PROJECT PHASING AND OPERATIONAL CONSTRAINTS
DURATION
24 HOUR
NIGHT CONSIRUC(ION
TAXIWAY
PROJECT
(CALENDAR
CONSTRUCION
OPERATIONS
CONNECIOR
SANS
ACCESS TO BOEING
ACCESS TO
ACCESS TO
PHASE
NOISE WAVER
NO. OF
RN NICHT
GENERAL WORK DESCRIPTION
POSITION A-2
COMPASS
GAYS)
AVNUBILM
NIGHTS
CLOSURES
TW B7
1W B6
(PAINT HANGAR)
BRIDGE
ROSE
1
10
GO
-
NO
M091RATIOx: SURhY CONTROL: CONSTRUCTION MCE55 GTE: WATERLINE INSTALLATION MAIN VALVE #SEC311A
CLOSED
OPEN
YES. mom NORIA
YES
YES
TO FIRE WATERUME STA 132+15,
ALL TAXIWAY B IMPROVEMENTS, ETA 26+70 TO STA 29+35: TOMMY B6 IMPROVEMENTS WEST OF
�' PROM
2
12
NO
-
NO
STA 2+10; WATERLINE IxSTALADOx FROM FIRE WATERUNE STA 133+15 M HYDRANT 1H3MB.
OPEN
CLOSED
NORTH a SOON
YES
NO
3
14
YES
14
NO
ALL HIGHWAY B IMPR%'MPI15. STA 22+50 TO SEA 26+70: REMAINING WAIERIINE INSTALLATIONJALINATICW.
OPEN
CLOSED
YES. FROM SOMAL
NO
NO
11
AS
NO
ALL NETNEWS B PROJECT IMPROVEMENTS, STA 15+91 TO STA 22+50
A
OPEN
OPEN
YES. FROM SOUTH
FEE
YES
3
YES
3
YEE
ALL THOMAS B PNUECIF IMPROVEMENTS, VA 15+91 TO STA UT50 AND CONSTRUCT TEMPORARY NATION MOM
P TO RUNWAY 16-34.
ML TMMAY B AND TAKWAY B7 PRESS IMPROMEMEMS. STA 10+07 TO SIA 15+91 (INCLUDES RUNWAY
5
12
YES
12
YES
PARR REPIACEMENR).
CLOSED
OPEN
YES FROM NORM
YES
YES
8
3
YES
3
YES
All BRUNEI IMPROVEMENTS SOUTH OF TIE PHASE 5 AND 6 REFERENCE FEMI
OPEN
OPEN
WE. mom MOM
SEE
YES
TOTAL COMRIST ONE IS ED CALENDAR RAYS
OMyM VEIL_
ARMS SUALL BE SOMINGUME, OF NOTES: THEIE6IELM` MINIMUM,IO"
ALOWNUM D RM THAND HE
*AINMZN FAIT EMEARTMEW OFNEAR
PAR AMON STANFORD SPECIFICATIONS R
FRA
M41-10)� Ax° MUNICIPALMUNICIPALaAsmurnM
SAW HUNG, E MOUNTED TO NOT FARE OF
BYtleCMwDIE AND ALL BE 5NUMMEO TRATE W
9NOT TO
ROME
LOUSE AGE .DA WEAMER, MIND
OR
i:ELai L IN ff"I"I
PROJECT PHASING AND OPERATIONAL NOTES
I THE END Of ALLOWED FEE FM PHASE 2 MAY WEHM WITH ME START OF
ALLOTTED TME FOR RUSE 3.
2 ME WOMEN OF PHASE 3 (14 CALENo RDAYS STAGE. OcwN MGM JULY 15.
2013. &W AM. TO JULY 2A 2013, NAT10N M MESE GYMOAR
DOES MALL NOT M BE ALLOWED WITHOUT PRIWRITTEN APPROVAL MGM ME
BOR
3. ME PHASE . NEW WWtt WAGE OCCUR AN ME UP 3 NIGHTS OF PHASE A.
a, OFF W RENTON STANDARD WORN HOURS ARE 7,00 M TO 10 NO PM MMM
THROUGH FRIDAY AND 9 00 AM TO NO N SATURDAY AND SUNDAY
NIGHT 10
THESE HOURS SQUIRED A STY Dim
PENTON WORK
ip MASE AMMA v HAS BEEN ISRAEL
MR THIS RAW WARREN
MEIAn MISE WAREN wcwoED FOR R6DHOUSE
WITHIN THE NTRACT WOUMENTS APPENDI,.
5. RUNWAY LOWMN 9uLL TME PLACE BErvh➢I THE HOURS OF NA Pu AND
&30 Au
6 MR
M DAWOODS
CONTROL TOWER HATCH OPERATIONAL HOURS ARE 7.W AN TO 9.99
ILY
7 HAD HOURS PRIOR TO BOEING NATURE THE PAINT WHARF DDI THE
CONTRACTOR SHALL WREARE CWSWULflON OPERATIONS HURT HAVE ME AMMINA.
TO GENERAL MOUNT PLO AIRBORNE FOD GENERATING ALTIVITIES WALL NOT
BY SUBSEQUENTLY HAS HOURS IOR TO CLOSED OPENING
N(ASSUOF ME THE
WORDS, ME YANG ME
L
OF 3HOURS)oTWO NRCNRFROM WE E PER WEEK ARE ANTICIPATED TO BE MOVED x
AND
LAW
APER EEEKwFM
M AGAT R OPENINGS OF ME TRUMP CIXRS ME
PASSB. WHEN ANCIENT ME WRING ADJACENT TO Nrv(WEINUCTON OPERATIONS, THE
CONTRACTOR PANEL MOVE ALL EOULPMENT, MEWHEL, AND OBSTRUCTING
MAIDERAOF PMAY FROM WE MlrkROMPTAMWAY PAWAMINIMUM UNTIL WE OF
H6 VACATED W MET MGM ME CFWE
MFAUxE
vGMM.
8. OUANY
�VE BOEING MAYOR ONE FREE
EENSANYY AIRCRAFT HS GO MN MUTY E
E IN WE WRONG PAM ARGUE IT
SORT TO SCHEDULBE WE E
STAND OBTAIN ILITY UP dWNOV PAW CONTIAGGRA TW � WORK M OR AM E
COMPETING TO AN AGTM WATERwE.
IO_ WRING
AN PNMECT TO BE PTI SE THE RFORMED TTHE HANDED CONTAPWGR SMALLLT MAY E
PMAIDE IB MVRSMHOTCE TO
MIN
D OF WORORT AND K NULL BE SCORANGE EDUIICN TOL FORM HAT OEAVOLINNO AGAR T
HAT POWER SHARES ME P
MINIMIZED ANG ME PERFORMED SO AS NOT TO DRAW NARROW OPERATIONS.
SITE PROTECTION MEASURES FOR PHASED CONSTRUCTION
ME COMWMOR Is REASONABLE TO BRANDS TEMPGPPM MEASURED TO PRORGT ME
9R, STORM SYSTEM, UPUMES, AND ALL OTHER MATING AND NEW INFRASTRUCTURE
FEW ORANGE DCC N OPERATIONAL NA EW RESULTING FROM PHASED
mxsMUCTgx.
CONTENTINGAGENTS, ON HOUSE ALL IMPLEMENT MEASURES TO PROTER. REUP PO
CONAIRTATED NEW WAGATRATTIRE, TWO WE COMPLETED AND WE $YOURE ME WELL PORTIONS
O OF WE ND NAW SUE WMME.
PRIOR TO THE M MENTS ME
slW- AGENT A PPENN DET x Wx THE
GTE AND WAGATFUTTIRE WILL BE MOUNTED, AS w10. IMPROVEMENTS AGE
CONSUMMATE FORM ONE PHASE TO EDYFFY ANY
TEMPOI MEASURED GOLAN, OR xFRASSTRUSTHE Thi ATAW IDE BLL E IMPLEMENTED TO
REROUTE OR LATER STORM WATER RUNOFF
MAKEE: ESV Tql% FH FE
ADJUST MAUDE ACCORDINGLY.
vanm m
Y
8
5�p9
Sd
�9
y�
� s �
O
�t 0
R,0US
AX
7WELL
ED R0
SSE
zM OZ
�w VAX
¢� GW
MELL
I GD F 0
oy �
3 i�
E 0W
0 AD
SE W
D
0
W
NOPE
JANU
Gj'
. D4010 -WE