CHANGE ORDER Owner
COR Form Architect
(This form Is to be executed In triplicate and each party Is to retain an original.) Contractor
Project Name: RENTON MICIR HOUSINGS Date: August 12, 1992
Project Address: 3151 NE 16th Street Change Order No.: Nineteen (19) Revise
Contractor Name: KIRTLEY•COLE ASSOCIATES URI! Project Ni 9007
d Address 1002. 1019 Streal COR Project No.: CAG 095.01
Snohomish, Washington 98200 Contract For. General Construction
-- Contrail Date: Oc1ob_or 31r 1991 O
The Contract Is hereby amended as follows: 0
C7
I'n
1. Per ORD Propose? Request $43,13124102, and KIr1leyCole
Modification Proposal N53, 6130192,allachod): 'Delete n
Alcoa Vent-a•Ridge vent and substitute Alcoa Commenlal ur
Venta•s•Rldge,• Add $2,988.40 m
2• Par KirtinyCOle Modification Proposal 654, 711192, O
(attached): 'Fury out wall In Room 151 to 9' thick Add $F35.04
to aecommodalo fire alarm panel by drinking fountain." m
3. Per Krrlioy s Modification Proposal #55, 71 0
z
(attached): 'provide additional strapping and Add $1,231,54
harp ors. at window bays.'
c�
4. Per Klrlley•Cole Modification Proposal 0163,1/28192, O
(attached): "Delete painting Inspection servlcas.' Subtract $(3,000.00)
m
TOTAL CONSTRl1CTION COST IMPACT OF THIS CHANGE ORDER ....... Subtract $989,88� Fn
The Change Order shall Include all Contractor(&) labor, material, Overhead, profit, and all direct and/or Indlrect costs associated
Werk. _
a Qrrr1
This Chan e Is not valid unless signed by the Owner, Architect, and Contractor.
TheOriginal Contrac7 Sum was.•....................•..,..•...........•,...........•.•........................................................—.$4 920,765.00
Net Change by previously authorized Change Order(&) was .................•............................................... ............ :401,102.58
The Contract Sum prior to this Change Order was...............••...,..•.................................................... .............. 65.22i,027.58
The Contract Sum will be revised by this Change Order in the amount of.........................•...................,.,.......•...•.....980.88
The new Contract Sura Incorporating this Change Order will be .•.•....•.••.................. .....••• .........•. •�� ..,�..i5,222,91T.40 z
The Contract Time will be changed by TBD • (Item 1) ...................•.................•...,,.....+ 1 day (Ilom 3) p
... .
The Substantial Completion Da1Q Including this Change Order Is ,...,.•....... ....,•...•........•••.. .......• , .......'January 10, 1902
•Sea Change Ordors 012 and Aria and Item (1) above for TBD Items. n
M
NOTE: The aLiove summary does not Include any Changes In the Contract Surto or Contract Time wtrlch hai been approved b
Change Directive or Owner's Field Directives.
THE ORD ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renlo Wa Iingto 98055
illlam, AIA
ting dAc
KIRTLEY•COLE ASSOCIATES
1002 -101h Street
Snohomis , Washington 98290
w
_
r'
XGordon'Clote
Date
CITY OF RENTON, P d R DEPT.
200 Mill Avenue Soidh
Renton, Washington 98055
Vincent Lee
MODIFYCATIOIi PROPOSAL
rK7IRTLEY Project: RENTON SENIOR HOUSING - JOB #315
,C
-- generaDate: June, 1x92
aontradon
p.c. box 1179 To: THE ORB ORGANIZATION, INC.
1002. 10th
anahomish
wuh. 96290 Initiated by: Architect
(206) 568.3173
Modification Proposal: Delete Alcoa 'Vent -A -Ridge - VAR" Ridge vent and substitute Alcoa "Commercial Vent -
A -Ridge - VARCOM:
Everett SheetmeW, Inc. 2,055,00
Cut roof sheathing to allow for ventilation - Labor (8 hours ® 28.W/hr.) $224.00 235.20
Small Tools Allowance ($224.00 X 5%) - $11.20
Subtotal _ $2,290.20
Overhead & Profit ® 1596 $343.53
Bonding 0 2% $52.67
Total ... $2,686.40
Remon for Modification: as per PROPOSAL REQUEST #43
Cost: Additional: $2,686.40 Credits: S-0- Net: $2,686.40
Chance In Calendar Days: TO BE DETERMINED
Recommendation:
Architect
General Contractor
Owner
Lo
, ./
tea'
Modification Propttsal Incorporated Into Change order Number:
Attachments: Everett Sheettnetal, Inc. - proposal
No action will be taken regarding thls item until we receive written suthoriution directing us to do so.
All contract voork will proccod on its normal schedule. PROPOSAL NO. J
JUN --25-92 FR I 1 r,i : 0e E VERF_ T T SHTMTU 2Z2-96" P.02
�� JI � � 4;• ThfJ !d: d5
s K I RTLEY COLE TEL NO 20t 3�-7919 tt^r::i r 1
KIRTL J' Y -COL J ASSOCIATES9 INC •
1007. 1Qth 5urscrT 0. Box i 170, 3whamW WA 96298
Phone (2D6j �•a 17sli�AR f2� SW • r91 �
rune 23, 1992
REQTIES I FO PROPQ9AL_
OLRAM UAR THU PORU DULY WUMN @LW4 ITLlidl
SUB/SUPPLIER: EVERETT SHEMETAL, INC,
ATTENMON: AmielBlll
IDR JECT: RENTON SENIOR HOUSING
JOB NUMBER: 313
DFSCFtiiYi70N OF
WORK: AB per PI7.0POSAL REQUEST #43, attached
PtESPON R RV' TUESDAY, IME 30, 1992
TOTAL AMOUNT
CONTRACT TIME REQUEST
� r y'tir
DAY(S)
Yeo
VA
-.Wn*.s rn
F"r ►a � "
h'jj '; ('^
It Jlv"I)
• 11as mDNIAL IUMM ALL ar TU COIN DNoLV=1xCLUjDj 10 A*fY CoM of r fWYC Dti%00 $MCH MAY OCCUR FR%4 p"Yf AND
ANY P n a ft P=1t C: tmx INLi.AYL
AUTHORIZED SIGNATURE: �----�
z
0
n
m
a ;,
in
a m
m
81
p
N
0
0
Fn
0
m
AW -12-1992 11:37 FROM THE DRI3 ORGRN l W AT I QN INC TO
2775523**9W7 P.02
1
PROPOSAL REQUEST
Owner
Axchltsdt
ORB Form 302
Conuscboc�
Data
June 25, ]992
Nuns
Renton 5.nlor Houff g
Frop°a"1 Request No:'grey-three (43)
pro)act A,ddms;
3551 NB lfitht Street
L actor Nurse
KSrtley-Co l• Assr�cia++s
ORB PrOact No.
CUR Contract Nos
9007
CAG 09"1
& Addrum
Box 1179
Snahoa,leh. W. ". . gton 9t;240
Contact For.
Ganval CorAmcdon m
Contraca Date: October 31,1941
plain submit a breahiown of this pro sed costs for modifications to the Contract Sum and/or Contract Time associated with the
propoeed 4har4ee in the Scope of Worst" to th© Contract Docuzn mb dussibed below.
iMa is not a Chance order os a Notice to p:aead with the work delaibed below.
'Urzslption of propoeed changes:
Daleta Alcoa'Vent-s-Ridgt • VAR" Ridge Vent and sutntituts Alma "CommercW Venter -Ridge • VARCOW.
tate t'roposal shall Include GorttrsctoKa) labor, tnateriaL ovaheed, Froin and all direct and/or incitrect cons a,soelMM WM *A
Change in Scope of Work. `
List of attachmsrts. If any, that doecribo above actloru:
i
E
Architect: Tjj6 ORB ORGAN17-A110N, INC.
Or Douglas G. Pedsrm
Page i of -I—
i�
Labnr - 1.5 hours 0 18.001inr.
Small Tools Allowance (42.00 X 5%)
Materials - 2 X 4 (40) 110 .28/if
WSST on materials ($11.20 X 8.2%)
Subtotal .
Overhead do Profit 0 159E .
r a
Bonding 0 296
Total .
Reason for Modification:
Cost;Additional: 565.94 Credits: $-0-
Change in Calendar Days: -0-
Recommendation:
Architect
General Contractor
Owner
Approved
C.O.i for
1 r
/�ITIA�
42.00
2.10
11.20
.92
$56.22
$8.43
$1.29
$65.94
Net; $65.94
Modification PropoW Incorporated Into Change Order Number: �9
_Attachments: /
No action will be taken regarding this hem until we receive written author{ution d4acting us to do so.
All contract work will proceed on its nomtal schedule. PROPOSAL NO.,
r
ILL
MODIFICATION PROPOSAL
KIRTLH Y
COLE U
Project:
RENTON SENIOR HOUSING JOB #315
ASSOCIATES. INC
fm
mate:
July 1, 1992
contractors
P.c. box 1179
To.
THE ORB ORGANIZATION
1002 - Itkh
snahomish
wash• 98290
'
Initiated by:
(206) Sf9.3175
Modltit:tttion Proposal: Ftrr Out
wall In RoamN� 151 t° 9" thick to acconcmodat,; lire alarm pgnel by drinking
fountain:
Labnr - 1.5 hours 0 18.001inr.
Small Tools Allowance (42.00 X 5%)
Materials - 2 X 4 (40) 110 .28/if
WSST on materials ($11.20 X 8.2%)
Subtotal .
Overhead do Profit 0 159E .
r a
Bonding 0 296
Total .
Reason for Modification:
Cost;Additional: 565.94 Credits: $-0-
Change in Calendar Days: -0-
Recommendation:
Architect
General Contractor
Owner
Approved
C.O.i for
1 r
/�ITIA�
42.00
2.10
11.20
.92
$56.22
$8.43
$1.29
$65.94
Net; $65.94
Modification PropoW Incorporated Into Change Order Number: �9
_Attachments: /
No action will be taken regarding this hem until we receive written author{ution d4acting us to do so.
All contract work will proceed on its nomtal schedule. PROPOSAL NO.,
r
ILL
MODIFICATION PROPOSAL
KIRTLEY
COLE 0 Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
genera Date: July 1, 1992
oontmetors
p.o. box 1179 To: THE ORB ORGANIZATION, INC.
1002 - loth
Snohomish
Z. 98240 Initiated by:
t206i 566-3175
Modification Proposal:
1. Provide additional strapping at East wing window bays as required by the Building Inspector:
Labor - 12 hours IIs 28 00lhr.a $336.00
Materials - (102) es. ® .41 Q 542.00 ..�
2. Provide skewed TH hangers for West wing in lieu of straps above:
Materials - (68) ea. a 8.56 m $582.00
$25.00
Small Tool& Allowance ($336.00 X 5%)
WSST on materials ($649.00 X 8.2%)
Subtotal •
Overhead do Profit 0 15%
Bonding 0 2%
Total .
Reason for Modification.
Cost: Additional: $1,237.54 Credits: $-0- Net
Chanze In Calendar Days: ONE (1)
Recommendation:
Architect
General Contractor
Owner
Approved
for C.O.
Slodiricallon Proposal incorporated Into Change Order Number: /47
Attachments:
No action will be taken rcguding this item until wr, receive written suthorixation directing us to do w.
All contract work will proem on its normal schedule, PROPOSAL NO.
378.00
607.00
16.80
53.22
$1,055.02
$158,25
$24.27
$1,237.54
$1,237.54
MOAIFICATIMN PROPOSAL
KIRTLEY
COLE 0 project; RSNTON SENIOR ROUSING - JOB #315
ASSOCIATES, INC
aeneM9 pate: July 28, 1992
contractor
p.o• box 1179 To: THE ORB ORGANIZATION, INC.
1042 - loth
Snohomish
wash. 98290 Initiated by: Owner
(206) 368.3175
Modlficatlon Proposal: Delete the painting inspection services:
Todd Robinson
-3,000.00
_ i1t
Subtotal . 5-3,000.00 Q
Total _, $-3,000.00
Reason for Modification:
Cost: Additional: s0.00 Credits: $3,000.00 Net: $3,000.00
Change In Calendar Days: -0- .�
Approved Reject
Recommendation: tot C.O.
I
Architoct
General Contractor MYKI
Owner
Modification Proposal Incorp hated Into Charge Order Number:
Attachments: Todd Robinson Painting - Proposal dated 7127192
No action will be taken resardin$ thio item until we receive written authorization dlnxtinR us to do su.
1111 contrct work will proceed on its normal schedule. pROpOSAL No. Sttr rYMiRE {631
im
Pace No. of pag
TODD ROBINSON PAINTING CO.
Cwmerdsi Folatin
Boo Sleft-Kinr; SE Sulfte 264
41
LACEY, WASHI GTON 98503 Lip T�e c
FAj2W 491.1944
(206) 491-1942
TO polo"r _7 2 7
En
-
ion ftAU9
xzd�OP
We vera" 1UM4 SpmMeauung and 914IM11" var;
�
;7z/
t _no
00�
A&
RAY- ------
AMVJNM
I
accordonft wilh above jpKifjc&tlDms, for IN sum
we pr"? hersbY to furnish material and labor
of
---------------- -------------
M Mawo is PWIMM 14 tM so
omW "WrOW-14 0 UP"Od
OWN I -see am" "" on
Mr.rVI wer wW Mb" JU *WMAft ANMen. 56MMW*
Orr ""M
AwWrad
:
signature � 1A
Now Thie PtWul may be
Wjjh(4rw*n by us if Mol 69"pw "1111"
I ' . " I
jk4'rt;ft"ff Jilt fropilljOl — Thl WV4 00016 $Wd'.1flCA1L6"%
W AClMolqwms are "tisfacwy MFW are hereby waplod. You M 4111h"I"A
to d, the work 6FIPHOW , "YMOM w
a -11 W made jj ovillnod abo-
-----------
� e
z
0
c�
m
—i -n
do
M
m©
—40
0
�r.
m'
o�
rz
r�
O
mm_
0 �"'
t� Fn
c cn
N
m �
Fn
cn
z
0
m