Loading...
HomeMy WebLinkAboutAdden 7 AGENCY CAG-00-045, Adden #7-11 'i" ' "/ atp.rtn."t of 7rasportatn Local Agency Agreement Supplement Agency Supplement Number City of Renton 6 Federal Aid Project Number Agreement Number STPUL-STPD-FMSIB-1276(004) LA 5541 CFDA No. 20.205 The Local Agency desires to supplement the agreement entered into and executed on May 7,2003 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name SW 27th St/Strander Blvd Connection Length 0.6 mi Termini West Valley Highway to Oakesdale Ave SW Description of Work ❑ No Change Construction of a railroad bridge at the BNSF tracks to span a road connecting SW 27th St to the Sounder Station.A two-lane road will provide commuters with vehicular access from Renton to the Sounder Transit Station. Reason for Supplement Obligate Surface Transportation Program (STP)funds for construction. Does this change require additional Right of ay or Easements? ❑ Yes ❑ No Estimate of Funding Type of Work (1) (2) (3) (4) (5) PREVIOUS AGREEMENT/ SUPPLEMENT ESTIMATED TOTAL ESTIMATED ESTIMATED SUPPLEMENT PROJECT FUNDS AGENCY FUNDS FEDERAL FUNDS P.E. a. Agency: $19,000 $19,000 $1,350 $17,650 % b. Other_Consultant $958,851 $958,851 $129,445 $829,406 Federal Aid c. Other-Consultant $846,446 $846,446 $846,446 CA.FMSIB $700,000 $700,000 $700,000 c.2.Other-Non-participation $857,591 $857,591 $857,591 d. State_ $10,000 $10,000 $675 $9,325 e. Total PE Cost Est.(a thru e) $2,534,297 $857,591 $3,391,888 $1,689,061 $1,702,827 Right of Way f. Agency % g. Other_Non-participation $562,221 $562,221 $562,221 Federal Aid h. Other Participation 1. State Ratio for Rw j. Total RNV Cost Est.(f thru j) $562,221 $562,221 $562,221 Construction k. Contract $6,703,092 $6,703,092 $904,917 $5,798,175 I. Other_Non-participation $230,301 $230,301 $230,301 m. Other_Non-participation $700,000 $700,000 $700,000 n. Other consultant $1,400,000 $1,400,000 $189,000 $1,211,000 6.`J % n.1.FMSIB $3,300,000 $3,300,000 $3,300,000 Federal Aid o. Agency $100,000 $100,000 $13,500 $86,500 Participation p. State $5,000 $5,000 $675 $4,325 Ratio for CN q. Total Const.Cost Est.(k thru p) $12,438,393 $12,438,393 $5,338,393 $7,100,000 r.Total Project Cost Estimate(e+j+q) $2,534,297 $13,858,205 $16,392,502 $7,589,675 $8,802,827 The local agency further stipulates that pursuant to said Title 29,regulations and policies and procedures,and as a condition to payment of the Federal funds obligated,it accepts and will comply with the f1pipacable provisions. AGENCY OFFICIAL Washington S to epartment of ransportation By By Denis Law, M , , Director of Highways and Local Programs 8 AUG 0 5 2011 ATTEST: -d � �� ' • �Rq/ - Date Executed Bonnie I. Walton, City Clerk