Loading...
HomeMy WebLinkAboutR-382035O N 00 cy) I C) I r) Lu r � r / Www \—p — AT BARS, CO • X Rl rn to �TT n N - A z —R/1N� m Rl v — _ �r T - r — T —T�T WA INGT _ CB— 42 I\ SE 1/4, SW 1/4, SEC, 05, T. 23 N., R.05E., W.M. KING COUNTY, WASIMVGTON T — T _ T J —TI$—r T] I m� o -� 8 I n II = \� Imp I � J 1" = 101 II II � coN �N 10 5 0 10 20 o I RI 00 co `o 0 ti J 70 V P z n C.� O � z m yy co n II � — —RAW— � p N V V r � r / Www \—p — AT BARS, CO • X Rl rn to �TT n N - A z —R/1N� m Rl v — _ �r T - r — T —T�T WA INGT _ CB— 42 I\ SE 1/4, SW 1/4, SEC, 05, T. 23 N., R.05E., W.M. KING COUNTY, WASIMVGTON T — T _ T J —TI$—r T] I -4 m� o -� 8 I n II = \� Imp I � Z 1" = 101 II II � coN �N 10 5 0 10 20 o I RI m 0 ti J -4 o I n ISCALE: 1" = 101 coN �N 10 5 0 10 20 o I RI m ti O O z n C.� O O m co — —RAW— rn L r .,,,�, —'"--W —W x •z I // w—www—Wr // • WWW 08 CORB CUT— \ rn B#3 C _ pSS s. , �t « _ I o / P ,t G « yst ,s «Rt t�\ tc x o 0 0 oo—D / dP / A 7 IN ,�_ P «�_t, / t ad « « G SS' e tt F%/«��««« ««t F « « « « < d o « t / b d SS « /t t t « « « t p« / d o ♦ �T� S �� « gt «e 7 / I d 6 d♦ _d / .. « «' t t t t . /« t t t t t • • t P e 1- Im d ♦♦ .. // o d. P SSS: P d B^ o P P P P F« BYPASSASS FLOW n i0 CB 2 0 0.6 MI[{ /« « «t: �_.a"pII'�G DRAININ 45A --------------L e Pvc ------ Gi «� I- �L PVC // H^Pvc-------� -- -- L / N� BRAIN 14 - 8 / r am P /DRAIN _m \� �)-RAIF-'Ir75 DRAIN 12 —ALM k7ft Ua 9) aF-ss– / I DRa A' n (�) / MG POLE« / I « • 1 • « . « « d �. o i N 6` P✓C i B" PVC - - - - - - - - - _ - // n d i FOOTING BRAIN ROOF DRAIN TO / / B" PVC « %« - I FROM INTERNAL PUMP C311 O 05 MIN / 6^ PVC / (SEE PLUMBING PLAN PO.P2 FOR PUMP SPECS AND CONNECTION) I281AIN / (SEE PLUMBING PIAN P.P. o CU#1 FOR CONNECTION) 91 A4f (M) IE: Ict& (AB) Know what's below. Call b.rora yml ala. NYWYCONFLICTNOTE." CAOTLON ME CONTRACTOR SHALL BE RESPONSIBLE FOR WRIMNC THE LOCATION DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING ME UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION THIS AND MEN SHALL INCLUDE CALLING UDUT' L00VE O 1-800-424-5555 POTHOLING ALL OF ME EXISTING URIITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTUDES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION TTT T I T — T — T T p p/i PP P 5 55 m ?X I CERTIFY THAT THE LOCATIONS AND ELEVATIONS SHOWN ON THE AS -BUILT PUNS FOR LBGACYRE114M SIGNED BY BRUN RALAS ARE BASED ON FIELD SURVEY LOCATIONS AND ELEVATIONS COMPLETED BY PACBI'CC0bTS0V= M IN JULY AND AUGUST OF 2017 AND PROVIDED TO IECO MR FINAL PLAIN PREPARATION. VA S R-382035 AS BUILT NOTES: 1. PLL PROPOSED CATCH BASINS ARE TYPE' WOH GRATED LOCKING LID UNLESS OTHERWSE SPECIFIED PER COR ST) 200.00 ANO INSTALLED PER COR SN 20200 2 OIL/WATER SEPARATOR SHALL BE LOCATED IN PARKING fARAGE. SEE PLUMBING PLN POP2 FOR LOCATION arv0 PLAN P5.0 FOR SPECIFMADON.