HomeMy WebLinkAboutAdden 1JUL -29 -2003 17:22 206 322 9594 P.02 %. ORDER � ev�sl'' O/03 CAG -03 -005 Adder #1-03 03 Owner Field X g P"i1 Architect X file X -� Contractor X Accounting X PROJECT: Renton Pavilion 233 Burnett Avenue South Renton, WA 98055 TO (Contractor): EDIFICE CONSTRUCTION CO., INC. 1417 -31ST AVENUE SOUTH SEATTLE, WA 98144 The Contract is changed as follows: CHANGE ORDER NO.: 1 DATE: 6/4/03 EDIFICE PROJECT NO.: 3107 CONTRACT DATE: 4/22/03 CONTRACT FOR: Renton Pavilion CITY OF RENTON RECEIVED CITY C-I ERK'.i OFFICE Addition of Builder's Risk Insurance per owner request. $6,335.02 Contractor's overhead and fee at 15 % S950.25 B & O Tax 0.686% $ 49.98 Bonding 0 1.0% $ 73.35 WSST c@ 8.8% $ 651.96 TOTAL THIS CHANGE ORDER $ 8,060.57 Not valid until signed by the Owner, Architect and Contractor. The original Contract Sum was $ 2,242,077.91 Net change by previously authorized Change Orders $ .00 The Contract Sum prior to this Change Order was $ 2,242.077.91 The Contract Sum will be increased by ibis Change Order in the amount of $ 8,060.57 The new Contract Sum including this Change Order will be $ 2,250,138.48 The Contract Time will be unchanged by 0 days. The Date of Substantial Completion as of the date of this Change Order therefore is 9/27/03. NOTE: The compensation allowed by this Change Order reflects only the direct cost of the changed work described above. It does not include any amounts for changes in the sequence of the work, delays, acceleration or impact costs. Edifice Construction Co., Inc. reserves the right to request compensation for any and all of these and related items of cost prior to any final payment of this contract. ARCHITECT: CONTRACTOR: Mithun Architects Edifice Construction Co., Inc. 1201 Alaskan Way, Suite 200 1417 -31st Avenue South Seattle, WA 98101 Seattle, WA 98144 By Date o Date / -- cup�rgeC 107 - rwyan in 6- 4-03.6= d City of Renton 1055 South Grady Way Renton, W 5 By Date 4- 414 TOTAL P.02