HomeMy WebLinkAboutD_Solera_Extension_240130
January 30, 2024
Tom Neubauer
Solera Manager, LLC
10900 NE 8th St, Suite 1200
Bellevue, WA 98004
SUBJECT: One-Year Extention Approval – New Expiration July 30, 2025
Solera Master Plan and Preliminary Plat / LUA18-000490 and LUA20-000305
Dear Mr. Neubauer,
This office has reviewed your request to extend an approved Preliminary Plat (File Nos. LUA18-000490 and LU20-
000305) for a period of one (1) year. The Master Plan and Preliminary Plat applications for the Solera project were
initially approved on January 30, 2019, and a major modification of the proposal was approved on March 14, 2021.
On April 20, 2020, the Renton City Council adopted an ordinance (Ordinance No. 5968) that temporarily extended
the validity of certain permits by a period of six (6) months due to on-going construction challenges created by
the COVID-19 pandemic. Preliminary Plats are valid for five (5) years and due to the COVID extension, the approval
would expire on July 30, 2024, or five years and six months following the initial preliminary plat approval. Pursuant
to Renton Municipal Code (RMC) 4-7-080L.2, a single extension of up to one (1) year may be granted to an
applicant who files a written request with the Administrator at least 30 days before the expiration of preliminary
plat approval, provided the Administrator finds that the applicant has obtained issuance of a construction permit
and has made sustained progress towards final construction, engineering, and surveying necessary to record a
final plat. Your request meets requirements of the extension criteria and qualifies for a one-time extension of one
(1) year, as an extension request was submitted more than 30 days prior to the expiration of the preliminary plat
approval, the Construction Permit has been issued and the applicant has made sustained progress towards final
construction necessary for the recording of the final plat. Therefore, your one (1) year extension request is
approved.
The one (1) year extension shall be measured using the expiration date of the Preliminary Plat approval after
issuance of the temporary six (6)-month extension (July 30, 2024) in order to ensure consistency with the
extensions granted to other projects under the emergency ordinance. Please note that all construction must be
completed or deferred, and the final plat recorded in accordance with City Code prior to the last day of the
extension of July 30, 2025. Pursuant to RMC 4-7-080L.3, one additional one-year extension beyond the one-year
extension may be granted by the Hearing Examiner if the applicant shows need caused by unusual circumstances
or situations that occurred during the prior extension period, which make it unduly burdensome to file the final
plat. The applicant must file a written request with the Hearing Examiner and the Administrator for this additional
extension; this request must be filed at least 30 days prior to the plat expiration date. Said request must include
all necessary documentation as to the need for the additional extension.
Sincerely,
Matt Herrera, AICP
Planning Director
cc: Dalton Arndt Devco Development Dalton.arndt@devcous.com
Brianne Bannwarth, Interim CED Administrator
Alex Morganroth, Senior Planner
Michael Sippo, Civil Engineer 3
Tom Neubauer, Solera Manager LLC
Page 2 of 2
January 30, 2024