HomeMy WebLinkAboutR-4000010
0
0
.i
CITY OF RENTON
RENTON MUNICIPAL AIRPORT/CLAYTON SCOTT FIELD
AIRPORT STAFF
Airport Manager - Ryan Zulauf
Assistant Airport Manager - Jonathan Wilson
TAXIWAY B SYSTEM REHABILITATION
NORTH PORTION RECONSTRUCTION
AND AIRFIELD SIGNAGE MODIFICATIONS
FEDERAL AVIATION ADMINISTRATION
AIP NO. 3-53-0055-023
JUNE 28, 2012
Sheet Index
01.0
COVER SHEET AND GHEET INDEX
01.1
LEGEND AND ABBREWATIONS
01.2
PMAOT LAYOUT PLAN
01.8
BURVEY CONTROL AND LAYOUT PLAN
01.4
PROWECT SAFETY AND PHASING PLAN PHAN I
REND MIDDLETON
;'
01.7
PROJECT SAFETY AND BIOMASS PHASING PLAM
01.8
STAGING, TRAFFIC CONTROL AND SAFETY NOTES
`"'
AND MTAILG
GLI
TEMPORARY EROSION CONTROL PLAN
(MILE
EROSION CONTROL NOTED AND DETAILS
SEE
PAVEMENT REMOVAL AND DEMOLITION PLAN
01.1
TAXIMAY 0 PLAN AND PROFILE
C1.2
TAXIWAY a PLAN AND PROFILE
C1.8
TAXIWAY 8 PLAN AND PROFILE
0.4
TAXIWAY 8 PLAN AND PROFILE
C1.5
TAXIWAY 8 PLAN AND PROFILE
C1.6
TAXIWAY L AND TAXIWAY M PLAN AND PROFILE
C1.7
PAYING SECTIONS AND DETAILS
DELI
TYPICAL TAXIWAY GROSS SECTIONS
DOLE
TYPICAL TAXIWAY CROSS SECTIONS
CL3
TYPICAL TAXIWAY CROSS SECTIONS
C&I
DRAINAGE DETAILS
DEG
DRAINAGE DETAILS
C&S
DRAINAGE DETAILS
R-400001
REND MIDDLETON
;'
`"'
"""`"TMAUUN'""ILS
Ob.l
TA%IWAY EDGE UGHTINO PLAN
%\ Q
Cb.Q
TA%IWAY EDOE UGHTINO PLAN
Project Manager
- Karla Kendall, PE
rwi
% d%
}\�, na
t
C6.8
C6.1
TA%IWAY EDGE UGHTINO SCHEDULES AND DETAILS
AIRPORT EMPHASIS MAN
¢
t tl #
cbs
AIRPORT EMPHASIS MAN
Project Engineer
- Mike Creeden, PE
/ ° w
I
c0.8
SIGNAGE SCHEDULE
06.4
BIBMABE SCHEDULE
FENCE DETAILS
Project Designer
- Wade BrooksC7.1
07.2
GENERATOR AREA LAYOUT PLAN
ENIIN7X
ELI
ELECTRICAL SYMBOLS AND ABBREVIATIONS
EIA
AIRPORT SITE PLAN
MET
TAXIWAY ! DEMOLITION PLAN (1 OF 0
Q
\
GAS
SEE
TAXIWAY B DEMOLITION PLAN IS OF 6)
TAXIWAY C DIMMITION PLAN (8 OF 6)
SEA
TAXIWAY B DEMOLITION MAN M OF 6)
/
SEE
TAXIWAY C DEMOLITION PLAN (6 OF 6)
N
B
E8.1
TAXIWAY E CONSTRUCTION PLAN (1 OF W
E3.2
TAXIWAY B CONSTRUCTION MAN @ OF 6)
IIfY}
b oT PROJECT
A
EAE
TAXIWAY! CONSTRUCTION MAN (s OF 6)
OW
0 SITE
U.4
E6-0
TAXIWAY b CONSTRUCTION MAN (. OF 6)
TAXIWAY 8 CONSTRUCTION PLAN (6 OF 6)
E8.6
MOUNTING VAULT DETAILS
VICINITY MAP
LOCATION
MAP
E4.0
EEemmeFA SYSTEM DET.MLB
NOT TO scnli
NOT
TO soli
EA.1
6FC TIM SYSTEM DETAILS
E4.2
GENERATOR DETAILS
EA.e
WIND DOME DETAY
CEID� DRAWING
E6.1
TAXIWAY 2ABT' CHICUST DIAGRAM
DECEMBER, "13
E6.2L
EXISTING OMINC INAGRAM
us
MM ONCLII! DIAGRAM
SEA
SCHEDULES
0134th Shed $1 wi4m
SPmnN
�20
M EPI
R 4 M-
741
wl to ARINO
R-400001