HomeMy WebLinkAbout4. Maple Highlands - HE Conditions - Final Plat Compliance MatrixMAPLE HIGHLANDS - PLAT CONDITIONS
CONFIRMATION OF COMPLIANCE
Condition Response
1)
The Applicant shall comply with the mitigation measures issued as part of the
Determination of Non -Significance Mitigated, dated January 11, 2019. APPLICANT IS IN COMPLIANCE WITH ALL CONSTRUCTION REQUIRMENTS ADDRESSED IN
SEPA DNS; ALL REQUIRED CITY IMPACT FEES TO BE PAID AT TIME OF BUILDING PERMIT
APPLICATION.
2)
The Applicant shall obtain a demolition permit and complete all required inspections for
the removal of the existing single- family residence and accessory structures prior to
Final Plat Recording.
COMPLETED UNDER APPROVED DEMO PERMIT(s) B22001285 (barn) AND B22001281
(house).
3)
The Applicant shall complete the Agreement to Cooperate in the Boundary Line
Adjustment Recording No. 20030310002076) prior to final plat recording to ensure all
boundary lines and lot dimensions are accurate in the final plat layout.
BLA AGREEMENT FROM RECORDING No. 20030310002076 established a permenant
easement; which now becomes Tract C. Tract C to be deeded to Owner of APN
1457500026. See copy of deed included to be recorded concurrently with Final Plat.
4)
The Applicant shall provide a minimum of ten feet ( 10') of on -site landscaping along all
public street frontages. A final detailed landscape plan, consistent with RMC 4- 8- 120
and RMC 4- 4- 070, shall be submitted to and approved by the Current Planning Project
Manager prior to issuance of the construction permits.
APPLICANT FULFILLED THIS CONDITION AS PART OF THE CITY OF RENTON APPROVED
MAPLE HIGHLANDS LANDSCAPE PLAN, SIGNED 9/30/2021 by Clark Close.
5)
The Applicant shall create a Homeowners' Association (" HOA") that maintains all
improvements and landscaping in the Storm Tract and any and all other common
improvements. A draft of the HOA documents shall be submitted to, and approved by,
the City of Renton Project Manager and the City Attorney prior to Final Plat recording.
Such documents shall be recorded concurrently with the Final Plat.
THE WASHINGTON SECRETARY OF STATE ISSUED THE ARTICLES OF INCORPORATION
CERTIFICATION TO THE MAPLE HIGHLANDS HOMEOWNER'S ASSOCIATION ON MARCH
28TH, 2022. CCR'S ARE INCLUDED WITH THIS SUBMITTAL. CCR'S NOTE HOA
RESPONSIBLE FOR LANDSCAPE MAINTENANCE AS REQUIRED.
6)
The Applicant shall retain all five ( 5) apple trees in the tree retention tract ( Tract B). A
final tree retention plan shall be submitted and approved by the Current Planning Project
Manager prior to issuance of the construction permits.
APPLICANT FULFILLED THIS CONDITION AS PART CITY OF RENTON APPROVED MAPLE
HIGHLANDS LANDSCAPE PLAN, SIGNED 9/30/2021 by Clark Close.
7)
The Applicant shall submit a final tree retention plan that is consistent with a final
arborist report. The final tree retention plan shall be submitted and approved by the
Current Planning Project Manager prior to issuance of the construction permits.
APPLICANT FULFILLED THIS CONDITION AS PART OF THE CITY OF RENTON APPROVED
MAPLE HIGHLANDS LANDSCAPE PLAN, SIGNED 9/30/2021 by Clark Close, SHEET 5 OF 41,
APPROVED CIVIL CONSTRUCTION PLANS DATED 10-1-2021.
All Recommended Conditions of Approval, numbered 1 through 20, as set forth on pages 18-20 of the HE Prelim Plat Decision Dated March 24, 2019, are included and
republished below as Conditions of Approval for the Maple Highlands Preliminary Plat.
8)
If frontage improvements on 164th Ave SE are not constructed from the intersection of
SE 132nd St and 164th Ave SE to the development than the Applicant shall ensure the
installation of fire sprinkler systems in all future homes located more than 500 feet from
162nd Ave SE, namely Lots 6- 10. If determined to be still be applicable by the Renton
Regional Fire Authority at the time of civil construction permit, the Applicant shall record
this sprinkler system requirement on the face of the final plat.
164th HAS BEEN CONSTRUCTED OUT TO INTERSECTION OF 132ND STREET; THEREFORE
FIRE SPRINKLERS ARE NOT REQUIRED AS PART OF PLAT/HOME CONSTRUCTION.
9)
A street lighting plan shall be submitted at the time of construction permit for review and
approval by the City' s Plan Reviewer prior to issuance of a construction permit
APPROVED "ILLUMINATION PLAN" PAGES "IL1" THROUGH "IL4" OF CIVIL
CONSTRUCTION PLANS, SIGNED BY CITY ENGINEER 10-1-2021, AND TRANSPORTATION
OPERATION "C BARNES" ON 10/6/2021. ALL STREET LIGHTS HAVE BEEN INSTALLED,
POWERED, AND INSPECTED AS OF THIS SUBMITTAL.
10)
Any proposal to convert the stormwater vault within Tract A to a stormwater detention
pond shall be considered a Major Plat Amendment subject to the requirements outlined
under RMC 4- 7- 080.M.2. TRACT 'A' REMAINED A STORMWATER VAULT.
11)
The proposed stormwater vault within Tract A shall be located entirely below ground.
Engineered construction plans showing the vault entirely below ground shall be
submitted at the time of Construction Permit review for review and approval.
ENTIRETY OF VAULT IS BELOW GROUND, PER APPROVED CIVIL CONSTRUCTION PLANS,
SIGNED 10/1/2021 BY CITY OF RENTON. PER FINAL COR ACCEPTANCE (2/15/24).
12)
The Applicant shall provide a plan showing existing and proposed improvements to
create a safe route from the project site to the future bus stop determined by Issaquah
School District or documentation from the Issaquah School District that an additional
stop will be added on the project site. The proposal for a safe route to all three schools
would be subject to review and approval by the Current Planning Project Manager during
construction permit application review.
THE APPLICANT'S ENGINEER OF RECORD SUBMITTED AN OFFSITE SCHOOL WALKWAY
PLAN ON 09/14/2021, IT WAS APPROVED BY CITY OF RENTON PLANNING STAFF.
13)All road names shall be approved by the City and the Applicant shall install all necessary
street name signs prior to final plat approval.
CITY OF RENTON TO CONFIRM ROAD NAMES. APPLICANT TO INSTALL ALL NECESSARY
STREET SIGNS PRIOR TO FINAL PLAT APPROVAL.
14)
Sanitary sewers shall be provided by the developer at no cost to the City and designed in
accordance with City standards. Side sewer lines shall be installed eight feet ( 8) into each
lot if sanitary sewer mains are available, or provided with the subdivision development.
CONSTRUCTED AS APPROVED IN CIVIL CONSTRUCTION PLANS, SIGNED BY CITY
ENGINEER 10-1-2021, PER FINAL COR ACCEPTANCE (2/15/24).
15)
Concrete permanent control monuments shall be established at each and every
controlling corner of the subdivision. Interior monuments shall be located as determined
by the Department. All surveys shall be per the City of Renton surveying standards. All
other lot corners shall be marked per the City surveying standards. The subdivider shall
install all street name signs necessary in the subdivision.
CONCRETE CONTROL MONUMENTS WILL BE BONDED PRIOR TO PLAT RECORDING. ALL
SURVEYING WILL CONFORM TO CITY OF RENTON SURVEY STANDARDS. ALL LOT
CORNERS HAVE BEEN MARKED PER COR STANDARDS. STREET SIGNS WILL BE PLACED BY
DEVELOPER.
16)
All utilities designed to serve the subdivision shall be placed underground. Any utilities
installed in the parking strip shall be placed in such a manner and depth to permit the
planting of trees. Those utilities to be located beneath paved surfaces shall be installed,
including all service connections, as approved by the Public Works Department. Such
installation shall be completed and approved prior to the application of any surface
material. Easements may be required for the maintenance and operation of utilities as
specified by the Public Works Department.
CONSTRUCTED AS APPROVED PER CIVIL CONSTRUCTION PLANS, SIGNED BY CITY
ENGINEER 10-1-2021, PER COR FINAL ACCEPTANCE (2/15/24).
17)
Any cable TV conduits shall be undergrounded at the same time as other basic utilities
are installed to serve each lot. Conduit for service connections shall be laid to each lot
line by subdivider as to obviate the necessity for disturbing the street area, including
sidewalks, or alley improvements when such service connections are extended to serve
any building. The cost of trenching, conduit, pedestals and/or vaults and laterals as well
as easements therefore required to bring service to the development shall be borne by
the developer and/or land owner. The subdivider shall be responsible only for conduit to
serve his development. Conduit ends shall be elbowed to final ground elevation and
capped. The cable TV company shall provide maps and specifications to the subdivider
and shall inspect the conduit and certify to the City that it is properly installed.
CONSTRUCTED AS APPROVED PER CIVIL CONSTRUCTION PLANS, SIGNED BY CITY
ENGINEER 10-1-2021, PENDING FINAL ACCEPTANCE.
18)
All lot corners at intersections of dedicated public rights -of -way, except alleys, shall
have minimum radius of fifteen feet ( 15'). CONSTRUCTED AS APPROVED PER CIVIL CONSTRUCTION PLANS, SIGNED BY CITY
ENGINEER 10-1-2021, PER FINAL COR ACCEPTANCE (2/15/24).
19)
The water distribution system including the locations of fire hydrants shall be designed
and installed in accordance with City standards as defined by the Department and Fire
Department requirements.
CONSTRUCTED AS APPROVED PER CIVIL CONSTRUCTION PLANS, SIGNED/APPROVED BY
REGIONAL FIRE AUTHORITY 9/30/2021, PER FINAL COR ACCEPTANCE (2/15/24).
20)
The Applicant would be required to install a temporary Type III barricade between City of
Renton right-of-way (ROW) and King County ROW ( south end of 164th Ave SE). In
addition, the Applicant install a fence at the south end of 164th Ave SE ( at the south
property line extended) to further restrict southbound vehicular traffic on 164th Ave SE
at the SE 134th St line. The fence shall include an opening as determined necessary by
City staff to allow for the passage of pedestrians. The barricade and fence shall be
installed prior to final plat approval.
TYPE III BARRICADE SHOWN ON APPROVED CIVIL CONSTRUCTION PLANS, Sheet 11 of 41,
SIGNED BY CITY OF RENTON ENGINEER 10-1-2021; TO BE CONSTRUCTED AFTER
GRIND/OVERLAY OF OFFSITE SEWER ON 135TH, PRIOR TO FINAL LIFT. PER FINAL COR
ACCEPTANCE (2/15/24).