HomeMy WebLinkAboutMFP24000590.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24000590 IVR Number: 24000590 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/08/2024Application Date:3340402805Parcel Number: 209 SW 12TH ST Permit Type:02/29/2024Issue Date:Franchise Permit Work Class:02/28/2025Expiration Date:Minor Utility Job Number: 101169545Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT P01, J01, EM1 CREWS EQUIPMENT TO BE IN ROW ALONG TRENCH. NO WORK IN ROW. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101169545 209 SW 12TH ST JENNY CHAU 253-208-9480 Scott Warlick CED Monday - Friday 8:00AM - 3:00PM MFP24000590 2/29/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG MAPLE AVE SW SW 12TH STP01SW 12TH STMAPLE AVE SW PV1EM1V01209MM0112121212121218181818STOPW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEAD BEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AS GRADY WAYSTOP W20-1ROAD WORK AHEAD W20-4ONE LANE ROAD AHEAD X'≥X'≥X'≥W20-7ARESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREFROM TO TOW AWAY AR E A PHONE 684-54 4 4 NAME OF FIRM X X X - X X X - X X X X NO PARKINGPLACE S IGNS BOTHSIDES OF WORK AREA1313131311111111111111NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVJason Bisenius425-424-7316jason.bisenius@pse.com1 OF 1209 SW 12TH ST, RENTON, WA 980550 51377367501/31/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hoursas per jurisdictional requirements. (Generallybetween 9 a.m. and 4 p.m. on non-arterials andfrom 9 a.m. to 3 p.m. on arterials. If night timework is approved, Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425MFP24000590 1-4" SCH'L 80 CONDUIT 317433-165738 T0/14 37.5 kVA 120/240V (B) SW#_____ (100T) 317441-165737 317424-165742 500 kVA 277/480V (ABC) 1-4" SCH'L 80 CONDUIT 1-4" SCH'L 80 CONDUIT SW 12TH S T ROW50' 317450-165764 T145/1 112.5 kVA 208V (ABC) GRA 26 317443-165738 T144/19X 317444-165761 T0/13 50 kVA 120/240V (B) SLAG7001 101 215 317433-165738 T0/14 37.5 kVA 120/240V (B) SW#_____ (100T) 209 336ACSR 336ACSRABC 317424-165742 500 kVA 277/480V (ABC) 317441-165737 317433-165738 T0/14 37.5 kVA 120/240V (B) SW#_____ (100T) 317441-165737 317424-165742 500 kVA 277/480V (ABC) 3Ø PRI 12KV 1/0 UG A: EJN448 B: EJN449 C: EJN450 OVERHEAD CIRCUIT MAP 2305E076 SCALE: 6" = 1 MILE 101169545SITE SPECIFIC NOTES P01 EXISTING 317433-165738: -EXISTING 1962 75FT CL-1 POLE TO REMAIN -INSTALL 200A 3-PHASE TERM LI TERM 6043.1003(TSU3LTW) -INSTALL (3) FUSES @100T (MID:3412700) -INSTALL SW#______ -INSTALL 4" PRI RISER ON S/O BRACKETS 6042.1000(RIS4CSS) PV1 NEW 317441-165737:3-20 -INSTALL 4'-8" X 7'X 6' VAULT W/ ADJ ANTI-SKID MID:9996162 6051.1500(SVTDAAS) -COIL CABLES TWICE AROUND VAULT -INSTALL GRID# V01 NEW 317424-165742:3-19B, 1-08A -INSTALL 7' X 7' 6'-2" VAULT 6045.5000(PM3P12D) -INSTALL 8' X 8' COVER (MID:7918001) -INSTALL GALVANIZED LADDER RACK (MID:9997916) -SET 500KVA, 277/480V PM XFMR (MID:6259250) -INSTALL (4) #501 - 750KCMIL SECONDARY CONNECTOR BARS (MID:7651003) -INSTALL (16) CONNECTOR LUGS BOLT KITS (MID:7651008) -INSTALL (3) L/B ELBOWS 6041.1000, ELB10J -INSTALL GRID # -CONNECT CUSTOMERS, OWNED, INSTALLED, AND MAINTAINED 2-RUNS OF 600KCMIL EM1 NEW: -INSTALL ELECTRONIC MARKER BALL (MID:7668501) M01 NEW: -PSE METER DEPT. INSTALL METER ON 800A PANEL SPAN NOTES: -SEE SITE PLAN, ONE-LINES AND TABLES FOR INSTALL SCALE: NONE CONDUIT ONE-LINE CUSTOMER NOTES Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4.Roads shall be paved or have a compacted , crushed rock base in place. 5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7.Inclement weather conditions may cause delays in construction times and dates. 8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10.Customer is required to have meter inspected and approved by L&I/City prior to construction. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 500kVA 277/480v 6259250 V01 317424-165742 POWER GENERAL NOTES - COMMERCIAL PROJECT All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 1. 2. N Vicinity Map 47.469457, -122.220439 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 02/22/23 R. REYNOLDS 253-262-7409 02/22/23 R.REYNOLDS 253-262-7409 02/22/23 RW-______RENTON BROTHERTON CADILLAC PERM POWER 3-PHASE L/E 209 SW 12TH ST, RENTON, WA 98055 N/A N/A N/A 101169545 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM NW 19-23N-05E N/A N/A 2305E074 2305E076 2305E074SE GRA-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Owner / Developer Contact Info officeATTN: BROTHERTON CADILLAC 209 SW 12TH ST RENTON, WA 98055 BRAD BROTHERTON 425-981-1000 513773675 . . . 101169545 Dist UG Maint Dist OH Maint Superior SITE PLAN SCALE: 1" = 50' JOB SITE & ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS. EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES EROSION & SEDIMENT CONTROL REQUIREMENTS STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 11' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01. -PROVIDE A 4' X 4' WORK PIT AT P01. -PROVIDE A 9' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT PV1. TRENCHING & CONDUIT. -TRENCH AND INSTALL ±130' OF 1-4" SCH'L 80 GREY PVC CONDUIT FROM P01 TO PV1. -TRENCH AND INSTALL ±260' OF 1-4" SCH'L 80 GREY PVC CONDUIT FROM PV1 TO V01. -TRENCH AND INSTALL ±60' OF 1-4" SCH'L 80 GREY PVC CONDUIT FROM PV1 TO EM1. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 20,000 800A ELECTRIC 176KW 383A 1.0% 2.4% CIRCUIT FEET ADDED: 450' CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS M01 1 V01 2 600KCMIL - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-26 06/2020 87.00 91.00 86 9.60 9.60 9.60 96.60 100.60 95.6 SCALE: NONE CABLE ONE-LINE 00 1"2" 00 50'100' ONE-LINE LEGEND PROPOSED UG RISER PROPOSED CABLE DISCONNECT - FUSED PROPOSED PULL VAULT EXISTING POLE PROPOSED PADMOUNT TRANSFORMER PROPOSED CONDUIT NOTE: PRIMARY CONDUIT IS PSE PROVIDED & CUSTOMER INSTALLED, UNLESS OTHERWISE SPECIFIED. PRIMARY CABLE IS PSE PROVIDED & INSTALLED Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) P01 PV1 4"1 130'X 1 0 0 0 211 185.2 PRI 12KV 1/0 UG 480'EJN448 EJN449 EJN450 PV1 V01 4"1 260'X 2 0 1 0 454.4 562.2 PRI 12KV 1/0 UG PV1 EM1 4"1 60'X 0 2 0 0 N/A N/A CONDUIT ONLY PROPOSED ELECTRONIC MARKER FAULT CURRENT TABLE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 500KVA 0.2 --2.30 26,100 AMPS DEDICATED FACILITIES (V01) for 383 LRC & Dedicated TRF Location SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE -DF V01 180 DED. WIRE 2-55 V01 ---UPGRADE 300KVA TO 500KVA TOTAL FT=180 TOTAL: 4" SCH'L 80 = 450'TOTAL: PRI 12KV 1/0 = 480'TOTAL BENDS 90° = 345° = 222° = 1 applicant should coordinate with the developer and developer's civil designer regarding the storm system contained in this area. the storm system is shallow and alignment of the conduit matches that of the storm system and V01 is located near a storm line. MFP24000590 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 02/22/23 R. REYNOLDS 253-262-7409 02/22/23 R. REYNOLDS 253-262-7409 6/1/23 RW-______RENTON BROTHERTON CADILLAC PERM POWER 3-PHASE L/E 209 SW 12TH ST, RENTON, WA 98055 N/A N/A N/A 101169545 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM NW 19-23N-05E N/A N/A 2305E074 2305E076 2305E074SE GRA-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 101169545COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN Customer Owned Services Prop 4" (P01,PV1) PM XFMR VAULT B-FLY DETAIL (V01) SCALE: NONE FRONT OF TRANSFORMERGUARD POST INSTALLATION GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN MIN WORK SPACE 5' MAX 5' MAX 6" CONCRETE 5' MAX 5' MIN 5' MIN PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. PAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-02 Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. PRIMARY TRENCH DETAIL FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic TOP VIEW 4' x 4' Work Pit (Pole Butt Must Be Exposed) TOP VIEW 6'MIN VAULT LID 3'MIN 3'MIN 3'MIN ROAD SIDE (PREFERRED) FIELD SIDE (PREFERRED) TOP VIEW VAULT LID 6775.0035.02Not to scale PULL VAULT B-FLY DETAIL (PV1) SCALE: NONE Prop 4" (P01) Prop Spare 4" (J02) Prop 4" (V01) Cables must enter the vault so that they will lay in the opposite direction. TOP VIEW 21" Min. bend radius LSG317on 750 cable Mark each cable withcable numbers Nylon cable tie PULL VAULT CABLE ENTRY DETAIL Not to scale 2" Excavation - 20 cubic yards 10'-0" 7'-0" 8'-0" 8" 6'-2" SIDE VIEW 6'-6"Crushed 6" Rock 11' 11' TOP VIEW 5'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL 4'-0" 1'-0" 5'-8" 8" 7'-0" Tubes for 1" adjustable bolts ( 4) Cover 2,490 lbs Top Section 1,835 lbs Base 4,760 lbs 4'-8" (2) 3' Square Plate Doors NOTE: For Installations in pavement or sidewalks with adjustable cover SIDE VIEW TOP VIEW 9'-0" 11'-0" 2" 6'-0" 6"Crushed Rock 3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards. 4'-8" x 7' Handhole ( 575) w/adjustable Cover MID#: 7663206 VAULT & EXCAVATION DETAIL Not to scale 6051.1500 Excavation - 20 cubic yards MFP24000590