Loading...
HomeMy WebLinkAboutC_Letter_Of_Understanding_Geologic_Risk_240301_v1 December 6, 2023 Job No. 441-004-023 Ms. Vanessa Dolbee Director of Community and Economic Development City of Renton 1055 S Grady Way Renton, WA 98057 RE: Letter of Understanding of Geologic Risk- Sophie Jo Short Plat Dear Ms. Dolbee: Please accept the following as the required Letter of Understanding of Geologic Risk from our client, Schneider Family Homes. This letter was a condition of submittal for the proposed Sophie Jo Preliminary Short Plat. Respectfully, ESM CONSULTING ENGINEERS, LLC CAROL ORR Senior Planner \\esm8\engr\esm-jobs\441\004\023\document\letter-003.docx Letter of Understanding of Geologic Risk This letter confirms that we, the undersigned party, being the agent for the legal property owners, do hereby acknowledge the risks associated with developing in an unstable area. Furthermore, we agree to advise, in writing, all prospective purchasers of the site, lots created by the proposed short plat, and structures or portions of structures of the unstable potential of the area. Please consider this document as the required Letter of Understanding of Geologic Risk required by the City of Renton. Sincerely, SCHNEIDER FAMILY HOMES ZACH J. SCHNEIDER Vice President Operations 6510 Southcenter Blvd, Suite 1 Tukwila, WA 98188