Loading...
HomeMy WebLinkAboutR-398711INNS C13 1 BOTTOM LIMITS OF BIORETENTION 1 AREA AS DENOTED ON PLAN UPPER LIMITS OF WITH DARK OUTLINE AND O BIORETENTION SOIL PER BIORETENTION AREA HATCH W LA DWGS OR 1.5' MIN F- CONSTRUCTION SEQUENCE FOR BIORETENTION AREA UPPER LIMITS OF - - - ---1. PLANTINGS BIORETENTION SOIL PER INSTALL TEMPORARY SEDIMENT CONTROL EMIRS AS SHOWN ON PLAN. PER LA to DWGS OR 15 MIN DWGS - 2. COMPLETE SITE GRADING. PROVIDE PROTECTION SO THAT DRAINAGE IS PROHIBITED FROM ENTERING BIORETENTION CONSTRUCTION AREA. I 6" PONDING agrw q OBE 3. SITE NTION TO NTEMPOR AREAS BIIORETENOTIONAREASCTTHATLETE WERERSED ASR RIY SEDIMENT RAPS SIORETENTION AREA BOTTOM SHOULD BE EXCAVATED 6 INCHES BELOW THE BOTTOM OF THE SEDIMENT TRAP 3" TOP MULCH �y ELEVATION AT TOP OFz " PRIOR TO CONSTRUCTION OF BIORETENTION AREA :(.o DTE LAYER LAYER (PER PLAN) � ,_ ,F E.WJHMK Ec w„+sMULCH 12" BOTTOM OF BIORETENTION 4 INSTALL BIORETENTION AREA IN ACCORDANCE WITH CITY OF RENTON STD PLAN MIN DEPTH IL AREA SHOULD BE LEVEL 26200 SOIL ON swims EN1�iT�SIDE 4SIDE REsooesieBIO WITH NO SLOPE SLOPES (TYP) '� y i SLOPES WSTD ;LOCKING ACT SUBGRADE 5. EXCAVATE BIORETENTION AREA AND INFILTRATION TRENCH. INSTALL FABRIC, AND l awEwO�rsk'Neaw ENTION BOTTOM BACKFILL INFILTRATION TRENCH. GEOTECHNICAL ENGINEER SHALL VERIFY SUBGRADE18" DEPTH BIORETENTION MIX v - WSOIL UPPER 3'-4' PRIOR TO BACKFILL. PROTECT INFILTRATION TRENCH FROM ANY STORMWATER UNTILREQUIRED UNDER FULL CEMENT OF SITE IS COMPLETELY STABILIZED AND STORM DRAINAGE SYSTEM IS CLEANED. ._� Ck e•« "t0 s_�w^¢aEXTENT ?U IKE OF BIORETENTION TERIAL _ �ill:12' sA„Occ. „OERLe FRI rREWRED 1IN BOTTOM AREA - PER CIN OF RENTON 6. SCARIFY THE TOP 3"-4” OF EXISTING SOIL SURFACES OUTSIDE OF INFILTRATION ___�`' DEPTH CITY OF 40 W/ LOCKING DUCTILE TRENCH CARE SHALL BE TAKEN TO NOT CONTAMINATE INFILTRATION TRENCH. DO ' sFEE " 1111111 II IIIIIIIIIIII 'E q NOT COMPACT NATIVE SUBGRADE SEATTLE MINERAL IRON BEEHIVE GRATE _i AGGREGATE TYPE 26 RIM SHALL BE 6" ABOVE BIORETENTION T °E'msR BOTTOM (TOP OF MULCH LAYER) T BACKFILL BIORETENTION AREA WITH BIORETENTION SOIL MIX AND AGGREGATE _ MATERIAL. OVERFILLING IS RECOMMENDED TO ACCOUNT FOR SETTLEMENT. LIGHT ¢+0.dPEeM1 j BOTTOM LIMITS OF BIORETENTION HAND TAMPING IS ACCEPTABLE IF NECESSARY. AREA AS DENOTED ON PLAN UPPER LIMITS OF WITH DARK OUTLINE AND 8. BIORETENTION SOIL MIX SHALL BE PER LANDSCAPE AND CITY OF RENTON SWDM BIORETENTION AREA HATCH BIORETENTION SOIL PER REFERENCE SECTION 11 C. BIORETENTION SOIL DEPTH SHALL BE A MINIMUM OF UPPER LIMITS OF 18 -INCHES ,y FFF 7l F IA DADS OR 1.5' MIN v. BIORETENTION SOIL PER - s„„� LA DWGS OR 1.5' MIN 9. PRESOAK THE PLANTING SOIL PER LANDSCAPE PRIOR TO PLANTING VEGETATION TO IT. 'IF' i-.. c. 's:« -- ,. 6” PONDIN aH'/v M ' AID IN SETTLEMENT. _ PETER; car � w.rew+saRmir. .., � v DEP jNA l 10. COMPLETE FINAL GRADING TO ACHIEVE PROPOSED DESIGN ELEVATIONS. LEAVE SPACE ,5c IT NU- 3” TOP MULCH FOR UPPER LAYER OF MULCH AS SPECIFIED ON PLANS. a enw s a«o.+s.eaa _sa[R�' ««_° POTu. LAYER 53ia�b9LERRg*R+L9€ ss FST f4bM2w i&'�g�,s�n ¢ E+ +, Fv+` L �&'.54a;&"'r� ;!^ '2Ra? � i. .�.-_: s. 97 e��5.�i�cs �a..a m. a. A- aR�w towomm is TRI stuFr+aRIM _ *n we maPwE�E`et uirc.euvo>rwarsRea„oReaw-src. _ 11. INSTALL DISCHARGE PAD PROTECTION AT FLOW ENTRANCES. DISCHARGE PAD WILL BE n��•T. esn rc a„ra,uvi. _ 18" DEPTH BIORETENTION - -- -' =`:TDO NOT COMPACT SUBGRADE SET INTO BIORETENTION SOIL AND NOT LOCATED OVER MULCH. ±T +aen+snMrouvw'ulvEhi s+sRsonullo-susbw PEEERtbrrapcT�n ':co• WITHIN BIORETENTION BOTTOM c M1 o Oss asuvnTEw,xcssmsa „weaa.nirovsoa+enwsE. SOIL MIX s ro„ews�lmw-..s'rcaaaysts att¢wfeERmokN O"E REQUIRED UNDER FULL / AREA. SCARIFY UPPER 3-4” 12. PLANT VEGETATION ACCORDING TO LANDSCAPE PLANTING PLAN. R .M„ RTLo„u.a/oR.si n+uOe a o. sE R.ame+t„T ORsw ss... a_+. s .I„. TUNE co9e.sD"CTER a„iiL 9E HONEST THANu.. wivaee.EoRsww EXTENT OF BIORETENTION PRIOR TO PLACEMENT OF r GRW, 4 E o45, CRA SEWsnq XiwrE VMN M1FEiG!!WrPMHM9M '4RiGTd6 fFPv3MT BOTTOM AREA AGGREGATE MATERIAL GENERAL NOTES src nnm. v.EE„RRsustaTexnwsaswuxRYaseeA. sEPreR?as, j - 13. CONTRACTOR IS RESPONSIBLE FOR KEEPING BIORETENTIONSOIL SEDIMENT FREE �3' WIDE BY 28' LONG AFTER INSTALLATION AND UPON COMPETITION OF CONSTRUCTION, AND ANY SEDIMENT CONSTRUCTION, R R� ews� a y s s u wxwwu o.uemv �.On. oaelEuiEmeu // RECEPTOR BED INFILTRATION TRENCH CONTAMINATED BIORETENTION SOIL SHALL BE REMOVED AND REPLACED AT THE c P vss '^sE « Ro E sx E c+c "`w V 12” DEPTH CITY OF SEATTLE +- e..„F Rw vrx TOw.O.u.Raew.x..eeEss. s Benne. TYPE 26 AGGREGATE MATERIAL TO BE PER AASHTO NO. 2 CONTRACTORS EXPENSE. INSWINUMMOMENTot o p . euPmE„Rsss ss s EEn; SIDs O PR. 9 _ w NIT we *Rt _ ses RSFa. T .::„os R.„csw.,„„a�wr.wRs.Rucm„. ePmO.OSOew,w.T.nvws+gees 6 ELEVATION OF RECEPTOR LAYER n .c -. r aN PsresRnNMe or xv svn'arx~, asrs ±esstawSmxxa+'9w+yygganpE.ns*sRR + Em,Uw - 12” APPROXIMATELY 7 FEET BELOW EX GRADE a. 5 c AATCfewRE+Nm E�m CONTRACTOR TO COORDINATE WITH I FOOD Hn GEOTECHNICAL ENGINEER FOR r = ^-' IN -,� „.,„v ��. R „.,, PROVIDE SEPARATION FABRIC ALONG -// LONG VERIFICATION OF SUBGRADE PRIOR TO ,. ” SIDES OF INFILTRATION TRENCH TO BACKFILL ,sva+w.wv.o+m=...,w 6” INTO RECEPTOR LAYER Pueuc woeKs STD. PLAN M2,00 BIORETENTION SERION - Pu9uCAVOBKs BIORETENTION OVERFLOW OUTLET M. PUTS i6x.ao DO NOT PLACE BETWEEN oEaaRTn4eRT (NO UNDERORAIN) - ILL 17 ' GFPAnrmSrvr STRUCTURE _ BIORETENTION AND GRAVEL OR AT r f BOTTOM OF INFILTRATION TRENCH SECTION A—A NUSL Nrs BIORETENTION FACILITY WITH INFILTRATION TRENCH V COR STD PLAN 262,00 - BIORETENTION SECTION (NO UNDERDRAIN) COR STD PLAN 262.40 - BIORETENTION -OVERFLOW OUTLET STRUCTURE R-398711 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING O SURFACE WATER UTILITY (Fitz -James 02/15/2018 rstraka 02/15/2018 O IT, ITS NOT USEDINTO 9 NOT USED l O NOT USED tti i p 4 FOFTE Rte. "=z°' ”'MERSTROMI "°w' 19" """' CITY OF RENTON FIRE STATION 15 1404 N 30TH .STREET 12/22/2017 1932 First Ave Call 3 Working Days SuitE201 Before You DIG! Seattle, WA 98101 I�`''� �5 °TN9 PERMIT RESUBMITTAL 2/12/18 eWSS'ONATt ur IMINOW TOP °Ar""' syN p. 206.725.1211 9E� �\ PERMIT RESUBMITTAL 1/29/18 RENTON, WA 98056 IN NOImm wC3.04 f. 206.973.5344 q �g p BID ADDENDUM NO. 2 I WE RON DATUM Planning/Building/Public Works 16 18 c„m. s� AT PILL Dept. DATE APPR engineeringpllcRwwlpdengineenng.Eom 7-800-424-5555 NO. REVISION BY SP"`"Css"cL' DRrwACE DEALS 18 C0 GO C0 In O O I U T(y� r-1 F�1 F�1 T Q J a) F - z W U O 0 F- U Q F- z z O U U) T z O F a F- W IKE