HomeMy WebLinkAboutCO 18RENTON PARKS TEL No.2775523 Rua 18.92 12:06 No -001 F'-02
CHANGE ORDER
Owner
COP Forrn
2 Per Kirtiey-Cole Modification Proposal 041, 6/23102, and RFI 160,
"
Architect
(This fomr is to be executed In triplicate and each porly Is to retain an origlnol.)
Conlrnclor
Project Name: RENTON SENIOR HOUSING
hole:
August 12, 1992
Project Address: 5151 NE 161h &beet
Change Order No.:
Eighteen (16) Revised
Contractor Name: KIRTLEY-COL E ASSOCIATES
OR8 Project No.:
COR Project No.:
0007
CAG 095.91
& Address 1002. 101h Street
Snohomish, Washington 98290
Contract For.
General Construction
Contract Dote:
October 31, 1991
The Conlract is heroby amended as follows:
1. Per Kidley-Cole Modiflcalion Proposal 039R, 7116192 and RFI 141,
8117192 (stlnched): 'Provide concrelo bases for PF bollard lights."
Add $54G 27
2 Per Kirtiey-Cole Modification Proposal 041, 6/23102, and RFI 160,
"
Add $32281
6/22192 (attached): "Trim roof sheathing to allow for gutter Installation
3, Per ORB Proposal Request 035, 012192, and Kirlley Colo Moditicalion
Proposal 045R, 7116192 (eltached): `Re-roiote exhaust dud from [levalm
MIC Room 0163 Into Unit 128.'
Acid $245.33
4, Per ORB Proposal Request 047, 5126102, Klrlley Cole Modification
Proposnl #61, T/10192, and Field Directive No, 24, 7/22192 (Copfes
attached): "Provide louvers at south end of east wing and south end
Add $2,600.03
of west wing.'
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDE13:..................................... Add $3,915.24
T Ire Change Order shall Include all :'onlraclor(s) labor, melerial, overhead, profit, and all direct aridlor Indirect costs associated
With the Change in Scope of Work.
This Change Order Is not vend unless signed the Owner, ArzhlleCl, amend Contractor.
TheOriginal Contract sum was .................. ................................... ................ .......... ........ ---- ...... — ...... ...... t4,620,765.00
Net Chnngn by previously authorized Change Ordor(s) was ... ...... ......... ......... ...................................................... 597,247.34
The Contract Sum prior to this Charwo Order was............................................................................................. 6,218,012.34
The Contract Sum will be revised by this Change Order In the amount of ....... ............................................. ............. 3,915.24
The new Contract Sum Inoorporallno this Change Order will be....................................................................... 3,221.927,58
The Coalroct Time will be Changed by......................................................................................... +2 days
The Subslanllal Completion Data Including this Change Order Is.................................................................*January 9, 1993
'See Chongi Order 4112 and Item 4 above for TBD Items.
NOTE: The above summary does not include any changes In the Contract Sum or Contract Time which hove been approved
by ORB Form. 301 - Construction Change Directive or Ownor"a Field Diroctivos,
THE OR13 ORGANITATION, INC
807 SW Grady Way, Suite 210
Renton, Washington 98055
f
1(r ' P De imam, AIA
Bete
KIRTLEY-COLE ASSOCIATE'1
t002. 10th Street
Snohomish, Washington 08290
a —9�
ordon Cole
Date
CITY OF RE=NION, P & R DEFT.
200 Mill Avenue South
Renton, Washington 88055
A�--.
Vincent lee
ate
z
0
rn
N�
M
mN
C:
m�A
�z
4
vN
O�
0
i
U)
z
O
c�
M
MODMCATIOr4 PROPOSAL
ICIItTLEY
COLE O Project: RENTON SENIOR HOUSING -JOB 1315
ASSOCIATES, INC
gCnam Date: July 15, 1992
eonulmrs
p.o. box 1179 To: THE ORB ORGANIZATION
1002 • 10th
onohomish
wuh. 99190 Initiated by:
{2206) 569-] 175
Modification Proposal: Provide concrete bases for "PF" bo''urd lights, not indicated on drawings:
Matecial - concrete (I yard 0 50.00)
Labor - 14 hours 0 28.00fhr. a $392.00
Small Tools Allowance ($392.00 X 5% - 19.60)
WSST on mated alsiquipment (550.00 X 8.2%)
Subtotal
Overhead & Profit 0 15%
Bonding a 2%
Total •
Reason for Modification: AcrY f f
Coat: Additional: $546.2-1 Credits: $ Net:
Change in Calendar Days: ONE (1)
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
Modification proposal Incorporated Into Cl=Se Order Numbew 4
Attachments:
No action will be taken regarding this item until we receive written atwwriution directing w to do w.
AU contract work wiU proceed on its normaldine.
PROPOSAL NO.
50.00
411.60
4.10
$465.70
569.86
S10.71
5546.27
$546.27 11
. ob
I
r,
i u. -+as- 02. U I u I ux I rr*l.l 04be r'rb--kl i e:. w: R o ue re l
3S
4�
O fz�
�- -.�,VQO 133 /'F/
c" 1HIiI
bW, yl
cn
Z
0
64C
L1.
r
R F.T
RZm%OL �t
ALri—V-1992 10314 FROM THF ORB DTIANIZATIONN INC TO r r 523**9W7
P.02
MODMCATIOL14 PROPOSAL
KIRTLEY
COLE *
project: RENTON SENIOR HOUSING -JOB X1313
ASSOCIATES, INC
POW
Hate: June 23, IM
OMMUeo"
p.o. box 1179
To: THE ORB ORGANIZATION
1004. 10tth
mohoctkh
wuh. "M
initiated by:
(200 X61-3175
Modlticadon Proporah Trio: roof sbeuhtng to allow for gutter tslatilladon.,
:191
Lab" - 8 boon @ 28.00lhr, - $224.00 -
235.20
0,
Small Tools Allowance ($224.00 X 5% - $11.20)
Su Wan - 1 hour 0 40.00/hr.
40,00
Subtotal .............................
$273.20
Ov"ead do Profit 0 1591 ...
S41.28
S�
�
$6.33
Bo * 2%
Total ...... ...
$322.81
Reason for Mod lleallon: a per RFI NI50
Cotta Additional. 5322,81
I : 5-0- Not:
Grad u
$322.81
Change In {Calendar Dalai ONE (1)
Approvad°
Reocmu ndadon:
for C.O.
ArchhM
'1 •t• +! L
Ganeral Comer
Owner
Modiiiadon Proposal Inoorponatd into Cheage Order Numbs:
Alalachwwft:
No option will be taboo r+ptft d90 karn wdl ws reoelw wrlam au%arinfi n dkovdaS w to da 00 -
All ocasrtet work WM Ptooeod oa iN no" so WUIC
Pti0t+a9AL NO. PQA?Y-0NII t411
I�
TOTAL P.02
JUI.-1G-'tW lrN 'M40f Iu.an,rrvv. awC-I -1 •. 01• - --
REQUEST FOR INFORMATION WD
RENTON SENIOR HOUSING
My int Raman. washinatan
CURB Na 9007�
wow �'�.f • Ca so !r'r�r1c
�'(a>i�''
1�
+� rrr► M
yyl��,rr�rw ww s.AD
.w
CURB Na 9007�
wow �'�.f • Ca so !r'r�r1c
�'(a>i�''
+� rrr► M
yyl��,rr�rw ww s.AD
.w
. '
rtew
Sa h
Gni
ft�f
O CA
Dam
-
AM"
"Wodlem
or�iMrr.■.,..,_ ��.
w
.� +r wrMwa� r 1++rrr +wr wrr rw+1hM MWrr.i.�r MiJ�1 � =mwmm=mmm
M Nw*" w "M! Mmw M mvmu* If FAY �'"m do A my �Vt r M
9!;
ca ow
rnT..l c 0.1
m
:I:fi
ra�
0
m
Z
O
0
in
MODIFICATION PROPOSAL
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING - JOB 0315
ASSOCIATES, INC
generaDate: July 15, 1992
cortractora
p.o. hart 1179 To: THE ORB ORGANIZATION
1002 - loth
snohomhh
wuh. 98290 Initiated by: Architect
(les) 564-3173 _
Modification Proposal: Re-route exhaust ductwork from Elevator Machine Room #163 into Unit 128 and discharge
throuoh west exterior wall. Wrap ductwork with sound insulation to reduce sound transmission. .Ib* d04" -
Smith Air Conditioning
WSST on materials ($75.00 X 8.2%
Subtotal ..
Overhead & Profit ® 15 96 . • . • ` ` ' '
Bonding 0 2% .. ' ' •
Total .....
Reason for hodification: as per PROPOSAL REQUEST #35
Cast; Additional: S245.33 Credits: $-0-
Change In Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner _.
203.00
6.15
i
$209.15
S31.37
$4.81
$245.33
Net: $245.33
Modification Proposal Incorporated Into Change Order Number-
Attachments:
umberAttachments: Smith Air Conditioning, Inc. - propoul dated 6/15192
NO action will be taken regarding this item until we receive written authorization directing us to do so.
All contract work will proceed on its normal schedule.
PROPOSAL NO.
N
4
JOR 1 LIEY"C©LE ASSOC1ri 1 ESS INC.,
)!6W 91290
1TUFAX mo "'PI 19
June 9, 1992
Lj'2 Uy�S T F o_R_ERS? L
MAXM = TM last ony ,MIN +Q►
SLTB/SiJPPLIER: SbJM A R C©NDMONNG, INC.
12439 Woodinville Drive
WwdinviRe, WA 98M
AMMON: project Esdmawc
SENIOR HOUSING
t. RENTON
PROJECT-..�
JOB NUMBER: 315
DESCRIPTION OF
WORMAS PER PROPOSAL REQUEST #33, ATTA ,GRED
R'1`S'POND BY: BY NO LATER '�N iVIONDA`Y, JUNE 15. 1992
i
TOTAL A.tiiOGTiT -y(s)
CONTR,r+►C'I"I'il1'LE REQUEST
• TM3 oyWAL agnj 17 ALL OF TIM COM NVOLVta SNrWOC40 &4Y COM OF DY1 IYL DAWILACL! wHrCH �IAY OCCUR FROM D�1AY! M
►
ANY Wats 91110±9 ar 1c:ca D[LAY71.
A LITHO RIZ EI) IGNATUR
r
DATE:
SIGNED.- L