HomeMy WebLinkAboutPRE_StaffComments_240125_v1DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
|www.rentonwa.gov
PREAPPLICATION MEETING FOR
Maplewood Driving Range Restoration
4040 Maple Valley Hwy
PRE23-000416
January 25, 2024
Contact Information:
Planner: Andrew Van Gordon, 425.430.7286, avangordon@rentonwa.gov
Public Works Plan Reviewer: Huy Huynh, 425.430.7384, hhuynh@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Development Engineering Director, Department of
Community & Economic Development Administrator, Public Works Administrator and
City Council).
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: January 25, 2024
TO: Andrew Van Gordon, Planner
FROM: Huy Huynh, Civil Engineer
SUBJECT: MDR Restoration
PRE23-00416
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
2223059010. The following comments are based on the pre-application submittal made to the City of
Renton by the applicant.
WATER
1. The project is within the City of Renton’s water service area in the Valley 196 Pressure Zone.
2. There is no proposed impact to the existing water utility system.
3. The development is subject to applicable water system development charges (SDC’s) and meter
installation fees based on the number and size of the meters for domestic uses and for fire sprinkler
use. The development is also subject to fees for water connections, cut and caps, and purity tests.
Current fees can be found in the 2024 Development Fees Document on the City’s website. Fees will
be charged based on the rate at the time of construction permit issuance.
• The SDC fee for water is based on the size of the new domestic water to serve the project.
The current water fee is $4,850 per 1 in meter, $24,250 per 1-1/2 in service, $38,800 per 2 in
service and $77,600 per 3 in service.
• Water service installation charges for each proposed domestic water service is applicable.
Water Service installation is $2,875 per 1 in meter, $4,605 per 1-1/2” service, and $4,735 per
2 in service.
• Drop-in meter fee is $400 per ¾” meter, $460 per 1” meter and $750 per 1-1/2” meter
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof
Renton
SEWER
1. The project is within the City of Renton’s sanitary sewer service area.
2. There is no proposed impact to the existing wastewater utility system.
3. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for sewer
is based on the size of the new domestic water to serve the project. Current fees can be found in the
2024 Development Fees Document on the City’s website. Fees will be charged based on the rate at
the time of construction permit issuance.
• The current sewer SDC fee is $3,650.00 per 1-inch meter, $18,250 per 1-1/2” meter, $29,200
per 2 in meter
• Final determination of applicable fees will be made after the water meter size has been
determined.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof
Renton
SURFACE WATER
1. There is an existing 12 in concrete surface water main on Maple Valley Highway (see record
drawing R-379001).
2. There is an existing 18 in private surface water main located on the parcel (see record drawing
R-295312).
3. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water
Design Manual may be required. Refer to Figure 1.1.2.A – Flow Chart in the 2022 City of Renton
Surface Water Manual (2022 RSWDM) to determine what type of drainage review is required for
this site. A drainage study complying with the 2022 RSWDM may be required. Based on the
City’s flow control map, the site falls within the City’s Flow Control Duration Standard area
Matching Forested site conditions. The site falls within the Lower Cedar River basin and
Maplewood Creek sub-basin.
4. Critical areas on site that may affect stormwater review include regulated (steep) slopes,
erosion hazard areas and landslide hazard areas.
5. The site is located in Zone 1 modified and Zone 2 of the City’s Aquifer Protection Area (APA). In
these zones, stormwater open conveyance system, such as ditches and channels, and water
quality facilities may required a liner per section 6.2.4 and 1.2.4.3 of the 2022 RSWDM.
6. The current City of Renton Surface Water Standard Plans that shall be used in all drainage
submittals. The current City of Renton Standard details are available online at the City of Renton
website:
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton.
7. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant
will be required to provide enhanced basic water quality treatment. Any proposed detention
and/or water quality vault shall be designed in accordance with the RSWDM that is current at
the time of civil construction permit application. Separate structural plans will be required to be
submitted for review and approval under a separate building permit for the detention and/or
water quality vault.
8. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the
new runoff created by this development to the maximum extent feasible. On-site BMPs shall be
evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan,
including the application of on-site BMPs, shall be included with the land use application, as
applicable to the project. The final drainage plan and drainage report must be submitted with
the utility construction permit application.
9. Any new storm conveyance installed on or off-site shall be designed and sized in accordance
with standards found in Chapter 4 of the 2022 RSWDM and shall account for the total upstream
tributary area, assuming developed conditions for onsite tributary areas and existing conditions
for any offsite tributary areas.
10. The development maybe subject to a surface water system development charge (SDC) fee. Fees
will be charged based on the rate at the time of construction permit issuance.
a) The current SDC fee is $0.92 per sq ft of new impervious surface
b) The full schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067870&dbid=1&repo=Cityof
Renton.
TRANSPORTATION
1. In accordance with RMC 4-6-060, if the site improvements and/or proposed building additions
exceed an overall valuation of $175,000, the project site(s) shall be required to meet the City’s
Complete Streets Standards.
a. The project is considered preventative maintenance and does not involve any building
addition; therefore, frontage improvement and dedication are not required per
exemption two (2) RMC 4-6-060
2. Refer to City code 4-4-080 regarding driveway regulations.
a. Driveway width (aggregate width if more than one driveway exists) shall not exceed forty
percent (40%) of the street frontage.
b. The width of any driveway shall not exceed fifty feet (50’) exclusive of the radii of the
returns or taper section, the measurement being made parallel to the centerline of the
street roadway
c. There shall be no more than two (2) driveways for each three hundred thirty feet (330’)
of street frontage serving any one property or among abutting properties under unified
ownership or control. For each additional one hundred sixty-five feet (165’) of street
frontage an additional driveway may be allowed.
d. Maximum driveway slope shall not exceed eight percent (8%). The Administrator may
allow a driveway to exceed eight percent (8%) slope but not more than fifteen percent
(15%) slope, upon proper application in writing and for good cause shown, which shall
include, but not be limited to, the absence of any reasonable alternative. To exceed
fifteen percent (15%), a variance from the Administrator is required.
3. Paving and trench restoration within the City of Renton right of way shall comply with the City’s
Restoration and Overlay requirements.
4. The development is subject to transportation impact fees. Fees will be charged based on the rate
at the time of building permit issuance.
a. Unless otherwise listed on the City Fee Schedule the impact fee per Net New PM Peak
Hour Person Vehicle Trip is $8,031.94
b. The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof
Renton
GENERAL COMMENTS
1. All proposed utility lines (i.e., electrical, phone, and cable services, etc.) along property frontage
or within the site must be underground. The construction of these franchise utilities must be
inspected and approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance
with code requirements:
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
3. All civil construction permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for
the most up-to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan
shall be on separate sheets.
5. Additional Building Permit Applications will be required for the following:
a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040.
b. Detention vaults for storm water flow control.
c. Demo of any existing structures on the project site(s).
6. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to
the permit type. Please visit www.rentonwa.gov for the current fee schedule.
7. A demo permit is required for the demolition of the existing building. The demo permit shall be
acquired through the building department.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: January 25, 2024
TO: Pre-Application File No. 23-000416
FROM: Andrew Van Gordon, Associate Planner
SUBJECT: Maplewood Driving Range Restoration – 4040 Maple Valley Hwy
(Parcel number 2223059010)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official decision-
makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public
Works Administrator, Planning Director, and City Council). Review comments may also need to be
revised based on site planning and other design changes required by City staff or made by the
applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal
Code. The Development Regulations are available online at
https://www.codepublishing.com/WA/Renton/.
Project Proposal: The project area is located at 4040 Maple Valley Hwy (Parcel number
2223059010). The applicant proposes to restore the existing Maplewood Drive Range.
Restoration is proposed through one (1) of two (2) methods: 1) filling depressions, installing
second use turf over the existing synthetic turf and filled depressions, installation of a concrete
perimeter turf nailer curb and restoration of the existing chain link fence surrounding the driving
range, or 2) removed existing turf, regrade the entirety of the drive range, install new turf,
installation of a concrete perimeter turf nailer curb and restoration of the existing chain link fence.
The City of Renton’s (COR) mapping system indicates the site is within a High Erosion Hazard area,
100-year flood hazard area, a Moderate Landslide Hazard area, a Very High Hazard area, sensitive
and protected slopes onsite, High Seismic Hazard Area, within shoreline jurisdiction, within 200
feet of wetlands, the Maplewood Wellhead Protection Area: Zone 1 Modified and the Maplewood
Wellhead Protection Area: Zone 2.
Current Use: The site is currently improved with the Maplewood Golf Course. The driving range,
surface parking and associated structures are located on the site.
Zoning/Land Use: The subject property is located within the Resource Conservation (RC) zoning
classification. The purpose of the RC zone is to provide a very low-density residential zone that
endeavors to provide some residential use of lands characterized by extensive critical areas or
lands with agricultural uses. It is intended to implement the Low Density Residential
Comprehensive Plan designation. This zone promotes uses that are compatible with the functions
Rocket Kiosk
Page 2 of 6
January 25, 2024
and values of designated critical areas and allows for continued production of food and
agricultural products. No minimum density is required.
It is also intended to provide separation between areas of more intense urban uses and critical
lands or agricultural uses; encourage or preserve very low-density residential uses; reduce the
intensity of uses in accordance with the extent of environmentally sensitive areas such as
floodplains, wetlands and streams, aquifers, wildlife habitat, steep slopes, and other geologically
hazardous areas; allow for small-scale farming to commence or continue; and provide viable uses
within urban separators.
The proposal would be a restoration of an existing area within an existing golf course. The
existing golf course is classified as a gold course, existing. This use is permitted within the RC
zone.
Development Standards: The project would be subject to RMC 4-2-110A, “Development
Standards for Residential Zoning Designations (Primary Structures)" effective at the time of
complete application (noted as “RC standards” herein).
Building Standards – The RC standards permit a maximum lot coverage for buildings to be 10
percent (10%) of the total lot area; the maximum impervious surface area is 15 percent (15%).
The allowed height is 32 feet (32’). In no case shall building height exceed the maximum allowed
by the Airport Related Height and Use Restrictions for uses located within the Airport Influence
area and Safety Compatibility Zones designated under RMC 4-3-20, Airport Related Height and
Use Restrictions.
Elevations were not provided, so the specific height of the fencing is unknown. Impervious
surface area coverage calculations were not provided. The height and coverage requirements
would be verified at the time of land use application review.
Setbacks – Setbacks are the minimum required distance between the structure and the property
line. The required setbacks for the RC zone are: minimum front yard and secondary front yard: 30
feet (30’); minimum side yard: 25 feet (25’); minimum rear yard: 35 feet (35’). In no case shall a
structure over 42 inches (42”) in height intrude into the 20-foot (20’) clear vision area defined in
RMC 4-11-030.
A full site plan was not provided. However, based on the City’s mapping system it appears the
existing facility meets zoning setbacks. Setbacks would be verified at the time of land use
application review.
Access/Parking: Access to the site is via Maple Valley Hwy. Surface parking is present on the site.
Driveway width shall not exceed an aggregate of 40 percent (40%) of the street frontage. There
shall be a minimum of 18 feet (18’) between driveway curb returns where there is more than one
(1) driveway on property under single ownership or control and used as one premises. The width
of any driveway shall not exceed 30 feet (30’). There shall be no more than one (1) driveway for
each 165 feet (165’) of street frontage serving any one property. For each 165 feet (165’) of
additional street frontage another driveway may be permitted. Maximum driveway slope shall
not exceed eight percent (8%). The Administrator may allow a driveway to exceed eight percent
(8%) slope but not more than fifteen percent (15%) slope, upon proper application in writing and
for good cause shown, which shall include, but not be limited to, the absence of any reasonable
alternative. To exceed fifteen percent (15%), a variance from the Administrator is required.
Rocket Kiosk
Page 3 of 6
January 25, 2024
Bicycle Parking –The number of bicycle parking spaces shall be equal to 10 percent (10%) of the
number of required off-street vehicle parking spaces for all uses except attached dwellings.
As proposed the project does not trigger parking requirements. Please review RMC 4-4-080,
Parking, Loading and Driveway Regulations for the full requirements. Compliance with parking
requirements, if applicable, would be verified at the time of land use application review.
Landscaping: With the exception of critical areas, all portions of the development area not
covered by structures, required parking, access, circulation or service areas, must be landscaped
with native, drought-resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in
the ROW planter will also be required. Landscaping may include hardscape such as decorative
paving, rock outcroppings, fountains, plant containers, etc. Minimum planting strip widths
between the curb and sidewalk are established according to the street development standards of
RMC 4-6-060, Street Standards. Street trees and, at a minimum, groundcover are to be located in
this area when present. Street trees shall be planted in the center of the planting strip between
the curb and the sidewalk at the following intervals; provided, that, where right-of-way is
constrained, irregular intervals and slight increases or decreases may be permitted or required.
Additionally, trees shall be planted in locations that meet required spacing distances from
facilities located in the right-of-way including, but not limited to, underground utilities,
streetlights, utility poles, traffic signs, fire hydrants, and driveways; such spacing standards are
identified in the City’s Approved Tree List. Generally, the following spacing is required: i. Small-
sized maturing trees: thirty feet (30') on center; ii. Medium-sized maturing trees: forty feet (40')
on center; and iii. Large-sized maturing trees: fifty feet (50') on center.
As proposed the project does not trigger landscaping requirements. Please review RMC 4-4-
070, Landscaping for full requirements. Compliance with the requirements, if applicable, would
be verified at the time of land use application review.
Significant Tree Retention: A review of COR Maps shows that there are mature trees on the site.
When significant trees (greater than 6-inch caliper or 8-caliper inches for alders and cottonwoods)
are proposed to be removed, a tree inventory and a tree retention plan along with an arborist
report, tree retention plan and tree retention worksheet shall be provided with the formal land
use application as defined in RMC 4-8-120. The tree retention plan must show preservation of at
least 30% of significant trees. Please refer to RMC 4-4-130, Tree Retention and Land Clearing
Regulations for further general and specific tree retention and land clearing requirements.
In addition to retaining a minimum of 30% of existing significant trees, properties subject to an
active land development permit shall comply with minimum tree credit retention requirements
of a minimum of 30 credits per net acre. Tree credits encourage retention of existing significant
trees with larger trees being worth more tree credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Rocket Kiosk
Page 4 of 6
January 25, 2024
TREE SIZE TREE CREDITS
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and
greater
13
A review of COR Maps and the provided documents appears to show mature significant trees
on site. Tree retention standards would need to be met. Tree retention standards shall be
applied to the developable area, as defined in RMC 4-11-040, Definitions D, of property. A formal
tree retention plan and tree retention worksheet prepared by an arborist or landscape architect
would be reviewed at the time of the land use application. See RMC 4-4-130, Tree Retention and
Land Clearing Regulations for full requirements.
Fences/Walls: Within residential zones the maximum height of any fence, hedge, or retaining wall
shall be 72 inches (72”). Within the front yard and secondary front yard fences, hedges, or
retaining walls shall not exceed 48 inches (48”) in height; in no case shall they exceed 42 inches
(42”) in height in any part of the clear vision area. Fences, hedges, or retaining walls shall not
exceed seventy-two inches (72") in height within any part of the interior side yard setback to the
point where they intersect the front yard setback or a secondary front yard setback, in which case
they shall be governed by the applicable limitations of the front yard or secondary front yard
setbacks. Fences, hedges, or retaining walls shall not exceed seventy-two inches (72") in height
within the rear yard setback except the fence, hedge, or retaining wall shall not exceed forty-eight
inches (48") in height where the rear yard abuts a public or private street. Fences, hedges and
retaining walls shall not stand in or in front of any required landscaping.
Height of the fencing was not provided. It appears the fencing is outside of applicable setbacks.
If it is greater than 72 inches (72”) in height a variance is required. See RMC 4-4-040, Fences,
Hedges and Retaining Walls for full requirements.
Refuse and Recyclables: All new developments for nonresidential uses shall provide on-site refuse
and recyclable deposit areas and collection points for collection in compliance with RMC 4-4-090,
Rocket Kiosk
Page 5 of 6
January 25, 2024
Refuse and Recyclables Standards. These areas shall not be located within required setbacks or
landscaped areas and shall not be located in a manner that hauling trucks obstruct pedestrian or
vehicle traffic on-site or project into public right-of-way. In nonresidential developments, a
minimum of three (3) square feet per every 1,000 square feet of building gross area shall be
provided for recyclables deposit areas, and a minimum of six (6) square feet per 1,000 square feet
of building gross floor area shall be provide for refuse deposit areas. A total minimum area of 100
square feet shall be provided for recycling and refuse deposit areas.
Enclosures for refuse or recyclables deposit areas/collection points shall have a gate opening at
least 12 feet (12’) wide and between 11 feet (11’) and 14 feet (14') for haulers.
Refuse and recycling requirements are not applicable as the proposal is for restoration of the
existing driving range and is not new development. See RMC 4-4-090, Refuse and Recyclables
Standards for full requirements.
Critical Areas: According to COR Maps, the site is within a High Erosion Hazard area, 100-year
flood hazard area, a Moderate Landslide Hazard area, a Very High Hazard area, sensitive and
protected slopes onsite, High Seismic Hazard Area, within shoreline jurisdiction, within 200 feet
of wetlands, the Maplewood Wellhead Protection Area: Zone 1 Modified and the Maplewood
Wellhead Protection Area: Zone 2. Within the project area
The overall purpose of the wellhead protection regulations is to protect aquifers used as potable
water supply sources by the City from contamination by hazardous materials. Development within
geologically hazardous areas requires a geotechnical study completed by a licensed professional.
Subject properties within 100 feet (100’) of rivers or streams requires a stream study be
conducted. Wetlands are located on the site; a wetland assessment would be required. Flood
hazard data would be required as a portion of the subject property is within the 100-year flood
hazard area.
A hydrogeologic study will be required if it determined that it would have a significant impact
on ground water. Maintenance and repair of existing public uses is permitted as an exempt
activity within geologic hazard areas, habitat conservation areas, streams and lakes: type F, Np
& Ns, and wetlands provided the applicant can show they meet the critical area exemption
criteria. It is the applicant’s responsibility to ascertain whether any critical areas or
environmental concerns are present on the subject property prior to development and/or
construction.
Environmental Review: The proposal would require environmental review pursuant to the State
Environmental Policy Act (SEPA) per RMC 4-9-070G.1.d for landfills and excavations over 500 cubic
yards.
Permit Requirements: The proposal would require Environmental Review (SEPA). Fees would
total $1,890.00 ($1,800.00 Environmental Review (SEPA) + $90.00 5% Technology Fee =
$1,890.00). An Administrative Variance request is $1,490.00. Each modification request is
$290.00. A Critical Area Exemption request is $0.00. A 5% technology fee added to the total cost
of the reviews would also be assessed at the time of land use application. All fees are subject to
change. Other informational applications and handouts can be found on the City’s Digital Records
Library.
The City requires electronic plan submittal for all applications. Please refer to the City’s
Electronic File Standards.
Rocket Kiosk
Page 6 of 6
January 25, 2024
Fees: In addition to the applicable building and construction fees, impact fees may be required.
The fee in effect at the time of building permit issuance will apply. When an existing structure or
building or portion thereof has been vacant for less than three (3) years, the impact fee shall be
the applicable impact fee for the land use category of the new use, less any impact fee previously
paid for the land use category of the prior use. If no impact fee was paid for the prior use, the
impact fee for the new use shall be reduced by an amount equal to the current impact fee rate
for the prior use. When an existing structure or building or portion thereof has been vacant for
a period of three (3) years or more, the impact fee shall be the applicable impact fee for the
land use of the new category; there shall not be a deduction of the impact fee that was or was
not previously paid for the land use category of the prior use.
Next Steps: When the formal land use application materials are complete, the applicant shall have
the application materials pre-screened prior to submitting the complete application package.
Please contact Andrew Van Gordon, Associate Planner at avangordon@rentonwa.gov or (425)
430-7286 for an appointment.
Expiration: It is the responsibility of the owner to monitor the expiration date.