Minor Franchise Permit: MFP23006322
IVR Number: 23006322
Permit Information
Permit Name: Comcast - JB0001643683
Address/Location:12/22/2023Application Date:0923059217Parcel Number: 4020 NE 4TH ST, UNIT A
Permit Type:01/18/2024Issue Date:Franchise
Permit Work Class:01/17/2025Expiration Date:Minor Utility
Job Number: JB0001643683Franchise Type:Cable
Description: This project proposes to riser down an existing utility pole then proof & pull approx. 10' in the city right of way,
continuing to target address. NO EXCAVATION
Contacts
Name Address PhoneTypeBilling
Leah Ihlenfeldt
Cablecom LLC
1316 Bonneville Avenue
Snohomish, WA 98290
B: (360) 670-4291ApplicantX
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Contact
CABLECOM LLC 20021 120th Ave NE, #101
BOTHELL, WA 98011
B: (360) 668-1300Contractor
Business License Number: 52252Construction Contractor: CABLEL*971DP
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Emergency
Contact
RENTONS R & S INVESTMENT 2101 4TH AVE #310
SEATTLE , WA 98121
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
COMCAST
Jessamin Santos
206-401-2188
WAConstruction_JointUse@comcast.com
360-670-4291
CABLEL*971DP
Cablecom LLC - Leah Ihlenfeldt
52252
12/21/2023
THIS PROJECT PROPOSES TO RISER DOWN AN EXISTING UTILITY POLE
THEN PROOF AND PULL APROVE 10' IN THE CITY RIGHT OF WAY, CONTINUING TO THE
TARGET ADDRESS. NO EXCAVATION.
COMCAST - JB1344737
MFP23006322
Scott Warlick 1/18/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Cablecom LLC
Leah Ihlenfeldt 360-670-4291
1316 Bonneville Ave Snohomish, WA 98290
4020 NE 4th St, Renton, WA
Comcast - JB0001643683
tbd upon permit inssuance
This project proposes to riser down an existing utility polethen proof & pull approx. 10' in the city right of way,continuing to target address. NO EXCAVATION.
MFP23006322
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 1/18/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessamin Santos
12/22/23
TRAFFIC CONTROL - KEY MAPC-11SCALE: N.T.STHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF4020 NE 4TH ST, RENTON, WAJB1643683-SMBPROOF & PULLRENTON20ISSUE FOR PERMIT12/19/2023DOMSHEET TC-1MFP23006322
D/WD/WD/WD/WD/WD/WD/WD/WD/WD/WBUS STOPOPUNION AVE NE 30 MPHNE 4TH ST 35 MPHXXXXL/2ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RBIKELANECLOSEDAHEADBIKESMERGEWITHTRAFFICXROADWORKAHEADW20-1XROADWORKAHEADW20-1NE 4TH PL 25 MPH11'10'6'5'10'4020 NE 4th St,Renton, WA 98056421 Union Ave NE,Renton, WA 98059SPEED (MPH)25303540455055606570LENGTH (feet)250305360425495570645730155200TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 OEV.HOST VEHICLE WEIGHT! 22,000 OEV.RURAL ROADS & URBAN ARTERIALSURBAN STREETS25 MPH OR LESS100' +/- (2)200' +/- (2)35 / 40 MPH25 / 30 MPH350' +/- (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.SIGN SPACING = X (1)RURAL ROADS, URBAN ARTERIALS,RESIDENTIAL & BUSINESS DISTRICTSMPH50/7035/4525/30TAPERTANGENT403020806040CHANNELIZATION DEVICESPACING (feet)SIGNTRAFFIC CONE OR DELINEATORLEGENDWORK VEHICLEGENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE, UNLESS OTHERWISENOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARETO MAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.253035404550551236060801001501802703206570---LANEWIDTH(feet)MINIMUM TAPER LENGTH = L/2 (FEET)TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.4020 NE 4TH ST, RENTON, WAJB1643683-SMBPROOF & PULLRENTON20ISSUE FOR PERMIT12/19/2023DOMTC-12SCALE: N.T.S.MFP23006322
COVER-TITLETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF4020 NE 4TH ST, RENTON, WAJB1643683-SMBPROOF & PULLRENTON30ISSUE FOR PERMIT12/19/2023DOMScope of work to Target address 4020 NE 4th St, Renton, WA·This project proposes to riser down an existing utility polethen proof & pull approx. 10' in the city right of way,continuing to target address. NO EXCAVATION.BUILDIn The City ROW·Existing Utility Pole: 1·Proof & Pull Existing Conduit:~10'VICINITY MAPSHEET INDEXSheet #1C-1Cover-Title2G-1General Notes3CD-1Construction PlansSCALE: NONEContactC-1PROJECT ID: JB16436831CD-1Jessamin SantosComcastJessamin_Santos@cable.comcast.com206-401-2188MFP23006322
GENERAL NOTESTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.4020 NE 4TH ST, RENTON, WAJB1643683-SMBPROOF & PULLRENTON30ISSUE FOR PERMIT12/19/2023DOMROADWAY CENTER LINEEXISTING COMCAST ROUTEEXISTING FENCELINEPROPOSED BORE ROUTEEXISTING WATER LINEEXISTING STORM DRAINEXISTING SANITARY SEWEREXISTING JOINT TRENCHEXISTING RECYCLED WATER LINEEXISTING TV SYSTEMEXISTING GAS SYSTEMEXISTING ELECTRICAL SYSTEMEXISTING TELEPHONE SYSTEMPROPERTY LINELINETYPESBORE PITWATER MANHOLEUNIDENTIFIED MANHOLEGAS METERWATER METERELECTRIC MANHOLESEWER CLEAN OUTSANITARY SEWER MANHOLESTORM DRAIN MANHOLECATCH BASINGAS/WATER VALVETREE/BUSHESGWEXISTING POLEEXISTING COMCAST PEDESTALNEW RISER ATTACHED TO POLEEXISTING IRRIGATION VAULTEXISTING COMCAST VAULTEXISTING UTILITY VAULT/PEDESTALSSCOECOWSDMONUMENTFIRE HYDRANTTRAFFIC SIGNAL COMBINATIONSTREET LIGHTTRANSFORMERNEW COMCAST LOW PROFILE NEW COMCAST PEDESTALNEW COMCAST VAULTPOWER SUPPLY W/ METERNEW COMCAST POWER SUPPLYSYMBOLSEXISTING WATEREXISTING TELEPHONEDRIVEWAYMAXIMUMD/WMAXW T RIGHT OF WAYEXISTING SANITARY SEWEREXISTING STORM DRAINPUBLIC UTILITY EASEMENTPROPERTY LINEMINIMUMFACE OF CURBEXISTINGCENTER LINECOMCASTL MINFOC (E) COMCAST CABBREVIATIONSPUEROWSS SDPL JTSSSDW+++TVTEGTVCATVNEW AERIAL STRAND/CABLE ROUTEOFFSETO/SBACK OF WALKBOWREMOVAL/REPAIRR/RNEW(N) G-12EDGE OF PAVEMENTEOPANCHOR SUPPORTPROOF & PULL ROUTE (NEW CABLE IN (E) CONDUITS)PROPOSED TRENCH ROUTERWOPGENERAL NOTES1.ALL GENERAL NOTES SHALL APPLY TO ALL DRAWINGS, PLANS AND DETAILS.2.CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA), AT LEAST 48 HOURS(AND NOT MORE THAN 14 DAYS) PRIOR TO THE START OF CONSTRUCTION BY CALLING (800)227-2600.3.CONTRACTOR SHALL POTHOLE/HAND DIG AND VERIFY ALL UNDERGROUND UTILITIES PRIORTO THE START OF CONSTRUCTION. ALL UTILITY LOCATIONS ON PLANS ARE APPROXIMATE,CONTRACTOR MUST VERIFY.4.CONTRACTOR SHALL VERIFY ALL FOOTAGES ON SITE, PRIOR TO THE START OFCONSTRUCTION. ALL DIMENSIONS SHOWN ON PLANS ARE APPROXIMATE.5.CONTRACTOR SHALL KEEP A COPY OF APPROVED PLAN(S) AND PERMIT(S) AT THE JOB SITEAT ALL TIMES AND PRESENT IT TO AN AUTHORIZED AGENT OF THE CITY OF RENTONAND/OR LAW ENFORCEMENT UPON REQUEST.6.CONTRACTOR SHALL ENSURE THAT ANY EXISTING FACILITIES DAMAGED OR REMOVED SHALLBE REPLACED IN KIND OR BETTER, INCLUDING BUT NOT LIMITED TO REPLACING EXISTINGSTRIPING AND REMOVING UNNECESSARY "USA" MARKINGS.7.CONTRACTOR SHALL WORK ONLY DURING APPROVED HOURS, UNLESS OTHERWISEAPPROVED IN WRITING BY THE "CITY ENGINEER."8.CONTRACTOR SHALL PERFORM ALL WORK AND TRAFFIC CONTROL IN ACCORDANCE WITHTHE CITY OF RENTON AND STATE OF WASHINGTON STANDARD PLANS AND SPECIFICATIONS,AND CURRENT WASHINGTON DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORMTRAFFIC CONTROL DEVICES" AND "WASHINGTON MODIFICATION (468-95 WAC)" FOR USE INPERFORMANCE OF WORK UPON HIGHWAYS. FLASHING ARROW SIGNS SHALL BE REQUIREDFOR ALL LANE CLOSURES.9.CONTRACTOR SHALL ENSURE ALL WORK PERFORMED IS IN ACCORDANCE WITHREGULATIONS AND STANDARDS SET BY ANY AND ALL REGULATORY AGENCIES HAVINGJURISDICTION AT THIS WORK SITE, INCLUDING BUT NOT LIMITED TO THE STATE OFWASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, THE STATE OF WASHINGTONDEPARTMENT OF LABOR AND INDUSTRIES, DIVISION OF OCCUPATIONAL SAFETY ANDHEALTH (DOSH), THE COUNTY OF KING, ALL WORK SHALL BE ACCESSIBLE AND SUBJECT TOINSPECTION BY CITY ENGINEER AND/OR AN AUTHORIZED AGENT OF COMCAST.10.CONTRACTOR SHALL "RED-LINE" ALL LAYOUTS, PLANS AND DETAILS, ON THE DAY OFCONSTRUCTION AND SUBMIT A COMPLETE SET OF "AS-BUILT" PLANS TO COMCAST UPONCOMPLETION OF THE PROJECT, AND TO CITY.11.CONTRACTOR SHALL NOTIFY RESIDENTS AFFECTED BY THE WORK IN LANDSCAPED AREA INADVANCE OF CONSTRUCTION.12.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS IN ADVANCE OFWORK COMMENCING.13.LANE CLOSURES ARE PROHIBITED BEFORE 8:30 AM AND AFTER 4:00 PM (3:00 PM OFFRIDAYS AND ON DAYS PRECEDING DESIGNATED LEGAL HOLIDAYS). NO LANE CLOSURES AREPERMITTED ON WEEKENDS AND HOLIDAYS.MFP23006322
D/WD/WD/WD/WFOCLANDSCAPESIDEWALKFOCLANDSCAPESIDEWALKOPUNION AVE NENE 4TH ST4020 NE 4th St,Renton, WA 98056421 Union Ave NE,Renton, WA 98059RISER DOWN EXIST. UTILITY POLEPROOF & PULL TO TARGET ADDRESSSCALE: 1:20CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.4020 NE 4TH ST, RENTON, WAJB1643683-SMBPROOF & PULLRENTON30ISSUE FOR PERMIT12/19/2023DOMCD-13MFP23006322