Loading...
HomeMy WebLinkAboutS-393307wo MR i 1/16' C596m) DETAIL) COVER & FRAME PLAN VIEW 25' DIA. 635M1 1' 3/4' r t25nn] L1Avn] 1'. 8 3/4• 1 L 2 1/2' --� 1222mn1 TEAM] TYP COVER SECTION VIEW COVER BOTTOM VIEW (3i )BLT 3D, (ALLEN HEAD) 5l A 115 SS RUBBER WASHER ILL EON BOLTING DETAIL 26 1/2' DIA E673m] AS vv Dm 1/4. t641M] 1 1/16' [Gm] — 1 vtb• v' wmu Dbf [z7MB [z7m1 NEDPREIY WA(ET 6• V9' [15PiNv] Limn] 1 ve• R m] 23 3/9• DIP CL OPEN Es94mm1 GASKET GROOVE DETAIL 27 5/16' DIA [6l 34 1/9' DIA [967mn1 MORS FRAME SECTION VIEW 1, ALL COMERS SHALL BE LOCKING LID PER EAST JORDAN IRON WORKS INC. No. 3T70 OR EQUAL 2. USE FRAME AND COMER FOR STORM (SPECIFY "DRAIN" ON COMER), SANITARY (SPECIFY "SEWER"). OR WATER (SPECIFY "WATER"). SID. PUIR - 401 PUBRC WORKS MANHOLE FRAME AND COVER DEPARTMENT DECEMBER 2008 PORTION OF THE NE 1/4 OF THE NW 1/4 SECTION 14, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. CITY OF RENTON, STATE OF WASHINGTON W (SEE NOTE 7) BEDDING MATERIAL FOR SANITARY SEWER PIPE (SEE NOTE 5) '—\ FOUNDATION LEVEL — LIMITS OF PIPE ZONE OF PIPE BEDDING FOR SANITARY SEWER PIPE NOTES. 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT 9EDMNG MATERIAL TO 95% MAX DENSITY EKCEPT DIRECTLY OVER PIPE HAND TAMP ONLY. 4. PIPE INSTALLATION SHALL BE PER SECTOR 7-08 OF THE STANDARD SPECIFICATIONS. 5. PIPE ZONE MATERIAL SHALL RE PER SECTIGN 9-03.12(3)' OF THE STANDARD SPECIFICATIONS OR PEA GRAVEL. 6. PIPE MUST BE ANCHORM IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED, 7. TRENCH WROTH SHALL BE PER SECTOR 2-09.4 OF THE STANDARD SPECIFICATONS. PUBLIC WORKS DEPARTMENT CjE2TOUMA ENGINEERS AND I'vLAND SURVEYORS,PLLC 255 SW 41st STREET - RENTON, WA 98057 PHONE (425) 251-0665 FAX (425) 251-0625 PIPE BEDDING FOR SANITARY SEWERS NO. I REVISION (1EM01X AS NFFCED) xxER SrvBE •4 I WN RE N!']Ef mal W ) �r somm SM MAN SII A 8" TZ ALL 9C' IBM SMALL K I.[CtlWt BY MEANS 0" A wN WITH CLEEOUT ANY KNEED. Top •5 RE165 SHHALL NOT BE •' SHIP AS REWYT➢ [Iw MORE ILCEPTI .. (EEE NOTE ID ggFFgrc tNE MAN 15lle D�NF]GTW % ESA AT SAID µo PSL atro _.._..-..-..-..-__ mu ROUT n .YE. n So"WE (era NON n) 6E,NwT ,ffE MD,E t„ FUR1M[ a s9E sENm ycco— mum g --IM[ _a MUSE '£I "OUSE EIgI HOUSE Y1 4` SM MA C POST PAAIRO E E. 8. Pet/ wean vow ME Wa0 -wwEE• SRNOLFD 5 N HER KAON IEIIEPS AND P WASEWUPPm ME snlD AND ExlElmfO TO ME TW OF ME STUD •• do E PRE 9JEAQ fIFAMOUT Ivi5: l (=R)M •' SEKR POE. SEE X016 t •" TEST 6E WRI ANO 1 AN SN UNE 4A Cpl CN'xe• suxFAa: ¢ENIauT mM crsr Ncx Nxc ANB cDWn(s6 sro Pux - w»� L IPwD FA6 uP Dmm MAx sMPE EMcr 15 MIRdINViNSPRODUCT R0. WS6]STf E1 PppCRTY LINE \ fT LL) PROFFNTY UK AL .WECIEY'WEER' pl UD).($E Sm. RAN Ant EORMSENLATON) P NW.i" 6'.0 �+ AOAPRP WIB L-NTME 4. OCE MM N Baa NRE 61 4" REDUCER N"+'ms9r PRMMEMS FOR mom_ Rua" rwlu'rnnla m,nRtw eNER uAM A m1 CLAY MAIN - OUT M ANEW pAL ­TNE• UMG'S1Rdm-BAW FLUENSE COLPIN6 (N MG M APPROVED EQUAL} 9. WMOKIE mum - PR N A HER PYB'M£ LNUME-SDNMhHACr EIEI]KE NJPUNGS (RRNCO OR APPNOLED EWK). DROP ! CSOO PVCMM - AUT M NEN R VN1G NOO WIW WGS OP CIXE-ONULD WM A RGMAL SILDLE No APHm1E0 EEIK). D. MINE IBM MAA - CYNE-PElID WM A PWAC EA➢KF (LP AFWm'60 EWW f. MNIXOE GCIWECI101 - Al COANNO W AS IM MS 91PLL IN AT YAXUFACTIRB NNDCK-Wis ON ME STRUCTURE BwmlD N�'6 SSSS- 1'31W 3iEE XERWTAL 9" T6 SEMSN GEMIII MAIN 6" YON. MAN MOM �S0µNS"MK�IXsW MNMw LOU[]? YIX�WEYwIOE Ix.r COL91 AT PtAttRn LIIF W }-9' STANDARD SIDE SEWER PUBLIC WORKS INSTALLATION DEPARTMENT (SEWER MAIN TO PROPERTY LINE) NOS: xv.ME BUSUNNO 2WN SENKS MY FR UE HAYMC 1. poor to newatM al n emlteY war onemactm. a MtlrwsMO LEVEL MAE LOCAND BELOW THE OfVATM pi MAN ne P"moke Aan the CItY a ral Polk MeeA H T UPSWEEP UE MWA OF ME boorPUSAC ME VER SYSTOA AMBAO[ROW REYtTnM ll SUCH AS SEAM CHEM ENUNDAOE ,. t NOR bBAIXµSE Val oil APPROIED EQUAL 91ALL BE ool, mtl Ntting= N=t [u b u paW �N AbYKiad rpNol er Ne KPm [ alwomen° tell ae VNMOL Cir we mmulwtam� NUN Cie EIEN9IE NIPLING bEMED OR EWALI ueN m plate5URFAE PEMOUT ]. A mFmm 9Y Of 21(1/4 pa !=Un moat b mahbinN . "L A- MANm the WWI a 2z yao [wrot be mammbw. tb NPNA aN an e , al ion a CNA a Amtm VO4e .mom Mm and then donall Eq' N at a ARCO of it WHOMPI NEAR! EOR •. Fm n �um ar:ae RANM,, Lot 2N mn am Wal me WW ELLVAHOH HW3 RNs pone mm x 11 m ON ANY own, pwmil Stat reaeY m, RANNERn and ,W,Mwtlw m En "t i'ro`n pMan, at wP='^tw linty Side ewer and comb Wwu Am City NawiEmtleep l AN eanwaN'm a the TO PROPERTY UNE s' -U' s' -O" oaw oo d al me ELN until deal a qNm by the %(EAN LINE FPM M WSE BW➢IXO UNAM I've her P 11.11 AN P, gmnted ab Me NaRl tptk WE INWFR BU IN SEMEN YAl took nv pumped wt and Mae MN oma. r-B'vmy tB r -a' s. 1psta�dnnNeed K AAN A ul"m• =°`er 1a' NON, I. andNm C$i ]\1 B. H N1w ne.et Noma o not off N R .r NRB mo I WMAR ANNA 1st "mmd[I�1 pa mm ona byowed; ha lfi a 1 LLI NRv A mg� a a s'!;p^- '8. ren n,wt amt-ill-NnrNot arvR�d'M N a and M o d aWed[mNacta. R 3An NM S �' 5? € §e, Ba i one,mal ON In A<In Rom n m Ne m z�u aE 9- , aOR VAN sI N1lmtmwMYmdry .� «IMw R - gg - ° M g B. a >al Im Ode N PeUm Nmt-al-any in W ya g g„3a Ci sic E wnd NIMlt to the mm m^o "Awl S 1 SBP a real i t Cie In Ne Pentm SI d Or Msu V_AA11 Sm. Unit, P aulNinB x aW wwe Nd1 now badeg m aWanw Mb Ebel baan9 Oo5. gg0 All9. al Nall dbe un 10 Ron, notlimtal ya � $ '� R n�`a. een o ane t"x ye aae.edam an m°s mot p ho oe uncut °Nee mB Nee O & MA 3 LCA teitlacN eater winatial tL It the wA11-W-wUY ma be MUMN Ne CALL FOR LOCATIONS BEFORE YOU DIG Sall rvm wT. The .lmmat at the bAtlmE enaN 04 48HR LOCATORS I-800-424-5555 'nswi to Mm[e thane. Ad ~ comate mm be mmmee to Ntem,z1 Nunau ���PP``�� TYPICAL BUILDING SEWER m. 8'ID 4�2 MRK PDEPA WORKS FROM PROPERTY LINE TO DEPARTMENT BUILDING CONNECTION AUGUST 2019 "AS -BUILT" NOTE: "AS—BUILT” IS BASED ON A ACTUAL FIELD SURVEY BY TOLIMA ENGINEERS AND INFORMATION SUPPLIED BY CONTRACTOR. C16006822 APPROVED SUBJECT TO °D"A SCALE SNI CITY OF NE 2nd ST SEWER EXTENSION RENTON SEWER DETAILS E. Mw m Planning/Building/Public Woks D�Pt. TAX LOT #142305-9092 BY DATE APPR ATS' SME WAMNrr 9170038 S-393307