CHANGE UDDER KIRTLEY-COLE ASSOCIATER)wner
ORB Foran 300 Archlttn
r
(rhLs farm is to be executed in triplicate and each party is to retain an original)
Contracto
Project Namc: RENTON SENIOR HOUSING
Date: April 24, 1992
Project . Address: 3151 NE 16th Street
Change Order No: Nine (9)
Contracto. Nme KIRTLEY-COLE ASSOCIATES ORB Project No.: 9007
& Addroew 1002 - 10th Street Contract For. General Construction
Snohomish, Washington 98290
Contract Date: CktnLcr 31, 1991
�rR
The Contract is hereby amended as follows:
1. per ORB Proposal Request No. 2, dated December 13, 1991 (attached) and Kirtley-Cole
Modification Proposal No. 6R, dated March 31, 1992 (attached).
Provide architectural, structural, mechanical, and electrical changes associated
with reconfiguration of elevators and other changes resulting from Building S 5,295.00
CodeReview. ADD; ...................................
2. per Kirtley-Cole M«iification Proposal No. 11, dated March 10, 1992 (attached).
Provide Fire Protection changes associated with Mechanical and Site revisions .. S29,416.04
Number -E' dated January 8, 1991 ADD: .......................................... .
Q�
TOTAL CONMUts f1ON COST IMPACT OF THIS CHANGE ORDER: ADD:......... .
.............. S34,711.04
List of Enclosures: d7
ORB Proposal Request No. 2
KC Modification Proposal No. 611
KC Modification Proposal No. 11
This Change Ordrr is not valid unless sign—Ed by the Owner Architect at.d Contractor.
. 54,620,76x.00
The Original Contract 'Sum was .......................... , .......................... I ...... S 55.0,010.94
Net Change by previously authorizeci Change Order(s) was ......... ...................... 55,176 010,44
The Contract Sum prior to this Change Order was ....... ....................................... S 34,7 5.44
The Contract Sum will be increased by this Change Order in the amount •)f . , , S5,211,486.48 347104
The new Contract Stun incorporating this Change Order will be .................... . .............. Nineteen th4) d .
The Contract Time will be increased by ......... . ............................
The Substantial Completion Date including this Change Order Is .............. • • .. • • • • • • '....... . . Dm3m x �, 193'1
NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time which have been approved by
ORB Form -VI - Construction Change Directive,
THE ORB ORGAN17i1TION, INC.
607 SW Grady 1Vay, Suite 210
u—i. AVashineton 98015
KIRTLEY-COLE ASSOCIATES
1002 - 10th Strwt
Snohomish, ashtington 98pa
�l
-- G rdon ole
r �
ate
CITY OF RENTON, P & R DEPT
200 Mill Avenue South
Renton,lVash:ngton 98055
� �`' ` L-
�j ce t Lex
Page IofI
OWNER
PROPOSAL ARCHITECT
TOR p
REQUEST FEED a
AIA o0CUMENT G709 OTHER
HOUSING
PROPOSAL REQUEST NO: Two (2)
PROJECT: RENTON SENIOR
{name, address} 3151 NE 16th
Renton. Washington 98055
OWNER: CITY OF RENTON DATE: December 13, 1991
PARRS AND RECREATION DEPARTMENT
TO: ICantractorl 7 ARCHITECT'S PROJECT NO: 9001
KIM.LEy _ COLE ASSOCIATES, INC- General Construction
1002 — 10th Street CONTRACT FOR:
Snohomish, Washington 98290
� CONTRACT DATED: October 31, 1997.
Please submit an itemized quotation for changes in the Contract Sum andlor Time incidental 10 proposed modifica-
tions to the Contract Documents described herein.
NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN -
THIS 1S NOT A CHANGE ORDER
Description: rwnnd^ deet -a -a of rh" "i"
Proiect work shall be revised as follows:
A. As shown on the attached revised sheets of drawings (ATTACHMENT 2). Drawings are
listed on ATTACHMENT I.
B. As called for on ATTACHMENT 3 - HARDWARE GROUT' 29.
C. As called foasClra provided in the bbd O � of the D- ELEVATORS. elete Section
Contract Documents.
14204 - ELEVATORSP
Attachments: IUrr anached drtcffl"n 'hal nropen dwer^"rrenr
ATTACHMENT 1 INDEX OF DRAWINGS
ATTACHMENT 2 BLUELINE DRAWINGS AS LISTED IN ATTACHMENT 1
ATTACHMENT3 HARDWARE GROUT' 29
ATTACHMENT 4 SECTION 14200 - ELEVATORS
ARCHITECT: THE Ogg ORGANIZATION, INC.
BY: Coral P. Dewilliam. AIA
AIA DOCUMENT L:09 PRl7POSAt REQUEST • APRtt 19'6 {DIT10% - AIAT G 1970 THE ONE PAGE
AMERICA✓ I%STITt:TE OF ARCHITECTS. 1735 NEW YORK AVl,, `I.w.. WASHINC�pv, D.C. 20"
w ills <d Pa+oWC0V VV V040"U5. eop►TI9M ra.n and h t to MY"r 17rON+ rbn
WAFNiN6: ur
THE ORB ORGANIZATION, INC.
607 SW GRADY WAY, SUTIE 210
RENTON, WASHINGTON 98055-2977
ATTAC14MENT 1
RENTON SENIOR HOUSING
INDEX OF DRAWINGS FOR
PROPOSAL REQUEST NO.2
DATE; JANUARY 7 1992
NOTE THE FOLLOWING DRAWINGS ARE (AS NOTED IN THE REVISION BOX IN THE
UPPER RIGHT HAND CORNER OF THE SHEET) DRAWING MARKED WITH ASTERISK
CONTAIN REVISIONS D.
ATTACHMENT 2 - THE DRAWINGS INCLUDED IN THIS INDEX ARE INCLUDED WITH
THIS PROPOSAL REQUEST.
DRAWING NO.
1S51JE
DESCRIPTION
�n
1»
#RCI ITTECTURAL
C
FIRST FLOOR PLAN - PARTIAL
ALI
Al2
C
FIRST FLOOR PLAN - PARTIAL AND ALTERNATE BIDS
PARTIAL
C
SECOND AND THIRD FLOOR PLAN -
A13
C
COMMON AREA PLAN
A22
C
STAIR PLANS, SECTIONS AND DETAILS
A23
C
EXTERIOR ELEVATIONS
p
A43
A5.1
C
BUILDING SECTIONS
Z
'A6.2
D
C
WALL SECTIONS
DOOR AND FRAME SCHEDULE
A8.1
A92
C
DETAILS
p
A93
C
DETAILS
�I
A9.4
C
DETAILS
•A95
D
DETAILS
STRUCTURAL
GENERAL MUCTURAL NOTES AND TYP. DETAILS
FIRST FLOOR AND FOUNDATION PLAN -PARTIAL
$
OS2.„52.1
C
SECOND FLOOR FRAMING PLAN, LOBBY AND COMMUNITY ROOM
S23
D
ROOF FRAMING PLAN - PARTIAL
C
THIRD FLOOR FRAMING PLAN - PARTIAL
9
SL4
D
ROOF FRAMING, PARTIAL
'S26
C
SECTIONS AND DETAILS
53.1
S33
C
SECTIONS AND DETAILS
ECHNI�AL
E
FOUNDATION PLAN - PARTIAL
M
zz
MIA
M13
E
FIRST FLOOR PLAN - PARTIAL
BIDS
A
FIRST FLOOR PLAN, PARTIAL AND ALTERNATE
MIA
E
E
SECOND FLOOR PLAN - PARTIAL
MIS
E
SECOND FLOOR PLAN - PARTIAL AND ALTERNATE BIDS
MIA
E
THIRD FLOOR PLAN . PARTIAL
M1.7
THIRD FLOOR PLAN - PARTIAL AND ALTERNATE BIDS
MISE
E
LARGE SCALE PLANS - LAUNDRY AND MECHANICAL DETAILS
M2.2
ROOMS
ELECTRICAL
C
LIGHTING AND POWER FIR5T FLOOR
El.l
C
SYSTEMS -FIRST FLOOR
E1.2
THE ORB ORGANIZATION, INC.
607 SW GRADY WAY, SUITE 210
RENTON, WASHINGTON 98055-2977
ATTACHMENT 3
RENTON SENIOR HOUSING
HARDWARE GROUP 29 FOR
PROPOSAL REQUEST NO. 2
DATE: DECEMBER 13 ]991
ADD THE FOLLOWING TO SPECIFICATIONS SECTION 087Cf0 - FINISH HARDWARE,
PARAGRAPH 206, CC.
CC. HARDWARE SET #29 HW -29 ;
(SMOKE DOORS ® ELEVATOR DOORS #98)
1-1/5 PR BUTTS ...... MC T4A3786 26D 4-1/4 X 4-1/2
1 LATCH ... ............. SA 8115 LNL 26D - (5-1/2" BACKSETI
1 MAGNETIC HOLD OPEN .......... RI FM998
1 CLOSER ........................ SA EN1230-0 180°
1 SET SMOKE GASKET .............. PE S88D
I
THE ORB ORGANIZATION, INC
607 SW GRADY WAY, SUITE 210
RENTON, WASHINGTON 98055-2977
ATTACHMENT 4
RENTON SENIOR HOUSING
ELEVATOR SPECIFICATION FOR
PROPOSAL REQUEST NO.2
DATE: DECEMBER 13,1 1
SECTION 14200
ELEVATORS
PART 1 - GENE -RAI,
1.01 SCOPE
A. Work Included:
Conveying systems for this work include but are not limited to passenger
elevator(s).
B. Related Work Described Elsewhere:
Section 05000
1.
Metal Fabrications
Section 08200
2.
Metal Doors and Frames
Section 08200
3.
Wood Dors
Section 08700
4.
Hardware
Section 09900
5.
Painting
Division 15
6,
Mechanical
Division 16
7.
Electrical
listed herein are not repeated in Division 16.
Note: Electrical requirements
1.02 QUALITY ASSURANCE
A. Codes R cations and Standards;
Refer to Section 01080 - APPLICABLE CODES AND $TANDAADS. Work in
this division shall conforrn to the latest issue of applicable provision of the
following:
1. UBC - Unifonn Building Code.
2. Fed. Std. - Federal Standards.
3. ANSI - American National Standards Institute.
4. ASTM - American Satiety for Testing and Materials.
5, AWS - American Welding Society.
6. NEMA - National Electrical Manufacturers Assoc.
7. NFPA - National Eire Protection Association: NEPA #8-
8. SSPC - Steel Structures Painting Council.
9. NEC - National Electrical Code: NEC Chapter 296.
10. WAC - State of Wasliington Statute: Ch. 296-81, 296-92-
11.
96-9211. ANSI/ASME - American Standard Safety Code for Elevators, Dumbwaiters,
Escalators and Moving Walks, A17.1.
12. ANSI A117-1 1986 Accessibility for Physically Handicapped.
z
O
j
0
m
_;
:n-
vi4
e
rn
ma
-4O
OC
G
my
O-1
o
n�
mrn
a 5
O
K(n
zn
z
O
6
m
W Idin uafifications:
The .,Uality of welding and the welding prose es shall be determined by
tes , the welder's ability to make sound welom,, under standard working
conditions with the equipment to be used in the work on this project, and in
conformance with AWS D1.1, Section S. The Contractor shall submit certified
copies of the qualifications of the welders employed on the contract. Each
welder shall be required to identify her/his work with a code marking, and a
listing of the names of the welders with corresponding code mark shall be
furnished by the Contracting Officer. Welders making defective welds after
passing the test shall be given a requalification test. Welders who fall a
requalification test shall not be permitted to perform work under this project.
1.43 SUBMITTALS
A. General:
Submit in accordance with the provisions of Section 01340 - SUBMITTALS.
Z
D
B. Shots Drawings:
The Contractor shall provide required catalog cuts and shop drawings for the
rn
following:
1. Plans, elevations and details of car enclosures for complete installation.
:q
2. The location and arrangement of elevator equipment.
Ui
v m
3. Provisions for handicapped compliance.
0
4. Manufacturer's product literature.
rn D
-400
CiDc
5. Weight capacity.
C:
6. Maximum occupant load.
� K
7. Speed.
m m
S. Dimensions.
9. Hydraulic lift drawings, specifications and dimensions.
i a
` p
I
�
C. Calculations:c^
Submit all calculations in triplicate to the Architect for reaction loads imposed
D
on the building and buffer load on the pit floor or depict these loads on the
j Drawings.
m
ttt
_
Din
1.04 PRODUCT DELIVERY STORAGE, AND HA.NDL1NG
C N
Refer to Section 01600 -MATERIAL. EQUIPMENT AND JOB CONDITIONS.
0
1.05 GUARANTEES WARRANi31:S AND BONDS
The Elevator Contractor shall guarantee that the materials and quality of work of the
apparatus installed meet the requirements of the specifications in every respect and
defects not due to ordinary wear and tear or
I
z
6
that the Contractor will make good any
final
improper use or care, which may develop within one year from date of
D
J
Acceptance.
0
� rai
PART 2 - PRgDUCTS
2.01 PRODI;CTS
A.Mer3l'
Contractor shall provide the following:
1. Quantity: Two (2)
2. Manufacturer. Dover Elevator Systems, Inc.
Page 4
ORB 9007
cod 12/13/91-3
SECnaN 14200
ELEVATORS
3 Tape; Pre -Engineered Hydraulic Elevator
4. Model: 'Seville 35'
S. Capacity: 3500 pounds
6. Inside Car Dimensions: 5'-5' deep, 6'-8' wide
Niall panels: Plastic laminate finish
Entrance: 3'-6' wide x 7-0" deep
Materials: Brushed stainless steel at cab interior.
Painted hollow metal at corridor entrance.
8. Door. Single Speed, side opening.
Material: Brushed stainless steel - at cab interior.
Painted hollow metal at corridor
9. Front Panel: Brushed stainless steel with swing -out access
10. Handrail: Oak plank (continuous)
11. Flooring: Vinyl composition tile. Color and pattern to be approved by
Architect.
12. Car Lighting: Fluorescent
13. Car Ceiling: Manufacturer's Standard 'suspended" ceiling.
14. Ceiling Height. 74'
Note. Ceiling shall be demountable and have a 9'-0" high x lb' deep
raised section at front or rear of car.
15. Battery lowering device and associated wiring which responds to loss of
building power by automatically lowering the "levator to t`Se ground floor.
Opening the doors then shutting off until power :It restc,ed.
2.02 GENERAL RE UIREMENTS
Elevators shall meet the requirements of the manufacturer as specified dbnve and
shall meet the following additional requirements:
I. Elevator shall be hydraulic.
2. Hydraulics shall be piston type, either telescoping hale -less type or bored
cylinder type.
3. Unit shall have microprocessor controllers, tivitlr selective callecive
operation. Motor generator sets are not acceptable.
q A fire recall system (including Phase 11 recall) should be provided for
each elevator.
5. Brakes shall have sufficient power to stop and hold the car with 1256 of
rated capacity.
6. Cab shall have an emergency phone station, emergency alarm button, and
emergency lighting.
7. Speed to be 125 fpm minimum, 150 fpm rnaximurn
8. Elevators shall have provisions for the handicapped as requiv,,d by code.
9. Electronic door sensing shall be manufacturer's standard pro)dmity
detectors.
10. Hall buttons and car buttons shall illuminate upon contact.
11. Hall gong or tone shall be adjustable in volume and mutably?.
12. Cab shall be capable of accommodating Renton Fire Departr ent Gurney
(approximately T-0' x 1'-10" i in a horizontal configuration.
Page 5
ORB W
cod 12/13/91-3
O
0
rn
SE•MON 14200
ELEVATORS
2.03 ELECTRICAL WORK
All work shall conform to the requirements of Division 16 and the following.
1. The power supply will either be a 480Y/27 volt, 3 phase, 4 wire grounded
system.
2. Lighting supply shall be 120V, 15A capacity.
3. Confirmation of current characteristics shall be furnished to the elevator
contractor by Contractor before commencing work.
4. All wires in the traveling cables must be terminated on a terminal board
with permanent identification matching that used in schematic diagrams.
5. All relays, switches, resistors, overload devices, fuses, timers, etc.,
mechanically or electrically operated, shall be permanently marked with
identification matching that used in the schematic design.
6. All devices shown in all schematic diagrams shall be identified to the
satisfaction of the Owner.
7. All field wiring must terminate at each control cabinet on approved and
properly identified terminal strips. Field wiring shall not terminate on
equipment or relay studs. All control wiring shall be of stranded
construction.
8. All identification :hall conform to the standards in Division 16..
PART 3 -.–EX—EC—LMON
3.01 UALIF CAT10NS
Elevator Subcontractor alification: The elevator subcontractor must qualify no
later than 90 days after the Award of Contract submitting satisfactory evidence of:
1. Plant and facilities adequate to produce and install the complete elevator.
2. personnel thoroughly experienced in each phage of design, manufacture,
installation and service.
3. Experienced personnel able to provide service without delay.
4. Repair parts and special tools locally available.
5. The ability to produce the reference documents called for under the
execution section of this standard. Contractor must provide the Architect
with a sample of the reference documents complete in all respects
demonstrating the kind of reference documents material that will be
supplied the Owner under the contract All material will be held in strict
confidence and returned to the proposer if requested. The successful
proposer must leave the sample material on file with the Architect until all
reference documents have been supplied in conformity with the Contract.
6. If the elevator subcontractor fails to meet the Owner's qualifications, the
Contractor shall provide an elevator subcontractor which does meet the
Owner's qualifications at no additional expense to the Owner.
3.02 EXECUTION
A. prep2ratory Work by General Contractor.
The following work is to be performed by the General Contractor. Provide:
1. A legal hoistway properly framed and enclosed.
2. Lighted and ventilated machine room.
3. Access doors and guards.
Page 6
ORB 9007
cod 12/13/91-3
z
0
_i
C7
ret
SECTION 14200
ELEVATORS
4. Steel channel door frames as located on drawings.
5. Beam supports for machinery.
6. poor sills and door sill angles (approximately 4' x 4' x 3/8' verify size
with elevator manufacturer.)
7. Supports for guide rail brackets.
8. Light outlets in pit as required by code.
9. Feeder wires to elevatar control panel.
W. Fused main line switch or circuit breaker in proximity to control panel`
11. Hoistway outlets for car lights.
12. :iachine room outlets for elevator signal equipment.
13. power for testing and adjusting elevator equipment, temporary power
during construction.
14. All cutting and patching of walls, floors or parti!ionr.
15. Protection of hoistway during construction.
16. Pit Ladder: Provide ladder 42" above bottom of terminal entrance. Provide
rungs 3/4" diameter steel and 4' from wall. Side rails shall be 3/8" x 2"
steel. Rails and rungs shall be welded together. Contractor shall provide
method for securing to wall.
17. Smoke Doors and }'ramex: Provide 20 minute rated doors and frame
assembly at each elevator entrance. Smoke doors are to be held open by
magnetic hold -opens and released by activation of smoke detectors.
17. Installation beam: Contractor shall provide size as required by elevator
installer. Contractor shall remove after use.
B. prior to installation, the installer shall examine the hoistway and machine room
to verifv that no irregularities exist that would affect the quality of execution of
Work. Written notification of any discrepancies should be submitted to the
Contractor and architect. Work shall not proceed until problems are corrected.
C. Testing
1. Upon nominal completion of elevator installation, and before permitting
use of elevator (either temporary or permanent), perform acceptance les's
as required and recommended by code and governing regulations or
agencies.
2. Final Acceptance of the installation shall be made only after all field quality
control inspections and tests are completed; all submittals and certificates
have been received in conformance with the Contract; speed, capacity, floor
to floor performance, and door operation comply with the contract
requirements.
3. The Contractor shall furnish personnel, equipment, and instruments to
perform required tests for acceptance of the equipment in accordance with
code and contractual requirements, including the following:
a. Insulation Resistance Test: Test safety circuit, door lock circuit, loop
circuit, and motor and generator field circuits at 500 volts. Ltinimum
resistance to ground one megohm.
b. Running Test: With equipment within 5 degrees of ambient machine
room temperature, perform the following:
1) Place thermometers in hoist motor, exciter and generator
windings.
21 Check floor to floor performance time, speed, stopping accuracy
and general ride of elevator with no load, balance load and full
load in car.
Page 7
ORB 9007
cod 12/13/91-3
O
-4
0
m
:4T
Cm
mg
Q�
C
m
�z
cr
O�
Mm
ON
5 F
0
iro
I
SECTION 142U0
ELEVATORS
3) Run fully loaded car continuously for a period of 34 minutes,
stopping at each floor in both directions for a period of 10
seconds.
In all test conditions, speed and performance times specified shall be
met, stopping accuracy shall be maintained without releveling and
general riding quality shall be acceptable to Owner. Temperature rise
in windings shall not exceed 50 degree`. C above ambient.
4. Following the proper installation and testing of equipment, the Contractor
shall furnish a certificate of final inspection and approval from the State of
Washington. The elevator contractor will be required to provide to the
Owner ail reference documents required to carry out adequate
maintenance. If there is any question regarding what is required by the
Owner, the Contractor shall review the requirements with the Owner. If
adequate reference documents are not already available from the supplier
on all equipment used in the installation, the elevator contractor will be
required to produce the necessary documents at her/his own expense to
the satisfaction of the Owner. All reference documents must be submitted
directly to the Owner at least two weeks prior to final inspection of the
elevator. All referency documents must be organized under separate cover
fo• the elevator unit in logical, indexed sequence for easy reference and
bound with a long-lasting, wear tesistant cover. In general, the required
material shall be as follows:
a. Drawin s Dia rams Schematics:
1) All drawings and shop drawings corrcctea to record drawings.
2) All diagrams shall be clearly legible in not -full-size details.
3) All drawings, pnnts and reproducible transparencies to be not
less than 24" x 4" or 18" x 24* if drawn to full size.
b. Manuals of Instruction (!tc.: Submit 8 copies of each, giving complete
descriptive information and instruction manuals, incluaing
ati
adjustments and sen -icing, covering the following where applicable:
1) Signal system used, including sequence of operation and
adjustment instructions.
2) Dtvr operation, including electric eye and sensitive edge, its
sequence of operation .-knd adjusting instructions.
Novice Function and Description:
Device or relay symbol and name.
A full description of the function device or relay in the
control and signal circuits.
4) Hydraulic valve and pumps:
Adjusting instructions
Oil flow schematic diagrams
5) Jack Packing
- Show cross section of seals and retainer
Procedures for packing
6 Provide literature for multi -section or inverted cylinder and/or
plungers.
;) Brake with complete adjusting instructions of made! used.
8) Summary of all adjustments made by elevator manufacturer,
installer and adjuster.
5, Parts Usts: Submit 8 copies. Summary parts list, indexed and organized
for easy reference to all ot!ier documents, covering all parts used in this
installation.
Page 8
ORB 9007
cod 12/13/91-3
Z
Q
0
to
:i '�
in
C0
M
0
—10
0r
�K
mm
0�
�Z.-�
u=ri
O-1
mm
00 Fn
o Fn
r.0)AM
SECTION 14200
ELEVATORS
6. Machine Room Reference Drawings: :fount 1 complete set of approved
schematic drawings on 1/4' tempered rnasonite and cover the entire
surface with dear 1/8' thick acrylic plastic, or in notebook with each page
mounted in acrylic plastic. Tape edges securely with 1-1/2' black plastic
tare. Deliver to Owner. ALL REFERENCE DOCUMENTS MUST BE
COMIlLETED TO THE SATISFACTION OF THE OWNER BEFORE
SUBSTANTIAL COMPLETION OF THE ELEVATOR WORK CAN BE
MADE. FINAL PAYMENT OF THE CONTRACT CANNOT BE MADE
UNTIL THE ELEVATOR WORK IS ACCEPTED.
D. Instructions:
1. instruct Owner's personnel in operation and daily maintenance of elevators.
Review emergency provisions and procedures. Train Owner's personnel in
normal procedures to be followed in checking for sources of operational
failures or rnalfunctions. Confer with Owner on requirements for a
complete ele-,ator maintenance program.
2. Make a final check of each elevator operation, with Ownefs persor,nel
present and just prior to date of Substantial Completion. Determine that
control systems and operating devices are functioning
E. ?Maintenance:
1. The Elevator Contractor shall furnish full maintenance of the elevator
equipment for a period of three months (90 days) after completion of the
elevator installation. Full maintenance shall include regular weekly
examinations of the installation by competent personnel and shall include
all necessary adjustments, repairs, lubricating, cleaning and the needed
supplies, etc., to keep the equipment in first class condition, except for
misuse, accidents, or negligence not caused by the Elevator Contractor.
2. Supply all special tools, wrenches and gauges as necessary to make
adjustments on the equipment.
F. WarraLl ins tion:
At least 30 days prior to warranty expiration, schedule final inspection and
retest with rwner's representative. Reyuir,men',shall include -Jose examination
of ail equipment. Replace, repair or adjust any equipment found defective and
covered by warranty prior to expiration of warranty period.
END OF SECTION
ORB 400"
cod 12/13/91-3
Page 9
Z
O
j
0
T
=t ,r
0 r
an
©C:
�K
mz
O�
�Cn
O
mm
00�
0
C rn
j to
z
O
n
M
MODIFICATION PROPOSAL
KIRTLEY RENTON SENIOR HOUSING • JOB 1315
COLE • Project:
ASSOCIATES, rNC
Date: March 10, 1992
ronuumrs
p.o. baa 1179 To: THE ORB ORGANIZATION
1002 - 10th
snohamish
wash. 98290 Initiated by:
(206) 568-3175
Modiric2tion Proposal: Additional costs due to Issue "E% dated 11$192:
Az -Tec Surveying
Basic Fire Protection
Alpine Rockeries
Todd Robinson Painting (450 1.f. ® 1.40110
WSST a 8.2% on materials ($11,989.20)
NOTE: KIRTLEY-COLE RESERVES THE RIGHT TO SUBMIT ANY FUTURE
CLAIMS ASSOCIATED WITH THIS ISSUE IF SUCH UNKNOWN CLAIMS
ARISE
Subtotal
Overhead do Profit 0 15 % .. .... . .
Bonding a 2% .. .
Total................. ........
....
Reason for Modificatlon:
Cost: Additional: $29,416.04 Credits: S-0- Net:
Change in Calendar Days: FOURTEEN (14)
Approved Reject
Recommendalion: for C.O.
Architect
General Contractor
Owner
hlodiCication Proposal Inrnrparated into Change Order Number:
Attachments: Subcontractor proposals
No action will be taken mlardint this item until we receive written authorization dirtxtint us to do w.
Ali contract wont will proceed on Ks normal schedule. pROPOSAL NO.
1,637.50
r�-
20,247.00
1,580.00
630.00
983-11
S25,077.61
53,761.64 1
FAX TRANSMITTAL
T0: D br a S a r
RECIPIENT'S FAX NUMBER: (_, 206 _ 4
FROM: Ax -Tec Surve in
DATE-
NUMBER
ATE:NUMBER OF PAGES (INCLUDIN COYER):
SUBJECT: Renton Senior Fiousin
COW4ENT5: Per our meetin on 2-19-92 1 have c ri
18 I/2 hrs field, and 5 hours ofc. tech. for revisions dated
1-8-92 and 2-14-92. This does not include electric. This Wil
& abavr
includater, roap ds and vertical chaes.
_ 1
e w
Sha) I
et K17 Fn
this
10'd
AZ -TEC FAX NUMBER: (206)471-9101 471-1700
If communication is not clearly received, please call: (206)
-�W
BASIC FEB2 6 1992
i6b ]FIRE KIRTLEY - COLE ASSOCI,
1► PROTECTIONS 3TC.
'061872 5
February 25. 1g92
Kirtley Cole Associates, Inc.
P.O. Box 1179
Snohomish. WA 98290
Attn: Greg Lrimhall
Res Renton Senior Mousing
Change Proposal for Revision E
Dear Greg;
The following is our cost proposals including credits, for
Revision E dated January 8, 1992. Our proposal covers the
revisions shown on drawings M1.1, 1.3, 1.4, 1.5, 1.6. 1.7,
1.6, and 2.2. Our proposal also covers installing the 6 inch
supply main from an existing 8 inch post indicator valve near
the vault into Room 151. The following is an itemised
breakdown of our costs.
CREDIT
6 inch underground supply ; 7770.00
Material
,...., :280.00
Labor
Miscellaneous (backhoe, etc.).. 1850.00
6 inch wet and dry risers (4 total)
Material g. 1 r 2.00
Labor ......................... 1672.00
Fabrication 172.00
Design ....................... 640.00
TOTAL CREDIT ..................:.•. 611677.00
EXTRA COST
8 inch underground suPPlv� s 1647.00
Material .............•.,.+...216
Labor, ....... 1216-00
216..00
Miscellaneous ................. 1
6 inch standpipes and floor cOntr•o1
Material ...................... $11771.00
Labor 11246.00
Fabrication ................... 1377.00
:
Design ..................... 104.00
629263,00
TOTAL COST .................•••••••
. • . s 17606.0"+
Total net cost "641.00
Overhead/Profit 15% ....•..........•620247.00
TOTAL NET COST FOR REVISION .......•
L= CO 82. 2c7
M = 10. q 'SZ• z0
Z
O
d
0
M
=1T
Fa
U
M
-1 0
O
ILL
KirtIey - Cole 'ass.
,entcn czenior Housing
page
pasic Fire will provide materia. dsign and installation
labor far the amount na
• $�•�: ethousand
to reduce
hundred forty seven dollars). It may be pas
the casts in this proposal by revising some of the piping.
We wou Ld be happy to discuss these alternatives with you.
should you be interested. Due to the necessary timthrequired
for plan approval we will need an answer r-eg+ youdshould have
proposal no later than March 17. 1sal if y
,any questions regarding this proposal please do not hesitate
t contact us. 'Thank you.
S�ncerely,, � t
Jtmes Doerke
B sic Fire Protection, Inc.
Z
O
0
M
-1 -t
0 M
C
0
Q
�
rn m
p
�z
Mm
Q�
C CCn
0
-4 Fn
QIII TF.H tl11Ai Fatl ■ 1+14 M fTt.:�.i* .ItrMM
1NI�li (C7MA ! M'I� I t1L =1 IAI! ,Tll'a ¢;O/ti� lie
.uc,v me omccrewav r+ns ct+E '� � �.-� • - • • .. C`, f% i 1..� S j � � �--•`--
.4j,r4ve 172adwtZr* a�7
23711 Gard Avenue SE
WOflbINVILLE. WASHINGTON 98072
o.sa opo" "a
788-1000 481.3486
TO
--------------
Rut ktA�dr .. M�1tAR'� :. ... ` . � • �. . .
] L9
�C�
so ¢
1.4
IRR TRt _
ORIGINAL iy .
G.azz
.. _mayf
0
Ms�OZ,. Du -
PYAI. LI' oc •L^�. '�4cL "+=u 411.1.... J
On P*
.ems■l�t��r,��4f11M hMl. s.OM'.p1fMiI�ML7R1�.
TODD ROBINSON PAINTING CO.
coww"cial Palnilno
SW
I1 Q�$ X64
( 491.1944
Ftp 491.1941
TO
r► /0% 0% h /1 /n n r
} WE ARE BOOM YOU ❑ Atbdod ❑ Under eepersta eowr vka
the fageaft 14rtnx
p Pena ❑ Samples
d Spadtiutkone
❑ Shop drawimp C]Printa
ri Coov of letter arec—hangs order ❑
THESE ARE TRANSMITTED ss dwked below: y for apprw51
❑ Approved ss submitted ❑ Rasubmkt��P�
❑ For approval Eu for dletrlbutlon
C7 Approved of noted p Submlt� D
❑ for your USA❑Return corrected PrimeC)As MuntW : Returned for ogrrtctIons
❑ For nrview and comment
z
O
9
n
m
Om
m
O
C
�c
m"
O
01 I
co
F
O
U
c�
m
MODIFICATION PROPOSAL
KIRTLEY
COLE 0 Project: RENTON SENIOR HOUSING - )OB #315
ASSOCIATES, INC
gencrat Date: March 31, 1992
contractors
p.o. box 1179
tool - 10th To: THE ORES ORGANIZATION
Snohomish
wash. 98:.90 Initiated by: Architect
(206) 569.3175
Modification Proposal: Architectural, structural, mechanical and electrical revisions as a result of Building Code
Review:
cost breakdown, attached
EXCLUDES: HARDWARE GROUT' /29 (LABOR & 'MATERIALS), NEED
CLARIFICATION ON IIARDWARE SPECIFICATIONS -
Subtotal .. . .
Overhead & Profit 0 15% ...... .............. .
Bonding 0 2% ......................
Total .............. .................
Reason for Modirtcation: as pe' PROPOSAL REQUEST N2
Cost: Additional: 55.295.04 Credits: S-0
Change In Calendar Days: FIVE (5)
Rc -onimendation:
Architect
General Contractor
Owner
Approved Reject
for C.O.
4,514.47 II 1
$a 514.01
$677.11
S143.a2
$5,295.44
Net: 55,295.00
torzstion tt;sscting us to do so.
hedute.
No. SIT( REVISED - 5ECOND R V SIIOON 1
--1 T
roI
Cm
rn
©n
C
rn r.
rn
aE. _
�z
�Cn
O
rnM
OF
0
z
O
M
#315 RENTON SENIOR MOUSING
MODIFICATION PROPOSAL #6 REVISED
S5oCl3iCs. lnc.:
Delete bumper guards at (2) deleted dumpster locations
at rear of building:
Labor - 4 hours ® 28.00/hr. ............
$(112.00)
Materials (22 if treated 3 X 10 @ 2,20/10 ....
(48.40)
2. Add 1" insulation board at floor/wall (perimeter):
490.00'
Labor - (950 if @ 26 if/hr. = 36.5 ltrs.) @ 28.00/hr.
1,022.00
fit around rebar dowels (360 ft t'?e 20 ft/hr,
G 18 hrs.) @ 28.00/hr. ...... I ...
504.00
Materials (630 s.f. a .2051st) ...........
129.15
3. Delete angle iron at (6) locations in elevator shafts:
Labor - (4 ea. into wood @ 4 hrs. ea, = 16 hrs.) @ 28.00
(448.00)
(2 ea. into concrete) 12 hours. Q 28.00 .
(336.00)
Materials - Hilti Hit system epoxy lags/wood lags
(85,00)
4, Additional caulking at elevator fire doors:
Labor (6 ea. @ 1 hr.) 6 hours @ 28.00/hr.
168 00
Materials - caulking (3 tubes @ 3.75/ea.) .....
11.25
5. Installation of deflection head:
Labor (12 openings @ 3 hrs. ca, = 36 hrs) a 28.00/hr
1,008.00
Small Tools Allowance (1,806.00 X 5%) .....
90.30
t
Labor........................
(4,692,00)
Materials ........................
(6,492.00)
Labor ..........................
490.00'
Materials ........................
7,064.00'
- EXCLUDES HARDWARE GROUP 29
Eastside Conitructioft:
Labor
1,500.00
..........................
1,000.00
Materials ........................
Ket h kan D , gall:
Labor..........................
450.00
150.00
Materials ........................
385.00
Labor ..........................
70.00
Materials ........................
Materials ........................
85.50
Milgard`Materials ................. . . .... .
698.00
Concrete & Iqtccl Systems:
Materials ........................
563.00
Labor..........................
(38.00)
(2b.OD)
Materials ........................
Labor ..........................
322.00
Materials ........................
762.91
Subtotal .....................
$4,195.71
WSST 0 8.2% of materials ($7,588.92) .... .
TOTAL ....................
$4,514.07
Au a, ►...
A4gd
t
0 LO
c
rLA
UO
44,9 �°
goo r-7- 1,x 3 0
6- CL
+
frill tlltll'. CAA Tf`1i1111 ` ICil
ADL6
Owt P—%
-zo or 1 '44.
#-a. ci Lee
Liu tk��
(� U 0 ft -1
.74
. Ca„rurs t1..ar,telas r.a >M>Ix W++. �,ti� lill4le Armur N.li. 11allt�vv. WA +�a>Ir>tl cxrtt 14f I �W1W fue t.�1b16�1.}411�
aping l Pape Na. of paQ,
q 71C
167445 Uncoln Avenue risen rng in Stairways JAN 2 � X992
Tacoma, WA 98421 r.Yt Concrete Treads
i :;r '�':• Tacoma FAX '-kht Structurals
. / 572.5353 572.5403 r "r; & OrnamentalLIQ • COLE ASSOC,
rro"L avurtrsao Ta
xiRTLEY COLE
1002 107H ST.
No III CDD[
A11cmrtcT I tk
We 1weby Iubmrt tpecsfIcAtlons and estimates for: F --.B
PROPOSAL REQUEST +IS
►MOIL[ OATa
!2061 568-3175 1 01 /2! /92
RENT
X11 LOCATION
SR. CENTER
FAX 568 -
ELEVATOR SILL ANGLES • • •�
THREADED STUDS ON COLUMNS. $563-00
NO TES:
-Slgaeo' pzaptata&1 and 1 t1�Inr_
office before any deliveries will be made.
'ae 1:11t�a Isla �ls>�be_aua11a11s1�aL#hA iah-sita to xlaLaael
delivery truck.
3. ShauXd-pa4>waen t -real -b a rocs! w�h� f h• i n f h nt Lbo '" an t h.a at per
this proposal. a service charge of fifteen (15) dollars will be
-.addald_Tha-Llan- prc csed�r e__a+LL Lcaa�mence-end-fn tame t_sth�a.te
of .000,d9 per cent will be charge daily an the peat dile amount.
.-ihe, ..aa=un paid- 1n__XuLL_.un t_LL_x L-L_cos
including attarney's fees. incurred by us as a result of the lion
procadurerthe__ss�teLce__charge-acrd_the-.sccesrculaa<,a d_.diltf!__1nto-rest .
ori the unpaid amount are also paid.
A --PLUS-N5.9=T.--1 F-AA-PLI.CABL E- - - -- - ------------------
5.
----------.--.---------.--5. TERMS: NET 101
6.-- The -ti-n3 l- purchAse-pr_Lca�sha`1_L_ba--id-jus.LerLbasecL_,on__tAhe .actual
materials ordered by the Job sit* Superintendent and delivered
-
-to- t he--- job-s.i•te-.usln f -Us. _quo tad- . acs
P Frt7pme hereby to furnish material and labor — complete to accordance with above specifications, for the sum of:
ONE THOUSAND. TWO HUNDRED AND NINTY-FOUR & NO CENT ollars ($ 81.294.00
ytnNR to ba mtOe at tallows:
NET 10 _
apt 1 WWW M attereettwe to w ee jb+e Ace, A4 .ere to ee temetetee a .eremew.le /
tAe11r1f I11*110Yla to 112MCIrIS entWM My SAW11ttelt er d"41WA Item Aber* Im.ftes. Aulhonled
ileM 11/1'Illtltla Nt+t teal! •t•p M eeKwlee enty Ws" .ttnen email~. !M —14 become en Sipnalur*
shrN rt+ar Ina tee" the eeemem. N eeree "Tt CIIA"n/awl u 00 (tribe att+eenlA Nate: This propdaal may be
eye ttay "eve t trot, o•+•.w eI tent' Are, W""o ane eiM1•f neteyurT,nl.tet•te. THIRTY C3O)
t.. verb" we"come by Wetemee`s cemeenutro tnwtan4c withdrawn by us it not aeeseled within days.
j�1i��r � VaDJ3110al —The above pytces. speeltlratlons
end tena are utftfaetbry and are hereby accepted. You are aulllonS00 Sientrtur■
10 do 111e twill as apectfled. Payment wall be made As outlined above.
Otte $1 Accaolance: Signature _
0
z
0
i
0
M
T.' -,'RIC INC. TEL -206-334-7056 Feb 04,92 10:54 No .003 p
MCM*
ti ` L�p
• 'I
S.Ldaa+ QHA,N%*= QMQ=H
u�Iuiap _ 2035
,'TO Kirtley Cola
1002 14th Street
Snohomish, WA 98290
nw«a
r2-4-92
toe NAMrJLCGa1A0N
Renton senior Houain
Proposal Request #2
Jae "UM"A
Jos w»UNI
IM111INa CON"OCT No.
OATS or DIETING CormWC'
We hereby agree to muu Ing cnangetH epocifled below: -
Add (8) smoke detector and (8) door holder in the hallways
in front of the elevators.
6 - Smoke detectors 0 ;86.70 ea. $ 340.20
8 -- Door holders @ $57.90 ea. $ 347.40
240, - Fire Wire 0 .184 per ft. $ 43.20
Misc. staples A wire nuts $ 6.00
6 hours of labor 0 $38.00 per hour S 220.00
Subtotal-14*r-80
Plum 13% $ 342.02
Total AMOUnt Due $ 1088.82
■�swwww=s
Notes The elevator voltage is 120/208 volt 3 phase not
480/277 volt 3'phalse like the proposal request: letter
stated. Please notify the elevator company of this.
NOTE. Tale Change oraer becomes pan of and In conforrnanae wits♦ the eYlellrtp aonlracl.
Wt AARKX hereby to make tha change($) speoifled above at this price j� s
PREVIOUS CONTRACT AMOUNT S
A,Rle>af1•=O — The abaw prices and speclfloatlons of
M Changes Order an rallelaetory and an hereby ao-
Aipted. All walk Io be pertormeid under lama terms and
cotldltlons as specified In original contract unless other.
R8YIOED CONTRACT TOTAL , $
04L1e at acceptance y -
Signature
a
C..
TEL:206-334-7056
'db OS,92 10:26 N0,004 P.
HMO
L crof� CHANCE ORDER
InAQ
TO Kirtley Cole
1002 10th Street
Snohomish, WA 98290
We hereby @gree to Mika the change(@! OP96111e0 oelow"
NUMOCR
WWI—
OAT!
2-4-92
JOIN MAMUt.00ATION
Renton Senior Houein
pro osal Request * 2
Nal IA
Joe F"oMh
"@ 1NG CONTAAtT "o.
DATE Or EXISTING 604TOAC7
Etevst:or disconnect to have auxiliary contacts
for battery lowering
2 - 200 Amp 3 phase disconn6 t {; 274.00)
2 - 200 Amp 3 phase diaeonnect: 420.00
2 - Contacts $ 128.00
Labor to install contacts (2) hours ® $35.00 per hour S 70.00
Total Due $ 344.00
oaeaQ�aa
Per Alan Narrid Sound Elevator
NOM This Change Order WOM44 pan of and In Conformance MIMI the exisling oanUaW.
WE AOA:IR hereby to make the ehangs(s) speclfled above at thle price (�
PRBVIOU9 CONTRACT AMOUNT
The above prlosa and epecifleatlons of
,We a Order ars aatltfactory and are hereby ac•
o*p[e�, All work to be Wormed under same terms and
eott4ftbni ae $Wlfted in oriolnal oantrect unlae other.
AEVISRD CONTRACT TOTAL
A�OpTIp —
Date of acceptance
ROW ELECTRIC, lire
ELECTRICAL CGNTRACTORS Td++��
TELEPRONI33"$ / 0i�l'"�ANGE ORDEF I
NUMERR 2090
TO Kirtloy Core
1002 10th .area-,
Snohomish, WA 48290
Pf OH1
oAn
the hardware door supplier.
3-23-92
J0e NAMULC10ATroN
Total Credit Due ($ 399.31)
Renton 8e11ior
floua:�nq
Revised C.O.
2035 )'R*2
.toa NUN Ign
Jog •`110Na
g11Poo C371P-tcT N
•tlINVIMilDigNATY11ltCONTrIACeQry war
OAT( OF axnsrtlf CQId?n
We hereby agree to make the onange(s) specllled below:.
Credit for magnetic door holder that are to be supplied by
the hardware door supplier.
b - Door holder 0 $37.90 ea. ($ 347.40)
Less 15% ($ 52.11)
Total Credit Due ($ 399.31)
■s�eteswswaas
NOTL Thls Change Order becomes put of and In conforrnancs with the extiting contract.
WE AMR hereby to make the Change(a) apeoified above at this prive
CATS
PREVIOUS CONTRACT AMOUNT
=
•tlINVIMilDigNATY11ltCONTrIACeQry war
REVISED CONTRACT TOTAL.
�
AOOMPTtD — The above prices and specifications of Dale of acceptance ., ..
this Change Order are eallefaclory and are hereby ac.
cepted. All work to be performed under same Urns and
conditions as specified In original contract unless other. 8lgnature ._ {owr+Inr
wise stipulated,