HomeMy WebLinkAboutMFP24000592.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24000592 IVR Number: 24000592 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/08/2024Application Date:7231500390Parcel Number: 1111 S 4TH ST Permit Type:02/22/2024Issue Date:Franchise Permit Work Class:02/21/2025Expiration Date:Minor Utility Job Number: 105104980Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO RUN OH SECONDARY WIRE FROM EXISTING P01 (317741 166162) TO EXISTING P02 (317741 166167). CUSTOMER TO TRENCH AT P02. 2 CONCRETE CUTS APPROX 600' TOTAL. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105104980 1111 S 4TH ST SHANNON MOORE 206-681-7086 MFP24000592 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 2/22/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG CEDA R A V E S 1 3 1 3 CEDAR AVE SCEDAR AVE SMILL AVE SMILL AVE SMILL AVE S11111107 1101V01J01 15 15 15 15 1515 1515 P01 P02 1313 1313 MM011515 LOCALACCESSONLY STREET CLOSEDTOTHRU TRAFFIC R5-133 R5-133STOP STOP STOP STOP W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROAD WORK AHEAD W20-4ONE LAN E ROADAHEADX'≥X'≥X'≥W20-7AW20-1ROAD WORK AHEAD BEPREPARED TOSTOP W3-4X'≥X'≥X'≥W20-7ACEDAR AVE S1313RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS BOTH SIDES OF WORK AREA BE ACON W AY S CEDAR AVE SMILL AVE S 13 13 1313 1313 1313 CROS S H E R E S/W C L O S E D R9-11AADA COMPLIANT CURB RAMP CROSS HERES/W CLOSEDR9-11AN SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Jason Bisenius 425-424-7316 jason.bisenius@pse.com 1 OF 11111 S 4TH ST, RENTON, WA 98057 0 514804474 02/01/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP POLE TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1300 MFP24000592 1107 1101 S 4TH ST 317740-166161 317741-166162 1/6 317741-166167 1111 DWY S/W ALLEY30' EOP 60' ROW GRA 16 4/0 TPX 5' ROW MILL AVE S317739-166161 37.5kVA 120/240V (B) 25 kVA 120/240V (B) CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED 4' X 4' WORK PIT 90° R=48" ±90'±10'CUSTOMER SUPPLIED & INST. 1-3" SCH. 80 DISCONTINUOUS CONDUIT ±100' PSE SUPPLIED & INST. 1-RUN 350 UG TPX ±140' 317741-166167 CUSTOMER SUPPLIED 4' X 4' WORK PIT SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.4779467,-122.204636 Owner / Developer Contact Info officeATTN: NGUYEN INVESTMENTS LLC 1023 SW 122ND ST SEATTLE, WA 98146 JOE NGUYEN 206-619-0161 OVERHEAD CIRCUIT MAP 2305E088 SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. Meter Set Superior ORDER#NOTIF# PWR PROJECT PHASE 104357492 3002421976514518047 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. SCALE: 1" = 20'105104980THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105104980 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP S. MOORE 206-681-7086 8/10/23 C. FURIA 253-778-9190 8/10/23 N/A N/A N/A C. FURIA 253-778-9190 8/10/23 RW-132071 RENTON RENTON HILL PM TRF UPGRD & 1Ø OH SEC L/E FOR NEW UG SVC 1111 S 4TH ST, RENTON, WA 98057 N/A N/A N/A 105104980 AS NOTED 1/1 KING N/A N/A CSPSKEPM SW 17-23N-05E N/A N/A 2305E067 2305E088 2305E067 GRA-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 514804474 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 4,800 SQ. FT. 320 AMPS ELECTRIC 15.9KW 140A 2.7% 4.0% 00 1"2" 00 20'40' CIRCUIT FEET ADDED: 0' PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:Shannon Moore 206-681-7086 Shannon.Moore@pse.com METER DETAIL @ M01 SCALE: NONE 32"Typical 24"Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36"Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas MeterAssembly 48" 4'8" Service (Permanent Detail:) Not to Scale ConduitEndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" FLOW DIRECTION NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P02) SCALE: NONE 4'x4' Work Pit SECONDARY CABLE & CONDUIT TABLE Work Location Cable Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P02 M01 SEC 350 UG TPX 140'3"100'1 0 0 0 2.7%4.0% UNDERGROUND CIRCUIT MAP 2305E067 SCALE: NONE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT P02. -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01. TRENCHING & CONDUIT. -TRENCH & INSTALL ± 100' OF 1-3" SCH 80 GRAY PVC CONDUIT FROM P02 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEES WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . SITE SPECIFIC NOTES AT J01: 317740-166162 -EXISTING VAULT & JBOX TO REMAIN -DISCONNECT CABLE BØ15625 TO V01 DURING CONSTRUCTION AT V01: 317739-166161 -EXISTING VAULT TO REMAIN -DISCONNECT CABLE BØ15625 TO J01 DURING CONSTRUCTION -REMOVE EXISTING 25kVA 120/240V PM TRF & RETURN TO PSE YARD -INSTALL (1) 37.5kVA 120/240V PM TRF (MID: 6247050) -INSTALL (2) 12kV ELBOW KITS 6041.1000 (ELB10J) -RECONNECT EXISTING SERVICES TO NEW TRF AT P01: 317741-166162 -EXISTING 1990 75' CL-1 TRANSMISSION POLE TO REMAIN AT P02: 317741-166167 -EXISTING 1972 40' CL UNK SECONDARY POLE TO REMAIN -INSTALL (1) 3" RISER ON NEW S/O BRACKETS 6042.1000 (RIS3CSS) AT M01: NEW METER BASE -REMOVE EXISTING TEMP METER -PSE METER DEPARTMENT TO INSTALL NEW 320A METER SPAN SPECIFIC NOTES FROM P01-P02 -EXISTING RUN OF 4/0 OH TPX TO REMAIN -INSTALL 1-RUN OF 4/0 OH TPX ±50' -SEE SITE PLAN, ONE-LINE AND TABLES FOR ADDITIONAL INSTALLS & REMOVALS SCALE: NONE NEW CABLE & CONDUIT DIAGRAM TOP VIEW 18" MIN 3' MIN WORKINGSPACE 18" MIN 3' MIN 4' MIN 6' MAX 5' PREFERRED 6" MIN 6' MAX 3' MIN 3' MIN JOB SITE JOB SITE DAVID BRINKMANN 253-234-6445 11/10/23 514518046Perm Service Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6247050 V01 317739-166161 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 317739-166161 25kVA WIRE STRINGING PRIMARY & SECONDARY Location Usage Wire Size & Type Quantity of wires Length (per wire)TotalFromTo P01 P02 S SEC 4/0 OH TPX 1 50'1 Trf Retirement 584051223 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P02 M01 SEC 1/0 OH TPX 1 80' TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. LAY 8" BOTTOM SKIRT ON TOP Neare s t S i d e W a l l or Ob s t r u c t i o n An y O b s t r u c t i o n Ab o v e M e t e r Me t e r E n c l o s u r e Working Space Meter Clearances SCALE: NONE 3-12 3-5 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-16 10/18/2022 162 198 179 -3 - 162 201 179 JOB SITE MFP24000592 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS