HomeMy WebLinkAboutCO 08CrM- gI•ogs 0"a"t-42,
CHANGE ORDER Owner
ORB Form 300 Architect
(nis form Is to be executed In triplicate and each party is to retain an original) Contractor
Project Name: RENTON SENIOR HOUSING
Date:
April 15, 1991
Project Address: 3151 NE 16th Street
Change Order No.:
8
Renton, Washington 98056
ORB Project No.:
9007
Contractor Name
City of Renton No.:
CAG 0095.91
& Address: Klrtley-Cole Associates, Inc.
Contract For.
General Construction
1002 - 10th Street
Contract Date:
October 31, 1991
Snohomish, Washington 98290
Tho Contract Is hereby amended : - follows:
SITE CIiANGES
Make revisions to the scope and costs of the project as described In Revised Site Drawings Issued subsequent to bidding EXCEPT for
lawn seed revisions
- plant revisions
erosion seed installation
lawn edge revisions
planting soil revisions
Theca shall be paid for under separate Change Order. Seo enclosed Attachment 1 (1 page) for the list of the drawings this change shall
encompass, See enclosed Kirtley•Cole Proposal Request 5R, Second Revision (25 pages) for cost breskdown and description of included
work.
TOTAL CONS-MUCTiON COST IMPACT OF MS CHANCE ORDER: ADD 585,502,15
The Change Order shall include a1j Contractor(s) labor, material, overhead, profit, and all direct and/or indirect cults associated with
the Change In Scope of Work.
This
Chane Order Is not valid unless aimed by the lett and Cen(rutar.
The Odglnal Contract Sum was .. . ........ . ............ . .......... . ..... $4,620,765.00
Net Change by previously authorized Change Order(s) was .......... . ................. I ............ 470,508,09
The Contract Sum prior to this Change Order was ................... ...... . .... . . . ... . .. . ... . ... 5,091,273.09
The Contract Sum will be Increased by this Change Order In the amount of .... ........... , , . • . • ... ... • 85,502.35
The new Contract Sum incorporating this Change Order will be ... . ................. . .... . ........... 5,176,775.44
The Contract Time will be increased by 15 days.
The Substantial Completion Date including this Change Order Is December 11, 1992.
THE j)' ORGANIZATION, INC., Architect
607 Crady WA S t 210
s)dn 5
1 Ilam, AIA
1 Date
Kittley-Col5 Assodates, Inc., Contractor
1002. t
1
5nohom
'Co Cole ,!,,
l.
C
Dale
City of Renton, Park+and Recreation, Owner
200 Mill Avenue South
Renton Washingtpn 98055
r�
Vincent C. L,
Date
Page IofI
TH. aR13 ORGANIZATION, INC.
607 SUV GRADY WAY, SUITE 210
RENTON, WASHINGTON 98055-2977
-ATTACHMENT1
RENTON SENIOR HOUSING
INDEX OF DRAWINGS FOR
SITE DRAWINGS, CHANGE ORDER NO. 8
DATE; APRIL 17 1 92
DRAWING
0,
DESCRIPTION
ISSUE
DATE
SDO.O
COVER SHEET
PDI
PROJECT DATA
B
10/25/91
SDO.2
SITE SURVEY
A
8/91
SD1.0
LAYOUT NOTES
E
1/8/92
SD1.1
MASTER SITE PLAN AND OVERALL LAYOUT
B
10/25/91
5D1.2
COMPOSITE UTILITIES
E
1/8/92
SD2.1
TEMPORARY FACILITIES AND EROSION
& SEDIMENTATION CONTROL PLAN
C
tlf22/91
SD2.2
ER05ION CONTROL DETAILS & NOTES
C
11/22/91
SD3.1
ROADWAY IMPROVEMENTS AND SITE DEVELOPMENT
& DRAINAGE PIAN
E
1 /8/92
SD3.2
SITE DEVELOPMENT & DRAINAGE PLAN
E
1/8/92
SD3.3
SITE DEVELOPMENT & DRAINAGE PIAN
E
1/8/92
SD7.4
SITE DETAILS
C
11/22/91
SD35
STORM DRAIN DETAILS
C
11/22/91
SD3.6
STORM DRAIN PROFILE
E
1/8/92
SD3.7
STORM DRAIN PROFILES
E
1/8/92
SD3.8
STORN DRAIN PROFILES
C
11/22/91
5D4.0
DEMO, GRADING, & DRAINAGE NOTES
B
10/25/91
SD4.1
DEMOLITION & GRADING PLAN
E
1/8/92
5D4.2
DEMO & GRADING PLAN
E
1/8/92
SD4.J
DEMOLITION & GRADING PLAN
C
11/22/91
SD4.4
STORM WATER DRAINAGE: NOTES
©
10/25/91
SDS.i
SANITARY SEWER PIAN
L
1/8/92
SD5.2
SANITARY SEWER PLAN
E
1/8/92
SD5.3
SANITARY SEWER NOTES & SPECIFICATIONS
U
10/25/91
SD5.4
SANITARY SEWER PROFILE
E
1/8/92
SD6.1
WATER PLAN
C
11/22/91
SD61
WATER PLAN
E
E
1/8/92
1/8/92
SD6.3
SD6,4
WATER PLAN
WATER UTILITY • GEIJLRAL NOTES
E1
10/25/91
5136.5
WATERLINE PROFILE LINE "A"
E
1/8/92
SD6.6
WATER LINE PROFILES LINES 11, C, D, & E
E
1/8/92
SD7,1
SITE PLAN
C
11/15/91
SD7.2
ENLARGED AREA OF SITE PLAN
E
1/8/92
SD7.3
STREET LIGHTING PLAN
E
C
1/8/92
11/15/91
SD7.4
Dc-:TAILS
C
11/13f91
SD75
DETAILS
SD9.1
PLANTING PLAN
E
13
1/8/92
10/25/91
SD9.2
FOUNDATION PLAN
SD10.1
IRRIGATION PLAN
C
11/22/91
SDI0.2
IRRIGATION DETAILS
El
10/25/91
IC
IRTLEY ' MODIFICATION rROPOSAL
COLE 0 Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
saner Date, April 14, 1992
contractor
P.O. box 1179 To: THE ORB ORGANIZATION
1002 • loth
snohamish
wash, 96290 Initiated b Architect
(206) 561.5175 y'
Modillcatian Proposul: Additional costs due to revised site/utility drawings (ISSUE "C", DATED 11122191):
Kirtley-Cole cost breakdown, attached $72,892.03
NOTE: EXCLUDES LANDSCAPING (OLYMPIC UNDERGROUND & LANDSCAPE NM
& MULCHING (ROADRUNNER EXCAVATING)
EXCLUSIONS: SEE SUBCONTRACTOR PROPOSALS
Subtotal .. .. $72,892.03
Overhead & Profit 0 15% ... $10,933.80
Bonding ® 296 .. .. .
$1,676.52
Total .... .. . S85,502.35
Reason ror Modilirutlon:
Cost: Additional: 585,502.35 Credits: 5-0- Nev $85,502.35
Change In Calendar Days: FIFTEEN (15)
Recommendation:
Architect
General Contractor
Owner
Appmed
rr
Modification Proposal Incorporated Into Change order Number:
Attachments: Kirtley-Cole cost breakdown, subcontractor proposals
No action will be taken regarding this item until we receive written ruthoriration directing w to do so.
All contract work will proceed on its normal schedule.
PROPOSAL NO. V
#315 RENTON SENIOR HOUSING
MODIFICA'T'ION PROPOSAL #5 REVISED
Kirtley-Cole_Associate,5—.l
I.
Sidewalk changes at 16th & Kirkland (Add two handicap ramps)
cut ramp into existing sidewalk:
Concrete cutting and removal .......
5 500.00
Pour & finish (8 hours ® 28.00) .....
224.00
Material ....................
70.00
Add ramp to new sidewalk .............
100.00
2.
Add concrete driveway on Kirkland. Avenue:
Additional placement & finish labor ........
150.00
Additional concrete ..................
75.00
3.
Add dumpster pad with wire mesh;
Grade, form, pour, finish, strip (16 hours 0 28.00)
448.00
Material ........ I ........ I ...
75,00
4.
Supervision - 16 hours a 40.001hr. ........
640.00
5.
Add 60 l.f. piping at trailer approach:
Installation (4 hours @ 28.001hr.) .........
112.00
Bobcat (2 hours Q 35.001hr.) ...... ,
70.00
Material (backfill 10 yards 0 15.00/yd) .....
150.00
Remove & restore ditch - bobcat (2 hours ID 35.00)
70.00
Labor (2 hours Q 28.00)
56.00
6.
Provide one additional "Fire Lane - No Parking" sign;
Steel post ...... I .........
118.{)0
Sign ....... I ........
25.00
Concrete & grout ...................
12.00
Labor - 6 hours @ 28.00/hr . ............
168.00
7.
Remove storm inlet protection at job completion:
30 ea. Q 2 hours labor each (60 hours 0 28.00)
1,680.00
8.
Provide visible barrier "SN" areas using 2" X 2" X 4'
stakes and barrier "Caution" taps::
Materials I ....................
L74.00
Labor - 16 hours 0 28.00 ..............
448.00
9. Addition and relocation of silt fencing at enlarged
topsoil piles:
Materials .....................
Labor -8 hours(W 28.00 ...............
.00
224.00
10. Provide light pole base,
Materials . . . . . I . . . . . .
00.0
. . . . . . . . .
Labor.....I..........I....
700.000
7
11. Additional trenching and backfill for conduit:
Labor. . I ..................
625.00
Small Tools Allowance (4,835.00 X 5%) .....
241.75
Az Tec SU ,evine:
Labor ...................
1,900.QU
Materials ................
0.00
RoAdRu ncr E�ccavating tnc.:
Labor .................... ,
3,000.00
Materials .....................
10,600.00
A.L. Reicon. inc.:
v
Labor ....... I .............
8,844.00
Materials ..................
25,437.00
Alpi
Labor .................... .
(1,259.00)
Materials I....I...............
(2,855.50)
['nncrete &Steel SvstCMs Inco
Labor ............. I .......
632.00
Materials .....................
1,343.00
M.A. Segale. Ino.:
Labor 651.00
Materials ..................... 1,201.00
Rob's Electric -Inc.:
Labor ..................... 3,220.00
Materials ..................... 7,653.72
Additional costs for I - 4" conduit between B 1 -box and E J -box
(included on current Puget Power drawing, not included on engin. drawing):
Robe Electric, Inc,
Labor ....... . ............. 241.50
Materials........ ............ MU
Subtotal............... .
WSST Q 8.2% of materials ($63,220.50) ........ .
TOTAL ................
EXCLUSIONS: SEE SUBCONTRACTOR PROPOSALS
$69,106.66
3.785,
$72,842.03
206-486-4014 wDRLNEREXCPA)ATtNG
TRANSMITTAL !7
December 18, 1991
768 P01 DEC 1U '91 09s.c1
486-4014
868.3168
22845 N.E. SIM, SUITE 174, 'REDMOND, 98083
FAX TRANSMISSION
TO: KIRTLEY COLE ASSOC., INC./GREG BRIMHALL
FM: ROADRUNNER EXCAVATING, IMC./MIKE WEEKS
RE: PROPOSAL FOR ADDENDUM 1 B
Proposal for Addendum 1B covers only the items listed below:
TEMPORARY EROSION
1. Re -dig Retention Ponds: Materials: $2200.00
400.00
TOTAL 19600-00
2. Structures/Temp.
Erosion Pond Materials; $3400.00
Labor 600.00
TOTAL $4000.0_0
3, Mu c : M a tsr---S-1-1-1-0''94�
$ 400,00,E
TOTAL $3510.00
GRAND TOTAL: $17,110.00 (WSST NOT INCLUDED)
Note: All other changes listed on pages SD 2.1, SO 2.2 of
the print last revised date 11/22/91 are not included
in the above price. This is due to the fact that no
scope of work was given by the architect.
Sincerely,
ROAORUNN R EXCAVATING, INC.
Gl�v
Michael L. Weeks
President
MLW/l l J
z
F,
f YU/ as 6.0. %0-k Y AA 1 Li'IVp..lU
I
A.L. REICON, INC.
P.O. BOa� 589."50 � OU4053 WON 98272
Fax 794-8935
TELECO[IZR TRANSMITTAL COVER SHEET
TOS-,z2/12'_______________-_________-__---------_-_
COMPANY: _.. - - ------
PROMS
shoots _---.-__-_----
TOTAL PAGES BENT{l.ncludin9 cover________-.._____
DATESl---------------------------------
RE:----���l--,40l1Sl___-^____-----------___-_..____
COMMENTS DR SPECIAL INSTRLfCi`ICINSs _ C-��- __----_--
'L4C n'__ d,-=- bsL- _-----
------------------- --- --
le
--Al-�------------------------------------------------------------
ORIGINAL WILL BE SENT BY MAIL
YES No i'
REPLY EXPECTED x85 NO
03/25/92 07:39 IT2065687919 1@002/012
A.L REICONr INC. LIEUVIE u OF
P.O. Box 936
MONROE, WASHINGTON 95272
vire
(206 568.3354 827.535J Ani rl 4
7AX (206) 794.893340 41 4r_Let
WE ARE bENDINt1 YOU �( Attached 0 Under aauaral■ curer vla _--the following Items:
❑ Shop drawings ❑ Prints ❑ Plana I I Sampta Fl 9peclf}cp.tlona
❑ Copy of latter 1k,(Chorip order I I _—._ . -- --•
roriea PATI 1 14*. I OCecnlPTION
rz-:Kf 4"'..—
THESE ARE TRANSMITTFD as checked below:
For approval
IJ Approved as submltttd ❑ Raeubmlt coplaa for approval
Q For your use ❑ Approved as noted j 1 Submlt coplea for dlalrlbutlon
As requested U Returned for corrections ❑ nalurn wrroc+ted printa
❑ For revif+v and eernment ❑
0 FOR BIDS DUE 19_._. ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS _
CORY TO__
,.' SIGNED:
03/26/92 07:39 92065687919
1
KIR i LL' Y -COLE ASSOCIATES, ES, INC.
1002. Ift StmKM.0. box 1179. Snohomllh, WA 99100
Phan. (206) S61.31751FA% (206) 361.7919
DATE*
REQUEST E S?H PRGPQS—U,
(PUAen U1unus roam oNLY wHG1 funhtTT zinc)
SUB/SUPPLTER: /14 /• I /./ /� r !.
AA * . . i
ATTENTION:r
zeR ♦ F
•tNUMBER:
®003/012
DESCRIPTION OF
WORK: �f7-P &A-=
RESPOND BY:
ITEM
NvNmIlit
DESCRIPTION
/llmsf
HSTMATED
QUANTITY
UNIT
UMP
PRIG/
ESTIMATED
AMOUNT
7 da
/
Ti r ��'/rTrr9
,
S
�
Q
6y vsr
TOTAL AMOUNT
CONTRACT TIME; REQUEST
DAY(S)
11
1111A 111.0MIA1. t4k71.M.CTf ALL OF 11111 COM iNVOLVFlJ 114CINVINC ANY COMS 01" Or .1 S. DAM 7 CII MAY OMM MOM DCLAV9 ANA
NV rdrt*IX GFTT.I.'T! OF SUCII DELAYS,
AUTHORIZED SIGNATURE:
DATE.-
SIGNED:
ATE.SIGNED: REBBIC SAG1;R
03/25/92
A
2005/012
03/25/62 07,41 'M20656F71319
0©8/012
r�iryr-r• -
A*wll12
o
172,10
Or,
GF
J -
(.
r
♦
/
is '
y? d7 ,�✓/
- ©
��sG
Ao
12 {i0
rte✓/�1-7iy
��
14 ej
or'
Q
1G
a' v`�
IT
14 111Z
to•.(JT
5°ems
75.00
Y
21
d
°
=2 Ili
r I� r �.
elyt
Zoo°�
200,0 CO
za ,']
- • t/'�%
_ rte _
7.co
goo• o
it/ -Z/-,
.-�r
24 ;� �, �
2� t•
>,�'.
SSG<.�
�4S
(n70..` -D
2n
30 10
519
! C / .iia
ZOD��
Q�•0{�
i
IIi 1
3 N 17,E
r y==am
I
03/25/92 07:42 02085687919
110007/012
a
AYImo/
7746
tti a
2 �wMA
if
4
G
.24
10—
=
11
1x
14 J, It
1c
18
10
20
21
2x
24
25
20
_
27 �---
---—�
.._
24
20
00
31
32
93
©3/2
=1--n
0
m
03/26/92 07:43 X21
03/26/92 07:44 42065687919 Q010/012
Jos �z
Z/7.
�rO
44-60
✓AY4.549
X11 !�'� s .�✓
�'
Sta?•�• I
10 .r vM �y
11 •+ 1
3 Vis
3 4 5.79
12 ., .•p
_ 9 Q�
_N
17 /r�f� d-1ga��Q —rL_
,o _
72,00
14arEQ�~oD
5%a
17 f
17 t
i7COQ
1a � ` r;�frr• � ��
�
_ct
2.00
49,00
64
L21 j/,— 'AA
22 ''' *�' ~Xrr ii �/ y r Lev/
% 4 3
3 Lr
344
24
Ut
25 %j/nom Q , /13!'►1r>T �- +
313
S�
20 alt
38 4ull
Iz
33 CJ'r 1/sY r /•4�1� _ �'
Z Qi•017
1
03/2
w
03/26/92 07 46 4208087919
c
012/012
&trI40
t
2
2,
A
5
a
n
_
1 ]
ail
I6
.,✓ fr
- :� ," ,�t�f,/._
4�
.. • .
�--��_
1�
�'.
to
..• �
�
�
10
r-
20
21
'
22
2]
24
2S
27
20
20
30
21
39
37
4
'-�
aurum *memo -kw*M ad powiftato o (pit, am &A&o" &-ww
7-
fes.
A6
wto*f
0 23711 63rd Avenue SE
M WOODINVILLF, WASHINGTON 98072
7MI000 481.3456
`d *.o V %00
P WPJU
M"e g! o ti�67ENTI
-pow. 0loo" " poem
Rep� 0 110 MPLY "am
Vor oor-ec
_A. ojZ
A 4*
Q
p
VGNID:
SENDER: MAIL RECIPIENT WHITE AND PINK SHEETS.
SENDER: DETACH AND FILE FOR FOLLOW-UP.
pEC— 4-91 WED
8 1 1 4 CONCRETE M STEEL_
167444 Lincoln Avenue
Tacoma. WA 98421
TicOMS FAX
572.5363 572.5403
1110100SM fuurt.11110 lir
►J 1 &TLEY
9W...i l�.cJi. N A .412,K f }.7Q
dip COW
tMV11SH. ,11+1 wrc uo iinM►
r *(M 4u1N11.1 %low1111"AlW,ll Jr#J
frupUsul No. ut fops
sptdolLtln= In Sts/nvtys
Prec=t Cancnrte TroMa
M Pips lOmt hlslron
1"46L ... , w cart
..la�,E:t1tLTTDl11 . SB uerrs r erre. . ,... .
,UN IINarnrn
!t'hi?Ohf „e
nru MNr,n
AS PER PHONE CONVERSATION WIGREG ON J2-3-91, ADA NO
AM INONAL WES . . . . . . . . . . . . . . . . ai, 9Ts. 00
FI i
NOYYiS
J. algnvd proposal and all requlrod information must be In our
office before any deliveries will be made.
2. Forklift or labor crust be evallably at the job site to unload
delivery truck.
J. Should payment not be received by the i0th of the morph As per
this proposal, a service charje of fifteen (13) dollars will be
added. The lion procedure will commence and Interest at the rate
of .00049 per cent will be charge dally on the past due amount.
rho account will not be considered paid In full until all oasts,
includin/ attorney's fees, incurred by us as a result of Cho lion
procedure, the s4►rvioe oharge and the accumulated daily interest
on the unpaid amount are ileo paid.
J. PLUS VSST, he APPLICABLE'
S. TERMS: NET JO
6. Thr r)nal purchase price shall bd adjusted bated on the actual
materials ordered by the Job site Superintendent and delivered
fu ti)w job site using the quoted pvr unit prices.
111! VrUIJU lr hureby to furn,gh lrluUrrtul grid sibur .• r:urnfllulu In MLctordance with 8bove SPICI}Icatn►nl,, lur tho .ugh at;
E. irj% .b1iNO, NINE NUNI?RBQd&QJffMTY:F-L�
V, dr Q0/ Oars (: - ti,.y7s. OO—fty
)"ffnnt IL Up Inam q II„ Iuws
IwM,lll N NN..MOW rY N N .bft.%Od. AN wW4 IN be OM..90490 w. i w.w Y.M.IM►.
4110101111110 nr/mp"l{ W .I..M..d WMiMM r<Mr swops o M /HMIs„ "M..Irw.. I,...rM M N.,IIMrIIW ..
tilq MIu1M.7 wN..Nrl1 wt M /«AMM carry Own 04104A Own .M 106......M sogfulutl
ININ *W" car .,.140— W w -&ft 1W NMWANU SMI Y/wr t4M► Aaft1..rr/ J
r do" Mewed *w "004" Lkpow M / 110% 11110011" M/ Wiff N"N"Ir wr.rr.rx r (lul■ thll /rOPOW R1Y bill
OWwNu1tNw MNSAwni W wwbM, *Uffowftaw 110M,u.1/ •nuNilrwil" wo it e* 844906d within th� r it Y
I
41
006664wrwe
In
319 I Cpr 17.91 1635 No .009 P,0_'
SEGALE ASPHALT DIV. TEL.2065750
II ADDITIONAL WORK AUTHORIZATION
M. A. SEGALE, INC. / ASPHALT DIVISION
i P,O. Box 88050 • 18500 Southcsnter Parkway
Tukwila, Washington 981$8 • (208) 575.0160
°`"NAMEI Kirtley-Cole Associates, Inc.
ITMEITt PO Box 1179
CITr/5TAT[t Snohomish, wA 98290
P14ON1 R 568-3175
GIN—O T11 October 21, 1991
DATE:
JOS NAME
STAIETt
CITY/STAT[I
JOB NO,a
Uecamber 17, 1991
Renton Senior Housing
3150 NE 16th Street
Renton
3150
You ars hereby eutharltsd to per>torm the following specifically desaibed additional works
ADD 3 speed bumps per ray telephone conversation with Greg on 12/17/91.
LABOR - ;375.00
MATERIAL - $ 75.00
ADDITIONAL CHARGE FOR ABOVE WORK IS $ $450.00 _
PAYMENT WILLIE MADE AS FOLLOWS:
ABOVE ADDITIONAL WORK TO BE P6111FORMBG UNDER SAME CONDITIONS AS SPICIFIED IN ORIGINAL CONTRACT UNLESS
OTHERWISE STIPULATED,
Date 1a. �AuthmIzInISignsivre
I Nl arONSNftA51
v� 4R[BY AGRi RNISH LAaOR AH kI :RIA — COMPLETE IN ACCORDANCE WITH THE ABOV T SPECIFICATIONS,
AT ABOVE 3T D t'RICi.
Authorind 3 gmMur Data Ma14 I
M AGTL711510 a NSAaI
THIS IS CHANGE ORDER NO.
NOTE i TRF II+.H1an Mern�M /ret of. wo In M orftv"M W th, %No 9111rtlry te"trrrt.
r.
1[/1
{n
8
5
0
d
M.A. SEC %LEI INC.
ASPHALT PAVING PROPOSAL
CONTRACT
ASPHALT DIVISION JOB N0,
P.O. eox ae05o ■ 10500 SOUTHCENTER PAAKVYAY ■ TUKWILA, WASHINGTON 0138
TELEPHONE: 17061575.0150 ■ FAX: (706) 575.3207 ■ 329.01 -SEBA LM-A372NO
Ki a -C le A sv�iates, Inc. Date: Januar 20 1992
PtoposalTo:
Project/ Address Renton Senior Housing_ _
Address:
City, State. Zip: _.
�nah4mish: WA 9_8290 310 NE 16th Street
Atte' Debbie _ 'Renton
Our proposal is to fumish the folIGA"I items, subject to the covenants, terms, and conditions set forth below
AND TO THF- MASTER TERMS AND CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL:
We hereby submit specifications and estimates for:
ADD DRIVEWAY
120 Square Yards of 4" Crushed Rock and 2" Asphalt.
LABOR 3276,00
EQUIPMENT AND MATERIAL $1,126.00
See Attached for Breakdown
N �
no
r�1
JAN 2 ? 1092
KIRTLEY • COLE ASSOCIATES
Terms of Payment —, subject to approval or modification by M.A. SEGALE, INC. Credit Department
according to the reverse side hereof.
This proposal is based upon pians and specifications prepared by
including any addenda thereto and together with die covenants, terms, and conditions of this Asphalt Paving Proposal Contract.
If Rider bona are ch,•cked, then referenced Riders are attached hereto and incorporated herein by this reference.
M Rider til: Notice to Customer in accordance with RCW 1&.27.114
Q Rider 12: Labor dt industries Construction Lien Master Documents
"'CEPTED BY
Respectfully submin
BUYER: SE EGAL NC.IASP DI/VO N
By:
Tice:
Dau
By:
Pat Skube
Tide: E Sa Or
i�
RQH'S ELECTRIC INC. Tr :206-334-7056 Fe 33.92 11 11 No.001 P.03 I'
Kirtloy Colo Associates
February 3. 1992
Page 2
Page Sb7.2
40 0 $1.03 per ft.
$
Pavision Nate 13 { Note! no vire or dpl.icing
is includod.)
$3.91 ea.
60' - 2V PVC Sch 40 0 $1.66 per ft.
$
99.60
3 - 24" PVC 9012 0 $7.11 ea.
$
21.33
6 - 2y" PVC Couplings 0 $2.16 on.
$
12.96
9 - 211 2 hole straps • $2.93 ea.
1
26.37
3 - 21)11 PVC Weatherheada 0 $47.55 •a.
$
142.65
3 - 2y" PVC Heli endue 0 $3.48 ea.
$
10.44
1 - Quart or glue 0 $4.25 ea.
$
4.25
20 hours of labor 0 135.00 per hour
�� 700.00
(No conduit is included except mast on house
everything else is direct burial)
Subtotal
$
1017.60
Plus 15%
$
152.64
Total Dun
$
1170.24
summa
ck=
Revision Note 012
4801 - 2" PVC Sch
40 0 $1.03 per ft.
$
494.40
2 - V PVC 90's @
$3.91 ea.
#
7.02
10 - 2" PVC Coupling's 0 $1.21 ea.
12.10
1 _ Quart of glue
0 $4.25 ea.
4.25
16 hours of labor
0 $35.00 per hour
60.00
Subtotal
$
1078.57
Plus 15%
$
161.79
Total Duo
$
1240.36
wwnsm:WWW
mit
ROB'S ELECTRIC INC. TEI -206-334-70'56 Feb 3 , 92 11 : 11 No .001 P .04
Kirtloy Cole Associate
February 3, 1992
Page 3
page SU7.3
1 Light pole & fixture
2 - J- boxes 0 $95.00 sa.
180, - %1 pVC Sch 40 0 .aoc per ft.
720, - 08 Copper 0 .304 par ft.
20 - 1� PVC Couplings 0 .e8t ea.
6 - ly Bch 40 Bell ends 0'$2.13 an.
4 - 1h Rigid 90'2 0 $15.34 OR.
2 1y Rigid 45's 0 $2.51 so -
12 - 1h PVC Female Adaptors 0 $1.00 •a.
'2 - Ground Clamps 0 $1.26 sa.
2 - Copper clad 5/8" a B' Grd rods 0 $7.i81 sa.
2 - Fuse kits 10 amp in line 0 $7.50 *&-
2 - Splice Kits 0 $23.31 as-
Re- connect relocated power pole mine. material
32 hours of labor 0 $35.00 per hour
Subtotal
plus 15%
Total
$ 1897.00
$ 190.00
$ 144.00
$ 216.00
j 17.60
$ 12.76
$ 62.16
$ 5.02
$ 12.00
$ 2.52
$ 15.22
$ 15.00
61.84
$ 250.00
3 1120.00
$ 4021.13
$ 603.17
$ 4624.30
ftkmrftwnmuw
RC6''S ELECTRIC INC
TEL:206-334-7056
Kirtley Cole Associates
February 3, 1992
Page 4
Feb 0392 1111 N0,001 P.05
puget Power drawing -chows 1-4" Co not shown on the engineers
pians. Between B J -box and E J -box.
180" - 4" FVC Sch 40 0
$2.94 per ft.
$ 529.20
18 - d°' FVC Couplings 0
$4.23 ea.
$ 76.50
1 - 4" 90,0 $113.30 •a.
$ 113.30
2 - 4" PVC Bell ends 0
$4.63 ea.
$ 9.26
1 - Quart of glue 0 $4.25
on.
; 4.25
6 hours of labor 0 $33.00
per,hour
# 210.00
Subtotal
942.61
Pius 15%
$ 141.30
Total Duo
$ 1083.89
MEMANNOWN
Total Amount Due
$11957.61
&W W WWr.wss
Not Includodt
Ditching
pole bases
Backfill
Puget Power
conduits may noc
Temporary Power
be correct
sizes. Z had no
Temporary Lighting
information
on secondary
Power Co. Charge
wire or pplices
to existing
Phone Co. Charge
housed.
TV Co. Charge
Thank ]fou,
Robert Poraoso
President
RP/i r
ROB'S ELECTRIC INC.
.F
TELr206-334-7056 Fe` 03.92 11 10 No.001 P,02
RORY ELECTRIC., flicame
ELIMICAL CCNU UCTORS �!1
3630 98th DRIVE S.E. • EVERETT, WA 9M
TELEPHONE 334-6834
MOBILE PHONE 3398783
February 3, 1992
Kirtley Cola Asnociatea
1002 10th 5t.
Snohomish, Wa. 98290
Rei Renton Senior Mousing Revision Notes
Attne Debbie
Page 8D7.1
Revision Note $3 TV Conduit
90' - 2" Pvc Sch 40 a $1.02 per ft. $ 92.70
2 - Rigid 90's a $22.96 ea. $ 45.72
1 - Rigid 45 0 $22.86 on. $ 22,86
6 - 2" F'emals Adaptors 0 $6.67 *a. $ 40.02
2 - 2" FVC Couplings a $1.21 aa. $ 2.42
1 Quart of Glue a $4.23 ea. $ 4.25
4 hours of labor 0 $33.00 per $ 140.00
Subtotal $ 347.97
Plus 15% $ 52.50
Total Dub $ 400.17
mmmummumc
Revision #3 Power Conduit
640' - 4" PVC 0 $2.94 per ft.(2 runes @ 320' ea.)
$
1881.60
6 - 4" Rigid 90's 0 $113.30 ea.
$
679.80
12 - 4" Female Adaptors 0 $5.88 ea.
$
70.56
2 - Stand offs 0 $20.00 aa,
40.00
4 - 4" PVC.Straps A $1.63 ea.
$
6.52
4 - 3" Lag Bolts (9 .360 aa.
$
1.14
2 - 4" PVC Dell ende 0 $4.63 ea.
$
$
9,26
17.00
4 - 4" PVC Couplings 0 $4.23 ea.
$
4.25
1 - Quart of glue 0 $4.25 am.
280.00
8 hours of labor 0 $35.00 per hour
$
2990.13
Subtotal
Plus 15%
$
448.52
$
3438.6"5
Total Due
hN
U)
O
t7
m
� �i
fgA
If1
d
��fJ
Z
w
�4 � �
��
• i
Z
V1
r
i