HomeMy WebLinkAboutR-398203M
M
O
ntO
O
r
A
LLI
IY
0
1—
Cn
U
J
J
LU
U)
I-__
U-1
GO
Z
W
Z
0
Z
W
ry
M
LU
W
W
CO
CD
TOP 349.9
IE 4" PER N 3489
I
f
i
I,
I
3
I-
-III IIII
III
I I-- —r
I �
I
ASPHALT
I
I �
e, I
y5U',
I
MOVE
EXTRUDED CURB ill,
CONCPAD
I S
opt. I I
yh '
CONC PAD
' INSTALL STRAW WATTLES a
ASPHALT PER DETAIL THIS SHEET II
ASPHALT
d
LOEXTRUDED
EMOVE------- _ REMOVE
CURB 34 __--
EXT NRUDED CURB"-
ROW DEDICATION
EMOVE (50 SF) M
___________ ---_---- STEEL
TO
(TIP
E UDED ELEPHONE re A HALTCONC.PAD r1P ,,SAWCUT & / \ 1D.64'Hao TRaP cGNGPAD IEa"PVIRMF3 PAVEMENT / 59p3."WW 344.65 FOR PHONEH2O IRON TRAP W 344.35%ASPHALT 4Lmj�-2-5-2-3 ----- ----- –yp 9– AD g
82.51' o
3---J4]-----154°38'21"E -
2.5' - POWER 90.01
a PAINT
-"-_-__--- INSTALL FILTERFB COPROTECTION x£ R ab
PER DETAI y SHEETcJiYP) 3sA s^A' cc
j ya
REMOVE SIDEWALK T
a /
O
EGIN REMOVE
a CURB & GUTTER M
SAWCUT &
REMOVE PAVEMENT
`y9 — SD SD
SOMH
OP ED ]
OCKE
CB
to J4Q4a. _..
PBGjJ neLC-
Land Planning • Civil Engineering
5130 South 166th Lane
SeaTac, WA 98188
T (206) 229-6422
11+00
Th — - SD — SD — SO Top
NE 10TH STREET LL
_SS
- SS zD SS . ' eP SS
JOB NO.
s R17370
I
AWCU & 3
EMOV PAV NT
NO REMOVE
JOINT 6
o 6URB & GUTTER
-- a
� I 3
� I
),9 3
DIRT i
I
3
\i I
SAWCUT&
II
11 X/ REMOVE Pj
BUS
ROVE
SID WALK
p
o�
yh
V
EROss
GNAL
STAND U
PIPE /
I
N SE DETAILTHIS
MH
( P 3493
Hao +/-1s..
N -S 343.6
— S1 SD
I
I
II 3
CROSS WALK
3
V
TI
, N
1
SD _T�I g � Sc
F
N
"____-_____-_"_.
v 3
10TH STA 10+00 = '^
CxaSS WALK UNSET STA 20+00
1N W
ZaN
N N
3 10+
5 O
SDMH
1 TDP 38.1
j ,ES LOCKED
Vl _a 3 I
LEGEND
PROPERTY LINE ia ADJACENT PROPERTY LINE
— — — — ROW CENTERLINE Know what's below.
— — ROW LINE Call before you dig.
HORIZONTAL GRAPHIC SCALE
100 5�
EROSION CONTROL NOTES: 1 inch - 10 f1
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER
UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLANS) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN
THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY
OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
B. ANY AREAS OF EXPOSED $OIL$, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH)
OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30TH) $HALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS E.G. SEEDING
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1ST AND MARCH 30TH INCLUSIVE,
UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE
WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TU, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12
HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1ST), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE
WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN
UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
WRhKK_ MM lees
HORQOMALNAD I"MW1
CITY OF
DATUM %R RENTON
IFuo~ONE INLH
el Planning/Building/Public Works Dept.
SCALE ACCORDINCIY
f
i
I
3
I-
-III IIII
III
I
wwvmciv.w,..®
I
I
a
®�
I
unnr
I
I
3
HETOR PNNG PROTCITON
=.P - Ewm
�
I I
I
I
I
I
3
I
I
I
3
�
I
WEIGHED
I
ILE
�uwuw `�o'i
roof nnmoia0�
�oem°MiEE
0
}1
196
I
N SE DETAILTHIS
MH
( P 3493
Hao +/-1s..
N -S 343.6
— S1 SD
I
I
II 3
CROSS WALK
3
V
TI
, N
1
SD _T�I g � Sc
F
N
"____-_____-_"_.
v 3
10TH STA 10+00 = '^
CxaSS WALK UNSET STA 20+00
1N W
ZaN
N N
3 10+
5 O
SDMH
1 TDP 38.1
j ,ES LOCKED
Vl _a 3 I
LEGEND
PROPERTY LINE ia ADJACENT PROPERTY LINE
— — — — ROW CENTERLINE Know what's below.
— — ROW LINE Call before you dig.
HORIZONTAL GRAPHIC SCALE
100 5�
EROSION CONTROL NOTES: 1 inch - 10 f1
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER
UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLANS) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN
THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY
OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
B. ANY AREAS OF EXPOSED $OIL$, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH)
OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30TH) $HALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS E.G. SEEDING
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1ST AND MARCH 30TH INCLUSIVE,
UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE
WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TU, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12
HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1ST), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE
WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN
UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
WRhKK_ MM lees
HORQOMALNAD I"MW1
CITY OF
DATUM %R RENTON
IFuo~ONE INLH
el Planning/Building/Public Works Dept.
SCALE ACCORDINCIY
U
W
O
O
O
(0
ii
7
R-398203 1W
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 10
SURFACE WATER UTILITY DEVELOPMENT ENGINEERING ()
rstraka 12/08/2017 JJustin Johnson 1212/2017 J
J
W
U)
DAM LU
RENTON SUNSET SHELL C-STORE1a-za-za1 z
2800 NE SUNSET BLVD FII
RENTON, WA 98056 PAGE: U)
ow NC Z
SITE PREPARATION AND C3 °
SHEET: or: Z
TESC PLAN AND DETAILS 3 5 U'
f
i
I-
-III IIII
III
wwvmciv.w,..®
®�
unnr
PVWAC INES
HETOR PNNG PROTCITON
=.P - Ewm
NAxcx ewx
U
W
O
O
O
(0
ii
7
R-398203 1W
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 10
SURFACE WATER UTILITY DEVELOPMENT ENGINEERING ()
rstraka 12/08/2017 JJustin Johnson 1212/2017 J
J
W
U)
DAM LU
RENTON SUNSET SHELL C-STORE1a-za-za1 z
2800 NE SUNSET BLVD FII
RENTON, WA 98056 PAGE: U)
ow NC Z
SITE PREPARATION AND C3 °
SHEET: or: Z
TESC PLAN AND DETAILS 3 5 U'
®�
unnr
la
WEIGHED
ILE
�uwuw `�o'i
roof nnmoia0�
�oem°MiEE
IEEE
ILL
RYM w�ITW
aA slia - aau
owORNS
:R
'evAiareNe
uAacx xow
U
W
O
O
O
(0
ii
7
R-398203 1W
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 10
SURFACE WATER UTILITY DEVELOPMENT ENGINEERING ()
rstraka 12/08/2017 JJustin Johnson 1212/2017 J
J
W
U)
DAM LU
RENTON SUNSET SHELL C-STORE1a-za-za1 z
2800 NE SUNSET BLVD FII
RENTON, WA 98056 PAGE: U)
ow NC Z
SITE PREPARATION AND C3 °
SHEET: or: Z
TESC PLAN AND DETAILS 3 5 U'