HomeMy WebLinkAboutMFP24000539.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24000539 IVR Number: 24000539 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/05/2024Application Date:7221400421Parcel Number: 422 RENTON AVE S Permit Type:03/13/2024Issue Date:Franchise Permit Work Class:03/13/2025Expiration Date:Minor Utility Job Number: 101152464Franchise Type:Electric Description: Puget Sound Energy Electric AT EXISTING P01 (317712 166212) CREW TO INSTALL TRANSFORMER AND SWITCH ON EXISTING POLE. CREW TO REMOVE SERVICE POLE AT P02 AND INSTALL NEW POLE ON PRIVATE PROPERTY. CREW WILL INSTALL OH WIRE FROM EXISTING P01 TO P02 AND RETIRE EXISTING OH SPAN FROM P01 P02. CREW TO INSTALL TRANSFORMER ON P02. NO HS CUTS. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101152464 422 RENTON AVE S DAVID ZETTERBERG 206-531-5841 MFP24000539 Scott Warlick CED 3/13/2024 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01 P02 ROAD WORK AHEAD W20-1 ROADWORKAHEAD W20-1 ROAD WORK AHEAD W20-1 ROADWORKAHEAD W20-1 ONE LANE ROADAHEAD CW20-4 ONE LANEROADAHEAD CW20-4 BE PREPAREDTO STOP W20-7b BE PREPAREDTO STOP W20-7b W20-7A W20-7A W20-7A W20-7ARenton Ave SRenton Ave SRenton Ave SB e a c o n W ay S B e a c o n W ay S OFFICE: 800-343-4049CELL:425.290.2577 WATCP@KNDSERVICES.NET CUSTOMER: CONTACT: LOCATION: DATE:W/O # David Brinkman 253-234-6445 06.22.22 DESIGNED BY: BRANDON CALLIHAM WSTCS#012803 511348125 PSE 422 Renton Ave S Renton,Wa BRANDON CALLIHAM Legend Cone ONE LANEROADAHEAD CW20-4 one lane road ahead Flagger Pole ROADWORKAHEAD W20-1 road work ahead W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop Work Area Manifest 16 x Cone 4 x W20-1 road work ahead 4 x W20-7A Flagger Ahead 2 x CW20-4 one lane road ahead 2 x W20-7b be prepared to stop 1 x high visibility flag target 1 x Sign PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE www.invarion.com MFP24000539 317711-166232 25 kVA 120/240V (B) ±60' CUST. PROVIDED 1-3" SCH40 CONTINUOUS PVC CONDUIT ±60' IN CUST. PROVIDED TRENCH PSE INSTALL 1-RUN 4/0 UG TPLX, ±95' IN CUST. INSTALLED SCH40 CONDUIT CUST. PROVIDED 4' X 4' WORKPIT CUST. PROVIDED 3/4 CU. YD. OF SAND CUST. PROVIDED 4' X 4' WORKPIT 350 410 356 412 416 420419 411 415 424 428 1304 1308#6CU317711-166232 25 kVA 120/240V (B) B 317712-166212 37.5 kVA (B) ERROR-SET SWITCH ID (25T) SLAT5475 ACCESS ROADRENTON AVE SBEACON WAY SGRA16"422"#6CU#6CUEOP10'ACCESS ROAD RENTON AVE SROW 10'#6CUS/W 5'S/W 5' EOP 26' N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Nu Ho 422 Renton Ave S Renton, WA 98057 Nu Ho 206.401.9000 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"101152464THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101152464511348125 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-16 4/2022 144 162 144 -1.43 - 144 163.43 144 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE D. ZETTERBERG 206-531-5841 4/5/22 D. BRINKMANN 206-794-8599 4/7/22 D. BRINKMANN -4/11/22 RW-126903 RENTON NU HO SFR INST. PRI. OH SPAN, REPL POLE W/OH XFMR, NEW OH/UG SVC 422 RENTON AVE S, RENTON 98057 N/A N/A N/A 101152464 AS NOTED 1/1 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.SW17 N/A N/A 2305E067 2305E088 2305E067 GRA-16 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: NONE CABLE & CONDUIT DIAGRAM SITE SPECIFIC NOTES: P01 - EXISTING #317712-166212 -EXISTING POLE AND EQUIPMENT TO REMAIN -INSTALL (1) 12kV DEADEND POLE-MTD 2ACSR 6016.1000 (DEDR21P) - INSTALL (1) SWITCH C/O 1PH LD INT 6022.1000 (DLS115F) - INSTALL (1) L/B C/O, FUSE @ 65T (3412600) P02 - EXISTING #317711-166232 -EXISTING 30' CL 1969 SECONDARY POLE TO BE REMOVED -INSTALL (1) 45' CL3 DISTRIBUTION POLE W/GROUNDS AS STAKED 6010.1000 (PD453) - INSTALL (1) 1Ø 25 kVA 120/240v XFMR, TAP A PHASE 6025.1000 (TRFNXF) -INSTALL (1) L/B C/O, FUSE @ 10T (MID:3412300) - INSTALL (1) STIRRUP & HOT CLAMP -INSTALL (1) 1-3" RISER ON NEW S/O BRACKETS 6042.1000 (RIS3CSS) - INSTALL (1) DOWN GUY 3/8 ANCHOR W/ AUTO GRIP, NEUTRAL 6013.0100 (GYD3SAN) - INSTALL (1) ANCHOR SINGLE HELIX 10' (W)6012.1000 (ANDH1) - TRANSFER EXISTING 3" RISER M01 - METER BASE -INSTALL (1) 200 AMP METER SPAN NOTE: -SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL DEVELOPER & CUSTOMER NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS -PROVIDE A 4' X 4' WORK PIT AT P02. -PROVIDE A 4' X 4' WORK PIT & 2/3 CU. YD. OF SAND AT M01. TRENCHING & CONDUIT -INSTALL ±90' OF 1-3" SCH'L 80 GRAY PVC CONDUIT FROM V01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. CIRCUIT FEED ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,000 SQ. 200AMPS GAS 9.8 kW 115A 1.5% 3.5% 00 1"2" 00 50'100' N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6211300 P02 317711-166232 SITE PLAN SCALE: 1" = 50' POWER GENERAL NOTES - RESIDENTAL PROJECT 1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON THE FOREMANS' COPY. 2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE. 3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED. 4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT, POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE APPROVED BY THE PROJECT MANAGER. 5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS, BEFORE WORK CAN BEGIN. 6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE. 7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM, OR AS REQUIRED BY YOUR LOCAL MUNICIPALITY. 8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS AS APPLICABLE. 9.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. 10.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS, COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL SIDE SLOPE THE TRENCH TO 1:1. JOB SITE JOB SITE E-Mail: Cell Phone: Project Manager Contact Information: Manager: David.Zetterberg@pse.com (206) 531-5841 David Zetterberg PARTIAL PLAN DETAIL SCALE: 1" = 20' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS Wk Loc Pole Data Pole TEL TV FIBER TRAN RMVD ID NUMBER Grid #Length Class Year TOPPED RMVD P02 317711-166232 30 CL-3 1969 WIRE STRINGING PRIMARY & SECONDARY Location Usage Wire Size & Type Quantity of wires Length (per wire)TotalFromTo P01 P02 P PRI #2 ACSR 3 185'3 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P02 SEC OH 1/O TPX 1 185' POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02 317711-166232 45 CL-3 SECONDARY CABLE & CONDUIT TABLE Work Location Cable Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P02 SEC 350 UG TPX 108'3"70'1 0 0 0 --N.A.% MFP24000539 101152464THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE D. ZETTERBERG 206-531-5841 4/5/22 D. BRINKMANN 206-794-8599 4/7/22 D. BRINKMANN -4/11/22 RW-126903 RENTON NU HO SFR INST. PRI. OH SPAN, REPL POLE W/OH XFMR, NEW OH/UG SVC 422 RENTON AVE S, RENTON 98057 N/A N/A N/A 101152464 AS NOTED 2/2 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.SW17 N/A N/A 2305E067 2305E088 2305E067 GRA-16 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CUSTOMER-SUPPLIED SERVICE TRENCH TV & TEL Electric Service Cable in 3" Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. UTILITY POLE EROSION CONTROL DETAIL Not to scale Adjacent to flowing ditches or bodies of water FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200TOP VIEW FLOWING DITCH or BODY OF WATER SLOPESLOPE SECURE BOTTOM OF FENCE WITH GRAVEL BAGS PLACE STRAW MULCH ON DISTURBED AREA INSTALL SILT FENCE AROUND POLE EXCAVATION EXCAVATED OR AUGERED HOLE POLE Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P02) SCALE:NONE 4'x4' Work Pit SERVICE LINE(UTILITY OWNED) SERVICE MASTCONNECTION POINT 26' 17-1/2' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE Gas Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" 3" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility MTR BASE DETAIL SCALE: NONE Top View4'3'4' 24" 32" Typical Min. 18" MIN 18" MIN 4' MIN6' MAX 5' PREFERRED 6" MIN6' MAX 3' MIN 3' MIN Neare s t S i d e W a l l or Ob s t r u c t i o n An y O b s t r u c t i o n Ab o v e M e t e r CT E n c l o s u r e Working SpaceMETER & CT Clearances SCALE: NONE MFP24000539