: IF POSSIBLE, ALL PERIMETER DRAINS SHOULD DISCHARGE TO A MUNICIPAL
STORM DRAIN, OR OTHER SUITABLE LOCATION BY GRAVITY FLOW. CHECK VALVES SHOULD BE INSTALLED
ALONG ANY DRAINPIPES THAT DISCHARGE TO A SEWER SYSTEM, TO PREVENT SEWAGE BACKFLOW INTO
THE DRAIN SYSTEM.
RUNOFF WATER: ROOF —RUNOFF AND SURFACE —RUNOFF WATER SHOULD NOT DISCHARGE INTO THE
PERIMETER DRAIN SYSTEM. INSTEAD, THESE SOURCES SHOULD DISCHARGE INTO SEPARATE TIGHTLINE
PIPES AND BE ROUTED AWAY FROM THE BUILDINGS TO A STORM DRAIN OR OTHER APPROPRIATE
LOCATION.
GRADING AND CAPPING: FINAL SITE GRADES SHOULD SLOPE DOWNWARD AWAY FROM THE BUILDING SO
THAT RUNOFF WATER WILL FLOW BY GRAVITY TO SUITABLE COLLECTION POINTS, RATHER THAN PONDING
NEAR THE BUILDING. IDEALLY, THE AREA SURROUNDING THE BUILDING WOULD BE CAPPED WITH
CONCRETE, ASPHALT, OR LOW —PERMEABILITY (SILTY) SOILS TO MINIMIZE OR PRECLUDE SURFACE —WATER
INFILTRATION.
4.5 STRUCTURAL FILL
THE TERM "STRUCTURAL FILL" REFERS TO ANY MATERIAL PLACED UNDER FOUNDATIONS, RETAINING
WALLS, SLAB— ON —GRADE FLOORS, SIDEWALKS, PAVEMENTS, AND OTHER STRUCTURES. OUR COMMENTS,
CONCLUSIONS, AND RECOMMENDATIONS CONCERNING STRUCTURAL FILL ARE PRESENTED IN THE
FOLLOWING PARAGRAPHS.
MATERIALS: TYPICAL STRUCTURAL FILL MATERIALS INCLUDE CLEAN SAND, GRAVEL, PEA GRAVEL, WASHED
ROCK, CRUSHED ROCK, WELL —GRADED MIXTURES OF SAND AND GRAVEL (COMMONLY CALLED "GRAVEL
BORROW" OR "PIT— RUN"), AND MISCELLANEOUS MIXTURES OF SILT, SAND, AND GRAVEL. RECYCLED
ASPHALT, CONCRETE, AND GLASS, WHICH ARE DERIVED FROM PULVERIZING THE PARENT MATERIALS, ARE
ALSO POTENTIALLY USEFUL AS STRUCTURAL FILL IN CERTAIN APPLICATIONS. IMPORT SOILS USED FOR
STRUCTURAL FILL SHOULD NOT CONTAIN ANY ORGANIC MATTER OR DEBRIS, NOR ANY INDIVIDUAL
PARTICLES GREATER THAN 4 INCHES IN DIAMETER.
FILL PLACEMENT: CLEAN SAND, GRAVEL, CRUSHED ROCK, SOIL MIXTURES, AND RECYCLED MATERIALS
SHOULD BE PLACED IN HORIZONTAL LIFTS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS, AND EACH
LIFT SHOULD BE THOROUGHLY COMPACTED WITH A MECHANICAL COMPACTOR.
COMPACTION CRITERIA: USING THE MODIFIED PROCTOR TEST (ASTM: D-1557) AS A STANDARD, WE
RECOMMEND THAT STRUCTURAL FILL USED FOR VARIOUS ONSITE APPLICATIONS BE COMPACTED TO THE
FOLLOWING MINIMUM DENSITIES:
FILL APPLICATION MINIMUM COMPACTION
FOOTING SUBGRADE AND BEARING PAD 95 PERCENT
FOUNDATION BACKFILL 90 PERCENT
SLAB —ON —GRADE FLOOR SUBGRADE AND SUBBASE 95 PERCENT
ASPHALT PAVEMENT BASE AND SUBBASE 95 PERCENT
ASPHALT PAVEMENT SUBGRADE (UPPER 2 FEET) 95 PERCENT
ASPHALT PAVEMENT SUBGRADE (BELOW 2 FEET) 90 PERCENT
SUBGRADE OBSERVATION AND COMPACTION TESTING: REGARDLESS OF MATERIAL OR LOCATION, ALL
STRUCTURAL FILLS SHOULD BE PLACED OVER FIRM, UNYIELDING SUBGRADES PREPARED IN ACCORDANCE
WITH THE SITE PREPARATION SECTION OF THIS REPORT. THE CONDITION OF ALL SUBGRADES SHOULD BE
OBSERVED BY GEOTECHNICAL PERSONNEL BEFORE FILLING OR CONSTRUCTION BEGINS. ALSO, FILL SOIL
COMPACTION SHOULD BE VERIFIED BY MEANS OF IN —PLACE DENSITY TESTS PERFORMED DURING FILL
PLACEMENT SO THAT ADEQUACY OF SOIL COMPACTION EFFORTS MAY BE EVALUATED AS EARTHWORK
PROGRESSES.
SOIL MOISTURE CONSIDERATIONS: THE SUITABILITY OF SOILS USED FOR STRUCTURAL FILL DEPENDS
PRIMARILY ON THEIR GRAIN —SIZE DISTRIBUTION AND MOISTURE CONTENT WHEN THEY ARE PLACED. AS
THE "FINES" CONTENT (THAT SOIL FRACTION PASSING THE U.S. NO. 200 SIEVE) INCREASES, SOILS
BECOME MORE SENSITIVE TO SMALL CHANGES IN MOISTURE CONTENT. SOILS CONTAINING MORE THAN
ABOUT 5 PERCENT FINES (BY WEIGHT) CANNOT BE CONSISTENTLY COMPACTED TO A FIRM, UNYIELDING
CONDITION WHEN THE MOISTURE CONTENT IS MORE THAN 2 PERCENTAGE POINTS ABOVE OR BELOW
OPTIMUM. FOR FILL PLACEMENT DURING WET —WEATHER SITE WORK, WE RECOMMEND USING "CLEAN" FILL,
WHICH REFERS TO SOILS THAT HAVE A FINES CONTENT OF 5 PERCENT OR LESS (BY WEIGHT) BASED ON
THE SOIL FRACTION PASSING THE U.S. NO. 4 SIEVE.
SURVEYED: SCALE: A'
DESIGNED: AS NOTED
DKM
DRAWN:
KLK ONE INCH
CHECKED:
DCD AT FULL SCALE
IF NOT ONE INCH
REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY
DCD
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
C TY OF
RENTON
Plan ning/Building/Public Works Dept
D �C. l,9
�r
46449�p
O C/S-��" r'w c•
NAL ENG`
`a.
sitts&hill
CIVIL I STRUCTURAL I SURVEY
4815 CENTER STREET I TACOMA, WA. 98409
PHONE: (253) 474-9449 I FAX: (253) 474-0153
http://www.sittshill.com/
REISSUED FOR PERMIT Project No.:
Proj. Engineer:
OCTOBER 30, 2023
19682 i Project Mgr.: DCD
DCD i Proj. Drafter: KLK
R-425402
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
SAMorman 12/05/2023
WASHINGTON STATE AUTO
DEALERS ASSOCIATION (WSADA)
621 SOUTHWEST GRADY WAY, RENTON, WA 98057
WSADA BUILDING ADDITION AND IMPROVEMENTS
GENERAL GEOTECHNICAL NOTES
DATE:
022.11.30
FIELDBOOK:
PAGE:
DRAWING NO:
CO.1
SHEET: 0R