Loading...
HomeMy WebLinkAboutR-396405I I I I N X J w z U 75 iv U U) Q L0 0 N 0 N 00 N 0 E 0 0 E I LEI 0 I N M O 00 1-1 0 i x X LLJ m 0 u) 0 N 0 00 1n O 0 0 00 w j z H 301NrS IN FILTER FABRIC SMALL &E SPL[CED AT POSTS USE STAPLES. 'HIRE RINGS, OR Ff]I HllA1 FNT TCI ATTA041 FARRIC TCi Pe7RT.4 13" MAX. jII I� X/ POST SPACING MAY BE INCREASED TO F IF WIRE BACIONG IS USED 2'x2' BY 14 Ca WIRE OR E-OLAVAL£NT. IF STANDARD -* STRENGTH FABRIC B5ED FILTER FNVAI MINIMUM a'ke" TRENcad uBACKFILL TRENCH WITH NA11VE SOIL 2'x4'NOCLI PO$IS, STEEL FENCk POSTS. REAR, OR EOUIVALENT NOTES 1, CONDITION OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SLT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOVL' ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE [DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTELTILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE AVAILABLE ON SITE. JA�IM511VI I {R 5!}D.15MM} TOR 51I i FIL M AOS IASrM 04751) 5p tp0 SIEVE 512E 4.30 O.15MM FOa OTHER FA8RICS L'1A.'ERPERMI7TIVI7{ A$ EW9" D.c75 r.C" : MI NI mum LBU LBi M N. FOk Exl'RA 0 kE NGH I;.kRl[ GRABTFN5RR 5TRENCIiT IASTM DCGR71 L,]OLBS NIN FOR}TANDAR0 STRFNGHT FABRIC tiRAB1EN5:LEEL17NGAliON ASTMb4632 B0%MAX. ULTRAVIOLATE R[$151A.4'U ABTA Nl.;S5 7G%MIN 2.2. STANDARD STRENGTH FABRIC REDOIREEL WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FCR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED. THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V F AT Y SILT N 2.4. IF A TYPICAL SILT FENCE IS USED. THE STANDARD 4X TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM & INCHES OF THE SIL E CE IS WELL BURIEG AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY. 3.2. IF GONCENTRATED FLOES ARE EVIDENT UPHILL 01) THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND, 3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP SEDIMENT, 3.4. SEDMENT MOST BE REMOVE1 WHEN SEDIMENT IS 61NCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. PUBLIC WORKS SILT FENCE STD. PLAN - 214.00 DEPARTMENT - - - MARCH 2O08 ❑RAINA13E GRATE GRATE FRAME tr SEDIMENT AND DEFIRIS i DRAINAGE GRATE - REC' orb FILTERED WATT=R TRIM � d y OVERFLOW BYPASS Fil- BELOUVINLET GRATE DEVICE 8b +b SECTION VIEW ISOMETRIC VIEW MOTES 1. 8I2e the Below Inlet Grate Device (BIG(}) for the storm water structure It %vi1 service. 2. The BIGD shall have a bolt -In hlgf,-flow rellef system (Overflow bypass). 3. The +etrieval syslem must allow removal of the BIGD without spilling the collected material. 4. Perform nlalnMenance In accordance with Standard SpedllcadGn 8-01.3(15). W ITYP.j � PUBLIC WORKS CATCH BASIN FILTER STD. PLAN - 218.30 ++� ` DEPARTMENT MARCH 2O08 V0 A VS 42 n U CO Q- <T�HG ENG 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 (425)251-8782 FAX CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES T.E.S.C. NOTES AND DETAILS FOR UW MEDICINE - VALLEY MEDICAL CENTER MEDICAL OFFICE BUILDING EXPANSION aROsror, AND air coH,raa REOOMMENDED DrdVEWAYS SHALL BE PAVED TO THE EDGE OF 11,1111 PRIOR TO INSTALLATION DP TI1E CONSTRUCTION ENTRANCE Ey,1SS�G O O AVOID oAMAGINC OF THE ROADWAY IT IS RECOMMENDED THATTHE R • 25' MIN. ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFFTi{E PAD t� INSTALL DRIVEWAY CULVERT IF THERE 15 A ROADSIDE DITCH PRESENT. AS PER CITY ROAD STANDARDS •"-8' QUARRY SPALLS GEbTEXTILE l 1 Z'MIN. TMCKNESS ^h PROVIDE FULL WIDTH OF NOTES INGRESS -EGRESS AREA 1, CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. �-� SADR �F W A Sy/ A, 1 24661 o�el e0 l S T AL 10/28/20 GRATT-ENSILE STREBN43TH IASTMP47531 7(V PSI miN:. GRABTENSILEFIONGATION(ASTM745371 VKMAX MULLEN BURST5TREHGTH{ASTMD379&80AI 4COPS1 MIN. AOS ASFMi)47511 20-45 U.S. STANDARD SIEVE 51ZE 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.2. FENCING SHALL BE INSTALLED) AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL 13E CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS INC LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT. THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE IJSEfl. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED. IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK. AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND, 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVEQ OR STABILIZED ON SITE, THE PAVEMENT SMALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY, 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AN D END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. PUSUC WORKS STABILIZED PLAN - 815.10 DEPARTMENT CONSTRUCTION ENTRANCE MARCH 2O08 ROCK MUST COMPLETELY COVER THE m % BOTTOM AND SIDES OF THE DITCH 6" MIN. 24"MIN. 2:1 SLOPES �INTS �`ao 2"-4" ROCK :2 QO�O L=TAAND BAEHE EOF EQUASUCH L =III==___� _ ICI-III-111,�11� I, _ _ �a�aa II-III-1I17-7111 NOTES 1. CONDITION OF USE 1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS. 1 .2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2.1, ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. PUBLIC WORKS CHECK DAMS SPACING AND STD. PLAN - 217.40 �NT02 DEPARTMENT CROSS SECTIONS MARCH 2O08 1 REVISED PER AS -BUILT CONDITIONS NO. REVISION Erosion Control Notes CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING. 1, These notes shall appear for all projects - site improvements, surface water utility, 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC wastewater utility, water utility, and transportation plans: SUPERVISOR (MAY BE CONSOLIDATED WITH THE 2. Before any construction or development activity occurs, a pre -construction meeting REQUIRED NOTICE OF CONSTRUCTION SIGN). must be held with the City of Renton, public works design engineer. 3. FLAG OR FENCE CLEARING LIMITS. 1 The Boundaries of the clearing limits and areas of vegetation preservation as 4. INSTALL CATCH BASIN PROTECTION. prescribed on the plan(s) shall be clearly flagged by survey tape or fencing fn the field prior to construction in accordance with Appendix D of the Surface Water 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). Design Manual and observed during construction. During the construction period, no disturbance beyond the clearing limits shall be permitted. The clearing limits shall be 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH maintained by the applicanVESC supervisor for the duration of construction, BARRIER, ETC.). 4. StabiNzed construction entrances shall be installed at the beginning of construction 7. INSTALL BAKER TANK AND FILTRATION SYSTEM. and maintained for the duration of the project. Additional measures, such as constructed wheel wash systems or wash pads, may be required to ensure that all 8. GRADE AND STABILIZE CONSTRUCTION ROADS. paved areas are kept clean and track out to road right of way does not occur for the duration of the project, 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY 5. All required sedimentation/erosion control facilities must be constructed and in WITH CLEARING AND GRADING FOR PROJECT operation prior to land clearing and/or construction to prevent transportation of DEVELOPMENT. sediment to surface water, drainage systems and adjacent properties. All erosion 10. MAINTAIN EROSION CONTROL MEASURES IN and sediment facilities shall be maintained in a satisfactory condition until such time ACCORDANCE WITH APPENDIX D OF THE SURFACE W that clearing and/or construction is complete and potential for on -site erasion has WATER DESIGN MANUAL AND MANUFACTURER'S passed. The implementation, maintenance, replacement and additions to RECOMMENDATIONS. erasion/sedimentation control systems shall be the responsibility of the permitee. 11. RELOCATE EROSION CONTROL MEASURES OR 6. The erosion and sedimentation control systems depicted on this drawing are INSTALL NEW MEASURES SO THAT AS SITE intended to be minimum requirements to meet anticipated site conditions. As CONDITIONS CHANGE THE EROSION AND SEDIMENT construction progresses and unexpected or seasonal conditions dictate, the permitee CONTROL IS ALWAYS IN ACCORDANCE WITH THE shall anticipate that more erosion and sedimentation control facilities will be CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. necessary to ensure complete siltation control on the proposed site. During the course of construction, it shall be the obligation and responsibillty of the permitee to 12. COVER ALL AREAS THAT WILL; BE UNWORKED FOR address any new conditions that may be created by the activities and to provide MORE THAN SEVEN DAYS DURING THE DRY SEASON additional facilities, over and above minimum requirements, as may be needed, to OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC protect adjacent properties and water quality of the receiving drainage system. SHEETING OR EQUIVALENT. 7, Approval of this plan is for erosion/sedimentation contl•ol only. It does not constitute 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE an approval of storm drainage design, size nor location of pipes, restrictors Pp g 9 r P P r r WITHIN SEVEN DAYS. channels, or retention facilities, 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED 8. Any areas of exposed soils, including roadway embankments, that will not be FOR MORE THAN 30 DAYS. disturbed for two days during the wet season (October 15L trough March 301h) or seven days during the dry season (April 15I tough September 30) shall be 15. UPON COMPLETION OF THE PROJECT, ALL immediately stabilized with the approved ESC cover methods (e.g., seeding, DISTURBED AREAS MUST BE STABILIZED AND BMPS mulching, plastic covering, etc.). REMOVED IF APPROPRIATE. 9. Wet season seasonal erosion and sediment control requirements apply to all construction sites clearing between October 1 and March 30 inclusive, unless otherwise approved by the City through an adjustment process. 10. Cover measures will be applied in conformance with Appendix D of the Surface Water Design Manual. 11. Any area needing ESC measures, not requiring immediate attention, shall be WET SEASON PROVISIONS addressed within seven (7) days. ALL OF THE FOLLOWING PROVISIONS FOR WET SEASON CONSTRUCTION ARE DETAILED IN THE REFERENCED SECTIONS. 12. The ESC facilities on inactive sites shall be inspected and maintained a minimum of THESE REQUIREMENTS ARE LISTED HERE FOR THE CONVENIENCE OF once a month or within 24 hours fallowing a storm event. THE DESIGNER AND THE REVIEWER. 13. At no time shall more than one (1) foot of sediment be allowed to accumulate within 1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN a catch basin. All catch basins and conveyance lines shall be cleaned prior to paving. UNWORKED WITHOUT COVER MEASURES IS REDUCED TO The cleaning operation shall not flush sediment -laden water into the downstream TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN system (SECTION D.2.1.2). 14. During the time period of October I" through March 30t", all project distributed soil 2• STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE areas greater, that are to be left un-worked for more than 12 hours, shall be PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS covered by mulch, sodding or plastic covering. (SECTION D.2.1.2). 15. Any permanent retention/detention facility used as a temporary settling basin shall 3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED be modified with the necessary erosion control measures and shall provide adequate AREAS SHALL BE STOCKPILED ON SITE (SECTION D.2.1.2). storage capacity. If the permanent facility is to function ultimately as an infiltration system, the temporary facility roust be rough graded so that the bottom and sides 4. ALL AREAS THAT ARE TO BE UNWORKED THE WET are at least three feet above the final grade of the permanent facility. SEASON SHALL BE SEEDED WITHHININDURING ONE WEEK OF THE O BEGINNING OF THE WET SEASON (SECTION D.2.1.2.6). 16. Prior to the beginning of the wet season (Oct. 1), all disturbed areas shall be reviewed to identify which ones can be seeded in preparation for the winter rains. 5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS Disturbed areas shall be seeded within one week of the beginning of the wet season. (SECTION D.2.1.2.2). A sketch map of those areas to be seeded and those areas to remain uncovered shall be submitted to the City of Renton for review. 6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCK 17. All ESC measures must be removed after construction activity is complete. PILED ON SITE (SECTION D.2.1.3.1). 7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE D.2.4.2 WET SEASON REQUIREMENTS REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN ANY SITE WITH EXPOSED SOILS DURING THE WET SEASON (OCTOBER 1 TO APRIL BY COARSE -GRAINED SOIL (SECTION D.2.1.4.2). 30) SHALL BE SUBJECT TO THE SPECIAL PROVISIONS BELOW. IN ADDITION TO THE ESC COVER MEASURES (SEE SECTION D.2.1.2), THESE PROVISIONS INCLUDE 8 SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE COVERING ANY NEWLY SEEDED AREAS WITH MULCH AND IDENTIFYING AND DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN SEEDING AS MUCH DISTURBED AREA AS POSSIBLE PRIOR TO SEPTEMBER 23 IN FLOW (SECTION D.2.1.5). ORDER TO PROVIDE GRASS COVER FOR THE WET SEASON. A "WET SEASON ESC 9 SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO PLAN" MUST BE SUBMITTED AND APPROVED BY THE CITY BEFORE WORK OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED PROCEEDS OR CONTINUES. DESIGN FLOW (SECTION D.2.1.6). 10. PHASING AND MORE CONSERVATIVE BMPs MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR SURFACE WATERS (SECTION D.2.4.3). 11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS (SECTION D.2.2). SURVEYED: SCALE: N/A VERI HORIZONTAL TAL• NAVD NAD 1983/183/1991 CITY 0 F DESIGNED: zw RENTON DRAWN: ZTW ONE INCH DATUM Planning/Building/Public Works Dept. ZTW 0/28/2 ZTW CHECKED: AS AT FULL SCALE IF NOT ONE INCH BY DATE APPR SCALE ACCORDINGLY APPROVED: AS 4' MIN 1' DEPTH 2"- 4" ROCK 3 2' SETTLING DEPTH 1 r 1.5'SEDIMENT STORAGE 1' DEPTH 3/4" - 1-1/2" WASHED GRAVEL CROSS SECTION NTS l' OVERFLOW DEPTH OUTFLOW CHANNEL IF . CONSTRUCTED BY EXCAVATION. S MAX �, sl FILTER FABRIC FENCING OVERFLOW SPILLWAY B' MIN WIDTH 15SEDIMENT STORAGE T SETTING DEPTH $ 1' DEPTH OF TA" ROCK, 1' DEPTH OF 3/4'-1/2" WASHED GRAVEL. NOTE: MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM .t SY O STD. PLAN - 211.00 ro PUBLIC WORKS SEDIMENT TRAP DEPARTMENT MARCH 2O08 21 MAX. SLOPE 3 LEVEL BOTTOM III ---III--- =III=III 2' MIN. SWALE SPACING DEPENDS ON SLOPE GRADIENT NOTES 1. CONDITION OF USE 1.1. REQUIREDAT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1 V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2H:1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAYBE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAYBE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP, 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED. ti�Y o �+ PUBLIC WORKS INTERCEPTOR SWALE STD. PLAN - 217.10 - DEPARTMENT 1 �Ntp MARCH 2O08 AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH 20H:1V 3-5% 300 FEET (10 T020)H:1V 5-10% 200 FEET (4To10)H:ly 10-25% looFFEr (2 TO 4) H:1V 25-50% V CONSTRUCTION RECORD Q DRAWING d THIS CONSTRUCTION RECORDING DRAWING IS A COPY OF THE APPROVED CONSTRUCTION DRAWINGS PREPARED BY BARGHAUSEN w CONSULTING ENGINEERS, INC AND HAS BEEN EDITED TO REFLECT ASBUILT CONDITIONS. THE IV INFORMATION PROVIDED ON THESE RECORD DRAWINGS IS A COMBINATION OF FIELD SURVEYED INFORMATION AND DOCUMENTED FIELD REVISIONS. O I� R-396405 IN COMPLIANCE WITH CITY OF RENTON STANDARDS I� w U r� 1 Q DATE, T.E.S.C. NOTES AND DETAILS 12/29/2017 UW MEDICINE - VALLEY MEDICAL CENTER FlELDBOOK: PAGE: MEDICAL OFFICE BUILDING EXPANSION DRAWING NO: I•L� 400 SOUTH 43RD STREET RENTON, WASHINGTON 98055 SHEET: OF: C4 28 I� R-396405 IN COMPLIANCE WITH CITY OF RENTON STANDARDS I� w U r� 1 Q DATE, T.E.S.C. NOTES AND DETAILS 12/29/2017 UW MEDICINE - VALLEY MEDICAL CENTER FlELDBOOK: PAGE: MEDICAL OFFICE BUILDING EXPANSION DRAWING NO: I•L� 400 SOUTH 43RD STREET RENTON, WASHINGTON 98055 SHEET: OF: C4 28