HomeMy WebLinkAboutCO 29CHANGE ORDER
CITY OF RENTON Owner
COR Form
(This form is to be executed In triplicate and each party is 10)v?iirT,si� o�J
1410V 13 1992 Architect
Contractor
Project Name: RENTON SENIOR HOUSING ntnLsze:- %.vLL
hLuElVED Change Order No.:
Project Address: 3151 NE 18th Strert ,1Y CLERK'S OFFICE
�1106vember 13, 1992
Twenty -Nine (29)
Contractor Name: KIRTt.EY-COLE ASSOCIATES ORB Project No.: 9007
& Address 1002 -10th Street COR Project No.: CAG 095-91
Snohomish, Washington 98290 Contract For. Geueral Construction
Contract Date: October 31, 1991
The Contract is hereby amended as follows:
1. Per ORB Proposal Request #60, 10113/92. and Kirtley-Cole Modification Proposal
#109, 10127!92 (copies attached): 'Frame openings at Roof Vents in Common Area Add $1,15$.43
Ceilings."
2. Per Kirtley-Cole Modification Proposal #1104,10115192 (copy attached):
Subtract (S108.10)
'Credit for water system fees."
3. Per Kirtley-Cole Modification Proposal 0113.11/4192 (copy attached): "Insulate Add 810.55
sprinkler pipes In attic.'
TOTAL CONSTRUCTION COST IMPACT 4F THIS CHANGE ORDER : ................................ ...... Add $1,880.88
The Change Order shall include all Contraclor(s) labor, material, overhead, profit, and all direct and/or indirect costs associated
with the Change in Scope of Work.
This Change Omer Is not valid unless signed by the Owner, Architect, and Contractor.
.$4,820,785.00
The Original Contract Sum was ....................... ............................................................................... .......................882.147.15
Net Change by previously authorized Change Ordcr(s) was.....................................................................5.282.912.15
The Contract Sum prior to this Change Order was...........................................................................
this Change Order in the amount of 1'880.88
The Contract Sum will be revised by . ng.........................................................5.284.573.03
The new Contract Sum incorporating this Change Order will be............................................................
The Contract Time will be changed by .................................... ....(.......................................................,................... 0days
The Substantial Completion Date Including this Change Order is............................................................
..,.January 28, 1993
See Change Orders #12, 18 & 19 for TBD items.)
NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved
by ORB Form 301 - Construction Change Directive or Owner's Field Directives.
N PbRDFPT
THE ORB ORGANIZATION. INC.
807 SW Grady Way, Suite 210
Renton, %l hinglon 98055
Illam, AIA
Date
KIRTLEY-COLE ASSOCIATES
1002 - 10th Street
Snohomish, Washington 98290
J
on Cole
A/, L' 9
Dote
CITY OF RENTO , -
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
Date
� T
r11
am
M
OC
C
�K
rn
O_
AZ
r
Q -n
-n ;o
Ds
rnrn
MODIFICATION PROPOSAL NO. 104
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING - 90811315
ASSOCIATES, INC
tenceal Date: October 15, 1992
contr iaon
p.o. box 1179 To: THE ORB ORGANIZATION. INC.
tom_ -loth
Snohomish
W13h. 9II:90 Initiated by: Owner
rabl 5610175
Modification Proposal: Credit for fees paid directly by owner (waterline connection/chlorinator pump rental):
Subtotal . , . • . .
Total ... .. .. .....
Reason for Modification:
-106.10 If
S-106.10 II
S-106.10 I
Cast: Additional: $0.00 Credits: $106.10 Net: S-106.10
Change In Calendar Days: -0-
Recommendation: for u -u.
Architect
General Contractor
Owner
Modilitution Proposal Incorporated into Change Order Number.
Attachments: Citic of Renton - Interfund Tnutsfer. dated MOM
No uiion will be taken reprding this item until we receive wrinen authorisation d4=609 us to do so.
All contrsct work will proceed on its normal schedule. ONE HUNDRED- FOUR (191LPROPOSAL NO. n
f
INTERFUND TRANSFER
Treader Number: Dabs„.,
General Descripdoa:
ao 070
Qwrrnrt n � }P
4lnfarl'++�$fyg�S1.II� p
Departtent To Be C>arged (Transfer (hit - Frons)
Department Authorization:
DtpCartlne W To Be C ej&ed (Transfer In -To) ' 1 ' v
Desai tion Account Number WO/Function Amount
Q o 87240 5530 1386.10
Less Deposit 401/500/00.364.90.00 87Z40 [1440.00)
Ant icnn/nn 'sAA_90.00 57240./5534 160.00
at.ro.dw
WNW room Dqww"
Ya,w. DepeeapW to be Cb"W
raik Depwn.m 0 ba Orod W
.•
MODIFICATION PROPOSAL NO. 109
1URTLEY
COLE i 1?rojWc REMN SEMOR HOUSING - JOB 11315
ASSOCIATES, INC
Dale: OcuAw 27, 1992
oonuamn
p.o. box 1179 To: THE ORB ORGANIZAnON, INC.
IOO2. 10th
snoboaush
w.sh. 98M Initiated by: Architect
MM) 568-3175
Modilicatinet Proposal: Frame openings at roof vents in Comma Area ceilings:
1V[ateriala - 2 X B (150) l.f. 0 .5&1f = $84.00
2 X 8 hangers (32) ea. o .38/ea = $12.00
Labor - framing (30 hours 0 28.00) = S840.00
Small Tools Allowance ($840.00 X 5%) = $42.00
WSST on materials (596.00 X 8.2%) ---
Sub-Ad ..
Overhead dt: Profit 0 15%
Bonding 0 2%
Total ...
Resew for Modlliration: as per PROPOSAL RMUES1i /60
coffl; Additional: $(,156.43 Credits: S'0"
Chmp in Caietld*r Days: -0-
lterommepdation:
Architect
General Coatracor
Owner
96.00
$985.87
$147.86
527..68
$1.156.43
Net: $1.156.43 1 1
IHodif (kation proposal Inwrporated Into Change Order Narnbc: 21
Auachrttents:
No action will be taken mprdin8 this item trach we-006rts —if"b"hmfoadkccting us to do so.
Ali eantrad work will pttuaad an its normal seho&de-
PROPOSAL NO. ONENUNi7