HomeMy WebLinkAboutS_RPES ADA Improvements_BQW_231027_v4BOND QUANTITY WORKSHEET INSTRUCTIONS
1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
This worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial
submittal to project close-out approval.
Submit this workbook, in its entirety, as follows:
•(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part
of the Technical Information Report (TIR).
•(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.
The following forms are to be completed by the engineer/developer/applicant as applicable to the project:
Section I: Project Information
•This section includes all pertinent information for the project
•This section must be completed in its entirety
•Information from this section auto-populates to all other relevant areas of the workbook
Section II: Bond Quantities Worksheets
•Section II contains a separate spreadsheet TAB for each of the following specialties:
•Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))
•Section II.b TRANSPORTATION (Street and Site Improvements)
•Section II.c DRAINAGE (Drainage and Stormwater Facilities):
•Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON
•Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON
•Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private
Improvements.
•Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the
form. Stormwater facilities (public and private) are required to be included in the bond amount.
•The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the
project with the exception of the maintenance period reduction.
•Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need
completing.
•Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure
for each write-in item.
•All unit prices include labor, equipment, materials, overhead, profit, and taxes.
The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.
Section III. Bond Worksheet
•This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out
submittals to release the permit bond on a project.
Page 1 of 15
Ref 8-H Bond Quantity Worksheet INSTRUCTIONS
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared: 10/27/2023 Project Phase 1 FOR APPROVAL
Prepared by:Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)Name:Alan Jacobson
PE Registration No:43667
Firm Name:Jacobson Consulting Engineers
Firm Address:255 S King ST, Suite 800, Seattle, WA 98104
Phone No.(206) 426-2600
Email Address:alan@jacobsonengineers.com
Project Location and Description Project Owner Information
Project Name: Renton Park ES ADA Improvements Project Owner:Alisha Smothers c/o Rent School District
CED Plan # (LUA):##-######Phone:(206) 531-2577
CED Permit # (C):##-######Address: 7812 South 124th Street
Site Address:16828 128th Ave SE Seattle, WA 98178-4830
Street Intersection:128th Ave SE & SE 168th Street Addt'l Project Owner:Additional Project Owner
Parcel #(s):282305-9084 Phone:Phone
Abbreviated Legal
Description:
W 1/2 OF NE 1/4 OF SE 1/4 & W 45 FT OF E 1/2 OF NE 1/4 OF SE 1/4
LESS S 724FT THOF LESS CO RD Address: Address
City, State, Zip
Clearing and Grading Utility Providers
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:NO Water Service Provided by:CITY OF RENTON
If Yes, Provide Forest Practice Permit #:N/A Sewer Service Provided by: CITY OF RENTON
Page 2 of 15
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
Estimated Civil Construction Permit - Construction Costs2
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance.
Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees.
Water A $-
Wastewater (Sanitary Sewer)B $-
Stormwater (Drainage)C $3,286.49
Roadway (Erosion Control + Transportation)D $82,908.71
Total Estimated Construction Costs E
A + B + C + D $86,195.20
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is:10.1%
Page 3 of 15
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
CED Permit #:##-######
Description No.
Unit (A)
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 $7.50 CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $90.00 Each
Catch Basin Protection ESC-3 $145.00 Each 4 580.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)$110.00 CY
Ditching ESC-5 $10.50 CY
Excavation-bulk ESC-6 $2.30 CY
Fence, silt ESC-7 SWDM 5.4.3.1 $5.00 LF
Fence, Temporary (NGPE)ESC-8 $1.75 LF 500 875.00
Geotextile Fabric ESC-9 $3.00 SY
Hay Bale Silt Trap ESC-10 $0.60 Each
Hydroseeding ESC-11 SWDM 5.4.2.4 $0.90 SY
Interceptor Swale / Dike ESC-12 $1.15 LF
Jute Mesh ESC-13 SWDM 5.4.2.2 $4.00 SY
Level Spreader ESC-14 $2.00 LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 $2.90 SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 $2.30 SY
Piping, temporary, CPP, 6"ESC-17 $13.75 LF
Piping, temporary, CPP, 8"ESC-18 $16.00 LF
Piping, temporary, CPP, 12"ESC-19 $20.50 LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 $4.60 SY
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)$51.00 CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 $2,050.00 Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 $3,675.00 Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 $2,525.00 Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 $22.00 LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 $80.00 LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 $1.15 SY 20 23.00
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 $9.20 SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 $11.50 SY
TESC Supervisor ESC-30 $125.00 HR 8 1,000.00
Water truck, dust control ESC-31 SWDM 5.4.7 $160.00 HR
WRITE-IN-ITEMS Unit
Reference #Price Unit Quantity Cost
Straw Wattles SWDM D.2.1.2.5 $4.00 LF 1720 6,880.00
EROSION/SEDIMENT SUBTOTAL:9,358.00
SALES TAX @ 10.1%945.16
EROSION/SEDIMENT TOTAL:10,303.16
(A)
Page 4 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 $7.00 CY
Backfill & Compaction- trench GI-2 $10.25 CY
Clear/Remove Brush, by hand (SY)GI-3 $1.15 SY
Bollards - fixed GI-4 $275.00 Each 12 3,300.00
Bollards - removable GI-5 $520.00 Each
Clearing/Grubbing/Tree Removal GI-6 $11,475.00 Acre
Excavation - bulk GI-7 $2.30 CY 67 154.10
Excavation - Trench GI-8 $5.75 CY
Fencing, cedar, 6' high GI-9 $23.00 LF
Fencing, chain link, 4'GI-10 $44.00 LF
Fencing, chain link, vinyl coated, 6' high GI-11 $23.00 LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 $1,600.00 Each
Fill & compact - common barrow GI-13 $28.75 CY 20 575.00
Fill & compact - gravel base GI-14 $31.00 CY
Fill & compact - screened topsoil GI-15 $44.75 CY
Gabion, 12" deep, stone filled mesh GI-16 $74.50 SY
Gabion, 18" deep, stone filled mesh GI-17 $103.25 SY
Gabion, 36" deep, stone filled mesh GI-18 $172.00 SY
Grading, fine, by hand GI-19 $2.90 SY 510 1,479.00
Grading, fine, with grader GI-20 $2.30 SY 510 1,173.00
Monuments, 3' Long GI-21 $1,025.00 Each
Sensitive Areas Sign GI-22 $8.00 Each
Sodding, 1" deep, sloped ground GI-23 $9.25 SY
Surveying, line & grade GI-24 $975.00 Day
Surveying, lot location/lines GI-25 $2,050.00 Acre
Topsoil Type A (imported)GI-26 $32.75 CY
Traffic control crew ( 2 flaggers )GI-27 $137.75 HR
Trail, 4" chipped wood GI-28 $9.15 SY
Trail, 4" crushed cinder GI-29 $10.25 SY
Trail, 4" top course GI-30 $13.75 SY
Conduit, 2"GI-31 $5.75 LF
Wall, retaining, concrete GI-32 $63.00 SF
Wall, rockery GI-33 $17.25 SF
SUBTOTAL THIS PAGE:6,681.10
(B)(C)(D)(E)
Page 5 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 $34.50 SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 $18.25 SY
AC Grinding, 4' wide machine > 2000sy RI-3 $11.50 SY
AC Removal/Disposal RI-4 $40.00 SY 160 6,400.00
Barricade, Type III ( Permanent )RI-5 $64.25 LF
Guard Rail RI-6 $34.50 LF
Curb & Gutter, rolled RI-7 $19.50 LF
Curb & Gutter, vertical RI-8 $14.25 LF 270 3,847.50
Curb and Gutter, demolition and disposal RI-9 $20.50 LF
Curb, extruded asphalt RI-10 $6.25 LF
Curb, extruded concrete RI-11 $8.00 LF
Sawcut, asphalt, 3" depth RI-12 $3.00 LF 215 645.00
Sawcut, concrete, per 1" depth RI-13 $5.00 LF 80 400.00
Sealant, asphalt RI-14 $2.25 LF 215 483.75
Shoulder, gravel, 4" thick RI-15 $17.25 SY
Sidewalk, 4" thick RI-16 $43.50 SY 441 19,183.50
Sidewalk, 4" thick, demolition and disposal RI-17 $37.00 SY 441 16,317.00
Sidewalk, 5" thick RI-18 $47.00 SY 137 6,439.00
Sidewalk, 5" thick, demolition and disposal RI-19 $46.00 SY
Sign, Handicap RI-20 $97.00 Each 4 388.00
Striping, per stall RI-21 $8.00 Each 7 56.00
Striping, thermoplastic, ( for crosswalk )RI-22 $3.50 SF
Striping, 4" reflectorized line RI-23 $0.55 LF
Additional 2.5" Crushed Surfacing RI-24 $4.15 SY
HMA 1/2" Overlay 1.5" RI-25 $16.00 SY
HMA 1/2" Overlay 2"RI-26 $20.75 SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 $32.25 SY
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 $24.00 SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 $51.75 SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 $42.50 SY
HMA Road, 4", 4.5" ATB RI-31 $43.50 SY
Gravel Road, 4" rock, First 2500 SY RI-32 $17.25 SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 $11.50 SY
Thickened Edge RI-34 $10.00 LF
SUBTOTAL THIS PAGE:54,159.75
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 6 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 $24.00 SY 32 768.00
2" AC, 1.5" top course & 2.5" base course PL-2 $32.00 SY
4" select borrow PL-3 $5.75 SY
1.5" top course rock & 2.5" base course PL-4 $16.00 SY
SUBTOTAL PARKING LOT SURFACING:768.00
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
Sealcoat Parking Lot WI-1 $0.85 SF 3925 3,336.25
Wheel Stops WI-2 $250.00 EA 4 1,000.00
SUBTOTAL WRITE-IN ITEMS:4,336.25
STREET AND SITE IMPROVEMENTS SUBTOTAL:65,945.10
SALES TAX @ 10.1%6,660.46
STREET AND SITE IMPROVEMENTS TOTAL:72,605.56
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 7 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 $30.00 SY
* (CBs include frame and lid)
Beehive D-2 $103.00 Each
Through-curb Inlet Framework D-3 $460.00 Each
CB Type I D-4 $1,725.00 Each 1 1,725.00
CB Type IL D-5 $2,000.00 Each
CB Type II, 48" diameter D-6 $3,500.00 Each
for additional depth over 4' D-7 $550.00 FT
CB Type II, 54" diameter D-8 $4,075.00 Each
for additional depth over 4'D-9 $570.00 FT
CB Type II, 60" diameter D-10 $4,225.00 Each
for additional depth over 4'D-11 $690.00 FT
CB Type II, 72" diameter D-12 $6,900.00 Each
for additional depth over 4'D-13 $975.00 FT
CB Type II, 96" diameter D-14 $16,000.00 Each
for additional depth over 4'D-15 $1,050.00 FT
Trash Rack, 12"D-16 $400.00 Each
Trash Rack, 15"D-17 $470.00 Each
Trash Rack, 18"D-18 $550.00 Each
Trash Rack, 21"D-19 $630.00 Each
Cleanout, PVC, 4"D-20 $170.00 Each
Cleanout, PVC, 6"D-21 $195.00 Each
Cleanout, PVC, 8"D-22 $230.00 Each
Culvert, PVC, 4" D-23 $11.50 LF
Culvert, PVC, 6" D-24 $15.00 LF
Culvert, PVC, 8" D-25 $17.00 LF
Culvert, PVC, 12" D-26 $26.00 LF
Culvert, PVC, 15" D-27 $40.00 LF
Culvert, PVC, 18" D-28 $47.00 LF
Culvert, PVC, 24"D-29 $65.00 LF
Culvert, PVC, 30" D-30 $90.00 LF
Culvert, PVC, 36" D-31 $150.00 LF
Culvert, CMP, 8"D-32 $22.00 LF
Culvert, CMP, 12"D-33 $33.00 LF
SUBTOTAL THIS PAGE:1,725.00
(B)(C)(D)(E)
Page 8 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 $40.00 LF
Culvert, CMP, 18"D-35 $47.00 LF
Culvert, CMP, 24"D-36 $64.00 LF
Culvert, CMP, 30"D-37 $90.00 LF
Culvert, CMP, 36"D-38 $150.00 LF
Culvert, CMP, 48"D-39 $218.00 LF
Culvert, CMP, 60"D-40 $310.00 LF
Culvert, CMP, 72"D-41 $400.00 LF
Culvert, Concrete, 8"D-42 $48.00 LF
Culvert, Concrete, 12"D-43 $55.00 LF
Culvert, Concrete, 15"D-44 $89.00 LF
Culvert, Concrete, 18"D-45 $100.00 LF
Culvert, Concrete, 24"D-46 $120.00 LF
Culvert, Concrete, 30"D-47 $145.00 LF
Culvert, Concrete, 36"D-48 $175.00 LF
Culvert, Concrete, 42"D-49 $200.00 LF
Culvert, Concrete, 48"D-50 $235.00 LF
Culvert, CPE Triple Wall, 6" D-51 $16.00 LF
Culvert, CPE Triple Wall, 8" D-52 $18.00 LF
Culvert, CPE Triple Wall, 12" D-53 $27.00 LF
Culvert, CPE Triple Wall, 15" D-54 $40.00 LF
Culvert, CPE Triple Wall, 18" D-55 $47.00 LF
Culvert, CPE Triple Wall, 24"D-56 $64.00 LF
Culvert, CPE Triple Wall, 30" D-57 $90.00 LF
Culvert, CPE Triple Wall, 36" D-58 $149.00 LF
Culvert, LCPE, 6"D-59 $69.00 LF
Culvert, LCPE, 8"D-60 $83.00 LF
Culvert, LCPE, 12"D-61 $96.00 LF
Culvert, LCPE, 15"D-62 $110.00 LF
Culvert, LCPE, 18"D-63 $124.00 LF
Culvert, LCPE, 24"D-64 $138.00 LF
Culvert, LCPE, 30"D-65 $151.00 LF
Culvert, LCPE, 36"D-66 $165.00 LF
Culvert, LCPE, 48"D-67 $179.00 LF
Culvert, LCPE, 54"D-68 $193.00 LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 9 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 $206.00 LF
Culvert, LCPE, 72"D-70 $220.00 LF
Culvert, HDPE, 6"D-71 $48.00 LF
Culvert, HDPE, 8"D-72 $60.00 LF
Culvert, HDPE, 12"D-73 $85.00 LF
Culvert, HDPE, 15"D-74 $122.00 LF
Culvert, HDPE, 18"D-75 $158.00 LF
Culvert, HDPE, 24"D-76 $254.00 LF
Culvert, HDPE, 30"D-77 $317.00 LF
Culvert, HDPE, 36"D-78 $380.00 LF
Culvert, HDPE, 48"D-79 $443.00 LF
Culvert, HDPE, 54"D-80 $506.00 LF
Culvert, HDPE, 60"D-81 $570.00 LF
Culvert, HDPE, 72"D-82 $632.00 LF
Pipe, Polypropylene, 6"D-83 $96.00 LF
Pipe, Polypropylene, 8"D-84 $100.00 LF
Pipe, Polypropylene, 12"D-85 $100.00 LF
Pipe, Polypropylene, 15"D-86 $103.00 LF
Pipe, Polypropylene, 18"D-87 $106.00 LF
Pipe, Polypropylene, 24"D-88 $119.00 LF
Pipe, Polypropylene, 30"D-89 $136.00 LF
Pipe, Polypropylene, 36"D-90 $185.00 LF
Pipe, Polypropylene, 48"D-91 $260.00 LF
Pipe, Polypropylene, 54"D-92 $381.00 LF
Pipe, Polypropylene, 60"D-93 $504.00 LF
Pipe, Polypropylene, 72"D-94 $625.00 LF
Culvert, DI, 6"D-95 $70.00 LF 18 1,260.00
Culvert, DI, 8"D-96 $101.00 LF
Culvert, DI, 12"D-97 $121.00 LF
Culvert, DI, 15"D-98 $148.00 LF
Culvert, DI, 18"D-99 $175.00 LF
Culvert, DI, 24"D-100 $200.00 LF
Culvert, DI, 30"D-101 $227.00 LF
Culvert, DI, 36"D-102 $252.00 LF
Culvert, DI, 48"D-103 $279.00 LF
Culvert, DI, 54"D-104 $305.00 LF
Culvert, DI, 60"D-105 $331.00 LF
Culvert, DI, 72"D-106 $357.00 LF
SUBTOTAL THIS PAGE:1,260.00
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 10 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
Specialty Drainage Items
Ditching SD-1 $10.90 CY
Flow Dispersal Trench (1,436 base+)SD-3 $32.00 LF
French Drain (3' depth)SD-4 $30.00 LF
Geotextile, laid in trench, polypropylene SD-5 $3.40 SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 $2,300.00 Each
Pond Overflow Spillway SD-7 $18.25 SY
Restrictor/Oil Separator, 12"SD-8 $1,320.00 Each
Restrictor/Oil Separator, 15"SD-9 $1,550.00 Each
Restrictor/Oil Separator, 18"SD-10 $1,950.00 Each
Riprap, placed SD-11 $48.20 CY
Tank End Reducer (36" diameter)SD-12 $1,375.00 Each
Infiltration pond testing SD-13 $143.00 HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 Each
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 11 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
WI-1
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:2,985.00
SALES TAX @ 10.1%301.49
DRAINAGE AND STORMWATER FACILITIES TOTAL:3,286.49
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Page 12 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 $3,400.00 Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 $58.00 LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 $65.00 LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 $75.00 LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 $80.00 LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 $145.00 LF
Gate Valve, 4 inch Diameter W-7 $1,225.00 Each
Gate Valve, 6 inch Diameter W-8 $1,350.00 Each
Gate Valve, 8 Inch Diameter W-9 $1,550.00 Each
Gate Valve, 10 Inch Diameter W-10 $2,100.00 Each
Gate Valve, 12 Inch Diameter W-11 $2,500.00 Each
Fire Hydrant Assembly W-12 $5,000.00 Each
Permanent Blow-Off Assembly W-13 $1,950.00 Each
Air-Vac Assembly, 2-Inch Diameter W-14 $3,050.00 Each
Air-Vac Assembly, 1-Inch Diameter W-15 $1,725.00 Each
Compound Meter Assembly 3-inch Diameter W-16 $9,200.00 Each
Compound Meter Assembly 4-inch Diameter W-17 $10,500.00 Each
Compound Meter Assembly 6-inch Diameter W-18 $11,500.00 Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 $23,000.00 Each
WATER SUBTOTAL:
SALES TAX @ 10.1%
WATER TOTAL:
(B)(C)(D)(E)
Page 13 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
CED Permit #:##-######
Existing Future Public Private Quantity Remaining
(Bond Reduction)Right-of-Way Improvements Improvements
(B)(C)(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 $1,150.00 Each
Grease Interceptor, 500 gallon SS-2 $9,200.00 Each
Grease Interceptor, 1000 gallon SS-3 $11,500.00 Each
Grease Interceptor, 1500 gallon SS-4 $17,200.00 Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 $92.00 LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 $110.00 LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 $120.00 LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 $144.00 LF
Sewer Pipe, DI, 8 inch Diameter SS-9 $130.00 LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 $150.00 LF
Manhole, 48 Inch Diameter SS-11 $6,900.00 Each
Manhole, 54 Inch Diameter SS-13 $6,800.00 Each
Manhole, 60 Inch Diameter SS-15 $7,600.00 Each
Manhole, 72 Inch Diameter SS-17 $10,600.00 Each
Manhole, 96 Inch Diameter SS-19 $16,000.00 Each
Pipe, C-900, 12 Inch Diameter SS-21 $205.00 LF
Outside Drop SS-24 $1,700.00 LS
Inside Drop SS-25 $1,150.00 LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10.1%
SANITARY SEWER TOTAL:
(B)(C)(D)(E)
Page 14 of 15
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
Date:10/27/2023
Prepared by:Project Information
Name:Alan Jacobson Project Name: Renton Park ES ADA Improvements
PE Registration No:43667 CED Plan # (LUA):##-######
Firm Name:Jacobson Consulting Engineers CED Permit # (C):##-######
Firm Address:255 S King ST, Suite 800, Seattle, WA 98104 Site Address:16828 128th Ave SE
Phone No.(206) 426-2600 Parcel #(s):282305-9084
Email Address:alan@jacobsonengineers.com Project Phase: FOR APPROVAL
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
MAINTENANCE BOND */**
(after final acceptance of construction)
Site Restoration/Erosion Sediment Control Subtotal (a)$10,303.16
Existing Right-of-Way Improvements Subtotal (b)$-(b)$-
Future Public Improvements Subtotal (c)$-
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)$3,286.49 (d)$3,286.49
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2 (e)$-
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2 (f)$-
Site Restoration P
(a) x 100%$10,303.16
Existing Right-of-Way and Storm Drainage Improvements R
((b x 150%) + (d x 100%))$3,286.49
Maintenance Bond EST1
((b) + (c) + (d)) x 20%$657.30
Bond Reduction2 S
(e) x 150% + (f) x 100%$-
Construction Permit Bond Amount 3 T
(P +R - S)
$13,589.64
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead, profit, and taxes.
Page 15 of 15
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 10/27/2023