HomeMy WebLinkAboutApproved drainage plan108T H P L A C E S E NEW 1ST FLOOR ADDITION 1,039 SF (HATCHED) EXISTING STRUCTURE TO REMAIN (e) ds (e) ds (e) ds (e) ds (e) ds(n) ds (n) ds (n) ds TEMP SOIL STOCKPILE WITH 6 MIL VISQUEEN COVER xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxSILT FENCE STABILIZED CONSTRUCTION ENTRANCE (e) ds EXIST. DOWNSPOUT DRAIN PIPE EXIST. DOWNSPOUT DRAIN PIPE NEW DOWNSPOUT DRAIN PIPE EXIST. CB EXIST. DRAIN PIPE Scale: Project #: Date: Drawn by: Checked by:LEWATE RESIDENCEASFAW LEWATE18303 108TH PLACE SERENTON, WA 98055PARCEL #: 508970-03602022-111 JUN.01.2023 Dan Garvida Asfaw Lewate AS NOTED REVISIONS: GARVIDA DESIGN GROUP, LLC Dan Garvida 206.590.1232 Dan.GarvidaDesign@outlook.com ADDITION & INTERIOR ALTERATIONOct. 05, 2023 1 Jan. 02, 2024 2 Feb. 14, 2024 2DRAINAGE AND TESC PLANC-200 DISTURBED AREA FLOWSIMPLIFIED SITE DRAINAGE PLAN AND FLOW CONTROL BMP PLAN DEFINITIONS: SMALL PROJECT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) THIS PLAN IS REQUIRED FOR ALL PROJECTS WITH GREATER THAN 750 SQUARE FEET BUT LESS THAN 7,000 SF OF LAND DISTURBING ACTIVITIES. A FIRST GROUND DISTURBANCE INSPECTION IS REQUIRED PRIOR TO START OF WORK ON ALL SITES WITH LAND DISTURBING ACTIVITY. SEE ESC INSPECTION PROCESS BELOW. TEMPORARY AND PERMANENT BEST MANAGEMENT PRACTICES (BMPS) SHALL BE USED TO ACCOMPLISH THE FOLLOWING MINIMUM REQUIREMENTS. ADDITIONAL BMPS ARE REQUIRED WHEN MINIMUM CONTROLS ARE NOT SUFFICIENT TO PREVENT EROSION OR TRANSPORT OF SEDIMENT OR OTHER POLLUTANTS FROM THE SITE. -MARK CLEARING LIMITS -DELINEATE ENVIRONMENTALLY CRITICAL AREAS -RETAIN TOP LAYER AND NATIVE VEGETATION -ESTABLISH CONSTRUCTION ACCESS -PROTECT DOWNSTREAM PROPERTIES AND RECEIVING WATERS -PREVENT EROSION AND SEDIMENT TRANSPORT FROM THE SITE -STABILIZE SOILS -PROTECT SLOPES -PROTECT STORM DRAINS -STABILIZE CHANNEL AND OUTLETS -CONTROL POLLUTANTS -CONTROL DEWATERING -MAINTAIN AND INSPECT BMPS -EXECUTE CONSTRUCTION STORMWATER CONTROL PLAN -MINIMIZE OPEN TRENCHES -PHASE THE PROJECT -INSTALL PERMANENT FLOW CONTROL AND WATER QUALITY FACILITIES •TOTAL SITE AREA: SIZE OF THE LOT, EXPRESSED IN SQUARE FEET. •IMPERVIOUS AREA (Ai): THE TOTAL SQUARE FOOTAGE OF NEW AND/OR REPLACED IMPERVIOUS AREA. IMPERVIOUS AREAS ARE THOSE THAT WILL NOT BE VEGETATED SUCH AS BUILDING ROOF AREA, DRIVEWAYS, WALKWAYS, PATIOS, ETC. LABEL THESE AREAS AS (Ai) ON THE PLAN SHEET AND NOTE THE TOTAL SQUARE FOOTAGE ON THE COMPOST CALCULATION WORKSHEET. •NON-DISTURBED AREA (ND): VEGETATED AREAS THAT WILL NOT BE SUBJECT TO LAND DISTURBING ACTIVITY (SEE D) DO NOT REQUIRE SOIL AMENDMENT IF THEY ARE FENCED AND CONTINUOUSLY PROTECTED THROUGHOUT CONSTRUCTION. THE FENCING MUST BE IN PLACE AT THE FIRST GROUND DISTURBANCE INSPECTION. THIS WILL BE MONITORED BY THE DPD SITE INSPECTOR. NO DISTURBANCE, INCLUDING VEHICLE TRAFFIC OR MATERIAL STORAGE, IS ALLOWED IN THESE AREAS UNTIL FINAL INSPECTION. LABEL THESE AREAS AS (ND) ON THE PLAN SHEET AND NOTE THE TOTAL SQUARE FOOTAGE ON THE COMPOST CALCULATION WORKSHEET. •OTHER (O): OTHER REPRESENTS EXISTING IMPERVIOUS SURFACE TO REMAIN, DRAINAGE FACILITIES, ENGINEERED STRUCTURAL FILL AREAS, RAIN GARDENS, ETC. LABEL THESE AREAS AS (O) ON THE PLAN SHEET AND NOTE THE TOTAL SQUARE FOOTAGE ON THE COMPOST CALCULATION WORKSHEET. •DISTURBED AREA (D): AREA (TURF AND LANDSCAPE) THAT MUST BE AMENDED WITH A MINIMUM OF 2 INCHES OF COMPOST AND BE LOOSENED SO IT WILL PROBE TO A DEPTH OF 12 INCHES PRIOR TO SITE FINAL INSPECTION. THIS INCLUDES AREAS IMPACTED BY CLEARING AND GRADING, STOCKPILING, SITE ACCESS, PATHWAYS AND MATERIALS OR EQUIPMENT STORAGE. LABEL THESE AREAS AS (D) ON THE PLAN SHEET AND NOTE THE TOTAL SQUARE FOOTAGE ON THE COMPOST CALCULATION WORKSHEET. NOTE: THIS PLAN IDENTIFIES THE MINIMUM MEASURES REQUIRED; ADDITIONAL MEASURES MAY BE REQUIRED BASED ON CONSTRUCTION METHODS AND ACTUAL AREA OF DISTURBANCE. COMPOST SOCK TREE & VEGETATION PROTECTION CS 1. 2.3010 ' -0 "3. 2" X 2" X 3' WOODEN STAKE 1' - 0"MIN.3" MIN.4" MAX.CONTOUR LINE (TYP.) 10' -0" @ 30^ ANGLE EACH END TO PREVENT FLOW AROUND (TYP.) L E N GT H VAR IES 2"X 2"X 3' WOODEN STAKE, SPACED EVERY 3' O.C. (TYP.) COMPOST SOCK ~ SEE NOTE 1 PROTECTE D AREA DISTURBE D AREA EXCESS SOCK MATERIAL, DRAWN IN AND TIED OFF AT STAKE (TYP.) SPACING VARIES(TYP.) SEE NOTE 3 COMPOST SOCK SHALL BE IN ACCORDANCE WITHSTANDARD SPECIFICATION 9.14.4(9). COMPOST SOCK SHALL BE A MINIMUM OF10" IN DIAMETEROR SIZED TO SUIT CONDITIONS AS SPECIFIED BY THE ENGINEER. ALWAYS INSTALL COMPOST SOCK PERPENDICULAR TO SLOPE AND ALONG CONTOUR LINES. REMOVE SEDIMENT FROM THE UP SLOPE SIDE OF THE COMPOST SOCK WHEN ACCUMULATION HASREACHED 1/2 OF THE EFFECTIVE HEIGHT OF THECOMPOST SOCK. MAY BE USED IN PLACE OF FILTER FENCE FOR PERMITER CONTROL. PLAN VIEW SECTION DETAIL (SHOWN AS SLOPE PROTECTION) 4. VEG TREE & VEGETATION FENCING AROUND ENTIRE DRIP LINE ON PERMIT SITE. ALTERNATIVE TREE PROTECTION, IF APPROVED BY DPD, AS SHOWN ON SITE PLAN4'-0"MIN.MUST BE INSTALLED PRIOR TO DEMOLITION TREE PROTECTION FENCING 1. OR GROUND DISTURBANCE 2.KEPT IN PLACE FOR THE DURATION OF CONSTRUCTION 3.NO SOIL DISTURBANCE OR ACTIVITY ALLOWED WITHIN FENCED AREA, SUCH AS MATERIAL STORAGE/STOCKPILING, PARKING, EXCAVATION, DUMPING, OR WASHING CANOPY DRIP LINE DEFINES TREE & VEGETATION PROTECTION AREA ORANGE MESH OR CHAIN LINK FENCE 4.MODIFICATIONS OF THESE REQUIREMENTS BY APPROVAL OF DPD PLANNER ONLY 5.IF ROOTS GREATER THAN 2 INCH FOUND OUTSIDE OF FENCING, PROTECT BY HAND EXCAVATION AND, IF NECESSARY, CUT CLEANLY AND KEEP MOIST MINIMIZE CONSTRUCTION ZONE VEGETATION PROTECTION 1. 2.PROTECT VEGETATION OUTSIDE CONSTRUCTION ZONE WITH FENCING AS SHOWN 3.USE 3 INCHES OR DEEPER WOOD CHIP MULCH OUTSIDE FENCED AREAS TO PROTECT FEEDER ROOTS 6.USE 3 INCHES OR DEEPER WOOD CHIP MULCH OUTSIDE FENCED AREAS TO PROTECT FEEDER ROOTS LINK TO MORE TREE PROTECTION INFORMATION: SYMBOL: SYMBOL: A A DRAINAGE ASSESSMENT: THIS PROJECT CONSIST OF ADDING 1,187 SF OF 1ST FLOOR NEW CONDITIONED LIVING SPACE TOWARDS THE REAR OF THE EXISTING SFR. 1,032 SF OF NEW IMPERVIOUS SURFACE (ROOF) WILL BE ADDED. NEW DOWNSPOUTS WILL BE CONNECTED TO EXISTING DRAINAGE SYSTEM ON SITE. EROSION AND SEDIMENT CONTROL (ESC) INSPECTION NOTES: At least three ESC inspections are required. The ESC inspections will be performed by city staffs. The inspectors will verify if the proper installation and maintenance have been made. . * ESC INSPECTION 1: PRIOR TO CLEARING AND GRADING ACTIVITIES -THE APPLICANT CALL IN AND COORDINATES WITH AN ESC INSPECTOR. THE ESC INSPECTOR WILL OUTLINE THE EROSION AND SEDIMENT CONTROL MEASURES AND PROCESS . * ESC INSPECTION 2: DURING CONSTRUCTION -THE APPLICANT CONTACTS THE ESC INSPECTOR FOR A SITE INSPECTION AFTER INSTALLING SELECTED ESC BMPs. THE INSPECTOR CHECKS THAT ALL THE BMPs ARE INSTALLED PROPERLY. NO CLEARING AND GRADING ACTIVITIES SHALL TAKE PLACE PRIOR TO AN APPROVAL BY THE INSPECTOR. THE INSPECTOR MAY CONDUCT AND MONITOR THE SELECTED TOOLS DURING CONSTRUCTION. . * ESC INSPECTION 3: AFTER CONSTRUCTION -THE APPLICANT CONTACTS THE INSPECTOR FOR A SITE INSPECTION AFTER COMPLETING THE CONSTRUCTION PROJECT. THE INSPECTOR VERIFIES THAT ANY DISTURBED SOILS ON THE SITE ARE STABILIZED PRIOR TO OCCUPANCY SCALE: 1" = 10'-0"1 SITE PLAN - DRAINAGE 3 3 3 3 3