HomeMy WebLinkAboutMFP24000537.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP24000537
IVR Number: 24000537
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/05/2024Application Date:3340404845Parcel Number: 608 SW 12TH ST
Permit Type:02/29/2024Issue Date:Franchise
Permit Work Class:02/28/2025Expiration Date:Major Utility
Job Number: 111027029Franchise Type:Electric
Description: Puget Sound Energy Electric TRANSMISSION POLE REPLACEMENT CREW WILL REPLACE 11 TRANSMISSION
POLES ALONG SW 12TH ST. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
111027029
SW 12TH ST & RAINIER - SW 12TH ST & SENECA
KEVIN POPICH 253-208-0000
MFP24000537
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 2/29/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
MAPLE AVE SW
317456-165797317450-165764317450-165764SW 12TH STW20-1ROADWORKAHEAD100'100'W20-3ROADCLOSEDAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD 181818181313R11-2STREETCLOSEDSTO
P
THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com1 OF 4SW 12th & Rainier - SW 12th St & Seneca St, Renton, WA (Renton)0 1190091607/14/2023Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP24000537
LIND AVE SW
MAPLE AVE SW317426-1656801111111111ROAD CLOSEDTOTHRU TRAFFICDETOURR11-4ROAD CLOSEDTOTHRU TRAFFIC
DETOUR R11-4W20-1ROAD
WORK
AHEAD
DETOUR
AHEAD W20-2100'100'W20-1ROADWORKAHEADDETOURAHEADW20-2100'100'W20-1ROADWORKAHEADDETOURM4-9L
DETOUR M4-9LDETOURM9-4R
DETOURM9-4R181813131111111112111111111118181211111112W20-1ROADWORKAHEADSW 12TH STS GRADY WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com2 OF 4SW 12th & Rainier - SW 12th St & Seneca St, Renton, WA (Renton)0 1190091607/14/2023LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425MFP24000537
SENECA AVE SW
LIND AVE SW 317422-1656551111111111W20-1ROADWORKAHEADDETOURAHEADW20-2100'100'11111111W20-1ROADWORKAHEAD141412121211111112121111111211S GRADY WAYROAD CLOSEDTOTHRU TRAFFICDETOURR11-4mainta
in
11
'
lane DETOURM9-4R
1313W20-1ROADWORKAHEADW20-1
ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1
ROADWORKAHEADNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com3 OF 4SW 12th & Rainier - SW 12th St & Seneca St, Renton, WA (Renton)0 1190091607/14/2023LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425MFP24000537
SW 12TH
ST317412-165608317406-165581W20-1ROAD
WORK
AHEAD
DETOUR
AHEAD W20-2100'100'
SENECA AVE SW
1414W20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1
ROADWORKAHEAD181812111111121211111112S GRADY WAYROAD CLOSEDTOTHRU TRAFFICDETOURR11-4ROAD CLOSEDTOTHRU TRAFFIC
DETOUR R11-4DETOURM9-4R
DETOURM4-9L
DETOUR M4-9LDETOURM9-4RRAYMOND AVE SWNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com4 OF 4SW 12th & Rainier - SW 12th St & Seneca St, Renton, WA (Renton)0 1190091607/14/2023LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425MFP24000537
Plotted:6/14/2023@1:01:53 PMP84193111027029.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
0
11900916
253-294-4103
206-303-7665
253-208-0000
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC 111027029111027029
100KING
111027029
108132004
571018629
TALBOT HILL - METRO RENTON (115 KV)
T. MOSER
J. GROOM
K. POPICH
1"=100'/4
RENTON, WA 98057 3&4T-0032507C
2305E074
SEC19 T23 R05E
06/14/23TRANSMISSION DRAWING SOURCE:T-00325 sh 3&4
PRECONSTRUCTION
WORK DRAWINGS AND DOCUMENTS
SAFETY
AT ALL TIMES.
- WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE
COMPLETION OF JOB.
- RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT
INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH.
- MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE
GENERAL NOTES PROJECT NOTES
VERT
W/
W
UG
TPLX
XMSN
XFMR
X-FER
TERM
TEL/TV
TAN
SW#
SW GRDS
SWBD
S
SA
SGL
SVC
R/C
REMV
REPL
RELOC
PRI
PTP
PH
OH
N
NEUT
MT
LB
LATL
INST
E
DWN GUY
DDE
DA
DBL
DISC
DE
C/O
CU
C/N
CL
CHG
BRKT
ANCH
VERTICAL
WITH
WEST
UNDERGROUND
TRIPLEX
TRANSMISSION
TRANSFORMER
TRANSFER
TERMINATION
TELEPHONE/TELEVISION
TANGENT
SWITCH NUMBER
SWITCH GROUNDS
SWITCH BOARDS
SOUTH
SINGLE ARM
SINGLE
SERVICE
RIGID CLEVIS
REMOVE
REPLACE
RELOCATE
PRIMARY
POLE TOP PIN
PHASE
OVERHEAD
NORTH
NEUTRAL
MOUNT
LOADBREAK
LATERAL
INSTALL
EAST
DOWN GUY
DOUBLE DEADEND
DOUBLE ARM
DOUBLE
DISCONNECT
DEADEND
CUTOUT
COPPER
COMMON NEUTRAL
CLASS
CHANGE
BRACKET
ANCHOR
ABBREVIATION KEYTRANSMISSION SYMBOL LEGEND
CONSTRUCTION NOTES
LINE CROSSING (PROFILE)
STREET LIGHT WITH POLE
STREET LIGHT
PUSH BRACE
SPAN GUY
MULTIPLE DOWN GUYS
DOWN GUY
REMOVED CONDUCTOR
NEW CONDUCTOR
EXISTING 230KV CONDUCTOR
EXISTING 115KV CONDUCTOR
EXISTING 55KV CONDUCTOR
NEW LATTICE TOWER
EXISTING LATTICE TOWER
NEW STEEL POLE
EXISTING STEEL POLE
NEW LAMINATE POLE
EXISTING LAMINATE POLE
REMOVED POLE
NEW POLE
EXISTING POLE
VICINITY MAP
- RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE.
IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
TO PSE STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY
- RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE
MATERIALS, EQUIPMENT AND PACKING SHALL BE REMOVED DAILY.
- WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION
OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST.
- ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES
WITH PERMIT REGULATIONS AND LOCAL TRAFFIC REGULATIONS.
- PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE
INSTRUCTED BY THE SYSTEM OPERATOR.
RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE
- PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND
- REFER TO PSE STANDARDS 6275.xxxx FOR SYSTEM GROUND REQUIREMENTS.
REFERENCED IN THIS DRAWING.
- DESIGN DETAILS AND NOTES SHALL SUPPLEMENT THE STANDARDS
ANY AND ALL CONSTRUCTION CHANGES.
INFORMATION. THE ENGINEER SHALL HAVE SOLE AUTHORITY TO APPROVE
- THE ENGINEER SHALL BE CONTACTED WITH REGARDS TO ALL TECHNICAL
FOR WOOD POLES CONSTRUCTION, DWG D-12842 SH 1 OF 1.
- ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARD NOTES
PROJECT SCOPE
1
BY THE PROJECT MANAGER.
HAVE BEEN SECURED. FINAL NOTIFICATION TO PROCEED SHALL BE GIVEN
- WORK SHALL NOT BEGIN UNTIL ALL EASEMENTS AND STREET USE PERMITS
"TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL".
THE MINIMAL REQUIREMENTS SPECIFIED IN PSE STD 0150.3200
- EROSION CONTROL PROCEDURES SHALL BE USED IN ACCORDANCE WITH
- NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
IN ADVANCE.
SWITCHING SHALL BE SCHEDULED WITH THE LOAD OFFICE A MINIMUM OF 3 WEEKS
OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE. ALL TRANSMISSION SYSTEM
- ALL DISTRIBUTION SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM
IN RIGHT-OF-WAY INVOLVING A PERMIT.
OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK
- NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS,
DISTRIBUTION SYMBOL LEGEND
- SEE 0300.1000 FIGURE 19 FOR
ENGINEER: TIFFANY MOSER PHONE: 253-294-4103
- REPLACE 11 BO POLES FOR PSELAKESIDE #1TALBOT HILL - LAKESIDE #2TALBOT HILL - PRESIDENT PARK
LAKE TRADITION - TALBOT HILL - CHRISTOPHERTALBOT HILL - O'BRIEN #3SHUFFLETON - O'BRIENO'BRI
EN
-
ASBURYBPA COVIN
GTO
N - BPA
M
A
PLE VA
LLEY #2SCL MAPLE VALLEY - SNO KING#1PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE/Foreign Transmission Station Click to View One Line Diagram Foreign Tran Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_02.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE/Foreign Transmission Station Click to View One Line Diagram Foreign Tran Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_02.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
PSE Transmission SW Sta Click to View One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Tran SW Sta Click to see One Line Diagram
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE/Foreign Transmission Station Click to View One Line Diagram Foreign Tran Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_02.pdf A5
6
T
H
P
L SP
NCE4
R
R
V
I
O
R
D
R
T
MESE 149
TH STAWYHUCSOTHG
ETAN
Y
718T21
N
T
1
1
0
ATT
D
D ELLEYALWPS TPLES
S
T
D
A
1
T
74T
H PL S
L
INTERURBAN AVE S
MI H
P RKUCS
1
S
0VS
T NT
VL
R1
S
EOUTHE4SG
D
E
S
S S
C
E3RD
Y
S 1
34TH S
T
3E
S
T
6N
D
T
A
L
B
O
T -
S
O
U
T
H (S
C
L)
8
1
S
T
P
L
S
PRESIDENT
8T069TH AVE SV
T
3NSE1SHPL
D
S I-5 HOV LNVALLEY FWYAI
CALI
TMB
R
H
TV56TH AVE SSHUFFLETON - O'BRIENHAS
E
3
8PD(DE-ENERGI
ZED)SPACIFIC HWY STS6RE81ST AVE SEKL
H
TALBOT HILL - BERRYDAHLE #3V64TH AVE SNS29TH AVE SE31ST AVE S6LIND AVE NWCHOST RD SEN11TH AVE SW T5DA34TH AVE S64TH AVE S3241ST AVE SS140TH AVE SETHEAVE414UHATO58THR 5 E77TH52ND AVE SHR 4 EH57TH AVE S51ST AVE S42ND AVE STW VALLEY HWYAVES40TH AVE SE118TH AVE SE124TH AVE SE59TH AVE S116TH AVE SEV 109TH AVE SE 125TH AVE SESSE140TH AVE SE84TH AVE S128TH AVE SE48TH AVE SSEATAC- BOW LAKES 121ST ST
N
A
E
- TALBOT HILL #1
CEDAR
N
FALL (SCL)
BPA MAPLE VALLEY
S 168TH ST
L
ORILLIA
STA.
SOUTHCENTER
CABLE
TUKWILA
1
ASBURY (SCL)
TALBOT HILL -
CABLE STA.
RENTON JCT.
NELSEN
BOW
ASBURY
S 185TH ST
ASBURY -LAKE
BOW LAKE
S 170TH ST
N
ES
ASBURY (SCL)
TALBOT HILL -
BPA MAPLE
VALLEY
BPA MAPLE VALLEY
- TALBOT HILL #2
PARK
HT
ASBURY (SCL)
TALBOT HILL -
4
HILL
TALBOT
HILLS
ROLLING
S 172ND ST
5H
S 188TH ST
FALL (SCL)
CEDAR
T
TUKWILA
S 188TH ST
S 181ST ST
S 182ND ST
GRADY
OLYMPIC
RENTON
VICTORIA
SE 180TH ST
EARLINGTON
6TH
SE 180TH ST
TALBOT HILL - METRO RENTON
BOEING
LONGACRES
RENTON
METRO-
SE 2ND PL
N 4TH ST
SE 132ND ST
NE 8TH ST
S 3RD ST
S2ND
S 144TH ST
S 139TH ST
S 144TH ST
NE 4TH ST
N2DST
S 132ND ST
S 128TH ST
U
SW 34TH ST
S 37TH PL
T
WA-599DUWAMISH RIVER
AIRPORT WAY S
8
S 133RD ST
N
S
S 148TH ST
E
BOEING
TALBOT HILL -
RENTON#2
BOEING RENTON #2
S
SE 164TH ST
UPLAND DR
S 160TH STS 166TH ST
S 164TH ST
S 162ND ST
1
E
1
S 186TH ST
H80T
S 160TH ST
14HT
D
S5T S
S 140TH ST
SE 184TH LN
S 146TH ST
S 137TH ST
PARK
S 184TH ST
S 179TH ST
S
S 124TH ST
SE 181ST ST
ST
T
N
E
S 130TH ST
S 137TH ST
T
SE 184TH PL
0
S
S
O
THST
NE 7TH PL
S
RB
SE 158TH ST
K
S
SE 186TH PL
8
S 135TH ST
S 143RD ST
T142ND AVE SE44TH AVE SRAINI
ER AVE N(DE-ENERGIZED)38TH AVE SSMPA C C A R
48TH AVE S
DR
T
S
S 129TH PL
SE
R
L
1STST
7
SE 185TH PL
S 124TH ST
S 133RD ST
S31ST AVE S145TH AVE SE117TH AVE SEBENSON RD S105TH PL SEP
T
N
H
S
NE 4TH
PL
5
W
SE
163RD
ST
YKMAIN AVE SDRAYARD405
405
405
5
5 SOUTH SUB #2SCL COVI
NGTON
-
BERRYDALE #1TALBOT HILL - LAKE YOUNGS (SCL)BERRYDALE -
BPA MAPLE VALLEY #1
SE 142ND ST SAMMAMISH - ECHO LAKEBPA MAPLE VALLEY -
LAKE TRADITION #1
TALBOT HILL - SNO KING#2SCL MAPLE VALLEY - file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Tran Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_02.pdfPSE Tran Sta Click to see One Line Diagram
AREA
CONSTRUCTION
AREA
CONSTRUCTION
111027029.dgn 6/14/2023 1:01:53 PM
06/14/2023
06/15/2023
06/20/2023
06/20/2023253-553-6959
MFP24000537
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
Plotted:6/14/2023@1:02:36 PMP84193111027029.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
0
11900916
253-294-4103
206-303-7665
253-208-0000
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC 111027029111027029
100KING
111027029
108132004
571018629
TALBOT HILL - METRO RENTON (115 KV)
T. MOSER
J. GROOM
K. POPICH
1"=100'/4
RENTON, WA 98057 3&4T-0032507C
2305E074
SEC19 T23 R05E
06/14/23TRANSMISSION DRAWING SOURCE:T-00325 sh 3&4 `RT 39°33'1/5 11+18`RT 0°44'1/4 9+141/6 13+51`LT 9°49'1/7 15+84`RT 39°53'1/3 7+13201
204 233 233
11+18
70/1
VT
1/5
9+14
65/H1
HPA
1/4
13+51
65/1
HPA
1/6
15+84
70/1
HPD
1/7
SEE SAG TABLE 1 SHEET 2
4500# NESC MEDIUM RS=289.5'
795 ACSR TERN
7+13
75/1
VT
1/3
2
10015020001"= 100'50PLAN SCALE
PROFILE SCALE
1002003004000VERT : 1"= 20'
HORIZ : 1"= 200'
03
SHEET
SEE
03
SHEET
SEE 5+00 10+00 15+00 20+00100
50
0
100
50
0
GUYING TABLE
REMARKS
ACTION
GUYS
NO
STAKE
OR
POLE
SPAN
OR
LEAD
ACTION
FIG DET
ANCHORS
FIGQTY
DESCRIPTION
UNIT
CONSTRUCTION
DESCRIPTION
UNIT
CONSTRUCTION
QTY 6072.1000
STD.PRAC.
1/3
1/7
REMOVE
INSTALL
REMOVE
INSTALL
2
3
1
2
INSTALL
INSTALL
1
1
3
3
B
B
PLATE 24 - 1 IN ROD - ANTP24
PLATE 24 - 1 IN ROD - ANTP24
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
1
1
1
1
55' S
50' S
24.5' NE
20' NE
6073.xxxx
STD.PRAC.
0100
0100
0100
0100
1/5 EXIST 48' S 6 3/8 SIDE DOWN 8' - GYT3S1 0100 1 EXIST
EXIST
EXIST 1
2
1 TRIPLE HELIX 10-12-14 - ANTH3
PLATE 24 - 1 IN ROD - ANTP24
LOG 2 X 10' ROD-3 EYE - ANTL2R 4 C
3 B SPLIT ANCHORS: 3 GUYS TO EACH ANCHOR
A2
POLE TABLE
STATION TYPE REMARKSACTIONGRID NUMBER
1/4
1/6
1/7
9+14
13+51
15+84
REPLACE
REPLACE
REPLACE
H1
1
1
HPA
HPA
HPD
6085.1000
6085.1000
6085.1010
21'317404-165887
317416-165852
317430-165835
PRACTICE
STANDARD
POLE TOP
FROM
FRAMING
DIST.DRILLING
SPECIFICATIONS
1025.1400CLASS
POLE
LENGTH
POLE
NO
STAKE
OR
POLE
FIG 10
FIG 10
FIG 11
65
65
70
100°C
100°C
100°C
TEMP
DESIGN
TRANS GPS
47.46859265
47.46892848
47.46929803
LAT LONG
-122.2139911
-122.215576
-122.2163447
1/5
1/3 75°C
75°C EXIST
EXIST 75
70 1
1 FIG 13
FIG 13 VT
VT 6085.1030
6085.1030 317403-165869
317405-165905 47.4686364
47.46855566 -122.2148125
-122.21317947+13
11+18
REMARKS
POLE RETIREMENT TABLE
1/7
1/6
1/4
65
65
70
1
1
1
317430-165835
317416-165852
317404-165887
WISHBONE
WISHBONE
WISHBONE
STAKE NO
POLE OR GRID NUMBER
CLASS
POLE
TEL TV FIBER ID NUMBERTRANRMVD
1963
1963
1963
TOPPED RMVD
POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS
LENGTH
POLE
INSTALLED
YEAR
SW GRADY WAY & RAINIER AVE S
CONDUCTOR NOTES: ADD OR REMOVE CONDUCTOR @ 1/10 AND RESAG FROM 1/4 TO 1/10 TO SATISFY TO SAG TALE 1
MAX
STRINGING SAG TABLE 1
#
904
923
945
968
992
1018
1047
1078
1111
1147
1188
4500
5.0
4.9
4.7
4.6
4.5
4.4
4.3
4.2
4.0
3.9
3.8
200
5.9
5.8
5.6
5.5
5.4
5.2
5.1
4.9
4.8
4.6
4.5
218
6.9
6.8
6.6
6.5
6.3
6.1
6.0
5.8
5.6
5.4
5.3
236
8.0
7.8
7.7
7.5
7.3
7.1
6.9
6.7
6.5
6.3
6.1
254
9.2
9.0
8.8
8.6
8.4
8.2
7.9
7.7
7.5
7.2
7.0
272
10.4
10.2
10.0
9.8
9.5
9.3
9.0
8.8
8.5
8.2
7.9
290
11.8
11.5
11.3
11.0
10.7
10.5
10.2
9.9
9.6
9.3
9.0
308
13.2
12.9
12.6
12.3
12.0
11.7
11.4
11.1
10.7
10.4
10.0
326
100
90
80
70
60
50
40
30
20
10
0
SPAN LENGTH IN FEET - SAG IN FEET
NESC MEDIUM LOADING, CREEP, R/S = 254 FT
795 ACSR TERN
FAHR
DEG
TEMP LBS
TENSION
STRUCTURE 1/4 TO STRUCTURE 1/10
DISPLAYED AT 75°C
SHUFFLETON - O'BRIEN 115KV
111027029.dgn 6/14/2023 1:02:36 PM
06/14/2023
06/15/2023
06/20/2023
06/20/2023253-553-6959
MFP24000537
Plotted:6/14/2023@1:03:18 PMP84193111027029.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
0
11900916
253-294-4103
206-303-7665
253-208-0000
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC 111027029111027029
100KING
111027029
108132004
571018629
TALBOT HILL - METRO RENTON (115 KV)
T. MOSER
J. GROOM
K. POPICH
1"=100'/4
RENTON, WA 98057 3&4T-0032507C
2305E074
SEC19 T23 R05E
06/14/23TRANSMISSION DRAWING SOURCE:T-00325 sh 3&4 MAPLE AVE SWRAINIER AVE SSW 12TH ST
s1/9Ns1/9Ss1/12`LT 9°49'1/7 15+841/8 19+00`LT 38°43'1/9 21+151/10 23+861/11 26+55`LT 9°33'1/12 29+54`RT 9°02'1/13 32+49316
299 295
215 271
269
29+54
65/1
HPA
1/1215+84
70/1
HPD
1/7
19+00
65/H1
HPA
1/8
21+15
80/H2
VT
1/9
23+86
70/H5
TDE
1/10
26+55
65/H1
HPA
1/11
32+49
70/1
HPD
1/13
SAG TABLE 1 SHEET 2
4500# NESC MEDIUM RS=289.5'
795 ACSR TERN
SEE SAG TABLE 2 SHEET 3
4500# NESC MEDIUM RS=253.5'
795 ACSR TERN
855# NESC MEDIUM RS=290'
#2 ACSR SPARROW
855# NESC MEDIUM RS=294'
#2 ACSR SPARROW
855# NESC MEDIUM RS=103'
#2 ACSR SPARROW
3
10015020001"= 100'50PLAN SCALE
PROFILE SCALE
1002003004000VERT : 1"= 20'
HORIZ : 1"= 200'
02
SHEET
SEE
02
SHEET
SEE 15+00 20+00 25+00 30+00100
50
0
100
50
0 35+0004
SHEET
SEE
04
SHEET
SEE
SW 12TH ST & RAINIER AVE S
REMARKS
POLE RETIREMENT TABLE
1/13
1/11
1/10
1/9
1/8
65
65
70
80
65
1
1
1
1
1
317426-165680
317443-165738
317450-165764
317456-165797
317444-165809
WISHBONE
WISHBONE
WISHBONE
WISHBONE
STAKE NO
POLE OR GRID NUMBER CLASS
POLE
TEL TV FIBER ID NUMBERTRANRMVD
1960
1960
1960
1960
1963
TOPPED RMVD
POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS
LENGTH
POLE
INSTALLED
YEAR
GUYING TABLE
REMARKS
ACTION
GUYS
NO
STAKE
OR
POLE
SPAN
OR
LEAD
ACTION
FIG DET
ANCHORS
FIGQTY
DESCRIPTION
UNIT
CONSTRUCTION
DESCRIPTION
UNIT
CONSTRUCTION
QTY 6072.1000
STD.PRAC.
1/9
1/10
1/13
REUSE
REUSE
REMOVE
REMOVE
INSTALL
3
3
2
1
2 REUSE 1 2 ATRIPLE HELIX 10-12-14 - ANTH3
3/8 SIDE SPAN 8' - GYT3OS
3/8 SIDE SPAN 8' - GYT3OS
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
1
1
1
1
1
51.5' SSW
90.5' N
45' E
14' S
14' S
6073.xxxx
STD.PRAC.
0170
0170
0100
0100
0100
s1/9N EXIST
EXIST 8.5' N
12' N 2
1 7/16 SIDE DOWN 8' - GYT7SI
7/16 STUB DOWN - GYT7SB 0170
0100 2
3 EXIST
EXIST
1
1
EXIST 1
EXIST
EXIST 1
1 LOG 2 X 10' ROD-3 EYE - ANTL2R
TRIPLE HELIX 10-12-14 - ANTH3
SINGLE HELIX 10 - ANTH1
PLATE 24 - 1 IN ROD - ANTP24
PLATE 24 - 1 IN ROD - ANTP24 3 B
B3
1 A
4
A
C
2
1/12 EXIST
EXIST
50' S
28.5' N 3
3 3/8 SIDE SPAN 8' - GYT3OS
7/16 SIDE DOWN 8' - GYT7SI 0100
0170 1
2
s1/12 EXIST
EXIST 70' W
79' W
1
2
3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE DOWN 8' - GYT3S1
0100
0100 1
1
EXIST 1 TRIPLE HELIX 10-12-14 - ANTH3 2 A
EXIST 1 PLATE 24 - 1 IN ROD - ANTP24 3 B
POLE TABLE
STATION TYPE REMARKSACTIONGRID NUMBER
1/8
1/10
1/11
1/13
19+00
21+15
23+86
26+55
32+49
REPLACE
REPLACE
REPLACE
REPLACE
H1
H5
H1
1
HPA
TDE
HPA
HPD
6085.1000
6085.1060
6085.1000
6085.1010
27.5'
28.5'
317444-165809
317450-165764
317443-165738
317426-165680
PRACTICE
STANDARD
POLE TOP
FROM
FRAMING
DIST.
DRILLING
SPECIFICATIONS
1025.1400CLASS
POLE
LENGTH
POLE
NO
STAKE
OR
POLE
FIG 10
FIG 17A
FIG 10
FIG 11
65
70
65
70
100°C
100°C
100°C
100°C
TEMP
DESIGN
TRANS GPS
47.46967164
47.46974937
47.46957642
47.4690757
LAT LONG
-122.2174989
-122.2193511
-122.2204096
-122.2226833
1/9
s1/9N
s1/9S
1/12
s1/12S
75°C
EXIST
EXIST
EXIST
EXIST
80
80
65
85
1
1
FIG 13
FIG 10
VT
STUB
STUB
HPA
STUB
6085.1030
6085.1000
317456-165797
317466-165798
317451-165796
317437-165708
317432-165708
47.46992241
47.46938899
-122.2182859
-122.2215844
STRUCTURE 3/11
SHUFFLETON - O'BRIEN (115KV):
STRUCTURE 3/8
SHUFFLETON - O'BRIEN (115KV):
130
29+54
37.5'
22.5'
27.5'
100°C REPLACE H2
1
47.46979097 -122.2183306
47.47017010 -122.2182938
47.46820702 -122.2215990
MAX
STRINGING SAG TABLE 2
#
1213
1255
1303
1356
1415
1482
1558
1645
1746
1863
2004
4500
2.4
2.3
2.2
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
160
3.0
2.9
2.8
2.7
2.6
2.5
2.3
2.2
2.1
2.0
1.8
180
3.7
3.6
3.4
3.3
3.2
3.0
2.9
2.7
2.6
2.4
2.2
200
4.5
4.3
4.2
4.0
3.8
3.7
3.5
3.3
3.1
2.9
2.7
220
5.3
5.1
5.0
4.8
4.6
4.4
4.1
3.9
3.7
3.5
3.2
240
6.3
6.0
5.8
5.6
5.4
5.1
4.9
4.6
4.3
4.1
3.8
260
7.3
7.0
6.7
6.5
6.2
5.9
5.6
5.3
5.0
4.7
4.4
280
8.3
8.0
7.7
7.4
7.1
6.8
6.5
6.1
5.8
5.4
5.0
300
100
90
80
70
60
50
40
30
20
10
0
SPAN LENGTH IN FEET - SAG IN FEET
NESC MEDIUM LOADING, CREEP, R/S = 267FT
795 ACSR TERN
FAHR
DEG
TEMP LBS
TENSION
STRUCTURE 1/10 TO STRUCTURE 1/15
2. 1/10 - 1/14 TO SATISFY SAG TABLE 2
1. 1/4-1/10 TO SATISFY SAG TABLE 1
CONDUCTOR NOTES: ADD OR REMOVE CONDUCTOR @ 1/10 AND RESAG:
DISPLAYED AT 75°C
DISPLAYED AT 0°C
DISPLAYED AT 50°C
SHUFFLETON - O'BRIEN 115KV
111027029.dgn 6/14/2023 1:03:18 PM
06/14/2023
06/15/2023
06/20/2023
06/20/2023253-553-6959
MFP24000537
Plotted:6/14/2023@1:04:01 PMP84193111027029.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
0
11900916
253-294-4103
206-303-7665
253-208-0000
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC 111027029111027029
100KING
111027029
108132004
571018629
TALBOT HILL - METRO RENTON (115 KV)
T. MOSER
J. GROOM
K. POPICH
1"=100'/4
RENTON, WA 98057 3&4T-0032507C
2305E074
SEC19 T23 R05E
06/14/23TRANSMISSION DRAWING SOURCE:T-00325 sh 3&4 REYMOUND AVE SWSW 12TH ST
SENECA AVE SWLIND AVE SWs1/19 Ns1/19 W
`RT 9°02'1/13 32+49`RT 0°36'1/14 34+961/15 36+571/16 37+601/17 39+60`LT 0°42'1/18 42+41`LT 65°36'1/19 44+65247
161 103 200
225
281
36+57
65
HPA-C
1/15
37+60
65
HPA-C
1/16
44+65
75/H2
VDE (LA)
1/19
32+49
70/1
HPD
1/13
39+60
65/1
HPA
1/17
42+41
70/1
HPA
1/18
855# NESC MEDIUM RS=290'
#2 ACSR SPARROW
855# NESC MEDIUM RS=294'
#2 ACSR SPARROW
SEE SAG TABLE 2 SHEET 3
4500# NESC MEDIUM RS=253.5'
795 ACSR TERN
855# NESC MEDIUM RS=217'
#2 ACSR SPARROW
34+96
65/H1
HPW
1/14
855# NESC MEDIUM RS=UNK
#2 ACSR SPARROW
855# NESC MEDIUM RS=103'
#2 ACSR SPARROW
855# NESC MEDIUM RS=UNK
#2 ACSR SPARROW
4
10015020001"= 100'50PLAN SCALE
PROFILE SCALE
1002003004000VERT : 1"= 20'
HORIZ : 1"= 200'
03
SHEET
SEE
03
SHEET
SEE
GUYING TABLE
REMARKS
ACTION
GUYS
NO
STAKE
OR
POLE
SPAN
OR
LEAD
ACTION
FIG DET
ANCHORS
FIGQTY
DESCRIPTION
UNIT
CONSTRUCTION
DESCRIPTION
UNIT
CONSTRUCTION
QTY 6072.1000
STD.PRAC.
1/14 REMOVE 1 EXIST 1 2 ATRIPLE HELIX 10-12-14 - ANTH33/8 SIDE DOWN 8' - GYT3S1 147' S
6073.xxxx
STD.PRAC.
0100
s1/19W
1/19 EXIST
EXIST
EXIST 12' W
63.5' N
47' W 3
3
3 3/8 SIDE DOWN 8' - GYT3S1
3/8 SIDE SPAN 8' - GYT3OS
3/8 SIDE SPAN 8' - GYT3OS
0100
0170
0170 1
1
1 EXIST 1 TRIPLE HELIX 10-12-14 - ANTH3 2 A
REMARKS
POLE RETIREMENT TABLE
1/18
1/17
1/14
65
65
65
1
1
1
317406-165581
317412-165608
317422-165655
WISHBONE
WISHBONE
WISHBONE
STAKE NO
POLE OR GRID NUMBER
CLASS
POLE
TEL TV FIBER ID NUMBERTRANRMVD
1964
1964
1989
TOPPED RMVD
POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS
LENGTH
POLE
INSTALLED
YEAR 30+00 35+00 40+00 45+00100
50
0
100
50
0 50+00SW 12TH ST & SENECA AVE SW
POLE TABLE
STATION TYPE REMARKSACTIONGRID NUMBER
1/14
1/17
1/18
34+96
39+60
42+41
REPLACE
REPLACE
REPLACE
H1
1
1
HPW
HPA
HPA
6085.1085
6085.1000
6085.1000
317422-165655
317412-165608
317406-165581
PRACTICE
STANDARD
POLE TOP
FROM
FRAMING
DIST.DRILLING
SPECIFICATIONS
1025.1400CLASS
POLE
LENGTH
POLE
NO
STAKE
OR
POLE
FIG 30
FIG 10
FIG 10
65
65
70
100°C
100°C
100°C
TEMP
DESIGN
TRANS GPS
47.46891442
47.46862079
47.46844329
LAT LONG
-122.2236546
-122.2254791
-122.2265858
1/15
1/16
1/19
s1/19N
s1/19W EXIST
EXIST
EXIST75°C
75°C
75°C EXIST
EXIST 65
65
75 FIG 13
FIG 10
FIG 10 HPA-C
HPA-C
VDE (LA)
STUB
STUB
6085.1040
6085.2000
6085.2000 317418-165637
317415-165626
317402-165560
317402-165565
317402-165543
47.46829379
47.46874937
47.46881403 -122.224288
-122.2246921
-122.2274685
LAMINATED STRUCTURE
H2
20' & 22.5'
44+65
37+60
36+57
16.5'
17.5'
1
1
H10
1
36.5
30
-122.227470947.46820702
-122.227650747.46826292
2. PLACE STRUCTURES 1/17 & 1/18 IN TRAVELERS AND EQUALIZE TENSION
1. ADD OR REMOVE CONDUCTOR @1/10 AND RESAG 1/10-1/14 TO SATISFY SAG TABLE 2
CONDUCTOR NOTES:
DISPLAYED AT 75°C
DISPLAYED AT 0°C
DISPLAYED AT 50°C
111027029.dgn 6/14/2023 1:04:01 PM
06/14/2023
06/15/2023
06/20/2023
06/20/2023253-553-6959
MFP24000537