Loading...
HomeMy WebLinkAboutR-398703LO O a co III fr M ?15 DHA 2596-77 \ 13',,.00 (CALCI Y rvasns'z2"w -' - - - - 551+02.39 v--- 1"IRON PIPE IS - 1 �� �� 2260:6'E OF PROP LINE I 224.04 LT REBAR/ CONTROL CAP I \ 1 \ �� END OF FENCE IS N 192409.364' \ / 0.6'E OF PROP LINE UTILITY NOTES EL 220.7 : E 1302594.966' \ --- _q25-- 1. REMOVE ALL EX UTILITY PIPING WITHIN 3 FEET OF FINISHED 3' �� GRADE AND COMPLETELY REMOVE ALL UTILITY STRUCTURES WITHIN STEEL FENCE POST�r 22 - - _ LIMITS OF WORK. UNLESS OTHERWISE NOTED COMPLETELY REMOVE \ - - ---_ PROPOSED RESERVOIR LIMITS (NOT ALL UTILITY PIPING AND APPURTENANCES WITHIN PROPOSED 2.0'E OF PROP LINE I .2 PART OF THIS RESERVOIR LI \ -� BUILDING FOOTPRINT, BIORETND WH AREAS, BELOW DRAINAGE STRUCTURES &FACILITIES, AND WHERE IN CONFLICT WITH -- - -_z PROPOSED IMPROVEMENTS UNLESS OTHERWISE NOTED. \ TEMPORARY ECOLOGY BLOCK WALL INSTALLED BY CONTRACTOR REMOVED BY OTHERS 2. PROVIDE CATCH BASIN PROTECTION AT ALL INLETS & CATCH p� 3 WALL TO PROVIDE TEMP EXCAVATION SUPPORT BASIN WITHIN 300 LF OF CONSTRUCTION. /22 \ AREA 3' z�` -AT 1H:6V INSTALLATION (TYR) _ _ _ � C PHASING NOTES: �p�� ----� R�Ro rV�1R \ INSTALL PERVIOUS PVMT / FF 2.2Q.0 0 SUBBASE TO RECEPTOR AREA 1: THE FIRE STATION CONTRACTOR WILL START THE WORK, / ��4 \\ \ AND PROTECT AND WILL BE RESPONSIBLE FOR COMPLETE CONSTRUCTION OF THE FIRE STATION AND SITE, INCLUDING ALL WORK SHOWN IN AREA 1. ��- _ AREA 2 (SHARED): CONSTRUCTION FENCE THE FIRE STATION CONTRACTOR SHALL BE RESPONSIBLE FOR: PROPOSED PARa. PHASE 1 SITE DEMO AND TESC, INCLUDING CLEAEL #33421 0-3 2 40 b. PHASE 2 SITE DEMO AND TESC, INCLUDING ROUGHNG. GRADING OF PROPERTY THE ACCESS ROAD AND PARKING AREA STABILIZATION AND ziar r 13 2 �2 ROUGH GRADING FOR IMPROVEMENT MPROVEMENT -y FUTUREHYDROSEED PER J' LANDSCAPE REBAR/ CONTROL CAP L N 192252.456' E 1302633.016' EL 211.80' I- I _- 217- 216- v II21� _ ----- r < PROVIDE TEMPORARY ¢ `J c�a EDGE PROTECTION 211_ y \ (TYP ALL EDGES) � \ TN ,..JTx ...1 CATCH BASIN FILTER -(TYP)(a) --55--�3-SS---- H- \� INSTALL TEMP 5.5' C -- W_� SIDEWALK PER COR PLAN 102 WITH CURT 1932 Ant Ave Suite 201 Seattle, m m m101 engineering pllc w~ �.I,dengln..dng.mm _ V ASPHALT u DRIVE WV Call 3 Working Days BeforeYou luu DIGI a a 1-800-424-5555 CHANNELED BOTTOM S. END OF FENCE IS 0.4'E OF PROP LINE PARCEL #334210-3237 BI RIM 212.39 IE NE 210.49 11 E W 210.34 11 E E 210.39 FUTURE BOT 209.44 CB h RIGHT-OF-WAY RIM 218.02 SETBACK IF NE 216.42 IF W 215.97 ASPHALT IF E 215.97 __- DRIVE BOT 214.92 12 "CONE/ SST ---SS--- S S � \ M 8/E�NC "CONE / -- i $$ 896.844OALC�/ '1 \\ N. 307H ST \I pS A AV PROTECT EX SIDEWALK V 78.83 Y\CALC) I \ ✓_ v _ 1_2" V I "' V A TO REMAIN \11178.84 (R1) 1I w- L - W2"ADS w--- - W_ \ W _�_ W->__ \ w \ SD--- D4-- \ \ W-T_----\�- \ D-�__Sp--- 72'COivIC s11s2'C NC 313 V PP/pc 12"CMP 50 - --__ - E--.-�_- - - a dJ _�_CONCIkETE WALK RASS PP7UG A HA z I� 8 e r-- B I(SOLID LID) ASPHALT DRIVE &,B nRIVF CB N I I I/ / I I I I I Lvl z B'T 1219 - &01sT - - SD- )NC916 M 16+00 TOP CASE 217.38 TOP NUT 215.09 W-- "CMP c `SD - a W b \t4 w, 0 90 H 1"=20' aha, O CITY OF PERMIT RESUBMITTAL 2/12/18 mxEoUP FENTON PERMIT RESUBMITTAL 1/28/18 `' SMN 1\L 1 2 BID ADDENDUM NO. 2 1 16 18 auo. DATUM Planning/Building/Public Works Dept. N0, REVISION BY DATE APPR �r�.------------ `�"W' N 20 0 10 20 40 Scale 1"=20' LEGEND - - - SEPARATION LINE m HYDROSEEDING OF EXPOSED AREAS, EXCAVATION AND -230� SILT EBY INSTALLATION OF PERVIOUS PAVEMENT SUBBASE, PROTECTION OF INSTALLED CONTRACTOR TO Ll O�4 THE PERVIOUS PAVEMENT SUBBASE, TEMP PROTECTION ALONG \ BE TRANSFERRED TO RESERVOIR PAVED EDGE AND ECOLOGY BLOCK WALL. e CONTRACTOR PROPOSED BUILDING OUTLINE c. INFILTRATION TESTING OF PERVIOUS PAVEMENT AREA. CONSTRUCTION FENCING d. INSTALL THE STORM DRAIN LINE AND CONNECT TO EX CB IN N. \ CATCH BASIN FILTER 30TH ST.. \� WORK SEPARATION e. INSTALL THE TEMP CONC SIDEWALK, CURB AND GUTTER \ \\ LINE E PROVIDE FOR FUTURE CONNECTIONS OF ALL WORK TO BE COMPLETED 'BY OTHERS'AS SHOWN ON THE PLANS. \ FENCE IS 0.3'W THE RESERVOIR CONTRACTOR (AS INDICATED "BY OTHERS") SHALL BE FIRES .TION nF PPnP iINF RESPONSIBLE FOR: I PROVIDE TEMPORARY a. COMPLETION OF ALL IMPROVEMENTS WITHIN AREA 2, INCLUDING EDGE PROTECTION STRUCTURE FINAL PAVING, PERMEABLE PAVING, FINAL GRADING, CURB ON \ (TYR ALL EDGES) WED WEST SIDE OF ACCESS ROAD, CURB WALL, PARKING STRIPING, \ \ / WATER MAIN LINE AND STORM DRAIN OVERFLOW LINE IN THE ACCESS ROAD, FRONTAGE FINAL WALKWAY AND DRIVEWAY IMPROVEMENTS \FF ID b. TESTING OF PERVIOUS PAVEMENT AREA k�V I AREA 3: THE RESERVOIR CONTRACTOR WILL START AND COMPLETE THE WORK, AND WILL BE RESPONSIBLE FOR COMPLETE - - - - -CONSTRUCTION OF THE RESERVOIR AND SITE, INCLUDING ALL WORK h I SHOWN IN AREA 3. RIM 215.28 Gg IE NE 209.28 v EN 2 IE S 209.18 TN ,..JTx ...1 CATCH BASIN FILTER -(TYP)(a) --55--�3-SS---- H- \� INSTALL TEMP 5.5' C -- W_� SIDEWALK PER COR PLAN 102 WITH CURT 1932 Ant Ave Suite 201 Seattle, m m m101 engineering pllc w~ �.I,dengln..dng.mm _ V ASPHALT u DRIVE WV Call 3 Working Days BeforeYou luu DIGI a a 1-800-424-5555 CHANNELED BOTTOM S. END OF FENCE IS 0.4'E OF PROP LINE PARCEL #334210-3237 BI RIM 212.39 IE NE 210.49 11 E W 210.34 11 E E 210.39 FUTURE BOT 209.44 CB h RIGHT-OF-WAY RIM 218.02 SETBACK IF NE 216.42 IF W 215.97 ASPHALT IF E 215.97 __- DRIVE BOT 214.92 12 "CONE/ SST ---SS--- S S � \ M 8/E�NC "CONE / -- i $$ 896.844OALC�/ '1 \\ N. 307H ST \I pS A AV PROTECT EX SIDEWALK V 78.83 Y\CALC) I \ ✓_ v _ 1_2" V I "' V A TO REMAIN \11178.84 (R1) 1I w- L - W2"ADS w--- - W_ \ W _�_ W->__ \ w \ SD--- D4-- \ \ W-T_----\�- \ D-�__Sp--- 72'COivIC s11s2'C NC 313 V PP/pc 12"CMP 50 - --__ - E--.-�_- - - a dJ _�_CONCIkETE WALK RASS PP7UG A HA z I� 8 e r-- B I(SOLID LID) ASPHALT DRIVE &,B nRIVF CB N I I I/ / I I I I I Lvl z B'T 1219 - &01sT - - SD- )NC916 M 16+00 TOP CASE 217.38 TOP NUT 215.09 W-- "CMP c `SD - a W b \t4 w, 0 90 H 1"=20' aha, O CITY OF PERMIT RESUBMITTAL 2/12/18 mxEoUP FENTON PERMIT RESUBMITTAL 1/28/18 `' SMN 1\L 1 2 BID ADDENDUM NO. 2 1 16 18 auo. DATUM Planning/Building/Public Works Dept. N0, REVISION BY DATE APPR �r�.------------ `�"W' N 20 0 10 20 40 Scale 1"=20' LEGEND - - - - PROPERTY LINE m - ROUGH GRADE -230� EX CONTOUR (INDEX) DS EX CONTOUR EX BUILDING PROPOSED BUILDING OUTLINE CONSTRUCTION FENCING SILT FENCE CATCH BASIN FILTER vv, AREA 1: CONCRETE PAVEMENT HEAVY DUTY CONCRETE FIRES .TION #15 f L 2L� 212.01 N V \FF ID I v EN 2 I� A SILT FENCER CEL #334210-3248 1 B CI sD SDC _ L S l RIM 206.40 IF W 204.20 o """' _ e. '. IF S 204.20 ISD IE E 204.15 I _ BOT 204.00 I I \ _. �____ __ \ ASPHAL I VI\ / I...............1.: r .L) TN ,..JTx ...1 CATCH BASIN FILTER -(TYP)(a) --55--�3-SS---- H- \� INSTALL TEMP 5.5' C -- W_� SIDEWALK PER COR PLAN 102 WITH CURT 1932 Ant Ave Suite 201 Seattle, m m m101 engineering pllc w~ �.I,dengln..dng.mm _ V ASPHALT u DRIVE WV Call 3 Working Days BeforeYou luu DIGI a a 1-800-424-5555 CHANNELED BOTTOM S. END OF FENCE IS 0.4'E OF PROP LINE PARCEL #334210-3237 BI RIM 212.39 IE NE 210.49 11 E W 210.34 11 E E 210.39 FUTURE BOT 209.44 CB h RIGHT-OF-WAY RIM 218.02 SETBACK IF NE 216.42 IF W 215.97 ASPHALT IF E 215.97 __- DRIVE BOT 214.92 12 "CONE/ SST ---SS--- S S � \ M 8/E�NC "CONE / -- i $$ 896.844OALC�/ '1 \\ N. 307H ST \I pS A AV PROTECT EX SIDEWALK V 78.83 Y\CALC) I \ ✓_ v _ 1_2" V I "' V A TO REMAIN \11178.84 (R1) 1I w- L - W2"ADS w--- - W_ \ W _�_ W->__ \ w \ SD--- D4-- \ \ W-T_----\�- \ D-�__Sp--- 72'COivIC s11s2'C NC 313 V PP/pc 12"CMP 50 - --__ - E--.-�_- - - a dJ _�_CONCIkETE WALK RASS PP7UG A HA z I� 8 e r-- B I(SOLID LID) ASPHALT DRIVE &,B nRIVF CB N I I I/ / I I I I I Lvl z B'T 1219 - &01sT - - SD- )NC916 M 16+00 TOP CASE 217.38 TOP NUT 215.09 W-- "CMP c `SD - a W b \t4 w, 0 90 H 1"=20' aha, O CITY OF PERMIT RESUBMITTAL 2/12/18 mxEoUP FENTON PERMIT RESUBMITTAL 1/28/18 `' SMN 1\L 1 2 BID ADDENDUM NO. 2 1 16 18 auo. DATUM Planning/Building/Public Works Dept. N0, REVISION BY DATE APPR �r�.------------ `�"W' N 20 0 10 20 40 Scale 1"=20' LEGEND - - - - PROPERTY LINE - - - - ROUGH GRADE -230� EX CONTOUR (INDEX) EX CONTOUR EX BUILDING PROPOSED BUILDING OUTLINE CONSTRUCTION FENCING SILT FENCE CATCH BASIN FILTER PROPOSED BUILDING CONCRETE PAVEMENT HEAVY DUTY CONCRETE FOR TREE REMOVAL AND PROTECTION, SEE LANDSCAPE SHEET LO.01 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING SURFACE WATER UTILITY (Fitz -James 02/15/2018 O rstraka 02/15/2018 ' FIRE STATION 15 1404 N 30TH STREET RENTON, WA 98056 PHASE 2 SITE DEMO AND TESC 12/22/2017 C1.02 00 10 O jo W T J F�a co H T 0 LL