HomeMy WebLinkAboutCO 16CHANGE ORDER
Owner
COR FarmArchitect
(This form is to be executed in triplicate and each party is to retain an original.)
Contractor
Project Name: RENTON SENIOR HOUSING Date: July- 13,
1992
Project Address: 3151 NE 16th Street Change Order No.:
Sixteen (16)
Contractor Name: KIRTLEY-COLE ASSOCIATES ORP -t No.:
COR (t No.:
9007
CAG 095-91
b Address 1002 - 10th Street
Snohomish, Washington 98290 Contmc4, For.
General Construction
Contract Date:
October 31, 1991
7
0
The Contract is hereby amended as follows:
ti
1) Per ORB Proposal Request No. 36, 6/2/92 and Kirtley-Cole
"Relocate
m
Modification Proposal No. 46, 6/24/92 (attached):
_
range hood exhaust duct work at units 123, 125 and 127 and Add $ 150.14
in west wing handicap units."
�m
2) Per Kirtley-Cole Modification Proposal No. 48, 6/25/92 and
m 0
RF1 Na. 140, 6/17/92 (attached): "'French and install
-40
0C
power, phone and cable T.V. utilities to #1708 Kirkland Add $1,600.30rn
m
Avenue N.E."
?�
a
3) Per ORB Proposal Request No. 32, 6/2/92 and Kirtley-Cole
C X
ModLfication Proposal No. 50, 6130/92 (attached): "Provide
Add $1,427.33
� to
plumbing revisions."
jAdd
TOTAL CONSTRUCTION COST IAIPACT OF THIS GRANGE ORDER: .....................................
$3,377.77
Order include all Contractors) labor, material, overhead, profit, and all direct andlor indirect casts associated
n1 m
N
The Change shall
©
with the Change ;n Scope of Work.
c
I Con
This Change Order is not valid unless signed by the Owner, Architect, and Contractor.
_
i m Cn
C)
$4,620,765.00
Zr-
i.
The Original Contract Sum was...........................................................................................I.......
587,419.01
Net Change by previously authorized Change Order(s) was . .......................................................
5 208, 184.01
-r
The Contract Sum prior to this Change Order was.......................................................................
i
3,377.77
i
The Contract Sum will be revised by this Change Order in the amount of ....................................
5, 211, 561.78
1 z
The new Contract Sum incorporating this Change Order will be ...................................................
+ 1 day
g
The Contract Time will be changed by .......................................... ..........
..........................
*January 3, 1993
F En
The Substantial Completion Date including this Change Order is - ........................................... ....
012 for TBD items.
z
*See Change order
Sum or Contract Time
,
which have been approved
9
3
NOTE: The above summary does not Include any changes in the Contract
by ORB Form 301 - Construction Change Directive or Owners Field Directives.
rn
THE ORB ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renton, Washington 98055
r,
Date
am, AIA
KIRTLEY-COLE ASSOCIATES
1002 - 10111 Stmet
Snohomish, Washington 98290
Y
-41G. ordon Cale
S uluc�' �L
Date
CITY OF RENTON, P b R DEPT
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
4
D e
MMMMMMMMMWM
MODIFICATION PROPOSAL
' 1URT LEY
COLE 0
project: RENT'ON SENIOR HOUSING - JOB 0315
AMOCIATES, INC
W
Date: June 24, 1992
caacrae�t►a
p.a. box 1179
th
To: THE ORS ORGANIZATION
i
1002 - ltkh
aoohomifh
wuh. "290
Initiated by: Architect
rzW 568-3175
Modliadoo proposal: Relocate range hood exhaust ductwork at Units 123, 125 and 127 to correct location of
ranges as shown on architectural drawings. At west wing handicap units, install range hood exhaust ductwork to
I
correspond to range locations shown on architectural drawings:
eo g
Smith Air Conditioning
128.40
p
Subtotal
5128.00
$19.20
Overhead do Profit ® 15%
ao
$2.94
Bonding a 2% ... ..... .... ... ... ....
S150114
Total ... .... .. .
d
Re Lson for Modiiiicatiort: as per PROPOSAL REQUEST' +136
Com: Additional: 5154.14 Credits: $ 0- Na:
Si50.14
w
Ch&W In Calendar Days: -0-
M
Approved
Reject
Recommendation-
tsar C.O.
,vaite:et
General Contractor
Owner
Mo&r',mbon PropoW bated tato CbxW Order Number: 16
Attar: Smith Air ConditioWng - proposal dated 6115192
this item until we .006"e "mco u�Mbwrimtioa throating w to do ro.
No action will be twlr� regarding g - � norsssa sehedvk.
All canted work gillPM--dpRQPt3SAL NO.
K�TLEY-COLE ASSOCIATES9 INC.
11102. 10th 9agwit.o. Box 1179, 3mbomii. WA 92290
PS1ar (306) 569-31751FAX OW 56167919
June 9, 1992
('lYAW UM nO Fat'!+ OM.Y WHM sIr!!liT1'iM
SUBISUPPIgR: SMITH AIR CONDITIONING, INC.
12459 Woodinville Drive
Woodinville, WA 98072
ATTENTION: Project Estimator
PROJECT: RENTON SENIOR HOT'.' -'NG
JOB NUMBER: 315
DESCRIPTION OF JUN 16 1992
WORK: AS PFR PROPOSAL REQUEST 136, ATTACHED KIRTLEY•COLE ASSOCIATES
RESPOND 'BY: By NO LATER THAN MONDAY, DUNE 15, 1942
ti.Vir TkAC T TIME REQUEST
• Tffi3
WAY OCCU[ FAQ DtX.AYi VWFRaFOdAL R VWn All O! Tm com mvoLym �G AMY com Of MAn DAMAGit'M'�CJy
AMY II NU MPEC1t Of AXS DQAY&
AUTHORMm SIGNA
�' nee
DATE:
SIGNED: