Minor Franchise Permit: MFP24000936
IVR Number: 24000936
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/27/2024Application Date:3342102710Parcel Number: 1012 N 34TH ST
Permit Type:03/13/2024Issue Date:Franchise
Permit Work Class:03/13/2025Expiration Date:Minor Utility
Job Number: 101171556Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO INSTALL AN OH TO UG CONVERSION SERVICE. CREW TO
DIRECTIONALLY BORE FROM EXISTING P01 (319366 166132) TO BP1 AND AND FROM BP1 TO METER. POTHOLE
ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101171556
1012 N 34TH ST
RUBY OTIS 2533956961
MFP24000936
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 3/13/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
1012 N 34th St Renton WA 98056 USAP01BP1STOPSTOPW20-1ROAD
WORK
AHEAD W20-4ONE LANE
ROADAHEADX'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7A11111111PARK AVE NBURNETT AVE NN 34TH STRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS ALONG WORK AREANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVSultan Wakid(425)424-6658sultan.wakid@pse.com1 OF 11012 N 34TH ST, RENTON, WA0 51410365802/13/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hoursas per jurisdictional requirements. (Generallybetween 9 a.m. and 4 p.m. on non-arterials andfrom 9 a.m. to 3 p.m. on arterials. If night timework is approved, Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITTRENCHMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658MFP24000936
10111101102110181104102310061012100192891992211051029101910151003100710111009N 34TH STD/W319366-16613237.5 kVA (A)EOP22'ROW50'319366-16614725 kVA (B)SLAH4798319366-166132CUSTOMER SUPPLIED4' X 6' RCV PITCUSTOMER SUPPLIED4' X 6' BORE PITCUSTOMER SUPPLIED3/4" CUBIC YARD SANDCUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED & INST.1-3" RED POLY DISCON. CONDUIT ±90'CUSTOMER SUPPLIED & INST.1-3" SCH. 40 DISCON. CONDUIT ±35'±90'±35'90°R=48"POWER GENERAL NOTES - RESIDENTIAL PROJECTNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/AOVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILECUSTOMER-SUPPLIED SERVICE TRENCHARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASECKTDATEEX_AEX_BEX_CNEW_ANEW_BNEW_CTTL_ATTL_BTTL_CMETERPerm. ServiceSuperiorORDER#NOTIF#PWRPROJECT PHASE3002559618108153881FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.10.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.9.PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"101171556THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)101171556UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPRUBY OTISN/AN/AJAMES WORKMANN/AN/AN/AN/AN/AJAMES WORKMANN/AN/AN/ARENTONVOYAGER SFRSIMPLE SVC TO 320A PANEL1012 N 34TH ST RENTON, WA, 98056N/AN/AN/A101171556AS NOTED1/1KINGN/AN/ACSPSKEPMN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A514103658E-Mail:Cell Phone:Project Manager Contact Information:Manager:RUBY OTIS(253) 243-4463RUBY.OTIS@PSE.COMLRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:4620 SQ FT320 AMPSELECTRIC27 KW140 A3.9%3.5%001"2"0050'100'CIRCUIT FEET ADDED: 0' TRENCH DETAILElectric Service Cable in Conduit (NTS)Electric Service Cable in ConduitExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCover12" Typical(6" Min)Backfill for ConduitFree of rockslarger than 8"in diameter)36" MINIMUM COVERIN RIGHT OF WAYTo Excavated Dirt Pile3" Schedule 40 Grey PVCBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200Field FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficTOP VIEWStandoff Bracket15" Min LengthConduit ClampConduitCONDUIT RISER PLACEMENT DETAIL (P01)SCALE: NONE4'x4' Work PitSECONDARY CABLE & CONDUIT TABLEWorkLocationCableConduitVoltageDropVoltageFlickerAs Built InformationSizeLengthDesign(ft)SizeLengthDesign(ft)BendsForeman - CompleteFROMTO(1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)P01M01SEC 350 UGTPX1703"130'10003.9%3.5%CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 6' BORE START PIT AT P01.-REQUIRED TO PROVIDE 4’ X 6’ BORE RCV PIT AT BP1.-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01.TRENCHING & CONDUIT.-BORE & INSTALL ± 90' OF 1-3" RED POLY PVC CONDUIT FROM P01 TO BP1.-TRENCH & INSTALL ± 35' OF 1-3" SCH 80 GRAY PVC CONDUIT FROM BP1 TO M01.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUIT.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .SITE SPECIFIC NOTESAT P01: 319366-166132-EXISTING 40' CL UNK 1985 POLE TO REMAIN-INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP BØ (MID: 2254000 & 2153100)-INSTALL (1) 3" SECONDARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS)M01 AT "1012": NEW METER BASE-INSTALL 320A METERSPAN SPECIFIC NOTES-SEE SITE PLAN, ONE-LINE DRAWING AND TABLES FOR NEW INSTALLSSITE PLANSCALE: 1" = 50'SCALE: NONEPRIMARY UNDERGROUND ONE-LINE DIAGRAM4" POLYElectric Service Cable in ConduitFinal GradeReceiving Pits will be excavated24" Typical(12" Min)36" MinCoverBackfill w/Will maintain 36" Min. depth while directional drilling36" MinDepthFinal Grade24" Typical(12" Min)6' LongBORE PIT DETAILNOT TO SCALEusing Vac Truck method.crushed rock 5/8 minusPLAN VIEWBackfill shall not damage the conduit.TYPICAL BORE COVERPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDSMFP24000936