HomeMy WebLinkAboutR-382027O
N
00
M
0
r)
LuI—
ADWNL
—SD—J5`)
VL OF RI
CIL OF RD
N
I � I
I I
4.5' OF -
JR I
O.W DEDICA77ON
r B6E cnr
SF
I
BM I
SSMH 540 - SS 2
RIM=40.]0' I I
IR 8• PVC N=34.2Y
LE 80 PVC S.=J4.O'
&'1/4, SW 114, SEC. 05, T. 23 N.,R.05E.,WM.
Sai I o� IO A / IGNGCOUNTY, WASFIINGTON
p1W
'. � '( ��• / / 8315
235 Of
N
FIN
,, �,,00c.
5 165 OF
a
a ;}T tso
y / N6?g815•E
I �
a /
i a
I I
3
I
I
I
•
I
N
•
GUY PO
r
Know what's below.
Call beforeyou dig. I
U77LnTCONFL(CTNOTE.•
CAUTION.•
TIE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LONDON,
NMENSION, AND DEPTH OF ALL EXISTING UVLIBES WHETHER SHOWN ON THESE
DIMS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING ME MRIZONTAL
AND VERTICAL LOCATION PRIOR i0 CONSTRUCTION. MIS AND THEN SHALL
NCLUDE CALLING UPO Y LOCATE 0 1-800-424-5555 POTHOLING ALL OR THE
TXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY
(EDIFY WHEMER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES AS
MOWN ON MESE PUNS ARE BASED UPON THE UNVERInED PUBLIC
NFNMAIroN AND ARE SUBJECT To VARIATION. IF CONFLICTS SHOULD OCCUR,
'HE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY i0
?ESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
DO\ / I CERTIFY THAT THE LOCATIONS AND ELEVATIONS SHOWN ON THE
/'� AS -BUILT PNS FOR LWACYRBN]ON nouro BY BRUN
n s'® SOIL NAL WNL RAL4B ARE BASED ON FIELD SURVEY LOCATIONS AND ELEVATIONS
r TRANSFORMER 1 -(DESIGNED BY OTHERS) COMPLETED BY PACFXC19ASTSBRVBYB,RIC IN JULY AND
PAD /
0
i�
RETAINING WALL,
�635-
irurn
rr;::rr15 PAGET POWER COMM
rlxxzrr
ISI rrrre
IMCI�Iis.T PUGET P/
:1
AUGUST OF 2017 AND PROVIDED i0 TECO ER FINAL PUN
PREPARATION.
�y S= ROSY
1 I CICOVER SHEET
CIA
N
STANDARD E, NOTES &LEGEND
C1.2 2 EXISTING FEATURES MM
CZ I;1A 8 ;15 C3ESC
.0 G
DEVVIS
313'GRACING PLAN
1 0A GRADING PIAN
OF LOQ CAT ROAD & DRAINAGE PUN
.2G ® S. ; -:.� / UNCIEN' 235 C4,1 DRAI
GAS DEEMO PLANPLANAND DETAILS
i C4.3 OFFSITE DRAINAGE PUN & PROPLE
M
DEED EEC.
NO 109
DATED
11/29/191515
MEAM:
R=1544..
OEJB
I O
L=119.1)
N
I � I
I I
4.5' OF -
JR I
O.W DEDICA77ON
r B6E cnr
SF
I
BM I
SSMH 540 - SS 2
RIM=40.]0' I I
IR 8• PVC N=34.2Y
LE 80 PVC S.=J4.O'
&'1/4, SW 114, SEC. 05, T. 23 N.,R.05E.,WM.
Sai I o� IO A / IGNGCOUNTY, WASFIINGTON
p1W
'. � '( ��• / / 8315
235 Of
N
FIN
,, �,,00c.
5 165 OF
a
a ;}T tso
y / N6?g815•E
I �
a /
i a
I I
3
I
I
I
•
I
N
•
GUY PO
r
Know what's below.
Call beforeyou dig. I
U77LnTCONFL(CTNOTE.•
CAUTION.•
TIE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LONDON,
NMENSION, AND DEPTH OF ALL EXISTING UVLIBES WHETHER SHOWN ON THESE
DIMS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING ME MRIZONTAL
AND VERTICAL LOCATION PRIOR i0 CONSTRUCTION. MIS AND THEN SHALL
NCLUDE CALLING UPO Y LOCATE 0 1-800-424-5555 POTHOLING ALL OR THE
TXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY
(EDIFY WHEMER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES AS
MOWN ON MESE PUNS ARE BASED UPON THE UNVERInED PUBLIC
NFNMAIroN AND ARE SUBJECT To VARIATION. IF CONFLICTS SHOULD OCCUR,
'HE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY i0
?ESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
DO\ / I CERTIFY THAT THE LOCATIONS AND ELEVATIONS SHOWN ON THE
/'� AS -BUILT PNS FOR LWACYRBN]ON nouro BY BRUN
n s'® SOIL NAL WNL RAL4B ARE BASED ON FIELD SURVEY LOCATIONS AND ELEVATIONS
r TRANSFORMER 1 -(DESIGNED BY OTHERS) COMPLETED BY PACFXC19ASTSBRVBYB,RIC IN JULY AND
PAD /
0
i�
RETAINING WALL,
�635-
irurn
rr;::rr15 PAGET POWER COMM
rlxxzrr
ISI rrrre
IMCI�Iis.T PUGET P/
:1
AUGUST OF 2017 AND PROVIDED i0 TECO ER FINAL PUN
PREPARATION.
�y S= ROSY
1 I CICOVER SHEET
CIA
N
STANDARD E, NOTES &LEGEND
C1.2 2 EXISTING FEATURES MM
CZ I;1A 8 ;15 C3ESC
.0 G
DEVVIS
313'GRACING PLAN
1 0A GRADING PIAN
OF LOQ CAT ROAD & DRAINAGE PUN
.2G ® S. ; -:.� / UNCIEN' 235 C4,1 DRAI
GAS DEEMO PLANPLANAND DETAILS
i C4.3 OFFSITE DRAINAGE PUN & PROPLE
TOTAL IMPERVIOUS AREA BEFORE PROJECT = 1,642 SF
NET NEW IMPERVIOUS DUE i0 PRGVECT = 25324 5F
TOTAL IMPERVIOUS SURFACE AREA AFTER PROJECT = 25,324 SF
ME �21d 51
.ynro. MEAO",t
a
5y ..
ME IMA, St
€ i
a E
�( MMElnn ss E xslnn v.
0 NENoU
�\ NEYxtt01 rve wu E19 s
$ ION
N i
i y NMhM
VIG7NITYMAP " .
ENGINEER
SURWOR
A T
SCALE: 111
201
20 10 0
20 40
MEAM:
EVEREST WA 98203
57,000 SF (1.31 Ac)
CONTACT. HARLEY C. PANED FLS
PROJECT DISTURBANCE AREA - 42,534 SF
UTIVTTAND SERVICEPROMERS
CABLEN:
FIREDISWCT.•
COMNST
KING COUNTY FRE DISTRICT j3Z
4020 AUBURN WAY NORTH
EAST KEN!
PO BOX 1048
24611 116TH AVE SE
AUBURN, WA 98002
KENT, WA 98030
APPROVAL. ME BOARD SHALL INCLUDE COLOR AND MATERNLS FOR THE FOLLOWING: GUARDRAILS FACADE TRUIMENIS, RETANINC WALLS. RAISED PORTERS
PHONE: (253) 859-3322
SCHOOL DISTRICT:
POWERANDGAS.
RENTN SCHOOL DISTRICT 1403
PL'GET SOUND ENERGY
300 SW ]TH ST
10885 NE 4TH STREET
RENTN, M 98055
FO BOX 97034
PHONE (425) 204-23M
BELIEVES, WA 98009-9]34
WATERANDSEWER
TEMPHONE.-
CITY OF RENTN
BWEST COMMUNICATIONS
1055 SOUTH GRADY WAY
450 110TH AVE NE
RENTN, WA 98055
PREMIS BUREAU, 4TH FLOOR
BELLEVUE WA 98003
TOTAL IMPERVIOUS AREA BEFORE PROJECT = 1,642 SF
NET NEW IMPERVIOUS DUE i0 PRGVECT = 25324 5F
TOTAL IMPERVIOUS SURFACE AREA AFTER PROJECT = 25,324 SF
ME �21d 51
.ynro. MEAO",t
a
5y ..
ME IMA, St
€ i
a E
�( MMElnn ss E xslnn v.
0 NENoU
�\ NEYxtt01 rve wu E19 s
$ ION
N i
i y NMhM
VIG7NITYMAP " .
ENGINEER
SURWOR
/6KM9F Q4PYRAINB CORAM•
ASP.L WTD SAINM4G
P.O. BOX 1418
4532-6 EVERGREEN WAY
EVERET, M 98206
EVEREST WA 98203
CONUA . SINTHON MOOUYIL
CONTACT. HARLEY C. PANED FLS
30-936
FAYS(425)
EM (42"425) 30339362
33942) -10269
243-6000
�) 489-4474
243-1561
NE - SURE 1050
84515 OF HEARING HE SOUTHERLY 160 FEE! OF HE NORTHERLY 235 FEET OF LOTS
N 1HINGT N W BOULEVBETWEEARD
FOUND PER
REFERENCE
ALONG LANE 312, 313, 314 AND 315. AS MEASURED ALONG PARALLEL LINES i0
WASHINGTON BOULEVARD NORTH PER REFERENCE 2001 SURVEY THE SOUTHERLY MARGIN OF SOUTHEAST 110TH STREET (ALSO
jkKNOWN AS MORGAN AVENUE), C D. HILLMAN'S LAKE WASHINGTON
CITPOFRFNTONBM GARDEN OF MEN, DIVISION NUMBER 5, ACCORDING i0 ME PIAT
• —� / "� CRT UTILITY PN CIN OF 2117 BENCHMARK THEREOF RECORDED IN VOLUME I i OF PUTS, PACE 8J, IN KING
CRT UTILIT DETAILS NUMBER 2117 3 ENC BRASS DISC AT THE NORTHWEST COUNTY, WASHINGTON;
CORNER CONCRETE RACE OF A SIGNAL BRIDGE AT A
•`: EXCEPT ME WESERLY 60 FEET OF SAID LOT 312 CONVENE) TO
COUULOCROSSING IN THE NORTH ENTRANCE OF LI -Cil LANDSCAPE &TREE RETENTION PUN COON PARK KING COUNTY BY OEM RECORDED UNDER RECORDING NUMBER
I' �F6AEX' 9WW COMMON• EL=3].25' 1035005;
( ;5935 1. THE APPLICANT SHALL COMPLY MM HE SIX MITIGATION MEASURES ISSUE AS PAR! OF THE DETERMINATION OF NbN-BNIflUNCE MITIGATED, INTO MARCH AND EXCEPT THAT PORTION OF LOTS 314 AND 315 CONVEYED TO
I6 2015.
BM THE STATE OF WASHINGTON BY DEM RECORDED UNDER RECORDING
N6i 615 2, THE APPLICANT SHALL SUBMIT A DElA!£D LANDSCAPE PN DEPICTING SIGNIFICANT LANDSCAPING ALONG HE STREET FRONTAGE WITH PUNTERS ADJACENT TO NUMBER 4655599.
THE BUILDING OR WITHIN COMMON OPEN SPACES AND ROOF PATIO SCREENS. INVERT ELEVATION OF HE NORTH
J J. THE ENING LA SHALL PROVIDE A DETAILED PN IDENTIFYING THE LONDON
RRE AND SCREENING ECT MAN FOR SURFACE AND ROOF MOONED EUIPME'. THE
8• PVC PIPE IN SSM -2 ACCORDING TO A5 -BUILT
SCREENING PUN SHALL E SUBMITTED TO, AND APPROVED BY, 85 SQUARE
PLANNING PROJECT MANAGER PRIOR i0 ENGINEERING PERMIT APPROVAL. DRAWING NUMBER 322206 DATED SOUTHWEST SSMH
4. THE PROPOSAL SHALL T NREVISED
ADMINISTRATIVE
ST INCLUDE AN AODTIONN 285 SQUARE FEET - AREA ORDER T TO REFUSE AND SQUARE
POTTAGE
ALTERNATIVELY, HE IS LOVED ♦RN TALI SOUTH OF SOUTHWEST OF
CICYQARENTON
PAST RIGH CORNER AND + - 10.0' WEDS! OF HE
J APPLICANT Al1Y REQUEST AN ADMINISTRATIVE MODIFICADON PURSUANT TO RML 4-9-250 IN ORDER N REDUCE Hf SQUARE FOOTAGE REQUIRED. HE /
/ REVISED FUDR PUN OR ADMINISTRATIVE MODIFICATION REQUEST SHALL BE SUBMITTED i0, AND APPROVED BY, HE CURRENT PLANNING PROTECT MANAGER EAST RIG' OF WAY LINE.
PRIOR PL BUILDING PERMIT APPROVAL EL=34.D' APPROVHD BY: MILE -
5. THE RELOCATION
SHALL BE REQUIRED (5 DEMONSTRATE HERE IS ADEQUATE AREA FOR REFUSE PICKUP WGNNOVER Y, PARKING STRUCTURE PLAINE WHICH MAY REQUIRE ATB
• • • THE RELOCATION OF A PARKING STALLS) HE REVISE FLOORPN SHALL BE SUBMIDM TO, ANO APPROVED B[ HE CURRENT PNNING PROJECT MANAGER Nqyp 88
PRIOR BUILDING PERMIT APPROVAL.
6 THE APPLICANT SHALL 8E REQUIRED TO REVISE HE PARKING PUN TO INCLUDE A TOTAL OF 105 STALLS AND THE FOLLOWING: RELOCATION OR PROPOSED APPROVIID BY: DAM'
�;•-.•••.•..• ]. THE APPLICANT SHALL SUBMIT A REVISED SITE PN DEPICTING A 4.5 FOOT (SUBJECT TO A FINAL SURVEY) RIGHT-OF-WAY OEDIUIION ALONG LANE APPROVEDBY, DAM
—
IF
BLVD N. THE REVISED SIE PN NO SHALL BE SUBMITTED T0, AAPPROVED BY HE PN REVIEWER PRIOR TO CONSTRUCTION PERMIT APPROVAL.
A REVISED GEOECHNICAL REPORT SHALL BE SUBMITTED PRIOR TO ENGINEERING PERMIT APPROVAL NOTING PROPOSED IMPACTS TO SEEP SLOPES AND ANY
• •Sep4 CONDMONS• CHANGES IN RECNMENDAMM ACCORDINGLY THE GEOTECHNICAL REPORT WOULD ALSO BE REQUIRED TO INCLUDE INFORMATION REGARDING HE STABILITY FOR
1. ME APPLICANT SHALL PROVIDE AN UPDATED GEOTECHNICAL REPORT FROM FARM SOLUTIONS NORTHWEST (ESNW) SOIL INFILTRATION, WITH RECOMMENDATIONS OF APPROPRIATE FLOW CONTROL BMP OPTIONS. IF INRLTRATION IS PROPOSED, HEN FALLING HEAD PERMEABIUTY
RATES ARE REWIRED TO BE PROVIDED.
INCLUDING A AND
PERMANENT
AND SPECIFIC RECOMMENDATIONS TO ADORES GROUNDWATER 17EDPTO, REIAED TO 9. THE APPLICANT SHALL SUBMIT A DETAlED COMMON OPEN SPACE/PUZA PUN WHICH INCLUDES SPECIFICATIONS FOR PEDESTRIM AMENITIES THAT ADD TO ME R-382027
EXCAVATION AND PERMANENT SLID -SUB DRAINAGE HE UPDATED REPORT SHALL BES MAY
BED BJ AND APPROVED BY PEDESTRIAN EXPERIENCE AND HUMAN SCALE INTENDED FOR HE DEVELOPMENT ME PN SHALL BE SUBMITTED T0, AND APPROVED BY, ME CURRENT
ME RAN REVIEWER, PRIOR TO FINAL ENGINEERING APPROVAL AT HE EXP REPORT MAY BE SUBJECT i0 INDEPENDENT PLANNING PROJECT MANAGER PRIOR TO BUILDING PERMIT APPROVAL.
PEER RENEW AT ME DISCRETION WITH
ALL
PUN REVIEWER AND AT THE EXPENSE NI THE
APPLICANT U1 THE APPLICANT SHALL SUBMIT A REVISED ELEVATION DERCNG SOME RECESS DEPTH FOR EACH WINDOW, IN MIN ME HVAC UNIT IS ABUTTED DIRECTLY
1 ME ARED BY SHALL COMPLY WITH NL RESIN RECOMMENDATIONS INCLUDED VIED B THE GEOTECHNICAL REPORT BELOW ME WINDOW AND WONIN A FRAME THAT GIVES THE APPEARANCE THAT IT'S AN INTEGRATED WINDOW SYSTEM. ME REVISED ELEVATIONS SHALL BE
PREPARED GI EARTH SOLUTIONS NORTHWEST AS REWSED/UPMED AND APPROVED BY ME PUN REVIEWER AS PART SUBMIRED TO AND APPROVED BY, ME CURRENT PLANNING PROJECT MANAGER PRIOR TO BUILDING PERMIT APPROVAL.
OF THE ENGINEERING PERMIT APPROVAL.
3ME APPLICANT SHALL CONTRACT WITH A GEOTECHNICAL ENGINEER IN ORDER i0 VERIFY THAT THE EARTH 11. THE APPLICANT SHALL SUBMIT REVISED ELEVATIONS DEPICTING ADDED ARCHITECTURAL DETAILING ELEMENTS ALONG THE GROUND FLOOR OF ME WEA
,S BUILT
. WORK, WASHINGTON BLVD N FACADE THE REVISE ELEVATIONS SHALL BE SUBMITTED TO AND APPROVED BY ME CURRENT PLANNING PROJECT MANAGER PRIOR FO
FOUNDATION AND OTHER RECOMMENDATIONS HAVE BEEN PROPERTY INTERPRETED AND IMPLEMENTED IN THE DESIGN AND BUILDING PERMIT APPROVAL
ENGINEERING PN DOCUMENTS. GEOTECHNICAL MONITORING SERVICES SHALL ALSO BE PROVIDED WRING CONSTRUCTION
INSIGHT ENGINEERING CO,
COVERING INSPECTIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT
12
THE APPLICANT SHALL INCREASE ME PITCH OF THE SHED ROOF ELEMENT IN ORDER i0 STRENGTHEN ME BUILDING DESIGN TO ME SATISFACTION OR THE
4 A PRORATED SHARE OF THE TRAFFIC SIGNAL AND ROADWAY IMPROVEMENT COSTS (CURRENTLY BEING CONSTRUCTED BY
CURRENT PLANNING PROJECT MANAGER REVISED ELEVATIONS SHALL BE SUBMITTED 70, AND APPROVED BY ME CURRENT PLANNING PROJECT MANAGER PRIOR
P.O. BOX - 1478
SELO SHALL BE FROM THE PROPOSED PROJECT UPON HE PT OF NUMBER OF
1.
3
TO BUILDING PERMIT APPROVAL.
THE APPLICANT IIA SUBMIT A MATERIALS R i THE APPROM F M CURRENT N MANAGED PRIOR BUILDING PERMIT
E APPLCA SHALL SUB E LS BDA D SUBJECT O E RO N O ECU E PLANNING PROJECT NAGE 0 TH BULDI C E
EVERETTWA 98206
TRIPS THAT WILL ME FRED
THAT WILL E
OF FUTURE BASELINE TRIPS AT HE SOUTHPORT GENE
AWED BY ME PROJECT To ME NUMBERBASELINE
APPROVAL. ME BOARD SHALL INCLUDE COLOR AND MATERNLS FOR THE FOLLOWING: GUARDRAILS FACADE TRUIMENIS, RETANINC WALLS. RAISED PORTERS
(425)303-9363 (425)303-9362 FAX
TERSE
COULO/
TR SHOULD SEGO ESTABLISH A STREET AND UTILITY
PARK ENTRANCE UKE WASHINGTON BLVD N ID
/
METAL SCREENS SUNSHADES WINDOWS FRAMES AND COLUMNS ACCEPTABLE MATERIALS INCLUDE A COMBNATIN Of BRICK INECRALLY COLORED CONCRETE
/
INP INSIGHTBNGINIB?RWG.NET
GC
LATECOMERS
UECOM TO REIMBURSE
AGREEMENT MESE FUNDS COULD BE USED i0 REIMBURSE ME COST OF THESE ROADWAY IMPROVEMENTS
MASONRY, PRE-FlNISHED METAL SINE STEEL CUSS UST -IN-PLACE CONCRETEOR OTHER SUPERIOR MATERIALS APPROVED AT THE OISCRETIN Of ME
O
THE AMOUNT ESTABLISHED BY SUCH AN AGREEMENT. THE FIM WILL BE BASED N (NEN PM PEAK HOUR )RIPS) /
SIE ADDRESS 1300 UNE WASHINGTON BOULEVARD N.
(TOTAL PM PUX HOUR TRIPS) X (COST OF NEW SIGNAL AND IMPROVEMENTS). ME FEE SHALL BE PATO PRIOR TO FINAL
(T
14.
THE APPLICANT THE APPROXIMATE OF ALL EXTERIOR BUILDING
FIXE MPLPROP SHALL BE REQUIRED TO SUBMIT A CONCEPTUAL SIGN PACKAGE INDICATES
T
TORO BUILDING REVIEW
DIRK
OB -19-2015
RENTN, WA 98056
OCCUPANCY
IWHICHTECR E AND LO'RIB TO HE CHARACTER OF
SIGNAGE. PROPOSED SIGNAGE SHALL COMPATIBLE WITH HE ARCHITECTURE AND EXTERIOR AND
5 HE APPLICANT SHALL UE A PUBLIC PUN IN COORDINATION WITH CITY OF ATN STAFF N
SUIMINCS
PROJECT
THE DEVELOPMENT THE CONCEPTUAL SIGN PACKAGE SHALL BE SUBMITTED i0. ANO APPROVED BV. HE CURRENT PNNING PROJECT MANAGER PRIOR i0
SI CURRENT
1
BUILDING PERMIT SUBMITTAL
DIRK
04-06-2015
EG NERALOUTREACH
AD PUBLIC, AREA RESIDENCES AND BUSINESSES AND APPROPRIATE PUBLIC
COMMUNICATE WITH ROAD USERS, HE GENERAL D,
BUILDING PERMIT APPROVAL
REV ND.
DESCRIPTION
INITIALS
DATE
TAX ACCOUNT NO'S: 334 45 0 0 001
CONDITIONS UNE AR O AND HE AND MOBILITY
ENTITIES ABOUT PROJECT INFORMATION ROAD CONDITIONS IN U
15.
FIXE APPLICANT SHELL PROVIDE A LIGHTING PUN THAT ADEQUATELY PROVIDES FOR PUBLIC SAFELY WITHOUT EXCESSIVE CURE ON
0
PRATTWORN
ROVED
EETECE OR THE WORK ZONE FIXE PUBLIC WTERING PUN HABE SUBMITTED !0, AND APPROVED BY HE CURRENT
A CHNG SHALL EDCASTING
USED IN ALL CASES WEPED
PROPERTIES: AT THE TIME OF BUILDING PERMIT REVIEW PEDESTRIAN SCALE AND ASSURE SAFE PEDESTRIAN
PLANNING PROJECT MANAGER PRIOR i0 APPROVAL.
E
AND VEHICULAR MOVEMENT UNLESS ALTERNATIVE PEDESTRIAN SOLE LIGHTING HAS BEEN APPROVED ADMINISTRATIVELY OR IS SPECIFICALLY LISTED AS EXEMPT
S BEEN MI
PERMI'1NO' 015002518
Y DEVICE, IN ANPERMIT
APPLICANT SHALL PROVIDE A SURETY DEVICE IN AN AMOUNT SUFFICIENT i0 PROVIDE IMPROVEMENTS
6. AM
FROM PROVISIONS LOUSE IN RMC 4-4-015 LIGHTING. EXTERIOR ON-SITE.
ET UZER MN
BETWEEN THE SITE AND HE NE WASHINGTON BVD GENE CWLON PARK WAY INTERSECTION.
ib.
FIXE APPLICANT SHALL SUBMIT BICYCLE PARKING DETAIL DEMONSTRATING COMPLIANCE WITH THE BICYCLE REQUIREMENTS OUTLINED 4-4-GBTO LC FOR
R.
SE 1A SW 1(4, SEC. 05I T.23 N.1 &05R, W,M,
R
HE SURETY DEVICE SHALL BE PROVIDED TO, AND APPROVED BY, HE CURRENT PUNNING PROJECT PRIOR
T PLANNING PROVE ER PRIOR TO
FIRM STRUCTURES. THE BICYCLE PARKING DETAIL SHALL BE SUBMITTED TO AND APPROVED BY HE CURRENT PLANNING PROJECT AIAIUCER PRIOR TO RUINING
MA AGE
AND BE HELD YEARS FROMIF THE
ECNSTRUCC EMEPSCUM
RT
0 of wARyHoC
CONNECTION ISENGINEERING EVA
D AS PVT BE ME DEVELOPMENT OF THE PARCEL TO MEEPRROVIDED
il.
TESTRIAN HE APPLICANT SHALL SUBMIT A REVISED DRAINAGE REPORT AND PUN IN COMPLANCE WITH CORE REQUIREMENT NO. 1. SPECIFICALLY, ME APPLICANT WOULD
,�
LEGACYRENTON
SURETY DEVICE WILL BE RELEASED. IF HE PEDESTRIAN CONNECTION IS NOT CONSTRUCTED PRIOR TO HE TERMINATION
BE REQUIRED TO REDESIGN THE DISCHARGE OF STORMWATER FROM THE SOWECT SITE TO THE NADLRA1 DISCHARGE LONDON i0 THE SOUTH. A DETENNON
NFe
IDA .�'y
OF HE TWO YEAR PERIOD, HE FUNDS WILL BE RELEASED TO HE CITY OF RENTON FOR HE CONSTRUCTION OF HE
VAULT OR DOWNSTREAM CAPACITY IMPROVEMENTS WOULD BE REQUIRED IF ME DOWNSTREAM CAPACITY IS NOT ADEQUATE AND/OR ME DIRECT DISCHARGE
LO
y
_
OWG FILENAgE
DESIGNED BY: DATE:
SCALE
JOB N0:
PEDESTRIAN CONNECTION
EXEMPTION CRITERIA IS NOT MET
130613-A9.DWG
JRC 11-04-2013
1"=20'
13-0623
18,
THE TA SHALL BE REVISED TO INCLUDE A BURLED TABLE FOR EACH PIPELINE PROJECT. ME REVISED TW SHALL BE SUBMITTED TO ME PUN REVIEWER
-� _
PRIOR TO ENGINEERING PERMIT APPROVAL
ARON
Y PRIOR TO
RMIT
ROVAL
2016)
LF' A ■■// YRS' T THT THE
E MPUCMT JECT WILL BE
SUBMIT A REVISEDED CTHE APPLfC4NT SMALL GUISE ME T WHICH PROPOSED
CD FOR
A DISCUENGINEERING
SION RDF THE EAV PEAK HHOURT MIP1 AAD /DR A ME HORIZON
JUSGIFIN110N FOR THE EXCLUSION OF
G V NON THE AM PEN( HOUR TRIPS FROV ME ANALYSIS ME REVISED M SHALL BE SURMITEO TO, AND APPROVE BY, THE PN REVIEWER PRIOR i0 ENGINEERING 12-15-2017
PERMIT APPROVAL.
y la