Minor Franchise Permit: MFP24000539
IVR Number: 24000539
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/05/2024Application Date:7221400421Parcel Number: 422 RENTON AVE S
Permit Type:03/13/2024Issue Date:Franchise
Permit Work Class:03/13/2025Expiration Date:Minor Utility
Job Number: 101152464Franchise Type:Electric
Description: Puget Sound Energy Electric AT EXISTING P01 (317712 166212) CREW TO INSTALL TRANSFORMER AND
SWITCH ON EXISTING POLE. CREW TO REMOVE SERVICE POLE AT P02 AND INSTALL NEW POLE ON PRIVATE
PROPERTY. CREW WILL INSTALL OH WIRE FROM EXISTING P01 TO P02 AND RETIRE EXISTING OH SPAN FROM
P01 P02. CREW TO INSTALL TRANSFORMER ON P02. NO HS CUTS. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101152464
422 RENTON AVE S
DAVID ZETTERBERG 206-531-5841
MFP24000539
Scott Warlick CED 3/13/2024
Monday - Friday 8:00AM - 3:00PM
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
P01
P02
ROAD
WORK
AHEAD
W20-1
ROADWORKAHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROADWORKAHEAD
W20-1
ONE LANE
ROADAHEAD
CW20-4
ONE LANEROADAHEAD
CW20-4
BE PREPAREDTO STOP
W20-7b
BE
PREPAREDTO STOP
W20-7b
W20-7A
W20-7A
W20-7A
W20-7ARenton Ave SRenton Ave SRenton Ave SB
e
a
c
o
n
W
ay
S
B
e
a
c
o
n
W
ay
S
OFFICE: 800-343-4049CELL:425.290.2577
WATCP@KNDSERVICES.NET
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
David Brinkman
253-234-6445
06.22.22
DESIGNED BY: BRANDON CALLIHAM
WSTCS#012803
511348125
PSE
422 Renton Ave S
Renton,Wa
BRANDON CALLIHAM
Legend
Cone
ONE LANEROADAHEAD CW20-4 one lane road ahead
Flagger
Pole
ROADWORKAHEAD W20-1 road work ahead
W20-7A Flagger Ahead
BE PREPAREDTO STOP W20-7b be prepared to stop
Work Area
Manifest
16 x Cone
4 x W20-1 road work ahead
4 x W20-7A Flagger Ahead
2 x CW20-4 one lane road ahead
2 x W20-7b be prepared to stop
1 x high visibility flag target
1 x Sign
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
K&D Services, as the preparer of this traffic
control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
NOT TO SCALE
N
S
EW
NOTIFY EMS, FIRE
AND POLICE
72 HOURS IN ADVANCE
www.invarion.com
MFP24000539
317711-166232
25 kVA 120/240V (B)
±60'
CUST. PROVIDED 1-3" SCH40 CONTINUOUS PVC
CONDUIT ±60' IN CUST. PROVIDED TRENCH
PSE INSTALL 1-RUN 4/0 UG TPLX, ±95' IN
CUST. INSTALLED SCH40 CONDUIT
CUST. PROVIDED
4' X 4' WORKPIT
CUST. PROVIDED 3/4 CU. YD. OF SAND
CUST. PROVIDED
4' X 4' WORKPIT
350
410
356
412
416
420419
411
415
424
428
1304
1308#6CU317711-166232
25 kVA 120/240V (B)
B
317712-166212
37.5 kVA (B)
ERROR-SET SWITCH ID (25T)
SLAT5475
ACCESS ROADRENTON AVE SBEACON WAY
SGRA16"422"#6CU#6CUEOP10'ACCESS ROAD
RENTON AVE SROW 10'#6CUS/W 5'S/W 5'
EOP 26'
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Nu Ho
422 Renton Ave S
Renton, WA 98057
Nu Ho 206.401.9000
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"101152464THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101152464511348125
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-16
4/2022
144 162 144
-1.43 -
144 163.43 144
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
D. ZETTERBERG 206-531-5841 4/5/22
D. BRINKMANN 206-794-8599 4/7/22
D. BRINKMANN -4/11/22
RW-126903 RENTON
NU HO SFR
INST. PRI. OH SPAN, REPL POLE W/OH XFMR, NEW OH/UG SVC
422 RENTON AVE S, RENTON 98057
N/A N/A
N/A 101152464
AS NOTED 1/1
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.SW17 N/A N/A
2305E067 2305E088 2305E067 GRA-16
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SCALE: NONE
CABLE & CONDUIT DIAGRAM
SITE SPECIFIC NOTES:
P01 - EXISTING #317712-166212
-EXISTING POLE AND EQUIPMENT TO REMAIN
-INSTALL (1) 12kV DEADEND POLE-MTD 2ACSR 6016.1000 (DEDR21P)
- INSTALL (1) SWITCH C/O 1PH LD INT 6022.1000 (DLS115F)
- INSTALL (1) L/B C/O, FUSE @ 65T (3412600)
P02 - EXISTING #317711-166232
-EXISTING 30' CL 1969 SECONDARY POLE TO BE REMOVED
-INSTALL (1) 45' CL3 DISTRIBUTION POLE W/GROUNDS AS STAKED 6010.1000 (PD453)
- INSTALL (1) 1Ø 25 kVA 120/240v XFMR, TAP A PHASE 6025.1000 (TRFNXF)
-INSTALL (1) L/B C/O, FUSE @ 10T (MID:3412300)
- INSTALL (1) STIRRUP & HOT CLAMP
-INSTALL (1) 1-3" RISER ON NEW S/O BRACKETS 6042.1000 (RIS3CSS)
- INSTALL (1) DOWN GUY 3/8 ANCHOR W/ AUTO GRIP, NEUTRAL 6013.0100 (GYD3SAN)
- INSTALL (1) ANCHOR SINGLE HELIX 10' (W)6012.1000 (ANDH1)
- TRANSFER EXISTING 3" RISER
M01 - METER BASE
-INSTALL (1) 200 AMP METER
SPAN NOTE:
-SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS
-PROVIDE A 4' X 4' WORK PIT AT P02.
-PROVIDE A 4' X 4' WORK PIT & 2/3 CU. YD. OF SAND AT M01.
TRENCHING & CONDUIT
-INSTALL ±90' OF 1-3" SCH'L 80 GRAY PVC CONDUIT FROM V01 TO M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT
ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
CIRCUIT FEED ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3,000 SQ.
200AMPS
GAS
9.8 kW
115A
1.5%
3.5%
00 1"2"
00 50'100'
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
37.5kVA 120/240v
6211300
P02
317711-166232
SITE PLAN
SCALE: 1" = 50'
POWER GENERAL NOTES - RESIDENTAL PROJECT
1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY
DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON
THE FOREMANS' COPY.
2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT
MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE.
3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO
COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED.
4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT,
POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE
APPROVED BY THE PROJECT MANAGER.
5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR
CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS,
BEFORE WORK CAN BEGIN.
6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE.
7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET
FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE
BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS
ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN
THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM, OR AS REQUIRED BY YOUR LOCAL
MUNICIPALITY.
8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS
AS APPLICABLE.
9.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES.
10.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS,
COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE
COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S
SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL
SIDE SLOPE THE TRENCH TO 1:1.
JOB SITE
JOB SITE
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
David.Zetterberg@pse.com
(206) 531-5841
David Zetterberg
PARTIAL PLAN DETAIL
SCALE: 1" = 20'
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
Wk
Loc
Pole Data Pole
TEL TV FIBER TRAN RMVD ID NUMBER
Grid #Length Class Year TOPPED RMVD
P02 317711-166232 30 CL-3 1969
WIRE STRINGING
PRIMARY & SECONDARY
Location
Usage Wire Size & Type
Quantity
of wires
Length
(per wire)TotalFromTo
P01 P02 P PRI #2 ACSR 3 185'3
WIRE REMOVAL TABLE
Work
Location Wire Size & Type Quantity
Length
(per
conductor)
Remarks
From To
P01 P02 SEC OH 1/O TPX 1 185'
POLE TABLE (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 317711-166232 45 CL-3
SECONDARY CABLE & CONDUIT TABLE
Work
Location
Cable Conduit
Voltage
Drop
Voltage
Flicker
As Built Information
Size Length
Design
(ft)
Size Length
Design
(ft)
Bends Foreman - Complete
FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P02 SEC 350 UG
TPX 108'3"70'1 0 0 0 --N.A.%
MFP24000539
101152464THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
D. ZETTERBERG 206-531-5841 4/5/22
D. BRINKMANN 206-794-8599 4/7/22
D. BRINKMANN -4/11/22
RW-126903 RENTON
NU HO SFR
INST. PRI. OH SPAN, REPL POLE W/OH XFMR, NEW OH/UG SVC
422 RENTON AVE S, RENTON 98057
N/A N/A
N/A 101152464
AS NOTED 2/2
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.SW17 N/A N/A
2305E067 2305E088 2305E067 GRA-16
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
CUSTOMER-SUPPLIED SERVICE TRENCH
TV & TEL Electric Service Cable in 3" Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
12" Min
in Conduit
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
12" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
UTILITY POLE EROSION CONTROL DETAIL
Not to scale Adjacent to flowing ditches or bodies of water
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200TOP VIEW
FLOWING DITCH or BODY OF WATER
SLOPESLOPE
SECURE BOTTOM OF FENCE
WITH GRAVEL BAGS
PLACE STRAW MULCH
ON DISTURBED AREA
INSTALL SILT
FENCE AROUND
POLE EXCAVATION
EXCAVATED OR
AUGERED HOLE
POLE
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" Min
CL
Direction of Vehicular TrafficCL
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
CONDUIT RISER PLACEMENT DETAIL (P02)
SCALE:NONE
4'x4' Work Pit
SERVICE LINE(UTILITY OWNED)
SERVICE MASTCONNECTION POINT
26'
17-1/2'
12'13'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,
DRIVEWAYS, AND PARKING AREAS
RESIDENTIAL PROPERTY
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
Gas Mtr
Elec. Mtr Base
12" Min 36" Typical
24" to 36" Max
Conduit Depth
Power Cable Conduit
Customer Provided
3" Schedule 40 Grey PVC
Regulator Vent
Utility-Provided
Gas Meter Assembly
Min
36"
Customer Provided
Conduit Stakes
48"
48"
3" Conduit Service Riser
from Gas Service Lines
12" Minimum Clearance
Customer Provided
Drainage Pipe
Work Pit Dimensions
Electric & joint Utility
MTR BASE DETAIL
SCALE: NONE
Top View4'3'4'
24"
32"
Typical
Min.
18" MIN
18" MIN
4' MIN6' MAX
5' PREFERRED
6" MIN6' MAX
3' MIN
3' MIN
Neare
s
t
S
i
d
e
W
a
l
l
or Ob
s
t
r
u
c
t
i
o
n
An
y
O
b
s
t
r
u
c
t
i
o
n
Ab
o
v
e
M
e
t
e
r
CT
E
n
c
l
o
s
u
r
e
Working SpaceMETER & CT Clearances
SCALE: NONE
MFP24000539