HomeMy WebLinkAboutCO 25CHANGE ORDER
Owner
Architect
COR Form
(This form is to be executed in triplicate and each party is to retain an original.)
Contractor
Project Name: RENTON SENIOR HOUSING Date:
Change Order No.:
October 5, 1992
25
Project Addrrss: 3151 NE 16th Stree!
Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.:
COR Project No.:
9007
GAG 095.91
8 Address 1002 - 10th Street
Snohomish, Washington 98290 Contract For:
General Construction
Contract Date:
October 31. 1991
The Contract is hereby amended as follows:
1. Per ORB Proposal Request #14, dated 3130192, and Kirtley-Cole Modification
Proposal #14R, 416192 (copies attached): 'Replace 3' double detector check Add
$4,00327
valve assembly with 4' assembly.'
2. Per Kirtley-Cole Modification Proposal #70, dated 8!4192 (copy attached)- Add
5893.99
'Additicrial costs for sanitary sewer delays." CTO RECHECK SALES T_
3. Per Kirtley-Cole Modification Proposal 071, dated 8!4192^ (copy attached):
Add
51.787.97
'Additional costs ref, hidden conditions.' K -C TO RE -CHECK SALES TAX
4. Per Kirtley•Cole Modification Proposal #72.8!4192 (copy attached): 'Additional'
Cost resulting from sequencing of water utility system, due to late UtilityAdd
-C TO RE -CHECK SALES TAX
S4,036.82
Permit issuance."
S. Per Kirtley-Cole Modification Proposal #84, 8118192 (copy attached): 'Fury down
1A; add blocking and build soffil pipe chase.' Add
$1,004 84
ceilings - room 155 and corridor
i
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: ..................... ... ......... Add
$11,726.89
I ^
The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct andlor
indirect costs associated
with the Change in Scope of Work.
This Change Order is not valid unless signed by the Owner. Architect, and Contractor.
$4,620,765.00
The Original Contract Sum was...................................................................................................................
. .....631,700.90
Net Change by previously authorized Change Order(s) was ............................................................................
prior to this Change Order was ................................................5:252,465.90
The Contract Sum g •••••••••'•'••' ...............................
In the of
.11,726.89
The Contract Sum will be revised by this Change Order amount ..................................................
264,152.79
The new Contract Sum Incorporating this Change Order will be.....................................................I.........
.5
•••••••• � �
The Contract Time will be changed by ......................................... SEE BELOW ........................................+
6 days
20, 1993
The Substantial Completion Date including this Change Order is ............................................. ................January
Change Orders 012, 18 619 for
TBD items.)
(See
does not include any changes in the Contract Sum or Contract Time which
have been approved
NOTE: The above summary
by ORB Form 301 - Construction Change Directive or Owner's Field Directives.
R DEPT
THE ORB ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renton. Washq ton 98055
! P* DeWilliam, ACA
Date
KIRTLEY-COLE ASSOCIATES
1002 - 101h Street
Snohomish, Washington 98290
CITY OF RENTON. P 8
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
i�Date io ✓?
-*NOTE: Acceptance of the additional days on this Change Order is conditional pendingreceiptof K.C. critical path method
i
schedule review.. 'i r+C-
z
O
1
0
m
z�
Orn
mQ
--46
0C:
m7
C) -i
Cz
r�
rn
n
Mm
b to
0 Fn
CZ c rn
N
r?
x
z
0
0
m
NIODIFICATIOt PROPOSAL
KIR TLEY
COLE • Project: RENTON SENIOR HOUSING - JOS x315
ASSOCIATES, INC
generaDate: April 6, 1992
contractors
p.o. box Il
1002 - 10th
To: THE ORS ORGANIZATION
snohornish
wash. 98290 Initiated by: Architect
(206) 568.3175
Modification Proposal: Replace '3' double detector check assembly with 4' assembly:
A.L. Reicon, Inc.
WSST ® 8.2% of materials ($2,766.03)
Subtotal
f Overhead & Profit 0 15% .... .... ...... ..... .
Bonding ® 2% ...... .. .. .... .
Total ......................
Reason for Modification: as per PROPOSAL REQUEST #14
Cost: Additional: S4,003.27 L Credits: S-0. Net:
Change in Calendar Days: FIVE (5) FROM DATE OF ACCEPTANCE
Recommendation:
Architect
General Contractor
Owner
3,186.03
226.81
$3,412.84
S511.93
S78.50
$4,003.27
54,003.27
Modification Proposal Incorporated Into Change Order Ntunher: G7
Attachments: A.L. Reicon, Inc. revised proposal dated 4/3192
No action will be taken regarding this item until we receive written authorization directing us to do so.
All contract work will proceed on its normsl schedule.
PROPOSAL NO. RTEEt! REVULDIUML
MS —
n
m
I NLEY-COLE ASSOCIATES, INC.
1008 - Ift Su*N O Sox 1171. Uohom", WA 9t"I
Phom M%) MW 1'73
DATE:
FAXMITTAL h
C206) 277 -Ml FAX
TO: P, L.
ATTN: Va _
FROM:
FA"- ! 4q - S / 35
RF:
PAGES: ^, i (Inducting Covert Sheet) If you do not receive all pages
please call (206) 277-900.
I
COMMENTS:
i1L 4 C��tr�. Ad --d L'�.�f4�'!dr..,' ? f+=-�
be UAB
-Pb
d
`.at dro
`,.1-c Coir•
L
P
Inter - JfYES N©
Reply Expected - NO
z
0
0
m
:45i
N
Gm
m§
0
m
ro
0
cz
0
m
�m
CG
K8
O
N
z
O
9
m
VIZATM5823 238TH S.E., WOODINVILLE, WA o6072
MAW FAX NO.: (tae) 468-0281
Vila fumrmmyc corwx
sir" 1!17
TELECOMMUNICATION COVER SHEET
DATE:
TO: �- 1 r 41 j)
FAX
OPERATOR:
THE FOLLOWING DOCUMEW INCLUDING THIS COVER SHEET IS. _ _ PAGES.
MESSAGE OF ANY): kemurn-0 rr],c -_ )azj�L...._ ._ ._.. _ �.�.,
_•__ _. �_�.... e.)l.Y`...r...._..
IF ANY OF THESE^PAGES ARE NOT LEGIBLE, OR YOU DO NOT RECEIVE ALL PAGES AS INDICATED ABOVE. PLEASE CALL
THE TELECOMMUNICATION OPERATOR AT THE PHONE NUMBER SHOWN BELOW.
(206) 483.2724 OR TOLL FREE IN WASHINGTON 1 (800) 422.3081
bELUNGi•" SEATTLE TACOAAA 8016E LAKE OSWEGO PASCO VAMC WER
PHONE r (201) 771.1210 (208) Z*4400 MM 363.4W (" 325-0M (50 8240123 ON) 547.2+110 (20!!x ""155
FAX I (20M 734.47t2 (208) 882.1811 Com) 2724367 42011 375.0834 15001 681.7213 !3001 547.231!7 (206) 238-5r5
z
O
m
Fn
cm
mo
0
0
zm
m
D _
cz
r�
m
m
v in
O
o FnM
zr
z
N
z
O
n
t
EIRTLE Y -COLE ASSOCLATES, INC.
1003 - 101b St wjp.O. Rax 1179, Saabomiab, WA 91.90
pbom (206) 56l-71731FAX (2106)36>1-7919
DATE:
REQJIEST FOR- PR-OPQSA
T [�TT�TfT (tl VASE IISC THIS MKM ONLY NYITSI sunurrTNG7 ♦ p
S lJBIS 4J i- PL MR: LGT,C, � 2 L //_7—. i
PROJECT: -
JOB NUMBER: e
DESCRIPTION OF -
WORK: ��E �'` f�d7i�SCc� ��iZK"�% C.(�' ,SSS c/• Gi<
RESPOND BY:
TOTAL AMOUNT
CO1rMU T TIME REQUEST
�? DAY(S)
T'ILIS MOlOSAL 0.M.EI.-7'S ALL OFTILL C45TS INYd'.YED INCLUDING ANY COSTS d FLAYS -0
1YIDCII b1AY dCCVA MOM DlaAYS AJ4t
oy xtrrtZ c>FlMM Or SiJCII DELAYS.
AVlia0R.i.LED SIGNATURE:
DATE' .
SIGNED: UMC SAGER
z
O
m
om
m©
-40
0-�C
rnpid
ca
0 -I
m
0 `"
o
0
z
0
d
0
m
04,-03/92 12.03 FAX 7948935 A.lr REICON
Z RTLEI -COLE ASSOCIATES, LNC.
100_ • loth S;rrn/P.O. Be& 11-19, Sppham4h. WA 91290
rhonc (_06) 3(1.3175/Fkx {1-06) s6s-"19
DATE:'If F2
REQUEST FOR -PROPOSAL_
aj.rAsC triC nim PoRm ONLY -14L4 surmr rimc)
SUB/SUPPLTER: � �2�1'�c .� rrrtr�it ,41- Q
rfL
=7Z
ATTENTION: r7�srF TlEru --
PROJECT:
JOB NUMBER:
DESCRIPTION OF
WORK:
RESPOND BY:
Z, Oil
�74/5'SO'
389<
6z0.Q0
2770.4
1� ,$-7
R
TOTAL AMOUNT
CONTRACT TIME REQU ST 1 7 DAY(S)
I
Jill$ 11101'05AL Rn-1,IX- SALLOV1111: CO i lS INv0LvVv INC lArDING ANY COM OF wittCtl mAY ocam ni(.*t ncLxvs.LW
My ulrrla: M- TL" OF !;VC11 rr..l.AY9.
AUTHORIZED SIGNATURE;
DATE:
SIGNED: 17F-.
S A C. r R
_+ -n
vm
m
m8
0C
mm
DZ
C�
�ca
0 -n
mrn
aFA
Fn
r.N
coz
0
d
0
m
.ESMATED
QUANTITY
r
i'
r
Z, Oil
�74/5'SO'
389<
6z0.Q0
2770.4
1� ,$-7
R
TOTAL AMOUNT
CONTRACT TIME REQU ST 1 7 DAY(S)
I
Jill$ 11101'05AL Rn-1,IX- SALLOV1111: CO i lS INv0LvVv INC lArDING ANY COM OF wittCtl mAY ocam ni(.*t ncLxvs.LW
My ulrrla: M- TL" OF !;VC11 rr..l.AY9.
AUTHORIZED SIGNATURE;
DATE:
SIGNED: 17F-.
S A C. r R
_+ -n
vm
m
m8
0C
mm
DZ
C�
�ca
0 -n
mrn
aFA
Fn
r.N
coz
0
d
0
m
MAR -30-1992 14:56 FROM
T►C ORB ORGANIZATION INC TO 2755239007 8.03/88
KIRTL.EY MODIFICATION PROPOSAL
COLE 0
ASSOCIATES
PROJECT;
DATE:ccricrectom
p.mbox 0= TO:—e099 Z " wowl% 282@0-
� 1�1 �-3'17713
MODIFICATION PROPOSAL A1,6 Wj 3r' Am,&
REASON
FOR MCDIRCAnc +t 4044Z�r� 0*
40 SV7
42:;4 7tv
��' pi(/��c�► sort I �'�
cost: ADDMO04At��-
CHAND£ IN CALF . ' R DAYS _
RECOURIMAT10#9 AMmvvd for C.O. ROOM
ARCHITECT
GENERAL CONTRACTOR
OVINER
MODIFICATION PROPOSAL INCORPORATED INTO CHANGE ORDER NUMBER_.—._
ATTAC##M E NTS:
NO action win be =ken rep ronp Chia item until we M"M writW 2uttwdzu0on dkocting us 10 do 30.
AE contract wotic'A p meed on b nixm23 tcRadulb.
FAOPOSAL NO. �
z
O
d
0
rn
q =n
Fn�
c "'
rn0
-i n
�r.
MT
0-4
O -n
c7 6
cco
M
x
v
rn
MEMORANDUM
TO: GREG BR nUMU
FROM: DALE REINER
RE: RENTON SENIOR HOUSING
C-Ct,nr3rn� -
U
SEP n 51992
KIRTLEY-COLE ASSOCIATES
4
SUBJECT: PRICE TO DELETE 3" DOUBLE DECTOR CHECK ASSUBLY AND
REPLACE WITH 4" ASSEMBLY
The owner's problem with this change order is the pricing
structure they are comparing.
I have submitted two separate prices$
1. per bid prices (Based on the estimates used to win the
contract)
2. per actual prices (Based on prices negotiated with the
supplier when purchasing the materials, taking other jobs
and projects into account)
The Owner wants to use the high, "bid pricing" for their credit
and the lower, "actual pricing" for the addition to the contract.
This is in error.
our Change order Request 01135-3 dated March 27, 1992, was based
on "bid pricing" and resulted in an increase of $3,667.88
(this was rejected by owner)
our second Change order Request for this Item, /1135-8, dated
Juin* 4, 1991, was based on "actual pricing" and the resulting
increase bscas $3,186.03
The current proposal the Owner has made per Memo dated August
14, 1992, (Copy Attached) is a Hybrid price showing an increase
to A.L. Reicon, Inc. of only $2,157.47. This is unacceptable
to us.
EMMA1OR
McHrMCT
ACMWMNG
DWIE
DUNE rl
FAX 18
COM
A.O,BDx 936 MaNRGrEMENDSWa, 96278 <
1 -1
re