HomeMy WebLinkAboutMFP24000155.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP24000155
IVR Number: 24000155
Permit Information
Permit Name: P.185744
Address/Location:01/10/2024Application Date:3123059135Parcel Number: 17930 TALBOT RD S
Permit Type:01/24/2024Issue Date:Franchise
Permit Work Class:01/23/2025Expiration Date:Major Utility
Job Number: P.185744Franchise Type:Telephone
Description: Access MH 621, MH 685, and MH 188 for splicing. At Pedestal 9640, place new HH and trench/bore approx 275' and
place new fiber cable to new HH. At new HH place and bore approx 20' to 17930 Tablot RD S. Pothole all existing
utilities. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Nathan Macleod
Lumen
7850 S Trafton St, Bldg B
Tacoma, WA 98409
C: (253) 583-6283ApplicantX
Merilyn Luong
Lumen
C: (206) 806-7160Applicant
Michael Smith
North Sky Communications
21320 84th Ave S
Kent, WA 98032
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
P.185744
17930 Talbot Road S Renton, WA 98055
2/12/2024 2/15/2924 9am 4pm
NorthSky Communications
Mike Smith 425-615-7121
16701 SE McGillivray Blvd Vancouver, WA 98683
Access MH 621, MH 188, MH 685 for splicing. At PED 9640, place new HH, place new fiber, and trench/
bore 275'. At new HH, place/bore to 17930 Talbot RD S.
MFP24000155
Monday - Friday 3:00pm
Scott Warlick CED 1/18/2024
Night work is
required for
accessing MH 188 in
the intersection.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Merilyn Luong
1/10/2024
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
Cover Sheet
1:50
P.185744 98055
Scope of Work: Manhole Access, Trenching, Handhole Installation, & Boring
Traffic Control Plan: Cover Sheet
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadwayconditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidthFeet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360425 495 570 645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
General Notes:1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones8. All sign spacing may be adjusted to accommodate at-grade
intersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
MH621
MH188
MH685
X
T
SHEET 1
SHEET 2
SHEET 3
SHEET 4
SHEET 5
www.invarion.com
MFP24000155
Imagery and map data ©2024, Google
17930 TALBOT RD S
S CARR RD35MPHS 43RD ST35MPH
MH621
11'
12'
11'
12'
10'
11'12'11'11'
16'
VALLEY PROFESSIONAL PLAZA
401 S 43RD ST
17910 TALBOT RD S
8'
30'12'W1-4
ROADWORKAHEAD
W20-1
ROADWORKAHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORKAHEAD
W20-1
W1-4
X
X
L/2
TALBOT RD S25MPH
S Legend
Bus Stop
Cone
MH
621 MH 621
Sign Stand
S Spotter
Traffic Light
Work Area
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
1 05
1:50
P.185744 98055
Scope of Work: Manhole Access
Traffic Control Plan: Lane Shift
Plan Scale
1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadwayconditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidthFeet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
Pedestrian Escort: Stop work, secure passable
ADA compliant Pedestrian access on existing
sidewalk (4' min.). Clear zone must be free of
overhead hazards when Pedestrians are moving
through the work area.
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.
01/09/2024 by:Elite Traffic Solutions
206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Jʅʙiʋɚ Mʝrɪȵeɡ
SPOTTER SHALL ASSIST PEDESTRIANS
THROUGH WORKZONE SAFELY.
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
www.invarion.com
MFP24000155
Imagery and map data ©2024, Google
17930 TALBOT RD S
TALBOT RD S25MPH
S CARR RD35MPH
S 43RD ST35MPH
MH188
11'
12'
11'
12'
10'
11'12'11'11'
16'
VALLEY PROFESSIONAL PLAZA401 S 43RD ST
17910 TALBOT RD S
ROAD
WORK
AHEAD
W20-1
ROAD
WORKAHEAD
W20-1
ROADWORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1 W4-2
RIGHT LANECLOSED
AHEAD
W20-5
X X X L S
8'35'
Legend
Bus Stop
Cone
MH
188 MH 188
Sign Stand
S Spotter
Traffic Light
Work Area
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
2 05
1:50
P.185744 98055
Scope of Work: Manhole Access
Traffic Control Plan: Right Lane Closure
Plan Scale
1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadwayconditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidthFeet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
Pedestrian Escort: Stop work, secure passable
ADA compliant Pedestrian access on existing
sidewalk (4' min.). Clear zone must be free of
overhead hazards when Pedestrians are moving
through the work area.
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.
01/09/2024 by:Elite Traffic Solutions
206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Jʅʙiʋɚ Mʝrɪȵeɡ
SPOTTER SHALL ASSIST PEDESTRIANS
THROUGH WORKZONE SAFELY.
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
www.invarion.comMFP24000155
2 uniform police
officers required
shift traffic to the
left lane for more
room to make the
right turn
This work shall take place at night.
Pre-construction meeting required
to discuss traffic control. This light
is on the SCOOT system and will
require additional coordination with
city inspection staff
Cone off this lane to
make more room for
cars making the turn
from the south
Imagery and map data ©2024, Google
17930 TALBOT RD S
TALBOT RD S25MPH
S CARR RD35MPH
MH685
X
11'
12'
11'
12'
10'
11'
11'
11'
11'
16'
17910 TALBOT RD S
8'35'
ROAD
WORK
AHEAD
W20-1
W4-2
RIGHT LANECLOSED
AHEAD
W20-5
ROAD
WORKAHEAD
W20-1
ROADWORK
AHEAD
W20-1
X X
X
L
B
8'35'
ROADWORKAHEAD
W20-1
W4-2
RIGHT LANECLOSEDAHEAD
W20-5
X
X
X
L
B
S
S
Legend
Bus Stop
Cone
MH
685 MH 685
X Ped 9640
Sign Stand
S Spotter
Traffic Light
Work Area
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
3 05
1:50
P.185744 98055
Scope of Work: Manhole Access
Traffic Control Plan: Right Lane Closure
Plan Scale
1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidth
Feet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
Pedestrian Escort: Stop work, secure passable
ADA compliant Pedestrian access on existing
sidewalk (4' min.). Clear zone must be free of
overhead hazards when Pedestrians are moving
through the work area.
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.
01/09/2024 by:Elite Traffic Solutions
206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Jʅʙiʋɚ Mʝrɪȵeɡ
SPOTTER SHALL ASSIST PEDESTRIANS
THROUGH WORKZONE SAFELY.
CONTACT KING COUNTY METRO
CONSTRUCTION COORDINATOR AT:
construction.coord@kingcounty.gov
206-477-1140
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
www.invarion.comMFP24000155
Imagery and map data ©2024, Google
17930 TALBOT RD S
TALBOT RD S25MPH
S CARR RD35MPH
X
11'
12'
11'
12'
10'
11'
11'
11'
11'
16'
17910 TALBOT RD S
X 11'
11'
11'
11'
ROADWORKAHEAD
W20-1
W4-2
RIGHT LANECLOSEDAHEAD
W20-5
X
X
X
L
B
8'35'
ROADWORKAHEAD
W20-1
10'
165'S
Legend
Bore Pit
Bus Stop
Cone
X Ped 9640
Sign Stand
S Spotter
Traffic Light
Work Area
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
4 05
1:50
P.185744 98055
Scope of Work: Trenching
Traffic Control Plan: Right Lane Closure
Plan Scale
1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidth
Feet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
Pedestrian Escort: Stop work, secure passable
ADA compliant Pedestrian access on existing
sidewalk (4' min.). Clear zone must be free of
overhead hazards when Pedestrians are moving
through the work area.
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.
01/09/2024 by:Elite Traffic Solutions
206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Jʅʙiʋɚ Mʝrɪȵeɡ
SPOTTER SHALL ASSIST PEDESTRIANS
THROUGH WORKZONE SAFELY.
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
www.invarion.comMFP24000155
Imagery and map data ©2024, Google
17930 TALBOT RD S
TALBOT RD S25MPH
S CARR RD35MPH
S 43RD ST35MPH
T
11'
11'
11'
11'
16'
VALLEY PROFESSIONAL PLAZA401 S 43RD ST
17910 TALBOT RD S
8'35'
8'35'11'
12'
11'
12'
10'
ROADWORKAHEAD
W20-1
ROADWORKAHEAD
W20-1
W4-2
RIGHT LANE
CLOSEDAHEAD
W20-5
X
X
X
L
B
S
Legend
Bore Pit
Bus Stop
Cone
T Hand Hole
Sign Stand
S Spotter
Traffic Light
Work Area
Traffic Control Planner
Elite Traffic Solutions
206-922-9205
julian@elitetrafficsolutions.com
Renton
King
5 05
1:50
P.185744 98055
Scope of Work: Handhole Installation & Boring
Traffic Control Plan: Right Lane Closure
Plan Scale
1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS & URBAN ARTERIALS
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH
45/55 MPH
35/40 MPH
25/30 MPH
25 MPH OR LESS
800'
SIGN SPACING=X (FEET) (1)
500'
350'
200'
100'(2)
(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidth
Feet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FEET)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570645 730
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
30
20
80
60
40
Pedestrian Escort: Stop work, secure passable
ADA compliant Pedestrian access on existing
sidewalk (4' min.). Clear zone must be free of
overhead hazards when Pedestrians are moving
through the work area.
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Metro Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 36 x 36 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.
9. Traffic Control Supervisor required for ROW impacts.
01/09/2024 by:Elite Traffic Solutions
206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Jʅʙiʋɚ Mʝrɪȵeɡ
SPOTTER SHALL ASSIST PEDESTRIANS
THROUGH WORKZONE SAFELY.
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT
"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
www.invarion.comMFP24000155
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB: BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE: WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.7515014500000”NVICINITY MAPSL17930 TALBOT ROAD SRENTON, WA 98055P.185744W26251KENTWAOB23N5E3112/28/2341®CUSTOMER NAME: PROLIANCE SURGEONSLCON: MIKIKO TSUJIPHONE #: 206-473-0001EMAIL: proliancesdwan@proliancesurgeons.comWFMT #: A.4976390ORDER #: N31453240ARMOR OR DSR #: 0501-2319492SCOPE OF WORK:POF: @ MANHOLE 621, SPLICE COUNT LRE25, 365-366 FROM EXISTING 48CT [SE13] TO EXISTING 48CT [A3KTF] FALLING TO MANHOLE188. @ MANHOLE 188, SPLICE COUNT LRE25, 365-366 FROM EXISTING 48CT [A3KTF] TO EXISTING 48CT [A3KMH] FALLING TO MANHOLE685. @ MANHOLE 685, SPLICE LR325, 365-366 FROM EXISTING 48CST [A3KMH] TO NEW 24CT [A3TGC]. PLACE NEW FIBER CABLE INTOEXISTING 4" NORTH ACROSS S CARR ROAD. APPROX 75' TO PEDESTAL 9640. @ PEDESTAL 9640, PLACE/TRENCH/BORE TO NEWHANDHOLE. APPROX 275'. @ NEW HANDHOLE, PLACE/BORE TO CUSTOMER'S BUILDING MPOP APPROX 20'. @ CUSTOMER'S BUILDINGMPOP, USE ENTRANCE FACILITIES TO TERMINATE FIBERS TO THE FDP THEN TEST FIBERS END TO END & TURN-UP NEW EQUIPMENT.SH OF DRAFTED BY: MOUNTAIN LTD/MT LTD ENGINEER: DELMER JEWELLPHONE NO: 360-918-4425EMAIL: delmer.r.jewell@lumen.comFIBER ENGINEER: TAYLOR HAYESPHONE NO: 725-577-0771EMAIL: taylor.hayes@lumen.comMFP24000155This permit is for Major construction work in the ROW and will be billed at an additional$158/HR for inspections. After hours and weekend work will be billed at $175/HR
TT
T
T
TEE
E
E
E CATV CATV CATV
CAT
V
CAT
V
CAT
V
CAT
V
CAT
V GG
GGG TS TS
TS
TS
TS WWWWW S S
S
S S
SD SD
SD
SD
SD C/L C/L C/L
C/L
C/L
C/L
R/W R/W
R/W
R/W
R/W
R/W
R/W
P/L P/L
P/L
P/L
P/L
P/L
B/C B/C B/C B/C
B/
C
B/
C
B/C
B/C
EOP EOP
EOP
EOP
EOP
TTTUSAMEEPWREE CATV
CATV TVTV CATV
CATV CATV
CATV
CATV
CATV CATV
CATV VTS C/L C/L VWSSDVETTTXXX'XXX'XXX'XXX'X IRRIG IRRIG F1NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB: RNGE:SECT:TOWN:GEO CODE: WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:JOB:GEO CODE:WC CLLI:DRAFTED BY: MOUNTAIN LTD/SH OF SL17930 TALBOT ROAD SRENTON, WA 98055P.185744W26251KENTWAOB23N5E3112/28/2342®MT LTD ENGINEER: DELMER JEWELLPHONE NO: 360-918-4425EMAIL: delmer.r.jewell@lumen.comFIBER ENGINEER: TAYLOR HAYESPHONE NO: 725-577-0771EMAIL: taylor.hayes@lumen.comMFP24000155
NOTE:FOR UNDERGROUND ACTIVITY: TEST AND VENTILATEMANHOLE/UTILITY VAULT PRIOR TO ENTRY, PLACEWARNING DEVICES AND WORK AREA PROTECTION ASREQUIRED, AND USE EYE AND HEAD SAFETY PROTECTIONPER FEDERAL, STATE, AND LOCAL REGULATIONS.TTT EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W EOP EOP EOP R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP 17930TALBOT RD SPARCEL#312305913517910PARCEL#31230591034300PARCEL#312305913510'42'102'80'70'106'60'78'75'17'20'22'80'14'S CARR ROADSIDEWALKSIDEWALK58'POF LMN MH 621LMN MH 188
0+75 LMNPED 9649NOTE:@ CUSTOMER'S BUILDING MPOP,USE ENTRANCE FACILITIES TOTERMINATE FIBERS TO THE FDPTHEN TEST FIBERS END TO END &TURN-UP NEW EQUIPMENT.NOTE:@ PEDESTAL 9640, PLACE/TRENCH/BOREPLACE NEW FIBER CABLE TO NEWHANDHOLE. APPROX 275'.NOTE:@ MANHOLE 685, SPLICE LR325, 365-366FROM EXISTING 48CST [A3KMH] TO NEW24CT [A3TGC]. PLACE NEW FIBER CABLEINTO EXISTING 4" NORTH ACROSS S CARRROAD. APPROX 75' TO PEDESTAL 9640.NOTE:POF: @ MANHOLE 621, SPLICECOUNT LRE25, 365-366 FROMEXISTING 48CT [SE13] TOEXISTING 48CT [A3KTF]FALLING TO MANHOLE 188.NOTE:@ MANHOLE 188, SPLICE COUNTLRE25, 365-366 FROM EXISTING 48CT[A3KTF] TO EXISTING 48CT [A3KMH]FALLING TO MANHOLE 685.0+00 LMNMH 685T2+20 4'X4' BORE PIT 13+70 4'X4' BORE PIT 23+90 MPOPNOTE:@ NEW HANDHOLE,PLACE/BORE TO CUSTOMER'SBUILDING MPOP APPROX 20'.10'
TALBOT ROAD SSIDEWALKSIDEWALK
PLANTER GRADE SOFT, ASPHALT &CONCRETE SURFACE36"
MIN TRENCH/BORE DETAIL 'A'TRENCH/BORE PLACEMENT OF 2" OR 4" CONDUIT - 36" MINN.T.S.6"MIN.2" OR 4" CONDUIT8'25SPEEDLIMIT35SPEEDLIMITNOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB: GEO CODE: WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS3RSL17930 TALBOT ROAD SRENTON, WA 98055P.185744W26251KENTWAOB23N5E3112/28/234SH OF DRAFTED BY: MOUNTAIN LTD/MT LTD ENGINEER: DELMER JEWELLPHONE NO: 360-918-4425EMAIL: delmer.r.jewell@lumen.comFIBER ENGINEER: TAYLOR HAYESPHONE NO: 725-577-0771EMAIL: taylor.hayes@lumen.comMFP24000155this bore path appears to be very nearour 8" watermain. 5' of separation isrequired from city utilities.