HomeMy WebLinkAboutR-422201N
N
O
0
W
0
p
W
l)
CW
G
0
Know whaft below.
Call before you dig.
mil\
�O
�\
�OHE__
OHE I�
\QHE—
-OHEOHEOHE OHEOHE
- OH E— OH E— OH E— OH E— OH E
�ryF\ OHF \OH
F
f\OHF °HF\oNe\ 00�� \°yF
\
0yf\ F
�OHf �OHF �OyF F�
�OyF �OHF �°Hf
�OyF°HF �OHf
e..
I
/
/
/
/
/
�0yf
�OyF
OF
�
OyFryF\ OyFy\ 0yF OHf
0/yF �O_�_Z,He OyF
.Oyf \OyF� Oyf OyF�
Oy Oy
F\OyFyF�Of
/ OHF °HF °HF
/ \ °HF< OHf� OHF�
OHf\ON,, Oi
HF\ 0Hf\ 0H,
E 0Hf 0Hf
0yF
1
BULLETIN #1
LR
8/22/22
DZ
2
BULLETIN #2
LR
9/30/22
DZ
3
BULLETIN #3
LR
10/25/22
DZ
ROW — AS—BUILTS
LR
4/28/23
DZ
NO.
REVISION
BY
DATE
APPR
DEMOLITION LEGEND:
SAWCUT AND REMOVE EXISTING PAVEMENT,
LANDSCAPE, AND OTHER IMPROVEMENTS, UNLESS
OTHERWISE NOTED. ALL UNDERGROUND UTILITIES
TO REMAIN IN PLACE UNLESS OTHERWISE NOTED.
...... EXISTING UTILITY TO BE REMOVED.
DEMOLITION NOTES:
OSAWCUT AND REMOVE EXISTING PAVEMENT, FENCING, AND STRUCTURES,
UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITIES TO REMAIN IN
PLACE UNLESS OTHERWISE NOTED.
OSANDBLAST
TO REMOVE EXITING STRIPING.
WATER LINE TO BE REMOVED AND EXISTING STUBS TO BE
OEXISTING
CAPPED.
FIRE HYDRANT TO BE REMOVED AND SALVAGED TO THE CITY
OEXISTING
OF RENTON.
EXISTING
STORM DRAIN LINE AND MANHOLE TO BE VERIFIED AND
5
ABANDONED
IN PLACE. CONTRACTOR TO CUT INTO PIPE IF NECESSARY.
OEXISTING
GREASE INTERCEPTOR AND SAND/OIL SEPARATOR TO BE
REMOVED
PER CITY STANDARDS. INFILL PER STRUCTURAL PLANS.
O7
EXISTING
GREASE INTERCEPTOR TO REMAIN.
OEXISTING
DOMESTIC 2" DCVA TO BE REMOVED.
OEXISTING
COMMUNICATION LINE TO BE UNDERGROUNDED.
EXISTING
POWER POLES AND POWER LINES UNDERGROUNDING TO BE
10
DEFERRED.
11
EXISTING
CURB AND GUTTER TO REMAIN.
EXISTING
BUS SHELTER TO BE REMOVED AND RELOCATED. SEE SHEET
12
R 1.0.
DEMOLITION LEGEND:
1. CONTRACTOR SHALL REPLACE AND/OR REPAIR ALL DAMAGES AFFECTED BY CONSTRUCTION
AND/OR REMOVAL OF EXISTING ADJACENT OFFSITE IMPROVEMENTS, INCLUDING WET OR DRY
UTILITIES, TO THE SATISFACTION OF THE CITY.
2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE GEOTECHNICAL ENGINEER
AND THE MOST CURRENT GEOTECHNICAL REPORT PRIOR TO DEMOLITION ACTIVITIES.
3. THE CONTRACTOR SHALL BE REQUIRED TO VISIT SITE PRIOR TO PRE BID MEETING TO
FAMILIARIZE THEMSELVES WITH DEMOLITION, GRADING, ETC. AND IMPROVEMENTS.
4. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY AND ALL ITEMS NOT OTHERWISE
LISTED HEREIN THAT CONFLICT WITH THE CONSTRUCTION OF THE PROJECT. CONTRACTOR
SHALL CONTACT ENGINEER IMMEDIATELY TO DETERMINE ANY ITEMS NOT SHOWN ON THE
PLANS THAT MUST BE REMOVED. FAILURE TO DO SO DOES NOT RELIEVE CONTRACTOR OF
RESPONSIBILITY AND COST FOR REMOVING ITEMS REQUIRED.
5. CONTRACTOR IS RESPONSIBLE FOR REVIEWING (IF APPLICABLE) ALL KNOWN ENVIRONMENTAL
INVESTIGATION STUDIES AND REPORTS PRIOR TO BIDDING. REPORTS ARE INCLUDED IN
PROJECT SPECIFICATIONS. CONTRACTOR TO COORDINATE WITH ENVIRONMENTAL ENGINEER ON
EXACT AREAS OF CONTAMINATION IF ANY.
6. CONTRACTOR TO DISPOSE OF ALL DEBRIS AND EXCESS MATERIAL ACCORDING TO LOCAL
REQUIREMENTS.
7. CONTRACTOR WILL REMOVE AND PROPERLY DISPOSE OF ALL PLANTS, TREES, AND
VEGETATION EXCEPT AS NOTED.
8. DEMOLITION CONTRACTOR TO SUBMIT TRUCK ROUTE, SCHEDULE OF DEMOLITION, TRAFFIC
CONTROL PLAN, METHOD OF DEMOLITION, AND DUST AND NOISE CONTROL MEASURES, AS
REQUIRED, TO OBTAIN EXCAVATION PERMIT.
9. CONTRACTOR TO REMOVE ANY EXISTING CONCRETE SLABS, WALLS, FLOORS, AND FOOTINGS
IN THEIR ENTIRETY.
10. ALL DEMOLISHED ASPHALTIC CONCRETE AND PORTLAND CEMENT CONCRETE IS EXPECTED TO
BE REMOVED FROM SITE.
11. CONTRACTOR TO INSTALL SECURITY FENCE SURROUNDING PROPERTY DURING DEMOLITION
WORK.
12. THE CONTRACTOR SHALL TAKE EFFECTIVE ACTION TO PREVENT THE FORMATION OF ANY
AIRBORNE DUST NUISANCE AND SHALL BE RESPONSIBLE FOR ANY DAMAGE RESULTING
FROM FAILURE TO FOLLOW CITY GUIDE LINES.
13. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE
LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION
OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE
IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE
CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES UPON THE REMOVAL OF
UTILITIES IN ADVANCE OF DEMOLITION CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE THE EXISTENCE OF AND LOCATION OF THOSE UTILITIES
SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY
ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY
LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR
VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE
CONTRACT.
14. ALL EXISTING REMAINING UTILITIES AND REMAINING IMPROVEMENTS IN PUBLIC RIGHT OF
WAY THAT BECOME DAMAGED DURING CONSTRUCTION SHALL BE COMPLETELY RESTORED TO
THE SATISFACTION OF THE LOCAL AGENCY ENGINEER, AT THE CONTRACTOR'S SOLE
EXPENSE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DOCUMENT PRIOR
DAMAGES.
15. IF ARCHAEOLOGIST MATERIALS ARE UNCOVERED DURING GRADING, TRENCHING OR OTHER
EXCAVATION, EARTHWORK WITHIN 100 FEET OF THESE MATERIALS SHALL BE STOPPED
UNTIL A PROFESSIONAL ARCHAEOLOGIST WHO IS CERTIFIED BY THE SOCIETY OF
PROFESSIONAL ARCHAEOLOGY (SPOA) HAS HAD AN OPPORTUNITY TO EVALUATE THE
SIGNIFICANCE OF THE FIND AND SUGGEST APPROPRIATE MITIGATION MEASURES, IF THEY
ARE DEEMED NECESSARY.
16. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT SERVICES, ETC.
NECESSARY AND INCIDENTAL FOR THE COMPLETION OF ALL DEMOLITION AND CLEARING
WORK AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN.
17. ALL ON —SITE AND OFFSITE WORK INCLUDED CONSISTS OF BUT IS NOT LIMITED TO THE
FOLLOWING:
17.1. DEMOLITION AND REMOVAL OF EXISTING BUILDINGS AND STRUCTURES. (INCLUDING
FOUNDATIONS)
17.2. REMOVAL OF EXISTING SIDEWALKS, DRIVES, CURBS, PAVEMENT, RETAINING WALLS, ETC.
17.3. REMOVAL OR CAPPING OFF OF EXISTING UTILITIES, UNDERGROUND STRUCTURES, SEPTIC
TANKS, DISPOSAL FIELDS, ETC.
17.4. CLEARING SITE OF TREES, BRUSH, DEBRIS, ETC.
17.5. UTILITY LINES SHALL BE EXCAVATED, REMOVED, AND BACKFILLED WITH ENGINEERED
BACKFILL.
17.6. REMOVAL OF OVERHEAD POWER LINES. CONTACT ELECTRICAL COMPANIES BEFORE DOING
ANY WORK.
17.7. REMOVAL OF ALL EXISTING NON —USABLE MATERIAL PER SOIL REPORT RECOMMENDATION.
17.8. UNDERGROUND FACILITIES ARE NOT DEPICTED ON THIS PLAN. CONTRACTOR IS
RESPONSIBLE FOR ALL.
RECORD DRAWINGS
'HIS RECORD DRAWING HAS BEEN PREPARED BASED ON INFORMATIOI
'ROVIDED BY THE GENERAL CONTRACTOR AND ENGINEER OF RECORD
p,_A N M LARS ANDERSEN & ASSOCIATES, INC.
� pF WA sh��� CIVIL ENGINEERS - LAND SURVEYORS - PLANNERS
0
` N�o�� 4694 WEST JACQUELYN AVENUE - FRESNO CALIFORNIA 93722
N TEL: 559 27 -2790 FAX: 559 276-0850 WWW.LARSANDERSEN.COM
'> f Tl
/STE \� 4/28/2023
S FSS�ONAL- SCOTT A. MOMMER RCE 56573 DATE:
APEX � m CITY 0 F
1"=80'
LR RENTON
LR ow mm I DATUM
DZ AT � 80E Planning/Building/Public Works Dept.
FN
DZ
R-422201
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
HOME DEPOT
CIVIL CONSTRUCTION PERMIT
DEMOLITION PLAN
oast
10/12/2022
D1.0
5 °F' 55
00
M
O
C)
N
N
u
H
H
N
Q
J
0
O
O
N
I-
0
a_
W
0
W
2
0