• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, March 4 through Friday, March 8, 6:00 p.m. to 6:00 a.m. Road closure
on S. 2nd St from Rainier Ave S to Lake Ave S for city construction work.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m. Intermittent
lane closure on NE 12th St and Jefferson Ave NE for utility installation. Questions
may be directed to Brad Stocco, 425-282-2373.
Monday, March 4 through Friday, March 8, 7:00 a.m. to 5:00 p.m.
Road closure on Aberdeen Ave NE between NE Sunset Blvd and NE 12th St for
construction work. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m.
Intermittent lane closures on S. Grady Way at Williams Ave S for construction
work. Questions may be directed to Tom Main, 206-999-1833.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m.
Road closure on Kirkland Ave NE between NE Sunset Blvd and NE 12th St for
utility installation. A detour route will be provided. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE and
Kirkland Ave NE for construction work. Questions may be directed to Brad
Stocco, 425-282-2373.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m. Intermittent
lane closures on Williams Ave S at Grady Way S for construction work. Questions
may be directed to Tom Main, 206-999-1833.
Monday, March 4 through Friday, March 8, 8:00 a.m. to 3:00 p.m. Southbound
travel and parking lane closures on Williams Ave S between S 2nd and S 3rd
Ed Prince, Council President
Members of Renton City Council
Page 2 of 2
March 4, 2024
Streets for construction work. Questions may be directed to Sam Stolmeier, 425-
430-7288.
Ongoing Street Closure (City of Renton Resolution No. 4446). FULL STREET
CLOSURE on Sunset Lane NE between NE 10th Street and Harrington Place NE in
support of the Solera Development Project (LUA20-000305). Questions may be
directed to Brad Stocco, 425-282-2373.