Loading...
HomeMy WebLinkAboutMFP24000591.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24000591 IVR Number: 24000591 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/08/2024Application Date:3342102465Parcel Number: 1012 N 33RD PL Permit Type:02/22/2024Issue Date:Franchise Permit Work Class:02/21/2025Expiration Date:Minor Utility Job Number: 105104943Franchise Type:Electric Description: Puget Sound Energy Electric CUSTOMER TO TRENCH AND INSTALL 3" DB120 CONDUIT AT P01 AND INFRONT OF PROPERTY TO INSTALL NEW 2" SPARE CONDUIT FOR APPROX 100' FOR FUTURE UG POWER. CREW TO INSTALL NEW SEC CABLE AT P01. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105104943 1012 N 33RD PL JASON SCHAEFER 425-320-6926 MFP24000591 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 2/22/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1012 N 33rd Pl Renton WA 98056 USA12 12 N 33RD PLN 33RD PLP01PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20-7AW20-4ONE LANEROADAHEAD 100'100'100'ROAD WORK AHEAD W20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1STOPSTOP BURNETT AVE NPARK AVE N NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVMatlock Highbarger(808) 375-4152Matlock.Highbarger@PSE.com1 OF 11012 N 33rd Pl, Renton, WA0 51447321801/29/2024Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hoursas per jurisdictional requirements. (Generallybetween 9 a.m. and 4 p.m. on non-arterials andfrom 9 a.m. to 3 p.m. on arterials. If night timework is approved, Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPPOLEMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425MFP24000591 10231019101510161007100910131003100710009189121011100910069971005921915991319339-16614410 kVA (C)319340-16613137.5 kVA (C) SLAH4795319340-16611637.5 kVA (C)SPARE 2" CONDUIT FORFUTURE PRIMARYUNDERGROUNDINGDW101245°R=48"45°R=48"90°R=48"SPARE 2" SCH'L 40 CONDUIT4/0 SEC TPX CABLE IN3" SCH'L 40 CONDUIT350MCM TPX CABLE IN3" SCH'L 40 CONDUIT*ALL CONDUIT WILL BE CUSTOMERPROVIDED & INSTALLED.*ALL CABLE WILL BE PSEPROVIDED & INSTALLED±30'±40'±35'±1 0 '±5'±100'319340-16613137.5 kVA (C) SLAH4795CUST. PROV4' X 4' WORK PITCUST. PROV5' X 5' WORK PITCUST. PROV4' X 4' WORK PITE-Mail:Cell Phone:Project Manager Contact Information:Manager:JASON SCHAEFER425-320-6926JASON.SCHAEFER@PSE.COMSCALE: 1" = 50'N/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)N/AUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJASON SCHAEFER425-320-692601/10/24T VAN SANTFORD253-318-689701/10/24N/AN/AN/AT VAN SANTFORD253-318-689701/10/24RW-RENTONN 33RD PL SUBDIVISIONNEW SEC L/E TO PED, NEW UG SVC, & SPARE CONDUIT INST1012 N 33RD PLACE, RENTON, WA 98056N/AN/AN/AN/AAS NOTED1 OF 2KINGN/AN/ACSPSKEPMSW-32-24-5N/AN/AA2405E127D2405E136R2405E127HAZ-15N/AN/AN/AN/AN/ANAN/AN/AN/APSEJASON SCHAEFER425-320-6926N/AN/AN/AN/AN/AN/AN/AN/AN/AN/ASITE SPECIFIC NOTESAT P01 319340-166131:-EXISTING 45' CL-3 (2020) POLE AND EQUIPMENT TO REMAINAT HH1:INSTALL (1) 4-POS SECONDARY PEDESTAL 9 X 14 X 30 PER STD. 6050.1000 (SEPS4)INSTALL (3) 4 POS #10 - 350KCMIL CONNECTION BARS (MID:7651005)AT M01:-INSTALL NEW 200AMP METERAT EM1:-INSTALL ELECTRONIC MARKER (MID:7668500)SPAN SPECIFIC NOTES**SEE ONE-LINE & TABLES FOR SPAN NOTE INFORMATION**Perm. Service POWER GENERAL NOTES - RESIDENTIAL PROJECT1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviationfrom this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman'sCopy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance. CUSTOMER NOTESCustomer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound EnergyStandards & Local Municipality (See PSE Electric Service Handbook for more details).1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior tocommencing work to get the underground facilities located.2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole,sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by theProject Manager.3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils orconstruction materials which would restrict construction and/or equipment access, before work can begin.4.Roads shall be paved or have a compacted , crushed rock base in place.5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (orguard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet awayfrom water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot whencrossing them.6. All work is to be done in accordance with local municipal and county permit requirements as applicable.7.Inclement weather conditions may cause delays in construction times and dates.8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. Thecustomer will provide any and all shoring or they will side slope the trench to 1:1.9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdictionrequirements. (Local jurisdiction may have additional requirements including notes detailing whereerosion or sediment control structures are to be installed, cross section details of the typical erosionstructures, & special requirements for work in sensitive areas.)10.Customer is required to have meter inspected and approved by L&I/City prior to construction.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILEN/AN/APSE Locates Req'dDeveloper Locates Req'dYesNoNoNoFlagging Req'dOutages Req'dCUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:VAULTS & WORK PITS.-PROVIDE A 5' X 5' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT HH1.-PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT P01.-PROVIDE A 4' X 4' WORK PIT & 1 YARD OF SAND AT M01.TRENCHING & CONDUIT.-INSTALL ±70' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM P01 TO HH1.-INSTALL ±50' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM HH1 TO M01.-INSTALL ±100' OF 1-2" SCH'L 40 GREY PVC CONDUIT FROM P01 TO EM1-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .LRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:3865 SQ.200 AMPSELECTRIC22.1KW140A2.6%3.9%CIRCUIT FEET ADDED: 0'SITE PLANNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:NW SEATTLE BUILDERS, LLC9675 SE 36TH ST, SUITE 105MERCER ISLAND, WA 98040JUSTIN LAGERS253-405-5587CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEHAZ-1511/6/23228247251002228249251SuperiorORDER#NOTIF#PWRPROJECT PHASEFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.001"2"0050'100'CABLE & CONDUIT ONE-LINE DIAGRAMSCALE: NONESECONDARY CABLE & CONDUIT TABLEWorkLocationCableConduitVoltageDropVoltageFlickerAs Built InformationSizeLengthDesign(ft)SizeLengthDesign(ft)BendsForeman - CompleteFROMTO(1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)P01HH1SEC 350 UGTPX100'3"70'02002.0%3.0%HH1M014/0 UG TPX70'3"50'10002.6%3.9%P01EM1SPARE CONDUIT ONLY2"100'0000--SECONDARY HH/PEDESTAL TABLEWorkLocationPedestalorHandholeNumber ofPositionsRequiredRemarksHH1PEDISTAL:SEPS44JOB SITEJOBSITEMFP24000591POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS N/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJASON SCHAEFER425-320-692601/10/24T VAN SANTFORD253-318-689701/10/24N/AN/AN/AT VAN SANTFORD253-318-689701/10/24RW-RENTONN 33RD PL SUBDIVISIONNEW SEC L/E TO PED, NEW UG SVC, & SPARE CONDUIT INST1012 N 33RD PLACE, RENTON, WA 98056N/AN/AN/AN/AAS NOTED2 OF 2KINGN/AN/ACSPSKEPMSW-32-24-5N/AN/AA2405E127D2405E136R2405E127HAZ-15N/AN/AN/AN/AN/ANAN/AN/AN/APSEJASON SCHAEFER425-320-6926N/AN/AN/AN/AN/AN/AN/AN/AN/ATV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverSeparation12" Min20" Min JOINT TRENCH DETAILElectric Service Cable in Conduit (NTS)To Excavated Dirt Pile36" MINIMUM COVERIN RIGHT OF WAYBackfill for ConduitFree of rocks(larger than 8"in diameter)Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.and DB120 for secondary spanCUSTOMER-SUPPLIED SERVICE TRENCHFLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200METER DETAIL @ M01SCALE: NONE32"Typical24"Min24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulatorGas MeterAssembly48"4'8"Service (Permanent Detail:)Not to ScaleConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line Conduit3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. Mtr VentUtility ProvidedSeal24"-36"TOP VIEW18" MIN3' MINWORKINGSPACE18" MIN3' MIN4' MIN6' MAX5' PREFERRED6" MIN6' MAX3' MIN3' MINN e a r e s t S i d e W a l l o r O b s t r u c t i o n Any Obstruction Above MeterCT EnclosureWorking SpaceCT ClearancesSCALE: NONEField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficTOP VIEWCONDUIT RISER PLACEMENT DETAIL (P01)SCALE: NONEFRONT VIEW WITH CONDUITSIDE VIEW WITH CONDUITTYPICAL 24" RADIUS DB120 PVC CONDUIT ELBOWSCONDUIT SHALL BESEALED WITH FOAMPedestal will accept up to six 3" conduits10"2"36"10"12"13"16"18"NEUTRALS SHALL BEIN THE FRONTCONNECTOR BARSSHALL BE STAGGERED2"10"13"16"18"10"SECONDARY PEDESTAL & CONDUIT DETAILNot to scale6050.1000-2MFP24000591